Skip to content
Georgia Commons
Menu

Tifton · Zoning Ordinance

Tifton Zoning Ordinance

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 4 of 6. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

This chapter sets forth the procedures for receiving, reviewing, and rendering decisions on applications for development, including all residential and nonresidential development and planned developments, as well as applications for rezoning, and all types of permits. This chapter also sets forth the requirements for appealing decisions and enforcement. It is the City's intent that the procedures and requirements set forth in this LDC shall be followed in order to seek approval for any development.

10.00.02 Qualifications for preparation of plans.

A. NPDES Permitting. All persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity with regard to NPDES permitting shall meet the education and training certification requirements as developed by the State Soil and Water Conservation Commission pursuant to the Georgia Erosion and Sedimentation Act of 1975, as amended.

B. Professional engineer or consultant required. Should certain design calculations be required to resolve flow problems, possible erosion or drainage problems, or other detailed design problems which might be encountered in the process of preparing the required improvement plan, the Manager shall be authorized to require the services of a professional engineer in the improvement plan design process. Should such services be required, such plans shall reflect the applicable state registration. All professional surveying or engineering service costs shall be the sole responsibility of the applicant.

10.00.03 Approvals required.

A. Subdivision Plat Required.

1. Platting Review Required.

a. All plats of subdivision of land within the City of Tifton shall not be recorded in the office of the Clerk of Tift Superior Court unless it has been approved per the provisions of the chapter.

b. The filing or recording of a plat of a subdivision without the approval of the appropriate reviewing bodies and/or authorities as required by this LDC is declared to be a violation.

c. No approval shall be required if no subdivision of land is anticipated, no new streets or roads are created or no new utility improvements are required or no new sanitary sewer or approval of a septic tank is required. If no approval of the Zoning Administrator is required, there shall be entered or stamped on any plat of survey the following: "No approval of the Zoning Administrator of the City of Tifton is required prior to recording this plat. This day of , , by

, Registered Surveyor, License No. ".

2. Use of Plat. The transfer of, sale of, agreement to sell, or negotiation to sell land by reference to, exhibition of, or other use of a plat of a subdivision that has not been given final approval by the Director and recorded in the office of the clerk of the Superior Court of Tift County is prohibited, and the description by metes and bounds in such an instrument of transfer or other document shall not exempt the transaction from prescribed penalties.

3. Opening and Improving Public Streets. The governing authorities shall not accept, lay-out, open, improve, grade, pave, or light any street, or lay any utility lines in any street, which has not attained the status of a public street prior to the effective date of this LDC, unless such street corresponds to the street location shown on an approved subdivision plat or the Major Thoroughfare Plan; provided that the governing authority may accept, lay out, open, and improve any street not so platted if it first submits such proposed action to the Planning Commission for its review and comment. Developers of subdivisions will be solely responsible for acquiring all rights-of-ways so that in the event the City of Tifton needs to perform maintenance, rights-of-ways will be in place.

4. Issuance of Building Permits. A building permit will not be issued for a parcel of land, lot, tract, or building site subject to this LDC unless the parcel is a lot of record for Tift County.

B. Building Permit Required. A building permit, or a sign permit in case of a sign, is required in advance of the initiation of construction, erection, moving, demolition, or alteration of any building or structure or sign. No building or sign permit shall be issued except in conformity with the provisions of this LDC; however, applications for permits received before the adoption of this LDC shall remain valid according to the requirements in place at the time of receipt, provided all requisite documentation and information has been delivered to the Director necessary for the issuance of a permit.

C. Site Development Plan Required.

1. A site development plan is required for approval of all single family residential development, all multi-family residential development, and all non-residential development.

Multi-family residential development means any development with three (3) or more dwelling units per building.

2. The development plan must demonstrate compliance with all design standards required for development in the zoning district in which the use is proposed.

3. A recorded plat is required for all developments.

D. Land Disturbance Permit Required.

1. No person shall conduct any land-disturbing activity without first obtaining a permit if required from the reviewing bodies to perform such activity, see Section 3.01.01.

2. Maintenance of all soil erosion and sedimentation control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner as well as the developer and any other parties designated for design or development work on the property by the property owner.

E. Certificate of Occupancy or Completion Required. A certificate of occupancy or completion issued is required in advance of occupancy or use of:

1. A building hereafter erected.

2. A building hereafter altered so as to affect height or location.

3. Any building or premises where a change in the type of use will occur.

F. Certificate of Appropriateness Required.

1. Required for Designated Historic Properties. After the designation by ordinance of a historic property or of a historic district, no material change in the appearance of such historic property or of a structure, site, or work of art within such historic district, including but not limited to demolition, shall be made or be permitted to be made by the owner or occupant thereof unless and until an application for a certificate of appropriateness has been filed, and such application has been approved and a certificate of appropriateness has been issued pursuant to the provisions of this LDC.

2. Exemptions for State and Local Government Entities. Notwithstanding any other provision concerned in this LDC, the Georgia Department of Transportation (GDOT) and any contractors, including cities and counties, performing work funded by GDOT are exempt from this LDC and the City of Tifton, Tift County, the State of Georgia and the Tift County Board of Education are exempt from the requirement of obtaining certificates of appropriateness; provided, however, that such local government entities shall notify the commission forty-five (45) days prior to beginning an undertaking that would otherwise require a certificate of appropriateness and allow the commission an opportunity to comment relative thereto.

G. Major Changes to Approved Site Development Plan. Major changes to an approved development plan, as defined below, shall require specific approval of an amended development plan.

1. Altering the amount and velocity of stormwater runoff from the site;

2. Increasing the amount of impervious surface by more than 10 percent within the development;

3. Altering the overall density of development; or

4. Increasing the amount of excavation, fill, or removal of vegetation during construction.

H. Exempt Situations. The following situations are exempt from the requirement to obtain an approved project development plan prior to the issuance of required permits:

1. Repairs to a facility that is part of a previously approved and permitted development;

2. Accessory structures, provided applicable permits are obtained;

3. Farm-related development on a bona fide farm as defined in Section 1.09.02; and

4. Single-family detached homes constructed within an approved, platted, and recorded subdivision. Single family detached homes on lots of record that are not part of a project development plan are also exempt.

10.00.04 Expiration of approvals.

A. Land Disturbance Permit. If construction described in a land disturbance permit has not commenced within six (6) months from the date of issuance of the permit, the permit shall expire. If construction described in a land disturbance permit is suspended or abandoned after work has commenced, the permit shall expire six (6) months after the date that work ceased.

B. Building Permit. Any building permit shall become void if the work involved has not begun within six (6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six (6) months after the work of development is commenced; provided that extensions of time and periods not exceeding six (6) months each may be allowed in writing by the Manager.

C. Preliminary Plats. Preliminary approval grants the developer a maximum time of eighteen (18) months within which he shall submit his improvement plan and final plat for approval unless a time extension is granted before the expiration of the eighteen (18) month period. If such time extension is granted, it shall be for not more than twelve (12) additional months. Failure to submit improvement plans and final plat within this time period, including extension if any, shall invalidate preliminary plat approval and require resubmission of preliminary plat.

D. Improvement Plan Approvals. Improvement plan approvals are valid for twenty four (24) months. If the subdivision is sold prior to completion and final platting, a mandatory review by the Department of Community Development shall be required.

E. Extensions. The time period for which a permit is valid may be extended for up to six (6) months where an application for such extension is filed and such extension has been granted in writing by the Manager.

(Ord. No. 2018-21, (Exh. A), 10-15-2018)

10.00.05 Resubmittal of denied applications.

No application for a zoning change affecting the same parcel of property (under same Tax I.D. and/or under same ownership) or part thereof shall be accepted until the expiration of at least six (6) months immediately following the denial of the rezoning request by the governing authority.

10.00.06 Requirements regarding developments of regional impact (DRI).

The Georgia Department of Community Affairs (DCA), pursuant to the Georgia Planning Act, has established criteria for the identification of certain large-scale developments, which have the potential to cause land use impacts beyond the boundaries of the respective local government where a project might be proposed. These developments, known as Developments of Regional Impact (DRIs), shall be submitted, based on established DCA standards, procedures, and format, to the Southern Georgia Regional Commission (SGRC) for review and recommendation prior to issuance of any local building or development permit, utility tap, or rezoning, whichever occurs first. As such, these requirements establish an official delay in the local permitting and/or review process to allow for compliance with these requirements.

10.00.07 Fees required.

A. All applications shall be accompanied by payment of application fees, as set forth in the City of Tifton Fee Schedule adopted by the Governing Authority An application shall not be complete until all required fees are paid. Such fees shall include the filing fee, and where notice is required, shall include an additional fee to defray the expense of preparing and mailing such notices.

B. For land clearing permits, a fee in addition to local permitting fees will be assessed pursuant to Georgia statutes. All applicable fees shall be paid prior to issuance of the land disturbance permit.

10.00.08 Procedures for conducting public hearings.

The following rules of procedure shall govern public hearings pertaining to development subject to the provisions of this LDC:

A. Public hearing procedure. All public hearings shall be placed on the appropriate body's agenda under a section entitled Public Hearings. The Chair or Mayor or their designee shall officially declare the public hearing open and shall announce that the written public hearing procedures and a copy of Georgia's Conflict of Interest Law are available to the attending public as a handout or are posted for public review. The Manager shall be responsible for providing a copy of the public hearing procedures and a copy of Georgia's Conflict of Interest Law as handouts and/or postings.

B. Announcement of matter for consideration.

1. The Manager or his/her designee shall announce the matter for consideration.

2. The Chair shall then call for acknowledgement of a potential conflict of interest by any members of the body.

C. Report of Manager. The Manager or their designee will then report the Department of Community Development recommendation and, if applicable, the recommendation of the City of Tifton Planning and Zoning Commission.

D. Public hearings records standards.

1. The clerk shall mechanically record the proceedings of all public hearings.

2. If requested by any party, verbatim transcripts of the public hearing can be prepared, but only if requested and purchased in advance by the requesting party, who must arrange at his expense for a certified court reporter to record and transcribe the hearing and furnish the original of the transcript to the appropriate body for its records.

3. The record of the public hearing and all evidence (e.g., maps, drawings, traffic studies, etc.) submitted at the public hearing shall be noted as such and shall become a permanent part of the particular project file.

E. Public comments shall be heard in an orderly fashion. Comments and testimony shall be provided in the following order:

1. The applicant or applicant's agent;

2. Citizens speaking in favor of the proposal or request;

3. Citizens speaking in opposition to the proposal or request; and

4. Rebuttal.

F. Any party may appear at the public hearing in person or by agent or by attorney.

G. Each person who appears shall identify himself by name and address; if the person is the applicant, he shall state whether he is the owner of the property or agent for owner.

H. Each applicant or other interested party who submits documents at the hearing shall identify each document. Each document submitted shall be made a part of the official record of the hearing.

I. Time periods for testimony. Where there are a large number of citizens wishing to testify at a given hearing, the Chair may invoke reasonable time limitations on both the proponents and opponents of a request. In such cases, these time limits shall apply to both sides of an issue equally, such minimum time period to be no less than ten (10) minutes per side. The Chair of the body hearing the request or proposal may otherwise limit discussion. The Chair of the body hearing the request or proposal may allow additional time in the Chair's discretion.

J. Citizens shall address their comments to the body as a whole. Individual attacks or cross examination of members, City employees or other citizens will be ruled out of order.

K. The body hearing the request or proposal retains the privilege to ask any questions of the Manager, other staff, or persons who have spoken on the matter.

L. After all citizen comments have been received, all further discussion of the specific application is reserved for the body hearing the request or proposal. The Chair or his/her designee shall then declare the public hearing closed and no further public comment will be entertained.

M. The body hearing the request or proposal may table the public hearing where additional information is necessary in order to render a decision. The continuation shall be to a specific time and date. Where an application is remanded to the Planning Commission for consideration of additional conditions, it shall be heard by the Planning Commission on their next available meeting date.

N. In the case of tabling of a matter, no further public comments will be entertained upon further consideration of the matter.

O. At the conclusion of the hearing by the body hearing the request or proposal, the Chair shall announce the decision. The Manager or his/her designee shall notify an applicant in writing of the decision. The written notification shall be made a part of the record.

(Ord. No. 2018-21, (Exh. A), 10-15-2018) Sec. 10.01.00 Application and decision-making requirements.

10.01.01 Pre-application conference required.

A. A pre-application conference is a meeting between an applicant and the City of Tifton staff, and/or other outside Departments as necessary, for the purposes of:

1. Exchanging information on the potential development of a site;

2. Providing information on permissible uses of the site proposed for development;

3. Providing information to an applicant regarding the design standards set forth in this LDC that are applicable to a potential application;

4. Providing information to an applicant regarding standards of regional, state, or federal agencies that may be applicable to a potential application;

5. Determining the need and requirements for supporting plans, documents, and studies;

6. Providing information to an applicant regarding infrastructure requirements and the construction of required improvements; and

7. Providing information to an applicant regarding the appropriate procedures and schedules for receiving and reviewing applications and rendering decisions regarding a potential application.

B. Prior to the submission of an application for a subdivision plat, site development plan, or improvement plan, an applicant shall submit a request for a pre-application conference.

C. A pre-application conference shall be held not more than two (2) weeks following the date of submission of the request for such conference.

D. An application must be submitted within six (6) months following the pre-application conference.

E. The pre-application conference shall include the members of the Department of Community Development staff and any additional Departments or individuals as may be needed by the Director.

F. The staff and other affected City, County, or State agencies will review all data submitted and advise the applicant of significant items which should be considered prior to submittal of their proposal.

G. It is the intent of the City that all requirements be identified during the pre-application conference. However, no person may rely upon any comment concerning a proposed development, or any expression of any nature about the proposal, made by a participant at the pre-application conference, as a representation or implication that the proposal will be ultimately approved or rejected in any form.

H. A prospective applicant may bring members of his project team, such as, but not limited to, the project engineer, land planner, architect, surveyor, or other person who will assist in the preparation of an application. A prospective applicant may provide an informal sketch plan to aid in the discussion. However, such an informal sketch plan shall not be reviewed in any way for compliance with the standards and requirements of this LDC, and shall be used only as an aid to the conduct of the pre-application conference.

(Ord. No. 2018-21, (Exh. A), 10-15-2018)

10.01.02 Determination of completeness.

A. All applications shall be complete before acceptance for review and decision-making. A determination of completeness is a determination that all required documents and plans have been submitted in sufficient number, and that all fees have been paid. A determination of completeness is not a determination of compliance with substantive standards and criteria.

B. The staff shall determine, within ten (10) days of receipt of an application, whether the application is complete.

C. If the staff determines that the application is not complete, the staff shall send notice to the applicant identifying the deficiencies. The applicant shall have thirty (30) days from the date of notice to correct the deficiencies. Until the applicant corrects the deficiencies, no further action shall be taken for processing the application. If the applicant fails to correct the deficiencies within the thirty (30) day period, the application shall be deemed withdrawn.

D. If the staff determines that the application is complete, the application shall be processed for review and action in accordance with the procedural requirements set forth in this chapter.

(Ord. No. 2018-21, (Exh. A), 10-15-2018)

10.01.03 Responsibilities for final action.

The table below identifies the types of applications and the entity that is responsible for the final decision regarding the application.

Table 10.01.03. Types of applications and entity responsible for final decision.

Department of Community Development Planning and Zoning Commission City Council Site development plans SFR: < 15 lots MFR < 24 units Lodging: < 6 units Department of Community Development Planning and Zoning Commission City Council Site Development Plan SFR > 15 lots MFR > 25 units X Amendments to site development plans X Administrative waivers X Extension of nonconforming residential uses X Preliminary plats, Minor subdivisions, Exempt plats, Improvement Plans X Final Subdivision plats X Variances X Appeal of administrative decisions X Telecommunication towers and antennas X

RPD/UAPD

development plan and rezoning X Vested rights determination X Permits: building permits, land clearing permits, sign permits, etc.

X (Ord. No. 2018-21, (Exh. A), 10-15-2018; Ord. No. 2024-03, 3-18-2024) Sec. 10.02.00 Submittal requirements.

10.02.01 Submittal requirements for all applications.

A. General Requirements.

1. Signature of applicant required.

All applications shall be signed by the applicant, and shall state his name and address.

2. The name and address of the owners of the land, and required signature of owner if different from applicant.

3. The community or area in which is located the land proposed to be reclassified and the street name and street number, if any, or if none, the location with respect to the nearby public roads in common use;

4. A property survey conducted no more than two (2) years prior to the filing of the application, containing the legal description, boundaries, land area, and existing improvements located on the site. Where two (2) or more parcels are included within a proposed development, the survey shall include all parcels that are part of the proposed development, including all phases. The survey shall be prepared and sealed by a surveyor registered in the State of Georgia.

5. The area of the land proposed to be reclassified stated in square feet if less than one (1) acre, and in acres if one (1) or more;

6. The present zoning classification for the subject property.

7. Other information to support the application as specified in this chapter and as may be required by the Manager.

B. Campaign contributions.

1. If applicant has made, within two (2) years immediately preceding the filing of the applicant's application, campaign contributions aggregating $250 or more to any member of the governing authority, it shall be the duty of the applicant and the attorney representing the applicant to disclose the following in the application:

a. The name of the local government official to whom the campaign contribution or gift was made;

b. The dollar amount of each campaign contribution made by the applicant to the local government official during the two (2) years immediately preceding the filing of the application; and

c. An enumeration and description of each gift having a value of $250.00 or more made by the applicant to the local government official during the two (2) years immediately preceding the filing of the application for the zoning amendment.

d. In the event that no such gift or contribution were made, the application shall affirmatively so state.

