8.5.9. Solid Waste and Industrial Landfill Facility

About this text

  • As published by enCodePlus, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

1. Compliance with Applicable Local, State and Federal Law

Compliance is required but may not be limited to the following:

1. O.C.G.A. §12-8-20 (Conservation and Natural Resources, Solid Waste Management), as applicable and as amended; 2. Georgia Department of Environmental Protection §391-3-4 (Solid Waste Management), as applicable and as amended; 3. City of Savannah Code Part 4 Chapter 2 (Refuse Collection and Disposal) as applicable and as amended.

2. General Standards 1. No facility shall be located within an area of high pollution susceptibility, as defined by Hydrologic Atlas #20, A Pollution Susceptibility Map of Georgia, as amended. 2. Landfill excavation or filling when located within the approach zones of any airport or airfield, shall be subject to FAA standards. This shall not apply to construction and debris landfills. 3. No fill shall be located within the 100-year floodplain and no excavation except as expressly authorized by the Mayor and Aldermen shall be located within the 100- year floodplain. 4. Provisions shall be made for the proper drainage of stormwater falling on or crossing the site at all times during and after completion of the operations. The operations shall not obstruct the normal flow of any public drain or abrogate the riparian rights of any other party to a stream or drain. 5. The depth of excavation and the materials to be used for fill shall not have any adverse effect on the supply, quality or purity of ground water or wells. 6. A layer of clean earth at least two (2) feet thick shall be deposited and thoroughly compacted over all final fill to bring the surface to the finished surface grade as shown on the topographic plan filed with the application for a Special Use Permit. The final fill and finished grade shall be stabilized, seeded and sodded or appropriately planted after completion and closure of each stage of landfill operations. 7. The operation shall be conducted so as not to create a nuisance or cause undue noise, vibration, dust, odor or incandescence to adjacent properties. The premises shall be kept in a neat and clean condition at all times. Daily operations shall include the clean-up of loose debris from adjacent roadways. Dusty conditions shall be corrected by sprinkling with water or by use of calcium chloride or some other method approved by the City Manager or his or her designee. No fires shall be permitted.

3. Application Requirements 1. The application shall be accompanied by an affidavit by the applicant that the proposed landfill operation will comply with all pertinent local, state and federal laws of regulations applicable to such landfill operations and that all required permits and approval have been or will be secured. Furthermore, in any case in which these rules are in conflict with state or federal law or regulation, the more restrictive rule, law or regulation shall take precedence. 2. A development plan in accordance with Sec. 3.8, Development Plan Review shall be submitted in conjunction with the application for a Special Use Permit (See Sec. 3.10). The development plan shall include: 1. A map of all water bodies, as defined by the State of Georgia Department of Natural Resources Integrated 305(b)/303(d) Report (latest edition), located within two (2) miles of the proposed facility boundaries. 2. Contours of not less than one (1) foot intervals; 3. The ultimate depth elevations of the area to be excavated and/or the ultimate height of areas to be filled; 4. Locations where excavation and filling operations will commence and the procedural sequence of operations; 5. Cross-sections at critical points to illustrate the methods to be employed in the process of excavation and fill; 6. The existing surface of the site and the surrounding properties within 200 feet from its boundaries; 7. Methods to be employed for surface drainage during and after completion of operations; 8. The ultimate finished surface of the site after all excavation and filling operations are completed; 9. If an industrial solid waste landfill, the type of waste to be received; 10. The volumes of materials to be excavated and filled on the site where operations are to take place, and the expected duration of landfill operations; 11. Improvements, such as new roads and pavements to be installed on and off the site to enable the operation to be carried out; and 12. An Environmental Site Assessment, including a hydro-geologic evaluation, shall be prepared by an engineer, landscape architect or environmental professional meeting standards set forth in the City of Savannah Engineering Department Design Directives.

Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:savannah/zoning/8.5.9@2026-11-14-75f699e893

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Savannah Zoning Ordinance, 8.5.9. Solid Waste and Industrial Landfill Facility | Georgia Commons