Sec. 4.7. Utilities and Utility Screening
About this text
- As published by enCodePlus, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
4.7.1
Location. The following utilities shall be located underground to the extent possible: potable water supply and distribution systems; wastewater collection, treatment, and disposal; irrigation, cable television, telephone, broadband multi-use transmission; and other utility services. Power distribution systems shall be located underground except for the existing utility corridor and the overhead power lines located on Little Neck Road and Bush Road. Underground utilities can be placed within the buffers and setbacks (as defined in Section 4.4.1) provided they are planned so as to accommodate the minimum 8' paved pedestrian leisure trail as well as other required buffer elements. Temporary overhead power lines shall be allowed during construction. See Figure 4.2 Primary Road Buffer.
Read this code where it is posted (enCodePlus) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.