2. Such disclosure shall be required to be filed at least ten (10) calendar days prior to the scheduled hearing.

10.02.02 Submittal requirements for site development plans.

A. Site plan submittal.

1. Erosion and sedimentation control plans. Plans must be prepared if required to meet the minimum requirements as contained in this LDC. Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the state soil and water conservation commission as a guide; or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws.

2. Data required for site plan.

a. Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes.

b. Description of existing land use at project site and description of proposed project.

c. Name, address, and phone number of the property owner.

d. Name and phone number of twenty four (24) hour local contact responsible for erosion and sedimentation controls.

e. Size of project, or phase under construction, in acres.

f. Activity schedule showing anticipated starting and completion dates for the project.

g. Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas.

h. Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan should show options for year-round seeding.

i. Detail drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.

j. The following maintenance statement shall be included on the plans; The installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land-disturbing activities and shall be maintained at all times. If full implementation of the approved plan does not provide for effective erosion and sediment control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source.

3. Map and plan requirements. Maps, drawings, and supportive computations shall bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying, or erosion and sedimentation control. All persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements as developed by the commission pursuant to O.C.G.A. § 12-7-20. The certified plans shall contain:

a. Graphic scale and north point or arrow indicating magnetic north.

b. Vicinity maps showing location of project and existing streets.

c. Boundary line survey.

d. Delineation of disturbed areas within project boundary.

e. Existing and planned contours, with an interval in accordance with the following:

Table 10.02.02. Map contour intervals.

Map Scale Ground Slope Contour Interval, ft.

1 inch = 100 ft.

or larger scale Flat 0—2% Rolling 2—8% Steep 8%+

0.5 or 1 1 or 2 2, 5 or 10

f. Adjacent areas and feature areas such as streams, lakes, residential areas, etc.

which might be affected should be indicated on the plan.

g. Proposed structures or additions to existing structures and paved areas.

h. Delineate the twenty five (25) foot horizontal buffer adjacent to state waters.

i. Delineate the 100-foot horizontal buffer along designated trout streams, where applicable.

j. Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, Chapter 6.

k. The following flood damage prevention criteria:

i. Elevation in relation to mean sea level of the proposed lowest floor, including basement, of all structures;

ii. Elevation in relation to mean sea level to which any nonresidential structure will be flood-proofed;

iii. Certificate from a registered professional engineer or architect that the nonresidential flood-proofed structure will meet the flood-proofing criteria in Section 3.02.18(B);

iv. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development.

10.02.03 Submittal requirements for building permits.

A. Application for building permit.

1. All applications for building permits, including single-family residential, agricultural buildings, and accessory uses shall be accompanied by a minimum one (1) site plan any may need as many as five (5) depending on the type of project drawn to scale showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units the building is designed to accommodate, the setback lines of the building on the permit lot, the various easements on the lot and such other information as may be essential for determining whether the provisions of this LDC are being observed.

2. The following is required on the site plan before the site plan is considered by the governing authority and any permits are approved.

a. Topography (MSL) existing and proposed;

b. Drainage plans;

c. Location and size of ingress/egress;

d. Water and sewer mains and services, both existing and proposed; and

e. Water and sewer services as well as fire hydrants in the lot and the specific meter size and location.

3. Period of validity.

a. Any building permit shall become void if the work involved has not begun within six

(6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six (6) months after the work of development is commenced; provided that extensions of time and periods not exceeding six (6) months each may be allowed in writing by the Manager or his/her designee.

b. Any unapproved deviation from the site plan shall cause the Manager or his/her designee to not issue a certificate of occupancy.

4. Single family residential, agricultural buildings, and their accessory uses, site plans need not be drawn to scale, but must be accurate as to dimensions of lot and proposed building and all building setbacks must be indicated on the plan.

5. The applicant for a building permit shall submit a certificate with his application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not meet the lot width and lot area requirements of this LDC then the applicant shall certify that such lot was a lot of record prior to the adoption of this LDC or is a lot which has been created through governmental taking of property.

6. Flood damage prevention. Any applications for a building permit which proposes to develop properties which have been duly identified as having a flood hazard potential must provide adequate technical information and comply with all the flood protection provisions in Chapter 3 of this LDC.

7. Wetland permit required. For any application for a building and/or development permit which proposes to develop properties which have been identified as having potential wetlands areas, except those exempted activities listed in Chapter 3, the applicant must document receipt of a nationwide, regional, general or individual permit or a letter of clearance that jurisdictional wetlands are not located on the subject property from the U.S. Army Corps of Engineers under section 404 of the Clean Water Act before any local building and/or development permit will be issued by the governing authority.

8. Sanitation permit required. For any application for a building and/or development permit that proposes the use of on-site, privately provided sewage disposal, a sanitation permit is required to comply with the Tift County Health Department. The application for such sanitation permit shall;

a. Show plainly and distinctly the location of the sanitation facility to be constructed, the nature of such facility and the legal owner of the real property upon which the facility is to be constructed.

b. Distinctly show that the provisions, rules and regulations for individual sewage disposal systems, are fully and completely adhered to.

c. Be supported by a map delineating contour lines at a minimum of two (2) feet intervals.

10.02.04 Reserved.

10.02.05 Submittal requirements for subdivision plats.

A. Preliminary Plats.

1. Title block and north arrow. The plat will show the name of the proposed subdivision, its location, the name, address and registration number of the surveyor preparing the plat and the date of the plat. A north arrow shall be included with a notation referencing the bearings to magnetic north, astronomical north or grid north.

2. General layout. The plat shall show information as to the proposed street layout and widths, layout of lots with a notation as to the minimum size and width of lots and proposed open space if any. Any lands to be dedicated will be clearly identified. The plat shall be drawn to scale. Scale, total acreage of the site and total number of lots created shall be indicated. Lot and block identification and building setback lines shall also be indicated.

3. Topography. The plat shall show existing contour lines dashed and any proposed contour lines solid, both set of lines to be at two (2) foot intervals, mean sea level (M.S.L.).

Prominent drainage features such as lakes, depressions, streams, and floodplain areas that could affect the design of the subdivision, shall be shown. Engineering data showing the high water elevation and how it was established shall be submitted with the plat.

4. Existing features. The plat shall show the locations and names of existing and platted property lines, streets and their rights-of-way, railroads and their rights-of-way, public and private rights-of-ways, sanitary sewer and size, water mains and size, bridges, culverts, storm drainage and size, easements, parks and other public open spaces, land lot and land district lines, city limits lines, and names of adjoining property owners or subdivisions. Groups of trees and wetland areas shall also be indicated.

5. Location map. The plat shall include a small-scale map of sufficient clarity so that the location of the proposed subdivision can be readily determined.

6. Water and sewer. A statement from the subdivider shall be submitted with the preliminary plat that will describe the method by which sanitary sewer and water facilities will be provided.

7. Future tract plan. In cases where a subdivision is to be developed in stages with additional plats being filed with the governing authority at a later date, the filing of the initial plat will be accompanied by a future tract plan, a reasonably accurate plat in sketch form of the entire tract which will show the future street system and topography for the entire tract.

8. Wetlands. Approximate location of wetlands boundaries shall be delineated on the preliminary plat. All preliminary plats delineating wetlands shall have on the face of said preliminary plat the note:

No fill or work shall be permitted within jurisdictional wetlands without a prior permit from the U.S. Army Corps of Engineers.

B. Improvement plans. The plans for the required public improvements shall be prepared for the approval by the Department of Community Development prior to the construction and only after approval of the preliminary plat. Such improvement plans shall show the proposed locations, sizes, types, grades and general design features of each facility and shall be based on reliable field data. Improvement plan approvals are valid for twenty-four (24) months. If the subdivision is sold prior to completion and final platting, a mandatory review by the Department of Community Development shall be required. Failure to comply may result in revocation of construction permit.

1. The improvement construction drawing shall be submitted on white background prints.

The sheet size shall be twenty four (24) inches by thirty six (36) inches unless another size is approved by the Manager or their designee. The drawing shall include the following information:

a. Construction plans. The developer shall provide the plan and profile of each proposed street indicating the existing ground surface elevation and proposed street grade surface elevation including extensions, except where street runs into an existing street, for a distance of 100 feet. Design shall be in accordance with good engineering practices.

b. Street-typical sections. A typical section of each proposed street shall be submitted, showing the width of pavement and the rights-of-way.

c. Water supply, sanitation systems, and storm water drainage. The plan and profile of proposed water and sanitation, storm drainage or other drainage systems, with grade and sizes indicated are required. Floodplain areas should also be indicated on the plan. Storm water drainage shall be consistent with applicable ordinances of the governing authority and other applicable governmental agencies. Water and sewer systems shall be approved by the Department of Community Development and all relevant state agencies. The plat shall not be recorded until the developer submits to the Manager all final permits required for the construction of all improvements from other state, local or federal agencies.

d. Utility service agreement. A developer's agreement for utilities service shall be required before final improvement plan approval is granted.

e. Other public improvements. A plan shall be prepared for parks, recreation or other public use areas and improvements if included in the approved preliminary plat.

f. As-built drawings. The designing surveyor or engineer shall submit to the Manager or their designee, two (2) sets of white background prints of certified as-built drawings prior to recording of the final plat.

C. Final Plats. Filing the final plat with the Manager shall include the following:

1. An application containing:

a. The name and address of the persons developing the subdivision and his agent(s);

b. Zoning of the property to be subdivided;

c. Whether or not the subdivision will be developed in phases;

d. Plans for serving the proposed subdivision with sewer and water facilities;

e. A complete list of deviations, if any, from the approved preliminary plat;

f. A copy of the agreement for providing the necessary water and sewer facilities; and

g. A fee to cover the cost of investigation and review of the preliminary plan, construction plans, and the final plat will be charged at time of application, as established in this LDC.

2. Sheet design. The final plat shall conform to all of the items listed under the preliminary plat and the requirements thereof, as set forth in this LDC and shall be drawn in black ink.

3. The final plat shall be drawn to scale. If necessary, more than one (1) sheet may be used as long as a key map is provided to relate each sheet to the entire platted area.

4. Surveyor certificate. The following certificate shall be entered on the face of the plat.

Placement of this certificate may vary as necessary:

I certify that all measurements are correct and were prepared from an actual survey of the property made under my supervision; the field data upon which this plat is based has a closure precision of one (1) foot in feet and an angular error of per angle point, and was adjusted using rule; the plat has

been calculated for closure and is found to be accurate within one (1) foot in feet; monument and pin locations are correctly shown by the symbols

and the pins are (type of metallic material and length).

Signed (Seal) (Date) Surveyor, Georgia Registration No:

5. The surveyor must certify whether or not the property is located in a special flood hazard zone and indicate the informational source and zone of the property. If the property is located within a flood hazard zone, then the limits of the zone must be shown.

6. Proposed lots located in any flood zone shall be delineated on the plat and shall require a certificate of elevation to insure future construction meets applicable ordinances regarding the floodplain.

7. Any identified wetlands must be indicated on the final plat, and proof of compliance with any U.S. Army Corp of Engineers requirements for wetlands must be submitted prior to recording of the final plat.

8. Owner certificate. The following certificate shall be entered on the face of the plat.

Placement of this certificate may vary as necessary:

We, the undersigned owner(s) and/or mortgagee(s) of the subdivision, hereby offer to dedicate and/or reserve for public use the rights-of-way, easements and other public areas as designated on this plat.

Owner Date Mortgagee Date __________________ __________________ __________________ __________________ __________________ __________________ __________________ __________________

9. Approvals.

The following spaces shall be provided in the form listed below for approval by all agencies having jurisdiction. Placement on plat may vary: Approved by the Tift County Health Department, Tift County, Georgia

Date Signed ______________________________ Health Department Representative Approved by City/County Engineer, City of Tifton/Tift County, Georgia Date Signed ______________________________ City/County Engineer Approved by City/County Manager, City of Tifton/Tift County, Georgia Date Signed ______________________________ City/County Manager

10. Surveying data. The final plat shall contain the location, bearing, and length of every street line, lot line and boundary line whether curved or straight. A note will be made on the plat as to whether curved or straight. A note will be made on the plat as to whether curved dimensions are arc or chord distances. Easement lines (and width), land lot and land district lines will be shown.

11. The final plat shall also identify each tract within the proposed subdivision by block and lot number.

12. All dimensions shall be shown in feet and decimals to the nearest 1/100 of a foot, and all angles shall be shown to the nearest second. The error of closure shall not exceed one in 10,000, or as defined by the technical standards required by O.C.G.A. § 15-6-67, of the Law Governing the Practice of Professional Engineering and Surveying, as amended. The final plat shall have a note listing the following:

Total Acres Total Lots

13. Monuments The final plat shall show the accurate location, material and description of all monuments. A permanent master bench mark shall be established within or adjacent to the site by transfer of levels, not less than third order accuracy, from the nearest approved bench mark of known mean sea level (M.S.L.) elevation showing its location on the final plat and recording its elevation on the final plat to the nearest 1/100 of a foot.

14. Easements. In addition to the requirements for the preliminary plat the final plat shall show the location and width of all public utility easements and drainage easements where required.

(Ord. No. 2018-21, (Exh. A), 10-15-2018)

10.02.06 Submittal requirements for rezoning applications.

A. Application for text amendment. In the case of a text amendment, the application shall set forth the new text to be added and the existing text to be deleted.

B. Application for map amendment. An application for a map amendment shall include the following information:

1. The community or area in which is located the land proposed to be reclassified and the street number, if any, or if none, the location with respect to the nearby public roads in common use;

2. A plat of the land in question, and a description by metes and bounds, bearings, and distances of the land, or if the boundaries conform to the lot boundaries within a subdivision for which a plat is recorded in the land records of Tift County; then the lot, block, and subdivision designations with appropriate plat reference; or the map and parcel number according to the current tax mapping system of Tift County;

3. The present zoning classification and the classification proposed for such land;

4. The name and address of the owners of the land; and the names and addresses of abutting property owners;

5. The area of the land proposed to be reclassified stated in square feet if less than one (1) acre, and in acres if one (1) or more;

6. The application number, date of application, and action taken on all prior applications filed for the reclassification of the whole or part of the land proposed to be reclassified.

C. In certain cases where it is deemed that a proposed use is compatible with the surrounding neighborhood but the required zoning would allow uses that are too intensive to mix compatibly with the surrounding area, the Mayor and Council of the City of Tifton may, upon recommendation by the City of Tifton Planning and Zoning Commission, or on its own initiative, apply certain conditions to a rezoning request in order to allow the proposed use while preserving the purpose and intent of this ordinance. In such cases where conditional zoning is approved, the approval shall be noted as follows: R-8(c), R-10(c), R-12(c), etc. Any uses would be subject to the conditions applied to the rezoning.

D. Special Use Permit.

(a) An applicant for a special use permit shall file an application on forms provided by the community development director. The grant or denial of a special use permit is a zoning decision and such decision shall follow the procedures for a rezoning as specified in this section.

(b) Any use which may be authorized by a special use permit may be approved by the mayor and city council only if, in the exercise of the mayor and city council's legislative discretion, they find that:

(1) A proper application has been filed in accordance with the requirements of this article;

(2) A recommendation has been received from the City of Tifton Planning and Zoning Commission in accordance with the provisions of Chapter 8 Section 8.02.00 of the City of Tifton Land Development Code;

(3) The applicant is in compliance with the particular conditions for the proposed special use that are required by this article;

(4) The use is consistent with the purposes and intent of this article; and

(5) After considering the application and the facts, and the standards for making a zoning decision contained in section Chapter 10 of the City of Tifton Land Development Code, the mayor and city council determine that the standards are satisfied such that the benefits of and need for the proposed special use outweigh any possible harmful effects, negative impacts, or damages to the neighboring properties or the city in general. In making this determination, the city council may consider the effects of the proposed use on traffic, public infrastructure and services, aesthetics, property values, the peaceful enjoyment of private property in the community, and other relevant factors.

(c) The mayor and city council shall consider all evidence in the record in making their decision. This article is automatically a part of the record in each case, as is the entire application file. The mayor and city council shall have the power to table the application for further information to be presented, or to remand the application to City of Tifton Planning and Zoning Commission if new information has been presented that they have not considered. The mayor and city council shall have the power to grant, deny, or grant with further specific conditions imposed.

(d) An application for a special use which has been denied shall not be resubmitted for a period of six (6) months.

(Ord. No. 2020-08, 6-15-2020)

10.02.07 Submittal requirements for PDR and PDO site plans.

In addition to the requirements of Section 10.02.01 (A) and Section 10.02.06, application for rezoning to Planned Development Rural (PDR) and Planned Development Urban (PDO) shall include:

A. A conceptual development plan which shall demonstrate the ability of the proposed use(s) to be located on the site in compliance with the standards of this LDC. The conceptual development plan shall be of sufficient detail to bind the applicant to the features depicted on the conceptual development plan, and shall contain the following information:

1. Project name.

2. Vicinity map showing zoning districts and existing land use within 500 feet of the boundaries of the site.

3. Total area in acres and square feet.

4. Current and proposed zoning classification, together with a summary of the applicable development standards for the proposed zoning district. A planned development shall include drawing notes detailing the proposed standards for site design and development for the PDR or PDO zoning district.

