Skip to content
Georgia Commons
Menu

Savannah · Zoning Ordinance

Article 8.0 - Use Standards

8.5.10. Mulch or Compost Processing Facility

About this text

  • As published by enCodePlus, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All mulch or compost processing facilities shall meet the standards of Georgia Department of Environmental Protection O.C.G.A. §391-3-4-.16 Composting, as applicable and as amended, unless a more restrictive standard is listed below.

1. Feedstocks A, B, D and D as defined in Sec. 13.2, Defined Terms, are permitted.

2. Prohibited feedstocks include asbestos containing materials, biomedical wastes and any other prohibited wastes defined in O.C.G.A. §391-3-4-.04(6).

3. Class 2 and 3 Composting Facilities

Facilities composting, grinding, chipping, and/or mulching of Feedstock Categories A, B, C, or D that operate under Permit-by-Rule or require a State of Georgia Solid Waste Permit.

1. No storage pile or windrow shall be located within the 100-year floodplain or within 75 feet of any watercourse. 2. A 50-foot undisturbed buffer shall be maintained between the facility and the property line or jurisdictional wetland. The United States Army Corps of Engineers may approve a reduced buffer from such wetland. 3. Such facility shall be at least 200 feet from any Residential zoning district, any residential use and any drinking water supply. 4. Such facility shall be located on a roadway classified as a collector or greater.

4. Class 4, 5 and 6 Composting Facilities

Facilities composting, grinding, chipping and/or mulching of Feedstock Categories A, B, C or D that operate under Permit-by-Rule or require a State of Georgia Solid Waste Permit. Also includes in-vessel composting producing more than 1000 cubic yards of finished compost per year.

1. No storage pile or windrow shall be located within the 100-year floodplain or within 75 feet of any watercourse. A minimum 50-foot vegetated area shall be provided adjacent to any watercourse to prevent unfiltered runoff of organics into the watercourse. 2. A 100-foot undisturbed buffer shall be maintained between the facility and the property line 3. A 50-foot undisturbed buffer shall be maintained between the facility and any jurisdictional wetland unless otherwise permitted by the United States Army Corps of Engineers. 4. Such facility shall be at least 500 feet from any Residential zoning district, any residential use and any drinking water supply. 5. Such facility shall be located on a roadway classified as a collector or greater.

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/zoning/8.5.10@2026-11-14-b7b2fd6d2b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Savannah Zoning Ordinance, 8.5.10. Mulch or Compost Processing Facility | Georgia Commons