Suwanee · Zoning Ordinance
Article XVIII - ADMINISTRATION, ENFORCEMENT, PENALTIES AND REMEDIES
SECTION 1801. Permits Requirements.
About this text
- As posted on the city's website, retrieved 2026-11-14
No building or other structure shall be erected, moved, added to or structurally altered without a Building Permit or a Development Permit issued by the Public Works and Inspections Department. No Building Permit shall be issued except in conformance with the provisions of this Ordinance.
All applications for Building Permits or Development Permits shall be accompanied by plans in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and the locations on the lot of any existing buildings or structures, the shape, size, height, use and the location on the lot of the building or structure to be erected, moved, added to or structurally altered and such other information as may be necessary to provide for the enforcement of this Ordinance.
All dimensions shown on these plans relating to the location and size of the lot to be built upon shall be based on an actual survey and the lots shall be staked out on the ground before construction is started.
A Building Permit once issued becomes null and void if the work or construction authorized is not commenced with 6 months, or if construction or work is suspended or abandoned for a period of 6 months after work has commenced.
Read this code where it is posted (city website (downloaded by hand)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.