5. Natural features, including topography at two (2) feet intervals, surface drainage, surface waters, flood plains, watershed areas, groundwater recharge areas, general location of wetlands, and the general location of wooded areas.

6. General soils.

7. Location with respect to any designated overlay districts.

8. General location of existing and proposed roads and utility rights-of-way or easements.

9. Location of existing property lines within the development site, if applicable.

10. General location of existing and proposed development by type of use.

11. Proposed residential density and dwelling unit types, if applicable.

12. Location of proposed open spaces, recreational areas, and public buildings and uses, indicating those areas reserved or dedicated for public use.

13. General plan for the provision of utilities and infrastructure.

B. Proposed legal instruments which shall demonstrate improvement, operation, and maintenance of any common property within a PDR or PDO development, including streets, drives, service areas, parking areas, recreational and community facilities, and open space.

10.02.08 Submittal requirements for amendments to the Land Development Code.

A. Applications for amendment of this LDC shall be made in the form of proposals for amendments of the text, standards, and other criteria. Proposals to amend the Zoning Map shall meet the requirements set forth in Section 10.02.06.

B. In addition to the application requirements set forth in Section 10.02.01(A), the following information shall be provided:

1. Identification of the specific provision proposed for amendment;

2. The proposed modifications in a strikethrough and underline format;

3. A detailed explanation of the rationale and justification for the requested amendment;

and

4. A detailed explanation of the potential impacts of the modification on the development of the City of Tifton.

10.02.09 Requirements regarding performance bonds.

A. A maintenance bond, in the amount equal to 115% of the total value of the improvements, shall be required as a guarantee to the governing authority for all materials and workmanship of any minimum improvements installed in a subdivision.

10.02.10 Specifications for digital file submittals.

A. General requirements.

1. All drawings shall be geographically referenced to the US State Plane coordinate system, NAD 83, GA West Zone, US Survey Feet.

2. All features depicted in the drawings shall be surveyed after construction. The governing authority will spot check all coordinates to ensure accuracy. Water system features shall § 10.02.00

be surveyed at a horizontal accuracy of < 0.5 ft and vertical accuracy of < 0.5 ft. Sewer system features shall be surveyed at a horizontal accuracy of < 0.5 ft and a vertical accuracy of < 0.1 ft.

3. The following feature geometry types shall be shot directly using the survey instrument:

a. All point features (hydrants, valves, sewer manholes, etc.);

b. All line features at all endpoints, bends, and turns (pipes, etc.); and

c. All polygon features at all corners and bends (project boundaries, lots, right-of-ways, etc.).

[4] The following feature types are acceptable: Line, Polyline, Text, and Insert.

B. Layering.

1. All required layers (as listed in this section) shall contain only the features that are described for that layer. For example, the BOUNDARY_LINE layer shall only contain the boundary line and not such features as north arrows or parcels.

2. All required layers shall be present in the drawing except for features that do not pertain to a particular project. For example, some commercial projects may not contain sewer taps as part of the construction and should not be included in the drawing.

3. All layers shall be clearly differentiated from each other. For Example:

a. Two (2) layers having the names "WATER_LINE" and "WATER_LINES" shall not exist in the same drawing.

b. SEWER_LINE_TEXT and SEWER_TEXT shall not exist in the same drawing.

4. All text shall appear on separate layers from the layers they annotate. For example, text describing a sewer line shall be on the SEWER_LINE_TEXT layer not the SEWER_LINE layer.

5. Text leaders shall be placed on the text layer, not the feature layer. For example, the leader for the diameter of a water pipe shall be on the WATER_LINE_TEXT layer, not the WATER_LINE layer. Leaders shall be drawn using Line features not Leaders.

C. Drawing.

1. All layers shall conform to the proper geometry type (line, polygon, text) as indicated in the table below.

Table 10.02.10. Digital file specifications.

Layer Name Type Layer Contents Sur- veyed ADDRESS_TEXT Text |Street postal address number No BLOCK_LETTER_TEXT Text |Indicates the block letter of a subdivi- No sion FIRE_HYDRANT Insert |Fire Hydrants Yes FIRE_HYDRANT_TEXT Text |Text associated with No FIRE_HYDRANT layer FLOW_ARROW Insert |Sewer line flow arrows No HORIZONTAL_AND_VERTICAL_ Line |Survey control points (rebar or monu- Yes CONTROL_POINT ments) with x, y, z coordinates

Layer Name Type Layer Contents Surveyed

HORIZONTAL_AND_

VERTICAL_TEXT

Text Text associated with

HORIZONTAL_AND_VERTICAL_

CONTROL_POINT

No LAND_LOT_LINE Line Land lot lines. No LAND_LOT_LINE_TEXT Text Land lot numbers and other text No LOT_NUMBER_TEXT Text Individual lot numbers. No PROJECT_BOUNDARY Poly The boundary line of the subdivision or commercial property.

Yes PROJECT_BOUNDARY_TEXT Text Text labels for the project boundary line.

No PROPERTY_LINE Poly Property Lines (parcel lines) Yes RAILROAD_LINE Line Railroad Lines Yes RAILROAD_TEXT Text Text associated with RAILROAD No ROAD_EDGE_OF_PAVEMENT Poly Polygon: Street Edge of Pavement (not back of curb) Yes ROAD_TEXT Text Road Names No SEWER_END-OF-LINE Insert End of sewer line Yes SEWER_END-OF-LINE_TEXT Text Text associated with

SEWER_END-OF-LINE

No SEWER_EXISTING Line Sewer lines present before the subdivision was built Yes SEWER_EXSITING_TEXT Text Text associated with the SEWER_EXISTING layer No SEWER_FORCE_MAIN Line Sewer force mains Yes SEWER_FORCE_MAIN_TEXT Text Text associated with the

SEWER_FORCE_MAIN

No SEWER_LINE Line Sewer lines built as apart of the subdivision.

Yes SEWER_LINE_TEXT Text Text associated with the SEWER_LINE layer No SEWER_MANHOLE Insert Sewer Manholes Yes SEWER_MANHOLE_TEXT Text Text associated with the SEWER_MANHOLE layer No SEWER_TAP Line Sewer taps Yes SEWER_TAP_TEXT Text Distance between taps in feet Yes UTILITY_EASEMENT Poly Utility line easement Yes UTILITY_EASEMENT_TEXT Text Text associated with Utility Easements No WATER_CAP Insert Cap at the end of water line. Yes WATER_CAP_TEXT Text Text associated with

WATER_CAP_TEXT

No WATER_EXISTING Line Water lines present before the subdivision was built Yes WATER_EXISTING_TEXT Text Text associated with

WATER_EXISTING

No WATER_LINE Line Water lines Yes Layer Name Type Layer Contents Surveyed WATER_LINE_TEXT Text Text associated with

WATER_LINE

No WATER_METER Insert Customers water meters Yes WATER_METER_TEXT Text Text associated with

WATER_METER

No WATER_REDUCER Insert Water line reducer Yes WATER_REDUCER_TEXT Text Text associated with

WATER_REDUCER

No WATER_SERVICE Line Water service lines Yes WATER_SERVICE_TEXT Text Text associated with

WATER_SERVICE

No WATER_VALVE Insert Water Valves Yes WATER_VALVE_TEXT Text Text associated with WATER_VALVE No WATER_VAULT Insert Large meter or fire connection vault Yes WATER_VAULT_TEXT Text Text associated with

WATER_VAULT

No PUMP_STATION Poly Walls of the sewer pump (lift) station Yes PUMP_STATION_TEXT Text Text associated with

PUMP_STATION

No

2. All polygon type features shall be completely closed. To accomplish this, lines may need to be duplicated on more than one (1) layer.

a. Subdivision parcels shall be closed figures on their layer (not closed with the subdivision boundary).

b. Road edge-of-pavement shall be drawn as closed polygons.

c. Where a polygon feature extends beyond the edge of the plan, the property boundary (repeated on the polygon feature's layer) shall be used to close the polygon.

d. All edges on polygon features shall be snapped together at the vertices. Gaps in polygon boundaries shall not be accepted.

3. Sewer features.

a. Sewer lines and sewer taps shall be digitized with proper directionality: lines shall be drawn from the uphill node to the downhill node or flipped after the lines have been digitized.

b. All tangents between sewer manholes shall be drawn with a single line.

c. All tangents shall be snapped at endpoints intersecting at the exact center of the manhole. No gaps shall exist between tangents.

d. Manholes shall be symbolized consistently with a circle centered exactly on the tangent endpoints.

4. Water features.

a. Water lines shall be digitized with all straight-line pipes consisting of only two (2) points. Straight-line pipes shall begin and end at the following features (nodes):

hydrants, valves, meters, pumps, tees, crosses, and valves.

b. Curves may be digitized with enough vertices to capture the curve geometry. Curves or arcs may also be used to designate curved pipe.

c. All water lines shall be continuous, with pipe endpoints snapped to each other at endpoints (nodes).

d. End-of-line caps shall be drawn to differentiate end-of-lines from lines that extend beyond the extent of the drawing. Caps shall be drawn for lines that are to be permanently capped when the project is complete, not for lines that are temporarily capped pending inspection.

D. Annotations.

1. Any non-standard water and sewer lines shall be annotated as such. Line diameter, material, ownership, etc. that does not conform to standard practice shall be noted in the corresponding annotation layer. For example, standard subdivision sewer lines are 8" in diameter. Any other diameter shall be annotated on the SEWER_LINE_TEXT layer.

2. All addresses and lot numbers shall be number data type (that is, no text or symbols (#, -, ft, _, ", ', etc.)). If the lot does not have a number, this layer shall be blank.

E. File naming and revisions.

1. File names shall correspond exactly to the subdivision name and shall be consistent from one (1) version to the next. The file name shall contain the drawing finalized date (in YYMMDD format) as part of the name. There shall be no blank spaces in the name, only underscores. An example file name for the November 10, 2003, final plat for the third phase of the Monarch Village subdivision is: "Monarch_Village_3_031110."

2. File finalized dates shall only be updated by the contractor/developer.

F. Deliverable format. All files shall be delivered on single disk media in AutoCAD (release 2005 or higher) DWG format. CDs, 4" floppies, and Zip disks are all acceptable media. Files shall not be spanned over more than one (1) disk.

Sec. 10.03.00 Notice requirements.

10.03.01 Zoning decisions.

A. Posting of property.

1. Not less than fifteen (15) or more than forty-five (45) days prior to the date set for the public hearing on any application for a map amendment (other than a map amendment initiated by the Planning Commission or the governing authority), the Manager or his/her designee shall erect a sign on the land proposed to be reclassified.

2. Such sign shall be erected within ten (10) feet of the boundary line of the property which abuts the most traveled public road; and, if no public road abuts thereon, then such sign shall be erected to face in such a manner as may be most readily seen by the public.

3. The sign shall show the application number, the present zoning classification, the proposed zoning classification, the scheduled date, time, and place of public hearing, and the telephone number to call for further information.

4. Removal of sign. Any such sign shall be maintained at all times by the Manager or his/her designee until a decision on the application has been made by the governing authority.

5. Notice to interested parties. A notice shall be given to the applicant and the body conducting the public hearing of the date, time, and place of the public hearing. All application files shall be placed in the custody of the Manager or his/her designee and be open to public inspection during regular office hours.

B. Publication of Notice.

1. At least fifteen (15) but not more than forty-five (45) days notice of the time, place, and purpose of said hearing shall be published in a newspaper of general circulation within Tift County, Georgia.

2. Such notice shall also state the application number and date, and shall contain a summary of the proposed amendment, if a text amendment, and in the case of a map amendment, the location of the property, its area, the name of the owner or their authorized agent, and the present and proposed zoning classification use for the property affected.

3. Advertisement to include disclosure.

a. Further, such advertisement shall advise the public pursuant to O.C.G.A. 36-67A-3 that any applicant or opponent of a proposed rezoning action who has made campaign contributions aggregating $250.00 or more to a local government official of the local government which will consider the application within two (2) years of the date of the application shall be required to file a disclosure with the City of Tifton:

i. The name and official position of the local government official to whom campaign contributions were made; and

ii. The dollar amount and description of each campaign contribution made by the opponent to the local government official during the five (5) years immediately preceding the filing of the application for the proposed rezoning action and the date of each contribution.

b. Such disclosure shall be required to be filed at least ten (10) calendar days prior to the scheduled hearing.

10.03.02 All other decisions.

A. Notice of public hearing shall be given.

1. Before making its decision on any appeal, request for a variance, or any other matter within the planning and zoning commission's authority, said planning and zoning commission shall hold a public hearing thereon.

2. At least fifteen (15) days' notice of the time and place of such hearing shall be sent to the appellant or petitioner, and to the owners of all properties either adjoining the property with which the hearing is concerned or situated directly across a public right-of-way from said property.

3. Such notice shall contain the name of the appellant or petitioner, the date, time, and place set for the hearing, and a brief statement of the nature of the hearing.

B. Public notice in newspaper. The planning and zoning commission shall give a public notice of the hearing in a newspaper published and circulated in Tift County and the City of Tifton, Georgia, by advertisement published at least fifteen (15) days prior to the date of the public hearing.

(Ord. No. 2024-03, 3-18-2024) Sec. 10.04.00 Procedural requirements.

10.04.01 Procedures for action by the environmental management staff.

A. Generally.

1. Compliance Review. For permit applications eligible for final approval by the City staff, the appropriate staff person shall review the application and all supporting materials to determine compliance of the application with applicable standards and criteria set forth in this LDC and applicable codes.

2. Decisions by Staff. The staff shall issue the permit or provide a written justification for the denial of the permit.

3. Appeals. Actions by the staff are subject to the administrative appeals procedure set forth in Section 10.05.00.

B. Application Review Process.

1. For applications to be submitted to the Planning Commission or City Council, the staff shall review the application and all supporting materials, and provide a report regarding compliance of the application with applicable standards and criteria within thirty (30) days of receipt of the application. The staff shall provide an analysis and recommendation regarding the following:

a. Consistency of the application with the City or County Comprehensive Plan;

b. Compliance of the application with the application requirements and development standards set forth in the LDC.

2. The staff shall transmit a copy of the compliance report to the applicant. The applicant shall have thirty (30) days to correct any deficiencies noted in the report and submit revised or additional documents. Upon receipt of the materials provided by the applicant to correct any deficiencies, the staff shall prepare a revised compliance report.

3. For matters subject to final approval by the staff, the compliance report shall be filed with the application as support for approval, approval with conditions, or denial of the application by the EMS.

4. For matters subject to final approval by the planning and zoning commission or City Council the compliance report will be forwarded together with the application and supporting materials for review, recommendation, and final action by the designated entity.

5. Actions by the staff are subject to the administrative appeals procedure set forth in Section 10.05.00.

6. It shall be the responsibility of the staff to coordinate the administrative review responsibilities.

C. Development Permit. No person shall conduct any land-disturbing activity within the jurisdictional boundaries of the governing authority without first obtaining a permit from the Manager or his/her designee to perform such activity.

1. Review of regulations.

a. The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the governing authority that affect the tract to be developed and the area surrounding it.

b. They shall review the zoning regulations, stormwater management regulations, subdivision regulations, flood damage provision regulations, and other provisions of this LDC and other ordinances which regulate the development of land within the jurisdiction.

2. Erosion and sedimentation control plan required.

a. The application for a permit must include the applicant's soil erosion and sedimentation control plan with supporting data, as necessary.

b. Said plans shall include, as a minimum, the data specified in Chapter 3 this LDC.

D. Approval of revisions to a recorded plat.

1. Where located on an existing road or street, the combination of previously platted lots, where the total number of lots does not increase and the resultant lots are equal to the current standards of the governing authority as determined by the EMS, shall be subject to administrative approval.

2. Such plats shall conform fully to the requirements of this LDC.

E. Approval of exempt plats.

1. Any plat submitted for recording to the office of the Clerk of Superior Court of Tift County that is not subject to this Section shall comply with O.C.G.A. § 15-6-67(d), as amended.

2. All plats exempt from the standard review process must be assigned a map and parcel number by the Tift County Board of Tax Assessors if a new lot is being created.

3. Resurveys of existing parcels which do not involve a map and parcel change must be verified by the Manager and by the Tax Assessor's office.

4. All exempt plats, which include resurveys of lots of record, exempt resubdivisions and exemptions by definition must be approved as exempt prior to recording.

5. All plats submitted for exemption must be submitted as an original with five (5) black line or blue line copies.

6. The original plats will be retained by the Manager or his/her designee. The copies will be stamped, signed and dated to allow recording.

F. Minor Subdivisions & Exempt Subdivisions.

1. Where a proposed subdivision involves no public improvements and requires a minimum level of engineering design, the Manager or their designee may approve the waiver of the requirements of filing a preliminary plat and may recommend approval of the final plat by staff.

2. A plat and application shall be submitted to the Manager or their designee which shall conform fully to the requirements of these regulations.

3. Where the minor subdivision is located on an existing road or street, the combination or recombination of previously platted lots, where the total number of lots does not increase, and the resultant lots are equal to the current standards of the governing authority as determined by the Department of Community Development, shall also be subject to administrative approval. Such plats shall conform fully to the requirements of this LDC.

G. Procedures for Preliminary Subdivision Plat.

1. Purpose. The purpose of the preliminary plat is to safeguard the subdivider from unnecessary loss of time and expense in preparation of a subdivision plat which does not conform with the specifications of this LDC. The preliminary plat requires accuracy of scale and dimension. Public agencies having jurisdiction will review preliminary plats regarding matters within their jurisdiction. During the review process, the subdivider or his agent may be called upon for consultation.

2. Filing. Any person desiring to subdivide land shall file an application as specified in Section 10.02.05 of this LDC.

3. Review of preliminary plat.

a. Upon receipt of the filing of the preliminary plat, the Manager or their designee shall prepare those materials for presentation to the staff.

b. Staff shall review the preliminary plat for technical compliance with the LDC, the Comprehensive Plan, and other ordinances of the governing authority that might impact the proposed land subdivision.

c. Staff shall, with or without modification, approve or disapprove the preliminary plat to the extent that it has jurisdiction.

d. If the plat is rejected, the respective reviewing agency shall provide a written statement specifying all aspects where the plat fails to comply.

e. Staff shall recommend in writing approval, postponement or disapproval within thirty (30) days of submission.

4. Approval of preliminary plat.

a. Upon approval of the preliminary plat by the staff, the developer is authorized to proceed with the preparation of the required improvement plans. No developer shall proceed with any construction or any other work in the proposed subdivision before obtaining approval of the improvement plans in writing.

b. Preliminary plat approval grants the developer a maximum time of eighteen (18) months within which he shall submit his subdivision improvement plan. A time extension may be granted by the staff before the expiration of the eighteen (18) month period. If an extension is granted, it shall be for not more than twelve (12) additional months.

c. Failure to submit improvement plans within this time period, including extension if any, shall invalidate preliminary plat approval and require resubmission of preliminary plat.

d. Additionally, if, in the opinion of the staff, substantial changes have been made to the approved preliminary plat, the revised plat shall be resubmitted as a new preliminary plat.

5. Postponement. Action is delayed for specific reasons which shall be noted and transmitted in writing to the developer by the staff. Postponed preliminary plans may be reconsidered by the EMS without resubmittal.

6. Disapproval. Staff shall deny the application for the subdivision if the developer's plans are not in compliance with this LDC. The specific reasons for disapproval shall be stated in writing to allow for correction. For further consideration, the developer must revise and resubmit his plans as though they were a completely new preliminary plat.

H. Procedures for Improvement Plans.

1. General requirements.

a. Subdivision plats receive their second official consideration as "improvement plans."

b. These plans shall be approved by staff who shall certify that the improvement plans are in conformance with this LDC, official specifications of the governing authority, and with the requirements of the approved preliminary plan.

c. No developer shall proceed with any construction work in the proposed subdivision before obtaining this approval.

2. Professional engineer or consultant required. Should certain design calculations be required to resolve flow problems, possible erosion or drainage problems, or other detailed design problems which might be encountered in the process of preparing the required improvement plan, the Manager or their designee shall be authorized to require the services of a professional engineer or consultant in the improvement plan design process.

Should such services be required, such plans shall reflect the engineer or consultant's state registration.

3. Filing. Any person desiring to subdivide land shall file an application as specified in Section 10.02.05 of this LDC.

4. Approval. Upon approval of the improvement plan by staff, and upon securing all required development permits, the developer is authorized to proceed with construction of the physical improvements in the subdivision, and may proceed with the preparation of the final subdivision plat.

5. Denial. Staff shall deny the application for the subdivision improvement plans if the developer's plans are not in compliance with this LDC. The specific reasons for disapproval shall be stated in writing to allow for correction. For further consideration, the developer must revise his plans to conform to the requirements of this LDC, and then submit the revised plans to the staff as though they were a completely new set of plans.

I. Procedures for Final Subdivision Plat.

1. Conformance.

a. The final plat shall conform with the approved preliminary plat and improvement plan.

b. If desired by the subdivider, he may submit only that portion of the preliminary plat he proposes to record and develop at that time, provided that such portion conforms with all requirements of this LDC.

c. The record plat, also known as the final plat, is to be prepared and sealed by a registered land surveyor licensed in the State of Georgia.

d. No plat of a land subdivision shall be recorded unless the plat conforms to the requirements of the LDC, and the governing authority has formally accepted dedication of any proposed streets and encroachments.

2. Filing.

a. Filing the final plat with the Manager or his/her designee shall include those items listed under Section 10.02.05 of this LDC.

b. At the time of filing with the Manager or his/her designee, a certificate of filing shall be furnished to the applicant which will include the time and date of filing.

3. Staff Review.

a. The staff shall review the final plat for technical compliance with the Land Development Code, the Comprehensive Plan, and other ordinances or regulations that might have an impact on the proposed land subdivision.

b. The staff shall recommend in writing, approval, postponement or disapproval.

c. If the final plat is disapproved, the reasons therefore shall be stated and the sub divider shall be so informed. The staff shall have authority to reject the final plat if they find that it does not conform with the approved preliminary plat, the approved improvement plan or to this LDC.

d. If the plat is rejected, the staff shall provide the sub divider with a written statement specifying all the respects in which it does not conform.

4. Recording a plat. The City of Tifton shall release the plat for recording as follows;

a. Upon satisfactory compliance with this LDC;

b. After the required bond or guarantee has been posted.

5. Distribution. The Manager or his/her designee shall distribute the final plat to the departments and agencies of the governing authority, utility companies, and others as established by the policies of the governing authority.

6. Map and parcel number assigned. Any plat approved through the subdivision process shall be assigned a map and parcel number by the Tift County Tax Assessors' office.

J. Procedures for Site Development Plans.

1. The staff shall review the site development plan for technical compliance with the LDC, the Comprehensive Plan, and other ordinances that might have an impact on the proposed development of land.

2. The staff shall recommend in writing, approval, postponement, or disapproval.

3. The staff shall not approve the site development plan if the developer's plans are not in compliance with this LDC. The specific reasons for disapproval shall be stated in writing to allow for correction. For further consideration, the developer must revise his plans to conform to the requirements of this LDC, and then submit the revised plans to the staff.

4. No developer shall proceed with any construction work on the proposed development without obtaining approval of the site development plan.

K. Certificate of Occupancy or Completion.

1. Certificate of occupancy or completion required. A certificate of occupancy or completion issued by the Director or his/her designee is required in advance of occupancy or use of:

a. A building hereafter erected;

b. A building hereafter altered so as to affect height, the side, front, or rear yard;

c. Any building or premises where a change in the type of use will occur; or

d. A manufactured home or mobile home dwelling hereafter sited and connected to utilities.

2. Issuance of certificate of occupancy or completion.

a. Upon payment of all required fees, the Director or his/her designee shall sign and issue a certificate of occupancy or completion if the proposed use of land or buildings is found to conform to the applicable provisions of this LDC, and if the building, as finally constructed, substantially complies with the sketch or plan submitted and approved for the building permit.

b. One (1) copy of all certificates of occupancy or completion issued which contain a statement of the intended use of the applicable property and other pertinent information, signed by the owner or his agent, shall be kept on file in the office of the Manager or his/her designee.

3. Denial of certificate of occupancy or completion.

a. A certificate of occupancy or completion shall not be issued unless the proposed use of a building or land conforms to the applicable provisions of this LDC and substantially complies with the sketches or plans submitted for obtaining the building permit.

b. Any unapproved deviation from the site development plan shall cause the Director or his/her designee to not issue a certificate of occupancy.

c. When a permit is denied, the Manager or his/her designee shall provide in writing his reasons for denying the permit within ten (10) days after said request.

4. Permits and licenses void when issued in conflict. Any permit or license issued in conflict with the provisions of this LDC shall be null and void.

L. Right-of-Way Utilization Permit - Reserved.

M. Tree Removal Permit - Reserved.

N. Temporary Use Permit - Reserved.

(Ord. No. 2018-21, (Exh. A), 10-15-2018; Ord. No. 2024-03, 3-18-2024)

10.04.02 Procedural requirements for PDR and PDO applications.

Approval of a site conceptual development plan and rezoning for the PDR or PDO district shall include the condition that such legal instruments are properly recorded and shall be binding on the development of the site.

10.04.03 Procedures for action by the Historic Preservation Commission.

A. An application for a Certificate of Appropriateness shall be accompanied by drawings, photographs, plans or other documentation as may be reasonably required by the Historic Preservation Commission (HPC) with applications involving demolition being required to be accompanied by post demolition plans for the site and shall be filed by the applicant with the

HPC.

B. Not earlier than twenty (20) days nor later than seven (7) days prior to the review of a Certificate of Appropriateness by the HPC, the HPC shall take such action as may reasonably be required to inform the owners of any property likely to be affected by reason of the application of the filing of such application and shall afford the applicant and such owners an opportunity to be heard in connection with the determination on such application.

C. The HPC shall approve the application and issue a certificate of appropriateness if it finds that a proposed material change in the appearance would not have a substantial adverse effect on the aesthetic, historic, or architectural significance and value of the historic property or the historic district.

D. The HPC shall deny a certificate of appropriateness if it finds that a proposed material change in appearance would have substantial adverse effects on the aesthetic, historic or architectural significance and value of the historic property or the historic district.

E. In making its determination to either approve or deny an application for a certificate of appropriateness the HPC shall consider, in addition to any other pertinent factors;

1. The historical and architectural value and significance of the property involved;

2. The architectural style of the property involved;

3. The general design, arrangement, texture and material of the architectural features involved and the relationship thereof to the exterior architectural style; and

4. The pertinent features of the other structures in the immediate neighborhood.

F. In its review of applications for certificates of appropriateness, the HPC shall not consider the interior arrangement of property or the interior use of property which does not have any effect on exterior architectural features.

G. The HPC may seek such outside technical advice concerning its decision on any application as its members deem necessary, provided that any expenses incurred in connection with such technical advice must have the prior approval of the City Council or Board of Commissioners.

H. The HPC shall approve or deny an application for a certificate of appropriateness within forty-five (45) days after the filing thereof by the owner or occupant of a historic property or by the owner or occupant of a structure, site, object, or work of art located within a historic district.

I. Failure of the HPC to act within such forty-five (45) days shall constitute approval of an application with no other evidence of approval being required.

J. Evidence of approval of an application shall be by a certificate of appropriateness issued by the

HPC.

K. Notice of the issuance or denial of a certificate of appropriateness shall be furnished by written record within ten (10) days of a decision thereon to the applicant and to all other persons who have requested such notice in writing filed with the HPC.

L. In the event the HPC denies an application, it shall specify its reasons for doing so, and shall transmit a record of such actions and reasons, in writing, to the applicant. The HPC may at its option suggest alternative courses of action it thinks proper if it denies the application. The applicant, if the applicant so desires, may make modifications to the plans and application and may resubmit another application at any time.

M. In circumstances where the application seeks a material change in the appearance of a structure which would require the issuance of a building permit, the denial of the application for a certificate of appropriateness shall be binding upon the staff charged with issuing building permits and, upon denial of such application no building permit shall be issued with respect to work or changes covered by such application.

N. Where, by reason of unusual circumstances, the strict application of any provision of this section would result in the exceptional practical difficulty or undue hardship upon any owner of any specific property, the HPC, in passing upon applications, shall have the power to vary or modify strict adherence to such provisions, or to interpret the meaning of such provisions, so as to relieve such difficulty or hardship; provided such variances, modifications or interpretations shall remain in harmony with the general purpose and intent of such provisions, so that the architectural or historical integrity, or character of the property, shall be conserved and substantial justice done. In granting variations, the HPC may impose such reasonable and additional stipulations and conditions as will in its judgment best fulfill the purpose of this

LDC.

O. Any person adversely affected by any determination made by the Historic Preservation Commission relative to the issuance or denial of a certificate of appropriateness may appeal such determination to the City Council.

1. Any such appeal must be filed with the Manager within fifteen (15) days after the date of receipt of notification to such appellant by the commission of its determination.

2. Upon appeal the City Council may approve, modify, or reject the determination made by the HPC, if the City Council finds that the commission abused its discretion in reaching its decision.

3. The decision of the City Council shall be made within forty-five (45) days of the filing of such appeal.

4. Appeals from decisions of the City Council may be taken to the Tift County Superior Court.

10.04.04 Procedures for action by the City Council.

A. Generally. Within the city limits of the City of Tifton, Georgia, the governing authority shall be the Mayor and City Council of the City of Tifton, Georgia.

B. Rezoning Procedures.

1. General conditions.

a. Zoning regulations, including the zoning map, may be amended by the governing authority on their own motion, on petition, or on recommendation of the Planning Commission, but no amendment shall become effective, unless it shall have been proposed by or shall first have been submitted to the Planning Commission for review and recommendation.

b. Before enacting an amendment to these regulations, the governing authority shall give public notice and hold a public hearing thereon as set forth in this LDC.

2. Application for amendment.

a. Applications for amendment of these regulations may be in the form of proposals for amendment of the text of these regulations or proposals for amendment of the zoning maps.

b. Applications shall be in the form specified in Section 10.02.00.

c. No application for a zoning change affecting the same parcel of property or part thereof shall be accepted by the Manager or his/her designee until the expiration of at least six (6) months immediately following the defeat of the rezoning request by the governing authority.

3. Referral to Planning Commission.

a. After the routine monthly application acceptance deadline, the Manager or his/her designee shall transmit a copy of the completed application to the Planning Commission, and applicable staff members, for review and recommendation.

b. The Planning Commission shall review each application for consistency with the adopted Comprehensive Plan, and the adopted standards for exercise of the zoning powers.

c. The Planning Commission shall have thirty (30) days within which to submit a report to the governing authority.

d. The staff report and Planning Commission recommendations shall then be transmitted to the governing authority.

4. Standards for exercise of zoning powers. In order to promote the public health, safety, and general welfare of the City of Tifton and the residents thereof against the unrestricted use of property, the following standards, and any other factors relevant to balancing the above-stated public interest, shall be considered by the governing authority in making any zoning decision:

a. The existing land use pattern;

b. The possible creation of an isolated district unrelated to adjacent and near districts;

c. The existing population density pattern and the possible increase or overtaxing of the load on public facilities;

d. Whether changed or changing conditions make the passage of the proposed amendment reasonable;

e. Whether the proposed change will adversely influence existing conditions in the neighborhood or the community at large;

f. Potential impact on the environment, including, but not limited to, drainage, soil erosion, and sedimentation, flooding, air quality, and water quality and quantity;

g. The reasonableness of the costs required of the public in providing, improving, increasing or maintaining public utilities, schools, streets and public safety necessities when considering the proposed change;

h. Whether the proposed change will be detrimental to the value, improvement, or development of adjacent or nearby property in accordance with existing regulations;

i. Whether the proposed change is out of scale with the needs of the neighborhood, area, or City of Tifton;

j. Whether the proposed change will constitute a grant of special privilege to the individual owner as contrasted with the adjacent or nearby neighborhood or with the general public; and

k. The extent to which the zoning decision is consistent with the Comprehensive Plan, as duly amended.

i. The Comprehensive Plan is established as official policy of the City of Tifton.

ii. As such, the goals and policies of the Plan, and the resultant Future Land Use Plan, shall serve as the guide under which areas are divided into zoning districts.

5. Additional Restrictions and Standards may be required.

a. Provided, that the governing authority may impose or require such additional restrictions and standards as may be necessary to protect the health and safety of workers and residents in the community, and to protect the value and use of property in the general neighborhood; and

b. Provided that wherever the governing authority shall find in the case of any permit granted pursuant to the provisions of these regulations that any term, condition or restrictions upon which such permit was granted are not being complied with, said governing authority shall rescind and revoke such permit after giving due notice to all parties concerned and granting full opportunity for a public hearing.

C. Removal of Recorded Subdivision.

1. After a subdivision has been recorded, the property owner or his agent may petition the governing authority for permission to remove the subdivision plat from the land records of Tift County.

2. The governing authority may permit such removal providing that no lot in the subdivision has been sold.

3. Upon giving its permission for such removal, the governing authority shall release bonds or cash posted by the property owner pursuant to the provisions of Section 10.02.09.

D. Amendments to LDC text. Action by the governing authority regarding proposed amendments to the LDC text shall be taken at an advertised public hearing, and shall be based on the following information:

1. The staff compliance report and recommendation;

2. The recommendation of the Planning Commission;

3. The application and supporting documentation; and

4. Testimony during the public hearing.

(Ord. No. 2018-21, (Exh. A), 10-15-2018) Sec. 10.05.00 Appeals.

10.05.01 Applicability.

A. The planning and zoning commission shall hear and decide upon appeals where it is alleged there is error in any order, requirement, decision, or determination made by the Manager or his/her designee in the enforcement of this LDC.

B. Appeals to the planning and zoning commission may be taken by any person aggrieved or by any officer, department, board, or bureau of the governing authority affected by any decision of the Manager or his/her designee. Such appeals shall be filed no later than thirty (30) days after the date of notification of the decision appealed from by filing with the Manager, and with the planning and zoning commission, a notice of appeal specifying the grounds thereof. The Manager or his/her designee shall forthwith transmit to the planning and zoning commission all the papers constituting the record upon which the action appealed from was taken.

C. The suspension, revocation, modification or grant with condition of a permit by the governing authority upon finding that the holder is not in compliance with this LDC; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the planning and zoning commission.

(Ord. No. 2024-03, 3-18-2024)

10.05.02 Stay of proceedings.

An appeal stays all legal proceedings in furtherance of the action appealed from, unless the Manager or his/her designee certifies to the governing authority after the notice of appeal shall have been filed with him that by reason of facts stated in the certificate a stay would, in his opinion, cause imminent peril to life and property. In such case, proceedings shall not be stayed otherwise than by a restraining order, which may be granted by the planning and zoning commission or by a court of record on application, on notice to the Manager or his/her designee, and on due cause shown.

(Ord. No. 2024-03, 3-18-2024)

10.05.03 Action on appeals.

A. Before making its decision on any appeal, request for a variance, or any other matter within the planning and zoning commission's authority, the planning and zoning commission shall hold a public hearing, in conformance with the provisions and notice requirements of this LDC.

B. The appellant and any public agency or private individual shall be entitled to present evidence on matters before the planning and zoning commission board, and the planning and zoning commission may request technical service, advice, data, or factual evidence from the Manager or his/her designee and the governing authority for assistance in reaching decisions.

C. The planning and zoning commission may, in conformity with the provisions of this LDC, reverse or affirm, wholly or partly, or may modify the order, requirement, decision, or determination of the Manager. The board may direct the issuance of a permit. It shall be the duty of the Manager or his/her designee to carry out the decisions of the planning and zoning commission.

(Ord. No. 2024-03, 3-18-2024)

10.05.04 Appeals to Superior Court.

Appeal from the Governing Authority. Any party aggrieved by any decision of the Mayor and City Council or the Zoning Board of Appeals may seek review of such decision by the Tift County Superior Court, as provided by law.

(Ord. No. 2024-03, 3-18-2024) Sec. 10.06.00 Enforcement and penalties.

10.06.01 Enforcement.

A. General Remedies. In case any building or structure is or is proposed to be erected, constructed, reconstructed, altered, converted, or maintained, or any building, structure, or land is or is proposed to be used in violation of these regulations, the Manager or his/her designee or any adjacent or neighboring property owner or occupant who would be damaged by such violation may, in addition to other remedies, institute injunction, mandamus, or other appropriate action or proceedings to prevent such unlawful erection, construction, reconstruction, alteration, conversion, maintenance, or use, or to correct or abate such violation, or to prevent the occupancy of said building, structure, or land.

B. Enforcement Authority. Upon determination by the Manager or his/her designee that reasonable grounds exist to believe that there exists any violation of any provision of this LDC, the building permit or a landscape plan, the Manager or his/her designee shall be entitled to take any, all or any combination of the following actions, or to cause such actions to be taken, as the Manager or his/her designee in his sole discretion shall determine to be appropriate:

1. Give written notice to the applicant, owner, developer, landscape contractor and/or other appropriate persons of the existence of such violations, the nature and extent of the violations, the actions necessary to correct the violations, and the time limit within which remedial actions must be taken;

2. Suspend or revoke any or all building permits and land disturbance permits issued;

3. Issue stop work orders in connection with any or all construction, work or other activity then being conducted upon the lot pursuant to any building or construction license, permit, or any land disturbance permit which has been issued;

4. Declare any bond or security given pursuant to this LDC forfeited in the event of circumstances authorizing the forfeiture following the giving of written notice to the principal and any surety thereon of intention to so do and the failure of the circumstances giving rise thereto to be remedied within sixty (60) days thereafter, to take all actions necessary to collect the proceeds thereof, and to proceed to remedy the circumstances giving rise to the forfeiture upon collection of the proceeds of the bond or security;

5. Institute civil proceedings to effectuate remedy of the circumstances giving rise to the violations; and

6. Take such other actions as are appropriate under the circumstances in order to obtain compliance with the provisions of this LDC consistent with applicable law and available resources of the governing authority.

C. Stay of enforcement. Filing of an appeal to determination of Manager or his/her designee to the planning and zoning commission or filing of an application for rezoning with the governing authority will automatically stay enforcement until the appeal or rezoning question is resolved.

D. Historic properties. The Manager or his/her designee shall be authorized to institute any appropriate action or proceeding in a court of competent jurisdiction to prevent any material change in appearance of a designated historic property or of any site, structure or object of art located in a historic district, except to the extent that such changes are made in compliance with the provisions of this LDC and to prevent any illegal act or conduct with respect to any such historic property or to any site, structure or object of art located in a historic district and to issue citations to any person engaged in any such activity.

E. Erosion control.

1. Notice of violation.

a. The Manager or his/her designee will periodically inspect the sites of land disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation.

b. If, through inspection, it is deemed that a person engaged in land disturbing activities as defined in this LDC has failed to comply with the approved plan, with permit conditions or with the provisions of this LDC, a written notice to comply shall be served upon that person.

c. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed.

d. If the person engaged in the land disturbing activity fails to comply with the time specified, he shall be deemed in violation of this LDC.

2. Investigation authority. The Manager or his/her designee shall have the power to conduct such investigations as he may reasonably deem necessary to carry out duties as prescribed in this LDC, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land disturbing activities.

3. Access for inspections to be permitted. No person shall refuse entry or access to any authorized representative or agent of the governing authority who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.

(Ord. No. 2024-03, 3-18-2024)

10.06.02 Penalties.

Any person who is convicted of violating a provision of this LDC, or fails to comply therewith or with any of the requirements of this LDC, or who shall erect, construct, alter, demolish or move any building or structure or has erected, constructed, altered, repaired, moved or demolished a building or structure in violation of a detailed statement or drawing submitted and approved under this LDC, shall, upon conviction, be penalized as provided in Chapter 1, Section 1-11 of the Code of Ordinances for the City of Tifton. Each day of continued violation shall be considered a separate offense.

10.06.03 Revocation and suspension of license/denial of permit.

A. In addition to other remedies and/or penalties provided herein, upon recommendation of the Director, the city manager shall conduct a hearing to determine whether or not a licensee's license should be revoked or suspended or the denial of a permit.

B. The City Manager shall have the authority to suspend or revoke the license of a person, to discipline a licensed person or deny the issuance of a permit upon a finding that the licensee or applicant has committed any one of the following acts:

1. Obtaining a license or permit by fraud or misrepresentation or otherwise knowingly giving false or forged evidence;

2. Being convicted or found guilty of or entering a plea of guilty or nolo contendere to a criminal act constituting a felony in any jurisdiction which directly relates to the practice of residential or general contracting or the ability to practice contracting;

3. Performing any act that assists a person or entity in the prohibited unlicensed practice of contracting if the licensee or applicant knows or has reasonable grounds to know that the person or entity is unlicensed;

4. Knowingly combining or conspiring with an unlicensed person by allowing his or her license to be used with the intent to evade the requirements of Title 43, Chapter 41 of the Official Code of Georgia, the City of Tifton Code of Ordinances or this LDC;

5. Failing in any material respect to comply with the provisions of Title 43, Chapter 41 of the Official Code of Georgia or violating any rule, regulation or order of the State Licensing Board for Residential and General Contractors, the City of Tifton Code of Ordinances or this LDC. A conviction or plea of nolo contender to a violation of the City of Tifton Code of Ordinances or this LDC shall be prima facie evidence that the license or permit holder has violated this subsection;

6. Abandoning a construction project in which the contractor who is the individual license holder or a business organization or permit holder for whom the license holder is a qualifying agent is engaged or under contract as a residential or general contractor. A project may be presumed abandoned after 90 days if the contractor has ceased work on or terminated performance on the project without just cause and without proper notification to the owner, including the reason for the termination, cessation, or abandonment;

7. Signing a statement with respect to a project or contract falsely indicating that the work is bonded; knowingly and falsely indicating by written statement issued to the owner that payment has been made for all subcontracted work, labor, and materials and for all materials furnished and installed which statement is reasonably relied upon and actually results in a financial loss to the owner; or falsely indicating that workers' compensation and general liability insurance are provided;

8. Committing fraud or deceit in the practice of contracting, including falsely advertising, representing, or holding himself or herself or an affiliated business organization out as having a valid and current license or permit;

9. Committing gross negligence, repeated or persistent negligence, negligence resulting in a significant danger to life or property or repeated violations of Title 43, Chapter 41 of the Official Code of Georgia or violating any rule, regulation or order of the State Licensing Board for Residential and General Contractors, the City of Tifton Code of Ordinances or this LDC;

10. Proceeding on any job without obtaining applicable permits and inspections;

11. Using or attempting to use a license that has expired or has been suspended or revoked;

12. Knowingly, intentionally or negligently engaging any subcontractor to perform work within the scope of the general or residential construction contract which requires a license under Title 43, Chapter 14 of the Official Code of Georgia who does not possess a current and valid license for such work; or

13. Failing to satisfy within a reasonable time the terms of a final civil judgment obtained against the licensee or permit holder.

C. Upon consideration of the recommendation of the Director and a finding by the city manager that ground or grounds may exist for the suspension or revocation of a license pursuant to the provisions of this chapter or the denial of a permit, then the city manager shall cause a written notice to be issued to the holder of such license or applicant, requiring such holder or applicant to show cause why the holder's license should not be revoked or suspended or permit denied.

The notice shall specify the date, time and place of the hearing which shall not be less than five days nor more than 30 days from the date of service of the notice. The notice may be served by certified mail, statutory overnight delivery or by personal service on the licensee or applicant.

The written notice shall state the alleged violations that may authorize possible suspension or revocation of such license or the denial of the permit.

D. At such hearing the holder of the license or applicant shall have the opportunity to show cause why the license should not be suspended or revoked or permit denied and shall be entitled to the opportunity to present evidence, to present witnesses, to cross examine witnesses presenting evidence in favor of suspension or revocation, to be represented by an attorney, and to have the proceeding transcribed or recorded at the license holder's or applicant's expense.

E. Following the conclusion of such hearing the city manager shall, within 30 days of the date of such hearing, render his decision. The City Manager may take any one or more of the following actions against any license holder or applicant found to have committed any one or more of the acts listed in subsection (B) of this section:

1. Place the license holder or applicant on probation or reprimand the license holder or applicant; or

2. Revoke a license, including the license of a person as an individual as well as that of a qualifying agent of a business organization together with the interest of the business organization qualified thereby in such license; suspend such a license for a stated period of time not exceeding one year; or deny the issuance or renewal of the license;

3. Suspend the ability of the applicant to apply for a permit for a specified period of time;

4. Require financial restitution to a consumer for financial harm directly related to a violation of a provision of this chapter;

5. Require continuing education; or

6. Assess costs associated with the investigation and prosecution.

The city manager shall determine whether the license in issue should be suspended or revoked and, if suspended, then the duration of such suspension. The fee for reinstatement of the license shall be $250.00.

F. Upon the suspension or revocation of such license or denial of a permit then the city manager shall cause the license holder or applicant to be notified in writing within ten days of such decision of the nature of such decision and the grounds therefor and thereupon the license shall immediately become suspended or terminated or permit denied in accordance with such decision. In the event a license is suspended or revoked, the license holder shall immediately upon receipt of such notice cease and desist from all activity authorized under such license in accordance with such decision and physically surrender such license to the finance director.

G. If the city manager determines that grounds do not exist to deny a permit or to suspend or terminate such license, or decides to not deny the issuance of a permit or suspend or terminate such license notwithstanding the existence of grounds therefor, then the city manager shall promptly notify the license holder or applicant thereof.

H. An appeal from the decision of the City Manager shall be taken to the Zoning Board of Appeals as provided in Section 10.05.00 of this Chapter. However, an appeal to the Zoning Board of Appeals shall not stay the decision of the city manager due to the inherent risk to cause imminent peril to life and/or property.

(Ord. No. 2015-05, 3-2-2015; Ord. No. 2018-21, (Exh. A), 10-15-2018)

CHAPTER 11. ARCHITECTURAL DESIGN

Sec. 11.00.00 Architectural design standards generally.

11.00.01 Purpose.

The goals of the architectural standards are to encourage the development of the character areas of the Greater Tift County Comprehensive Plan of the City of Tifton, to preserve the context and character of the City of Tifton, to stimulate neighborhoods and to protect and enhance aesthetic attractions to residents, tourists and others, and thereby promote and stimulate business, to protect and enhance the attractiveness of the city to home buyers, tourists, visitors and shoppers, and thereby support and promote business, commerce, and industry, and provide economic benefit to the city, and to encourage creativity and high quality design and construction. In order to be consistent with local architectural character, building designs are encouraged to reflect local, unique, and traditional designs to help avoid a common generic appearance.

(Ord. No. 2020-07, 6-15-2020)

11.00.02 Applicability.

All development activity within the zoning districts, GB, WLI, NC, MR, and RP, with the exception of single family dwellings, within the City of Tifton, shall be reviewed for compliance with Section 11.01.00, and all subsections therein, of the Land Development Code along with any other portion of the City of Tifton Code of Ordinances.

The design standards for single family residences within the zoning districts R8, R10, R12, R14, R20, MR, RP, and NC shall conform to Section 11.02.00, and all subsections therein, of this Chapter, and any other applicable codes and ordinances.

Development activity means all new construction, modification, addition, alteration, moving, destruction or demolition which would affect the exterior appearance of any structure, building, land, site or other object, including, but not limited to, the following:

A. The demolition of any building, structure or object.

B. The moving or relocation of any building, structure or object.

C. Except for housecleaning, any material work on the exterior appearance of existing buildings by additions, reconstruction, rehabilitation, alteration or any maintenance, or any exterior material changes.

D. Any new construction of a principal building or accessory building or structure subject to view from a street or public way.

E. Changes in existing walls, fences, steps, sidewalks, streets and paving or construction of new walls, fences, steps, sidewalks, streets and paving, if along street rights-of-way, public lanes or public alleys.

(Ord. No. 2020-07, 6-15-2020) Sec. 11.01.00 Commercial design standards.

No mobile building may be used as a permanent principal structure, except provided by law, without a permanent foundation in accordance with all applicable building codes. Care should be taken to ensure any mobile building used in this manner is designed to blend the building with the foundation.

(Ord. No. 2020-07, 6-15-2020)

11.01.01 Ratios and amounts of allowed building materials.

A. With the exception of accent/trim materials, there shall be no more than three (3) primary building materials used. The allowed facade materials shall not apply to entry doors and/or roll-up doors.

B. Buildings over five thousand (5,000) square feet shall be broken up to look like multiple buildings rather than one (1) large box.

C. The amount of permitted material shall be calculated using the gross square footage of wall area per façade that is visible from the street and shall be no more than fifty (50) percent of any one (1) approved material. For example, a building has a front facade with a gross facade area of one thousand two hundred (1,200) square feet with four hundred (400) square feet consisting of windows and doors. Begin with one thousand two hundred (1,200) square feet for required building material calculations. A wall area of one thousand two hundred (1,200) square feet shall have no more than six hundred (600) square feet of stucco on the front facade [e.g. (1,200 × 50% = 600)]. The balance shall be brick or other allowed material. Trim or accent material may account for up to ten (10) percent or one hundred twenty (120) square feet.

D. Blank wall facades. The length of a blank wall (no windows, doors, or offsets in the horizontal plane) shall not exceed fifty (50) feet for building facades which are visible from public streets or parking lots.

E. Pronounced entries. Principal building entrances must be oriented for convenient pedestrian access and provide cover from sun and rain. This may be accomplished by recessing the entry way, placing it within an arcade, under a projecting canopy, or within a mass or tower projecting from the primary façade.

(Ord. No. 2020-07, 6-15-2020)

11.01.02 Building materials.

Types of building materials shall be limited as follows:

A. Preferred materials for exterior walls:

1. Brick.

2. Glass, including glass storefront construction.

3. Stone.

4. Split-face block/concrete masonry units (CMU) may be used if limited to fifty (50) percent of the surface area of the façade.

5. Finished precast concrete limited to fifty (50) percent of exterior wall surfaces.

6. Stucco.

7. Natural wood and/or cement-based siding.

B. Materials prohibited in exterior walls:

1. Unfinished concrete and precast "T's".

2. Unfinished concrete block.

3. Reflective exterior materials shall not be used.

4. Vinyl siding.

5. Steel gates, burglar bars and steel roll-down curtains. Interior security measures are not regulated.

C. Roofs.

1. Materials for pitched roofs shall be limited to architectural grade composition shingles, natural slate, natural terra cotta, copper or factory finished sheet metal.

2. Mansard type roofs are prohibited.

3. Roof penetrations and equipment (except chimneys) shall be screened by parapet, located on the rear slope, or otherwise configured to have as minimal visual impact as practicable from the public street or space.

(Ord. No. 2020-07, 6-15-2020)

11.01.03 Site.

A. When any parcel of land within the corporate limits of the city abutting existing public streets is developed with new construction, or over half of an existing structure is remodeled or renovated, the owner or developer shall install the following:

1. A four-foot-wide sidewalk along the entire length of any road frontage.

2. Provide paved pedestrian connections from public sidewalks to the site interior (may not be located within a required tree island). These pedestrian pathways shall be ADA compliant. Incorporation of pedestrian-friendly features and amenities wherever possible.

Pedestrian paths (e.g., sidewalks, mulched paths) should encourage pedestrian travel throughout an entire project. Pedestrian paths connecting adjacent properties and projects are also strongly encouraged.

3. Sites should include a minimum of any two (2) of the following and shall meet all accessibility codes:

a. One (1) bicycle rack.

b. One (1) bench.

c. One (1) trash receptacle.

B. Off-street loading areas required in Land Development Code shall be located in the rear of buildings and screened from view from adjacent property or streets.

C. Care should be taken to locate stormwater detention or retention areas in the least conspicuous areas of the project site or design them as a water feature. Additional care should be taken to mitigate the visual intrusion of detention or retention areas through the use of heavy landscaping, or concealing these areas underground. Utilization of the retention or detention pond as an attractive site feature is the preferred alternative.

D. Fence Screening required in other portions of this Land Development Code shall be of a permanent material such as wood slates or decorative metals. Materials such as plastics, tarps, PVC, and any other type of temporary materials are not permitted.

(Ord. No. 2020-07, 6-15-2020)

11.01.04 Accessory structures and other features.

A. Accessory structures shall be of the same general style and materials as the principle structure and shall be anchored on a permanent foundation. For mobile buildings, care should be taken to ensure the foundation and accessory structure blend so as to not look like a mobile building.

(Ord. No. 2020-07, 6-15-2020) Sec. 11.02.00 Residential design standards.

The purpose of City of Tifton's Residential Design Standards is to garner a relationship between the various features of a building including texture, proportion, entrance design, doors, windows, trim details, roofs, and materials in addition to the mass and scale, and to provide standards so new buildings are not out of place with their neighborhood.

(Ord. No. 2020-07, 6-15-2020)

11.02.01 Architectural elements.

There are various architectural elements that may be found on a home such as transoms, trim detail, porch, shutters, window mullions/casings, brick detail, cornice detailing, masonry exterior veneer.

Also, a variety of architectural styles are present in the City of Tifton; therefore, no specific style or theme will be required.

The City of Tifton's intent is to establish standards for:

A. New development that incorporates an architectural style or architectural elements consistent with the desired style of development in the surrounding neighborhood, and

B. New development that complements the architectural heritage of the district in which it is located, and

C. Multiple residences within a single development that relate architecturally with each other and the elements of the surrounding neighborhood.

Items that are considered inappropriate are no architectural elements, use of an architectural style that does not complement the fabric of the surrounding neighborhood, and exact replication of each residence.

(Ord. No. 2020-07, 6-15-2020)

11.02.02 Front side of residence.

All new homes shall have the front of the residence facing the street. The front of a residence is the most highly designed side utilizing the following elements:

A. Appropriate:

1. A change in plane, building wall projection or recess.

2. Architectural details.

3. Variety in material and texture.

4. Ornamental doors.

5. Porch.

6. Shutters.

7. Primary entrance emphasized using a gable or stoop.

8. Arches, columns, cornices.

B. Inappropriate:

1. Facades without articulation or other architectural detail to provide visual interest and variety on the facade.

2. Exact replication of each residence.

(Ord. No. 2020-07, 6-15-2020)

11.02.03 Side and Rear of Residences.

A. Appropriate:

1. An overall design of the side or rear façade(s) of the residence should be consistent with that of the primary façade regarding architectural style, materials, finish, color and detail.

2. Architectural embellishments, decking, awnings, and landscaping are used to identify the rear entrance.

B. Inappropriate:

1. A rear or side façade that does not enhance or support the architectural style of the building.

(Ord. No. 2020-07, 6-15-2020)

11.02.04 Materials.

A. Appropriate:

1. Materials compatible with the existing and/or desired context of the surrounding area.

2. The use of high-quality materials which result in residences that will be as maintenance free as possible and long-term components of the urban fabric.

3. Residential building materials consistent with and relating to the architectural style of the surrounding residences.

4. Building materials appropriate to the scale of the residence.

5. Use of the following durable materials: brick, stucco, stone or fiber cement siding.

B. Inappropriate:

1. Exterior walls designed and/or constructed of materials with a limited life expectancy.

2. Materials incompatible with the architectural style of the residence.

3. The use of the following materials on building exteriors:

a. Poorly crafted woodworking and finishing techniques.

b. Mill finish aluminum extrusions for windows and doorways.

c. Unfinished cinder block walls.

(Ord. No. 2020-07, 6-15-2020)

11.02.05 Roofing.

A. Appropriate:

1. Roofing materials and style, which are compatible with existing and/or desired context of the surrounding neighborhood.

B. Inappropriate:

1. Differing roofing materials, especially for additions and porches.

(Ord. No. 2020-07, 6-15-2020)

11.02.06 Other architectural features.

A. Appropriate:

1. Shutters and awnings the shapes, materials, proportions, and design of which are in character with the style of the residence.

2. The inclusion of other architectural details and elements (railings, flower boxes, etc.) as appropriate to the style and function of the residence.

3. Gutters, downspouts, utility boxes, meters, etc. located as visually unobtrusively as possible. Where feasible, they should not be visible from the street.

4. The location of central air conditioning components as far away from the street as possible and/or out of public view.

5. Light fixtures that are designed to respect, enhance and contribute to the architectural style, detailing and elements of a residence.

6. Light fixtures that reinforce the overall composition of the façade with regard to material, size, scale and shape.

(Ord. No. 2020-07, 6-15-2020)

11.02.07 Accessory structures.

A. Accessory structures shall be of the same general style, materials, and roofing as the principle structure and shall be anchored on a permanent foundation. For mobile buildings, care should be taken to ensure the foundation and accessory structure blend so as to not look like a mobile building.

B. Accessory structures that are not required to have a permit to construct or move, one-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided that the floor area is not greater than two hundred (200) square feet, are not subject to the design guidelines of this section. However, setbacks and Historic Preservation Guidelines must be followed.

(Ord. No. 2020-07, 6-15-2020)

Appendix 1. TECHNICAL STANDARDS MANUAL FOR STREETS, DRAINAGE, AND

STORMWATER MANAGEMENT

Sec. 1. Introduction.

The following technical criteria and design standards shall be used as a supplement to the City of Tifton Unified Land Development Code (ULDC) and all other related City of Tifton Ordinances. These may include, but are not limited to: the City of Tifton Subdivision Ordinance, Flood Hazard Reduction Ordinance, Soil Erosion and Sedimentation Ordinance, Utilities Ordinance, Zoning Ordinance, and all other ordinances which regulate the development of all land, public and private, within unincorporated City of Tifton.

The following technical standards shall be used as the minimum design criteria for development or redevelopment within City of Tifton. Development and redevelopment includes all residential, commercial, industrial or institutional development performed within the County's jurisdiction, as described in Sections 1.1 and 1.2 below. Whenever there is a discrepancy between minimum standards or dimensions required under this Technical Guidance Document and those contained within other City of Tifton Ordinances or regulations, the most restrictive or the Staff Development Review Committee's (SDRC) interpretation shall apply.

1.1 Applicability.

This Technical Standards Manual shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt as outlined below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria:

1. New development that involves the creation of 5,000 square feet or more of impervious cover, or that invoices other land development activities of one acre or more.

2. Redevelopment that includes the creation, addition or replacement of 5,000 square feet or more of impervious cover, or that involves other land development activity of one acre or more.

3. Any new development or redevelopment, regardless of size, that is defined by the SDRC to be a hotspot land use. A hotspot is any area located within a drainage basin that is known to have historical drainage issues related to flooding.

4. Land development activities that are smaller than the minimum applicability criteria in items 1 and 2 above if such activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place at different times on different schedules.

1.2 Exemptions.

The following activities are exempt from these standards:

1. Individual single-family or duplex residential lots that are not part of a subdivision or phased development project.

2. Additions or modifications to existing single-family or duplex residential structures.

3. Agricultural or silvicultural land management activities within areas zoned for those activities, unless located in hotspot areas, as defined in Section 1.1 above.

4. Repairs to any storm water management facility or practice deemed necessary by the SDRC or County's Engineer.

2.1 Interpretation of certain terms or words.

Except As specifically defined herein, all words in the Technical Standards Manual have the customary dictionary definitions. For the purpose of these standards, certain words or terms used herein are defined as follows:

Words used in the present tense include the future tense. Words used in the singular include the plural, and words used in the plural include the singular. All pronouns used herein shall be deemed to include the masculine, the feminine and non-personal entities.

Whenever reference is made in the Technical Standards to another section of this manual, all parts of that section are deemed to be included in such reference.

The word "shall" is always mandatory.

The word "may" is permissive.

The word "person" includes a firm, association, organization, partnership, trust, company, or corporation as well as an individual.

2.2 Definitions.

The definitions set forth in the Tifton-City of Tifton Unified Land Development Code (ULDC) are incorporated herein by reference and shall have the same definitions herein as set forth in the ULDC.

Other important definitions include:

Development or Land Development means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving and any other installation of impervious cover.

Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate storm water runoff, or cause additional nonpoint source pollution.

Sec. 3. General provisions.

3.1 Plan review and approval.

The development of land within City of Tifton, Georgia shall require the submittal of plans, plats, or construction drawings as may be required by the ULDC and these Standards to the City of Tifton Staff Development Review Committee (SDRC). Approval of these documents must be received prior to the initiation of any development activities.

3.2 Staff development review committee.

As outlined in the ULDC, the Staff Development Review Committee (SDRC) is responsible for the review and approval of development plans to which this Technical Standards Manual applies. All applications for development within unincorporated City of Tifton must be submitted to the SDRC for review and shall include all required applications, application fees, plats, development and building plans, and reports as necessary. Refer to the ULDC or other applicable ordinances for additional details of submittal requirements.

3.3 Responsibility and liability.

Approval of plans, plats, or construction drawings by City of Tifton shall not imply nor transfer acceptance of responsibility for the application of the principals of engineering, surveying, architecture, landscape architecture, or any other profession, from the professional corporation or individual under whose hand or supervision the plans, plats, or construction drawings were prepared and sealed.

3.4 Design professional.

All development plans submitted to the County for review must conform to the applicable standards and specifications established herein by the County, and must be prepared, signed, and sealed by a Georgia registered design professional. The design professional must be a Professional Engineer, Registered Architect, Registered Land Surveyor, Registered Landscape Architect or other qualified design professional licensed by the State of Georgia.

3.5 As-builts for subdivisions.

Before final plat approval or the issuance of a building permit, the Owner of a land development must submit as-built drawings to the County for review and final approval. The owner shall submit one full size (size D - 24"x36") or larger set of drawings and a set of plans in electronic format. As-builts shall include all utilities, roads, storm drainage and detention pond structures, or other information as required by the SDRC. As-builts shall be certified by a registered design professional stating that the all improvements have been built in accordance with the plans and specifications.

Sec. 4. Requirements.

4.1 Required improvements.

Except as otherwise provided by the ULDC, a Developer shall provide, install and pay for the following improvements to serve their development:

A. Water supply and distribution

B. Sanitary sewage collection

C. Sewage disposal systems

D. Road grading and surfacing

E. Storm drainage

F. Road name signs

G. Electricity

H. Natural gas (optional)

I. Traffic control devices Utilities shall be located where possible in accordance with the proposed utility location detail.

4.2 Easements.

Easements having a minimum width of twenty (20) feet and located along the side or rear lot line shall be provided as required for utility lines, underground mains, cables and drainage.

Maintenance easements shall be provided when deemed necessary by the SDRC. When a subdivision or land development is traversed by a watercourse, drainage way, channel, or intermittent stream, a stormwater or drainage easement of at least twenty-five (25) feet shall be provided from the top edge of each bank. Such easements may be used as a location for Pedestrian Ways, bikeways and other amenities which do not conflict with the basic maintenance function of such easements.

4.3 Permits.

As outlined in the ULDC, a developer may be required to obtain the following permits from the County for development within City of Tifton:

• Land Disturbance Activity Permit

• Subdivision Permit

• Building Permit

• Driveway Permit

• Water System Extension Permit

• Sanitary Sewer Extension Permit

• Applicable Zoning Permits

• Applicable Variances The developer shall consult the SDRC on any other County permits that may be required which are not listed herein.

Nothing in these Technical Standards shall impose any obligation on City of Tifton to obtain or assist in obtaining permits, approvals, and/or clearances from other local, state or Federal agencies having jurisdiction over elements of a project. It is solely the developer's responsibility to obtain all such required permits, approvals, and/or clearances. The developer shall furnish the County with copies of all such permits, approvals and/or clearances before authorization to proceed with development is requested.

Sec. 5. Street design standards and specifications.

5.1 Design standards.

All roads and bridges constructed in City of Tifton shall be designed in accordance with the latest editions of the American Association of State Highway and Transportation Officials (AASHTO) design guides and specifications as well as Georgia Department of Transportation (GDOT) Standards except as provided in these technical standards.

5.2 Street classification.

Six (6) functional classifications are identified by the City of Tifton Subdivision Ordinance and the Tifton-City of Tifton Thoroughfare Plan. Any street not indicated on the thoroughfare plan will be classified by the SDRC. The six classification categories are as follows:

A. Major Arterial Street: A street which is designated as such on the Thoroughfare Plan and which is intended to provide, within an identified planning period, swift, safe and convenient traffic movement within and through the county. A major thoroughfare.

B. Secondary Arterial Street: A street which is designated as such on the Thoroughfare Plan and which is intended to provide easy and convenient traffic movement within the county.

C. Collector Street: A street which is designated as such on the Thoroughfare Plan and which is intended to collect traffic from local streets and direct it safely to secondary major streets.

D. Dead-end Streets: A street having only one end open for access to another street, and the other end being abruptly terminated with no turnaround (excludes cul-de-sacs). Future development of dead-end streets is not permitted within City of Tifton.

E. Marginal Access Street: A street generally parallel to and adjacent to an arterial street providing access to abutting properties and protection from through traffic.

F. Local Street: A street used for local circulation in areas providing access to abutting property. Local streets serving residential areas shall be designed to discourage use by through traffic.

5.3 Minimum right-of-way widths and dedication requirements.

The Thoroughfare Plan illustrates the functional classification of streets and the general location of future arterial and collector streets in the County. The right-of-way dedication requirements expressed below shall correspond to the functional classifications illustrated on the Thoroughfare Plan. Should a proposed subdivision adjoin an existing unimproved roadway, the developer shall dedicate additional right-of-way to meet the minimum right-of-way requirement for the applicable functional classification of the adjoining street.

Table 5.3.a. Minimum right-of-way and pavement widths Functional Classification Minimum Pavement Width (ft) Minimum Right-of-Way (ft) Major Arterial 48 120 Secondary Arterial 48 100 Collector 24 80 Marginal Access 24 70 Local* - Ditch 22 60 Local* - Curb and Gutter 22 40 *local roadways are also known as rural minor roadways.

If a median is included as part of the site plan, minimum median width for a divided street shall be at least ten (10) feet measured from back of curb to back of curb.

The right-of-way width shall be sufficient to allow the required minimum pavement width, curb and gutter or ditch, utilities and a minimum ten feet separation of water mains from sanitary and storm sewers.

(Ord. No. 2019-11, 3-18-2019)

5.4 Roadway sectional composition.

The applicable standard shall be based on functional classification and the predominant zoning through which a street passes. See latest edition of the Georgia Department of Transportation (GDOT) Standard Specifications for the Construction of Roads and Bridges for specifications of referenced asphaltic concrete types. For all street classifications, before asphalt pavement is placed, a bituminous prime shall be applied to the base material in accordance with GDOT specifications.

Application rate shall be a minimum of 0.15 gallons and a maximum of 0.20 gallons per square yard.

For typical roadway cross sections with asphalt pavements or concrete pavements, see the attached typical details.

5.4.1 Local Streets.

• 1 - 12.5 mm Asphalt SuperPave (165 lbs/sq. yd.) top course or 1 - 9.5 mm Asphalt SuperPave (165 lbs/sq. yd.) top course

• 6 - Graded aggregate base (GAB) or 6 - Soil cement (Soil cement shall be mixed in place) Base shall be compacted to 98% maximum dry density per standard proctor test ASTM D698.

5.4.2 Collector Streets (for residential, office, institutional, and commercial developments).

Asphalt Pavement:

• 1 - 12.5 mm Asphalt SuperPave (165 lbs/sq. yd.) (top course)

• 2 - 19 mm Asphalt SuperPave (220 lb/sq. yd.) (binder)

• 6 - Graded aggregate base* (GAB) or 6 - Soil cement** (Soil cement shall be mixed in place) Base shall be compacted to 98% maximum dry density per standard proctor test ASTM D698.

* Graded aggregate base may include crushed concrete, limerock or granite.

**For soil cement, a mix design by a licensed Geotechnical Engineer in the state of Georgia must be submitted to the SDRC's Engineer for approval.

Concrete Pavement:

• 7 - Concrete pavement per specifications detailed in Section 5.5.5.

• 4 - Graded aggregate base course compacted to 98% maximum dry density per standard proctor test ASTM D698.

5.4.3 Arterial Roads (including industrial roads).

Asphalt Pavement:

• 1 - 12.5 mm Asphalt SuperPave (165 lbs/sq. yd.) (top course)

• 2 - 19 mm Asphalt SuperPave (220 lb/sq. yd.) (binder)

• 3 - Asphaltic base 25mm Asphalt Superpave

• 8 - Graded aggregate base* (GAB) or 8 - Soil cement** (Soil cement shall be mixed in place) Base shall be compacted to 98% maximum dry density per standard proctor test ASTM D698.

* Graded aggregate base may include crushed concrete, limerock or granite.

**For soil cement, a mix design by a licensed Geotechnical Engineer in the state of Georgia must be submitted to the SDRC's Engineer for approval.

Concrete Pavement:

• 8 - Concrete pavement per specifications detailed in Section 5.5.5

• 4 - Graded aggregate base course compacted to 98% maximum dry density per standard proctor test ASTM D698.

5.4.4 Commercial Development.

A. Heavy Duty Asphalt Pavement:

• 2 - 12.5 mm Asphalt SuperPave (220 lbs/sq. yd.) (top course)

• 3 - 19 mm Asphalt SuperPave (330 lbs/sq. yd.) (binder)

• 8 - Graded aggregate base* (GAB) or 8 - Soil Cement** (Soil cement shall be mixed in place) Base shall be compacted to 98% maximum dry density per standard proctor test ASTM D698.

* Graded aggregate base may include crushed concrete, limerock or granite.

**For soil cement, a mix design by a licensed Geotechnical Engineer in the state of Georgia must be submitted to the SDRC's Engineer for approval.

Concrete Pavement:

• 8" - Concrete pavement per specifications detailed in Section 5.5.5.

• 4" - Graded aggregate base course compacted to 98% maximum dry density per standard proctor test ASTM D698.

B. Light Duty Asphalt Pavement:

• 2" - 12.5 mm Asphalt SuperPave (220 lbs/sq. yd.) (top course)

• 8" - Graded aggregate base* (GAB) or 8" - Soil Cement** (Soil cement shall be mixed in place) Base shall be compacted to 98% maximum dry density per standard proctor test ASTM D698.

* Graded aggregate base may include crushed concrete, limerock or granite.

**For soil cement, a mix design by a licensed Geotechnical Engineer in the state of Georgia must be submitted to the SDRC's Engineer for approval.

Concrete Pavement:

• 7" - Concrete pavement per specifications detailed in section 5.5.5.

• 4" - Graded aggregate base course compacted to 98% maximum dry density per standard proctor test ASTM D698.

5.5 Subgrade, base and pavement material and construction specifications.

5.5.1 Testing. All tests and data described below shall be conducted or provided and paid for by the paving contractor of developer. Test results shall be submitted to the SDRC's Engineer for review and/or approval. Testing shall be performed by a licensed Geotechnical Engineer (or his/her authorized representative working under his/her direct supervision) in the State of Georgia who has been prequalified by the GDOT for Area Classes 6.04a or 6.04b and must be approved by the SDRC. A list of GDOT prequalified consultants is available on the GDOT's website.

5.5.2 Subgrade. All fill materials proposed for use in roadway construction that could affect the performance of pavements, curbs or utilities should meet the given requirements for structural fill.

Structural fill material should be free of organics, deleterious material, debris and rocks greater than six (6) inches. Fill soils should have a plasticity index less than 20, a liquid limit less than 40 and a Standard Proctor (ASTM D698) dry density of at least 100 pcf.

Embankments shall be constructed in eight to twelve inch lifts. Individual lifts shall be compacted using sheep's foot rollers, vibratory compactors, pneumatic tire rollers or other equipment capable of obtaining the required compaction. The surface of the completed subgrade shall be bladed to a smooth and uniform texture. The centerline profiles shall conform to the established elevations with an acceptable tolerance of +/- ½ inch. The acceptable tolerance under a template conforming to the designed cross-section shall be +/- ¼ inch.

Soil density tests shall be performed on roadway fills four (4) feet in height and greater. The compaction tests will be performed to within twelve (12) inches of the final grade of the subgrade.

For the fills requiring compaction tests they shall be compacted to ninety-eight (98) percent of maximum dry density per the standard proctor test (ASTM D698, AASHTO T99). One set of compaction tests shall be performed on every other twelve (12) inch lift at one hundred-foot intervals along the roadway fill section. A licensed Geotechnical Engineer in the state of Georgia (or his/her authorized representative working under his/her direct supervision) shall perform the tests. Where the subgrade compaction is determined to be less than the required degree, the developer shall remove, replace, and/or recompact the section in question, or use other means approved by the Engineering Department, until the density is determined to meet the required limit. Copies of all test results shall be submitted to the SDRC.

The compaction of the top twelve (12) inches of the subgrade shall be inspected by proof rolling.

The subgrade shall have sufficient stability to support any and all types of construction equipment used to construct roadway without "pumping" (vertical and/or horizontal displacement of the subgrade). The "proof-roll" compaction inspection of the subgrade shall be by a vehicle with a minimum gross vehicle weight of 24,000 pounds, fully loaded with a minimum of 16 tons (32,000 lbs) of graded aggregate (54,000 lbs total weight minimum). The weight of the proof-roll inspection vehicle and the accompanying load shall be shown on a printed "load-out" ticket from a reputable quarry. Representatives of the SDRC shall be present and approve all subgrades. The contractor, at the contractor's expense, shall correct any areas not passing the proof-roll inspection.

The contractor shall be responsible for contacting the SDRC at least three (3) days prior to any proof-roll to schedule an on-site inspection of the proof-roll. Failure to perform all testing and arrange the on-site inspection may lead to a denial of acceptance of the road by the County. It may also lead to additional testing requirements at the contractor's expense.

5.5.3 Graded Aggregate Base (GAB). GAB may include limerock, crushed concrete base or granite.

GAB materials should be tested for GDOT compliance by a licensed Geotechnical Engineer (or their authorized representative working under their direct supervision) in the State of Georgia who shall be approved by the SDRC.

A. Placement of the base material shall be inspected and approved by the SDRC as specified below. The paving contractor/developer is responsible for requesting such inspections at least three (3) days in advance, and placement of base shall not be done until such inspections have been scheduled.

B. The compacted base course (graded aggregate or crusher run) shall have sufficient stability to support any and all types of construction equipment used to construct the roadway without "pumping" (vertical and/or horizontal displacement of base due to any number of factors including too much water, not enough compactive effort, etc.), regardless of compaction. The "proof-roll" compaction inspection of the graded aggregate base shall be by a vehicle with a minimum gross vehicle weight of 24,000 lbs, fully loaded with a minimum of 16 tons (32,000 lbs) of graded aggregate (54,000 lbs total weight minimum). The weight of the proof-roll inspection vehicle and the accompanying load shall be shown on a printed "load-out" ticket from a reputable quarry. A licensed Geotechnical Engineer in the State of Georgia (or their authorized representative working under their direct supervision) must certify all proof-roll compaction inspections. A representative of the SDRC shall be present for all proof-roll compaction tests of all graded aggregate bases in the unincorporated areas of City of Tifton. The contractor, at the contractor's expense, shall correct any areas not passing the proof-roll inspection.

C. The graded aggregate base thickness, as required in this Technical Standards Manual, shall not be deficient in any area by more than ½ total inches. Any deficient area shall be corrected by adding additional quantities of the same materials and rebuilt to the desired thickness. The contractor, at contractor's expense, and during the proof-roll compaction inspection process, shall do the measurement. Three holes shall be dug every 1500 feet or one hole per each 500 feet, to confirm the required thickness. At least one hole shall be dug for any areas less than the above footage. A representative of SDRC shall determine the hole locations and confirm the depth of graded aggregate base.

5.5.4 Soil Cement. A mix design for soil cement must be designed by a licensed Geotechnical Engineer in the state of Georgia and must be submitted to the Engineering Department for approval. Soil cement should be a minimum of 6" thick. The mix design should include forming pills of the proposed subgrade soils with different amounts of cement to determine an appropriate cement content to be used and to determine if the proposed soil materials are suitable or require blending/replacement.

In-place soil-cement shall be cored, and the cores shall be measured for thickness and compression tested to determine if the required 3000 psi strength is obtained at 7 days. A minimum of 1 core per 500 feet of roadway in alternating lanes should be taken with no less than two (2) cores for each section of roadway. Individual core thicknesses should be no less than ½ inch below the required thickness with an overall average thickness at or above the specified value. Corrective work for cores below the thickness requirements or compressive strength will be required in accordance with GDOT Standard Specifications.

5.5.5 Concrete Pavement.

A. Concrete pavement compressive strength shall be four thousand (4,000) psi at twenty-eight (28) days. Concrete test cylinders will be taken from each batch poured for every seven hundred fifty

(750) feet of street-paving construction. These shall be tested according to ASTM C31-69 and C39-72 to ascertain the twenty-eight day compressive strength.

B. A concrete slump test (ASTM C143-74) will be conducted at the same time that the cylinders are made. The concrete shall not be accepted which has a slump value greater than 2 ½ inches.

C. Core samples shall be made at intervals of not less than five hundred (500) feet and not more than one thousand (1,000) feet of paving. A core sample report must be approved by the SDRC prior to final plat approval.

5.5.6 Asphalt Pavement.

A. Placement of asphalt shall be inspected and approved by the SDRC as specified below. The paving contractor/developer is responsible for requesting such inspections at least three (3) days in advance, and placement of asphalt shall not be done until such inspections have been scheduled.

B. Core samples shall be taken of the asphalt at intervals of not less than three hundred (300) feet and not more than five hundred (500) feet. Samples shall be taken from the center of the travel lane and samples shall alternate between travel lanes. The thickness of the asphalt shall not be less than ¼" from the plan dimensions. A core sample report must be approved by the SDRC prior to final plat approval.

5.5.7 Subdrains (Cross drains). Subdrains may be required at the SDRC's discretion depending on roadway and groundwater conditions on site. Refer to section 6.17 for technical criteria and design standards concerning subdrains.

5.6 Design speed and grade.

Table 5.6.a. Design Speed and Grade Street Classification Minimum Grade Maximum Grade Maximum Design Speed All Curb and Gutter Streets 0.5% 45 MPH Arterial 0.2% 8% 55 MPH Collector 0.2% 10% 45 MPH Local 0.2% 10% 35 MPH

5.7 Curb and gutter.

Concrete curbs and gutters shall be constructed with Portland Cement Concrete having a twenty-eight

(28) day breaking strength of three thousand (3,000) psi. Slip form or machine curb and gutter shall have expansion material minimum of one-half (1/2") inch thick with a maximum spacing of one hundred (100') feet and abut a solid structure where one (1) day's pour abuts a previous day's pour.

Construction joins 1/4 - 1/3 the depth of the gutter shall be sawed or tooled at a maximum spacing of ten (10) linear feet. Concrete curb and gutter shall meet GDOT Standard 9032B, modified to eighteen inches (18") for commercial/parking lots and twenty-four inches (24") for all local and collector roadways designed with curb and gutter. When a standard curb is used, it shall be a minimum of six inches (6") (GDOT Std. 9032B Type 2 curb) in height. Curb cuts shall also be in accordance with GDOT Std. 9032B, Details of Recessed Curb. Typical details for curb and gutter, as well as curb cuts, are illustrated in the attached detail drawings. For major arterial roadways, the design must meet all applicable GDOT standards. Design and spacing requirements for curb and gutter are included in section 6.7.1.

5.8 Sight distance and alignment.

All driveways shall be located and streets aligned so as to provide at least the horizontal and vertical sight distances as listed below. All sight distances shall be determined by the methods found in the latest edition of A Policy on Geometric Design of Highways and Streets (AASHTO).

5.8.1 Horizontal Site Distance. Horizontal sight distance refers to the ability to detect objects in the roadway while negotiating a horizontal curve. The distance is measured from a point at which the height of the driver's eye is 3.50 feet above the roadway to a stationary object having a height of six

(6) inches above the roadway.

Table 5.8.a. Minimum Horizontal Site Distance Street Classification Minimum Horizontal Site Distance Arterial 500' Collector 350' Local 200'

5.8.2 Vertical Site Distance. Vertical site distance refers to the ability to detect an object in the roadway while negotiating the crest of a hill. The distance is measured the same as for horizontal curves.

Table 5.8.b. Minimum Vertical Site Distance Design Speed Minimum Vertical Site Distance (ft)

20 MPH 150

25 MPH 175

30 MPH 200

35 MPH 250

40 MPH 300

45 MPH 400

50 MPH 450

55 MPH 500

5.8.3 Minimum Horizontal Radii of Centerline Curvature.

Table 5.8.c. Minimum Horizontal Radii Street Classification Radii (ft) Arterial As recommended by AASHTO or 350' Collector 120 Local 120

5.8.4 Tangents. Between reverse curves there shall be not less than the following minimum tangents.

Table 5.8.d. Minimum Tangents Street Classification Minimum Tangent (ft) Arterial As recommended by AASHTO or 200' Collector 100 Local 100

5.8.5 Super Elevation. The design of arterial and collector roadways may require the super-elevation of the travel surface on horizontal curves, as determined by design speed, in accordance with AASHTO Standards. The design and horizontal alignment for local streets serving residential areas should avoid the use of super-elevation where possible, as required by design speed. In all instances, the maximum super-elevation rates shall be in accordance with AASHTO and GDOT Standards. Under no circumstance is a curved street of any classification to be reverse super-elevated.

5.8.6 Intersections. In approaches to intersections, there shall be a leveling of the street at a grade not exceeding two (2) percent for a distance of not less than fifty (50) feet from the nearest right-of-way of the intersecting street (refer to typical details).

5.9 Minimum cul-de-sac specifications.

A. Permanent cul-de-sacs shall be limited in length so that each cul-de-sac serves as street access for no more than twenty-five (25) lots.

B. Cul-de-sacs shall terminate in a circular turnaround having a right-of-way of not less than 100 feet.

C. Paving within the turnaround shall have an outside diameter of not less than eighty (80) feet.

D. Islands are prohibited in cul-de-sacs.

E. For typical cul-de-sac layout, refer to attached details.

5.10 Acceleration and deceleration lanes.

Table 5.10.a. Minimum Deceleration Lane Design Street Classification Minimum Deceleration Lane Length Arterial 200' and 100' taper Collector 150' and 75' taper Local 100' and 50' taper For any driveway or street located on a major thoroughfare, except driveways serving one (1) to five (5) single-family residences, a deceleration lane shall be provided. The minimum length for deceleration lanes at all new street locations shall be as shown above except that either the SDRC or the GDOT district traffic and safety engineer, as applicable, may specify longer or shorter deceleration lanes based on grade, distance from an intersection, design speed, etc.

The Georgia DOT will determine the need for and design of acceleration lanes on state routes.

The SDRC shall determine the need for and design specifications for acceleration lanes along county streets.

Typical sections for the addition of deceleration and widening sections are included in the attached typical detail drawings.

5.11 Turn lanes.

Turn lanes, left and right, shall be designed in accordance with the Manual for Uniform Traffic Control Devices (MUTCD). The developer/contractor shall be responsible for the installation of turn lanes and intersection improvements where a new roadway meets an existing paved roadway within the County.

The developer/contractor shall resurface all lanes within the improvement area when turn lanes are required.

5.12 Driveways.

5.12.1 Driveway Dimensions. Residential driveways shall have a maximum width of twenty-four

(24) feet measured at the right-of-way line from back of curb to back of curb (or edge of pavement if there is no curb).

Commercial, industrial, manufactured home park and multi-family development driveways shall have a maximum width of forty (40) feet measured at the right- of-way line (back of curb to back of curb or from edge of pavement if there is no curb). For those businesses with frequent or heavy freight traffic, the SDRC will approve driveway widths and radii in excess of forty feet on a case by case basis.

Two way drives will be a minimum of twenty-four feet in width measured at the right-of-way line from back of curb to back of curb.

5.12.2 Typical Driveway Details. For typical driveway details, refer to the attached typical details.

5.13 Street resurfacing (if required).

A. All work shall be in conformance with the Georgia Department of Transportation Standard Specifications for Construction of Roads and Bridges, latest edition.

B. All weak areas shall be removed and repaired with proper full depth patches. All debris (soil, GAB, and asphalt) shall be removed and disposed of properly.

C. The surface to be overlaid shall be thoroughly cleaned and all debris removed.

D. A track coat of asphalt (AC-10 or AC-20) shall be applied to the entire surface to be overlaid.

E. The overlay thickness shall be 1 - 1 ½" inches of 9.5 mm SuperPave asphalt concrete. For lifts of 1 ½" inches or greater, 12.5 mm SuperPave asphalt concrete shall be used. The maximum lift thickness shall be 2" inches.

F. Prior to placing the overlay, a leveling course of 4.75 mm SuperPave asphalt concrete shall be used where necessary or as determined by the SDRC or Road Department.

G. The County will evaluate the existing pavement conditions and determine the overlay thickness using the methods in the Asphalt Institute's manual, Asphalt Overlays for Highway and Street Rehabilitation. For all streets other than residential, actual traffic counts will be obtained and coring, or other acceptable methods of obtaining the actual existing pavement thickness, will be utilized. In no case shall an overlay thickness be less than one (1) inch.

H. For typical street resurfacing and replacement and saw cuts, refer to the attached typical details.

5.14 Street and traffic signs.

Developers shall be responsible for placing street signs and traffic signs in accordance with these regulations. Signs and posts shall be installed in accordance with the Manual for Uniform Traffic Control Devices (MUTCD) and must meet clearance, height above pavement, and all other applicable regulations. All required signs shall be in place prior to the occupancy of any structure and must be inspected and approved by the SDRC prior to the acceptance of a roadway by the County.

Sign posts shall be square tube with break-away support. Signs shall be Telespar (or approved equal) and meet the following criteria:

• Square posts

• 7/16" pre-punched holes on 1" centers

• 14 Gauge

• Steel with Pre-galv Plus coating

• Corner bolted

• Anchor a minimum of 36" 12-gauge tubing (1" - 2" left exposed above the surface)

• Shall have the following dimensions (or as approved by SDRC):

Table 4.14.a. Street Post Dimensions Tube Size (in) Wall Thickness U.S. Std. Gauge & Inch Area (in2) Wt/Ft (lbs) l (in4) s (in3) r (in) Post 2 × 2 14 (.083) .474 1.99 .296 .296 .790 Anchor 2.25 × 2.25 12 (.105) .695 2.77 .561 .499 .898

5.14.1 Street Name Signs. Major street name signs shall be installed above the intersecting local street name sign. All street name signs shall be mounted parallel or nearly parallel to the street and shall be visible on both sides. A street name sign shall be installed for every street at an intersection.

Standard street name signs shall be extruded nine (9) inch blanks with six (6) inch letters.

County road signs shall be white on green, and private road signs shall be white on blue.

5.14.2 Traffic Signs. Traffic control devices to include signs, signals, street markings, etc., shall be installed by the developer. The type and location of traffic control devices shall be determined by the SDRC's Engineer based upon the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD), latest edition.

Stop signs shall be installed at every intersection. Stop signs shall be 30-inch unless at an intersection of 45 mph road or greater. In this case, a 36-inch stop sign is required. Speed limit signs shall be 24-inch by 30-inch. All other signs shall be in accordance with the MUTCD.

5.15 Striping and pavement marking.

The contractor shall be responsible for the installation of pavement markings to include, at a minimum, centerline striping, edge of pavement striping, stop bars, raised pavement markers (turtles), words, directional arrows and chevrons (hatches). Additional pavement markings may be required at the SDRC Engineer's discretion. All pavement markings except centerline striping and edge of pavement striping shall be thermoplastic. Stop bars shall be a minimum of twenty-four (24) inches, and words, chevrons, and directional arrow dimensions shall be in accordance with GDOT Standards (see GDOT details t01 through t19).

5.16 Utility locations.

In order to promote uniformity in installation and more effective and less damaging maintenance, a uniform system for locating utilities is hereby established. The locations are noted in the typical details. Applicable utilities and their locations shall be noted on subdivision construction plans and as-built drawings.

Detection tape for utilities may be required at the discretion of the SDRC. Detection tape shall be composed of a solid aluminum foil encased in a protective plastic jacket. Tapes shall be color coded in accordance with APWA color codes with the following legends: Water Systems, Safety Precaution Blue, "Caution: Water Line Buried Below". Colors may be solid or striped. Tape shall be permanently printed with no surface printing allowed. Tape width shall be minimum 2-inches when buried less than 10-inches below the surface. Tape width shall be minimum 3-inches when buried greater than 10-inches and less than 20-inches. Detection tape shall be equal to Lineguard Type III Detectable or Allen Systems Detectatape Wire. In addition, prior to backfill of trench the Contractor shall furnish and install 14 gauge coated copper wire. The wire shall be installed along the pipe during the backfill operation. Wire shall be brought up at each hydrant.

5.17 Sidewalks (if applicable).

A. Sidewalks are required for all developments on parcels which connect to an existing sidewalk system (a neighboring parcel has a pre-existing sidewalk). In this case, the sidewalk will be carried across/through the development, aligning to the existing sidewalk system.

B. Sidewalks shall be five (5) feet wide and shall be designed in accordance to all applicable American Disabilities Act (ADA) standards.

[C]. Sidewalks shall be constructed only on individual lots that have been permitted for construction.

[D]. For typical sidewalk cross-sections, refer to the attached typical details.

5.18 Landscape islands/traffic dividers (if applicable).

In order to promote uniformity in the configuration and construction of landscape islands/traffic dividers ("islands/dividers") within the right-of-way at entrances to residential, commercial, industrial or institutional developments, a uniform standard is hereby established.

A. Where an island/divider is planned, the right-of-way shall be a minimum eighty (80) feet in width at the connecting public road. The right-of-way shall remain eighty (80) feet in width for a distance of 150 feet at which point the right-of-way will taper to the appropriate right-of-way width as required in Section 5.3.

B. The island/divider shall be delineated with curb and gutter regardless of whether curb and gutter is required in the remainder of the development.

C. The island/divider shall be at least 100 feet long and shall not be more than sixteen (16) feet in width from the back of curb to back of curb with a sixteen (16) foot travel lane on each side of the island/divider.

D. No signs or structures shall be allowed in the island/divider. No trees or plants shall be placed in the island/divider that will block a person's view of oncoming traffic travelling within the connecting roadway. Any object encroaching into the right-of- way or obstructing the view of oncoming traffic shall be removed.

Sec. 6. Stormwater design standards and specifications.

6.1 General requirements.

An adequate drainage system, separate and independent of any sanitary sewer system and including any necessary ditches, pipes, culverts, intersectional drains, drop inlets, bridges, etc., shall be provided for the proper drainage of all surface water for all applicable land developments. Sizing and location of all drainage structures shall be the responsibility of a qualified Georgia registered design professional. The County shall require the use of on-site control methods such as retention or detention to mitigate the stormwater and drainage impacts of the proposed land developments. The SDRC shall not approve any preliminary plat of a subdivision that does not make adequate provisions for storm and flood water runoff channels or basins as determined by the SDRC's Engineer.

No building permit shall be issued for any building within a subdivision or no development permit shall be issued for the development of land, if an adequate system of drainage and stormwater management is not present throughout the land to be developed.

For development or redevelopment projects, on-site control methods, such as retention or detention, shall be provided for the ENTIRE site when,

A. The amount of impervious surface is 5,000 square feet or more, regardless of whether the impervious surface is new or being replaced.

B. When the land disturbance activity associated with the proposed development/redevelopment is 1 acre or more.

6.2 Method of design and capacity.

Storm sewers, where required, shall be designed in accordance with the Georgia Stormwater Management Manual (GSMM), latest edition, and the County Stormwater Design Standards as outlined below. Copies of all design computations shall be submitted along with required plans.

Drainage improvements shall consider and accommodate, as necessary, potential runoff from the entire upstream drainage area as well as from within the site. The drainage improvements shall be designed to prevent effects on the upstream drainage system and increases in runoff to downstream systems for each of the design storms to the extent practicable.

6.3 Runoff computation.

The designer should consult Table 2.1.1-2 in the GSMM when deciding which hydrologic method to utilize. The following general applications should be applied:

A. For all drainage areas less than 25 acres, the Rational Method shall be used.

B. For all drainage areas greater than 25 acres, the SCS method or similar Unit Hydrograph Method shall be used. Computer methods with routing capability may also be used.

6.4 Design frequency.

A. The 100-year average return frequency storm shall be used for the design of all onsite storm water conveyance systems.

B. The 100-year average return frequency storm shall be used for all offsite drainage which enters the site and/or is conveyed through the site by the storm system.

C. Detention systems shall be designed to meet standards 3, 4 and 5 of the GSMM.

6.5 Rainfall estimation.

A. For the Rational method, Georgia Soil Conservation rainfall intensities shall be used.

B. For the SCS method, the 24-hour rainfall depths as shown in the TR-55 Manual shall be used.

6.6 Runoff coefficients/Curve numbers.

A. For the Rational method, standard runoff coefficients shall be used.

B. For the SCS method, the curve numbers as shown in the TR-55 Manual shall be used.

6.7 Pre-development site conditions.

A. For redevelopment sites, all existing impervious areas shall be treated as unimproved (i.e.

forested) in the pre-development analysis.

For new development sites, existing conditions shall be defined as the conditions of the site at the time of application for a Land Disturbance Permit.

6.8 Inlet design.

6.8.1 Spread Limits.

A. The maximum allowable spread in the roadway shall be based on the 2-year design storm and shall be limited to no more than six (6) feet of spread in the roadway gutter. Inlets shall be located along the roadway at sufficient intervals to intercept flows before they exceed the maximum spread limit. In no instance shall inlet spacing exceed three hundred (300) feet.

B. The formulas for gutter flow shall be used to determine the spread in the roadway.

C. At sag locations, the roadway shall have a minimum of 0.5% longitudinal slope within fifty

(50) feet of the level point in the sag. For large flows, flanking inlets may be required on either side of the low point to prevent exceeding the spread limit.

6.8.2 Capture Efficiency.

A. For the 10-year design storm, the capture efficiency for inlets on grade shall be no less than 90%, and the capture efficiency for inlets at sump locations shall be 100%.

B. At sump locations, the capacity of the inlet shall be determined using the weir equation unless precast boxes with special inlets are used, which may be designed with the orifice equation. The minimum curb transition/apron length on either side of the basin shall be six (6) feet for inlets open on three (3) sides.

C. Inlets shall not be allowed in the radius section at intersections, except where flows are very small, road grades are very flat, or the entire intersection is in a sag condition.

D. Within a piped drainage system, an adequate number of manholes or inlets shall be constructed to provide for cleaning and maintenance of the stormwater system. In no instance shall spacing exceed three hundred (300) feet between structures.

6.8.3 Weir Opening Height. For inlets, the minimum allowable weir opening height shall be four

(4) inches and the maximum allowable weir opening height shall be eight (8) inches. Trash racks shall be used as necessary or as required by the SDRC.

6.9 Pipe design.

A. The Manning equation shall be used for pipe design, assuming pipe flowing full.

B. The orifice equation shall be used to check the required headwater depths at all catch basins, junction boxes or pipe inlets along the system to predict and prevent surcharge conditions.

C. Alternatively, a computer model using the Standard Step method or other approved energybased method may be used to compute the hydraulic profile.

D. For complex systems, the SDRC may require computation of the hydraulic profile.

E. Minimum pipe size shall be 15" in diameter when using curb and gutter. A minimum of 18" diameter pipes are required for all ditch sections (i.e. driveway pipes), except for sock drain systems.

F. The maximum slope for all drainage pipe shall be 10%. In cases where steep slopes are inevitable, the design professional should use concrete anchors or other factory recommended anchor systems. Details shall be provided on the construction plans.

G. In the case, due to cover restrictions, dual pipes (double barrel) must be used, headwalls will be required. No more than two (2) pipes will be allowed at a crossing if a larger pipe or structure cannot be installed due to cover restrictions.

6.10 Detention ponds.

Detention ponds, either dry or with permanent pool, shall be designed in accordance with the GSMM to accommodate Minimum Standards 3, 4, and 5 of the GSMM, including Stream Channel Protection for the 1-year, 24-hr storm event, Overbank Flood Protection for the 2- through 25-year storm events and Extreme Flood Protection for the 100-year storm event. Ponds shall be designed to reduce the post-development peak flows of the 1- through 100-year storm events to the pre-development rates.

An emergency spill way shall be provided to accommodate a storm event exceeding the 100-year storm.

Inlet pipes shall be placed so that the invert of the pipe is above the permanent pool elevation.

Riprap, or other energy dissipation methods, should be utilized at the end of an outlet to prevent scouring and erosion.

Outlet structures shall be designed to prevent clogging in accordance with the GSMM.

An adequate maintenance access easement of twenty (20) feet must be provided around the entire perimeter of a detention pond. The access easement shall be sloped toward the pond with a slope no less than 1% and no greater than 5%.

The maximum depth of a pond shall be 10 feet.

(Ord. No. 2020-06, 6-15-2020)

6.11 Outfall structure design.

Rip-rap shall be installed around the top and sides of all outfall pipes. On steep slopes, the last joint of pipe on a plain end outlet shall be a full eight (8) foot joint. A precast headwall or an approved reinforced concrete headwall is required for all pipe outfalls thirty-six (36") inches and over. Where a drainage outfall is an substantial distance above the bottom of a stream or ditch into which it empties, a junction box with a rip- rapped stub will be required.

6.12 Energy dissipation.

A. Energy dissipation measures shall be installed at all pipe outlets to prevent downstream channel erosion. Rip-rap aprons shall be designed in accordance with Georgia Stormwater Management Manual guidelines for Storm Drain Outlet Protection or other approved method.

B. Precast manhole sections may be adapted for use as energy dissipaters at outfalls. The energy dissipater shall be designed so as not to adversely affect the hydraulic capacity of the system.

C. Grouted rip-rap may be used in high velocity conditions or where safeguarding of the material is needed. The SDRC may require rip-rap to be grouted on steep slopes and/or high velocity conditions or when stabilization of the rip-rap is needed.

6.13 Roadway culvert design.

A. Roadway culverts refer to structures installed under the roadway which convey flows from existing creeks, live streams, or drainage channels that originate upstream of the site and carry offsite flows through the site.

B. The design of all roadway culverts shall comply with GDOT and FEMA guidelines.

C. The following table shall be used for the design of all roadway culverts.

Table 6.12.a. Culvert Design Roadway Designation Design Storm Allowable Flooding Depth Emergency Access Routes 100-Year 6.0 ft Maximum Gutter Spread Collector Roads 50-Year 6.0 ft Maximum Gutter Spread Local Roads 25-Year 6.0 ft Lane Width Open Roads with No Other Outlet 100-Year 6.0 ft Lane Width Open Parking Lots 10-Year Maximum 0.5 ft Depth Roadway Designation Design Storm Allowable Flooding Depth Parking lot detention areas with flood warning signage 100-Year Maximum 1.5 ft Depth Material storage areas/landscape areas with

flood warning signage 10-Year Maximum 2.0 ft Depth

D. The permanent impoundment of water on the upstream side of the culvert (i.e., dams) is not permitted.

6.14 Open channel design.

A. Open channels refer to all overland diversions, existing and proposed, which convey storm flows through the site.

B. Grassed channels - where steep slopes, highly erosive soils, or other conditions prevent the proper establishment of grass by seeding & mulching, sod or manufactured erosion control mats will be required. Where grassing is required, the work will not be accepted until grass is well established as determined by the SDRC.

C. For all open channels, which cross or border on building lots, and where the 100- year flow exceeds 50 CFS, the 100-year flood line shall be computed and the lowest floor elevations shall be set at least two (2) feet above the flood elevation.

6.15 Pipe construction materials.

A. Design Loading - At a minimum, all pipe materials shall be capable of supporting H-20 loading under minimum cover. All HDPE pipe shall also be of sufficient thickness to meet the design load requirements for the proposed cover height. Greater design loadings shall apply to industrial, commercial, or special situations as appropriate.

B. Minimum Cover - Two (2) feet minimum cover shall be required for all pipe materials in the right of way, measured from the outside top of the pipe to the finished subgrade at the lowest point.

Minimum cover requirements may be reduced based on class of pipe being utilized only if extenuating circumstances exist. In these cases, Class V RCP will be required.

C. Bedding - Minimum bedding standards for High-Density Polyethylene (HDPE) pipe shall be such that stone bedding (i.e. No. 57 stone) shall be placed to half of the pipe diameter for all depths greater than four feet and/or in accordance with manufacturer's specifications, whichever is greater.

D. Storm Drain - All storm drain pipes located under roadways that are accepted by the County for long-term maintenance, shall be constructed of reinforced concrete pipe (RCP - Class 3 or better) meeting Georgia Department of Transportation Standards. All longitudinal storm drain pipes shall be reinforced concrete pipe (RCP - Class 3 or better) or High-Density Polyethylene (HDPE).

All pipes shall have a minimum diameter of 15 inches and must be designed and installed with adequate cover in accordance with manufacturer's specifications. In situations where the SDRC has reason to suspect that a pipe system may have not been installed properly, the SDRC may require at their discretion, video inspections of pipe systems to be provided at the Owner's expense prior to acceptance of the system.

E. Side Drains - All side drain pipes (driveway pipes) located within the public right-of- way or dedicated County easements that are accepted by the County for long-term maintenance, shall be constructed of HDPE or reinforced concrete pipe (RCP - Class 3 or better) meeting Georgia Department of Transportation Standards. The minimum diameter of all pipes shall be 18 inches and shall meet the standards set forth in section 6.15.C above.

F. All other pipe systems not within the public right-of-way shall be constructed of reinforced concrete pipe (RCP - Class 3 or better) or HDPE meeting Georgia Department of Transportation Standards. In the case where HDPE pipe originating from private property is joined to RCP, in the right-of-way, a transition structure, approved by the SDRC, must be provided at the right-of-way line by the Owner.

All pipes must have a minimum diameter of 15 inches and must be designed and installed with adequate cover in accordance with manufacturer's specifications. The minimum cover for pipes, which run along individual lot property lines in residential developments, shall be increased to three feet to account for the potential for damage due to residential fence construction.

In situations where the SDRC has reason to suspect that a pipe system may have not been installed properly, the SDRC may require at their discretion, video inspections of pipe systems to be provided at the Owner's expense prior to acceptance of the system.

6.16 Inlets and manhole construction.

A. Inlets and manholes shall be constructed in accordance with GDOT Standard Specifications.

B. All structures deeper than four (4) feet must be constructed with steps.

C. The minimum drop from the edge of the roadway to the throat of the inlet shall be six (6) inches for the standard two foot (2') offset from the road. Greater offsets shall require greater drops to achieve the desired 25% cross-slope for the apron.

6.17 Subsurface drainage (if applicable).

Subdrains may be required at the SDRC's discretion depending on roadway and groundwater conditions on site.

A. Subdrains shall be constructed in accordance with the manufacturer's recommendations.

B. Subdrains shall be installed within 2 1/2' of the back of the curb and shall be properly connected to a permanent drainage structure such as a catch basin, or routed to a suitable location off the right-of-way.

C. All subdrains shall have a minimum of two (2) feet of cover.

D. Subdrains shall be installed prior to the base course.

E. Subdrains are required on both sides of the street where mucking out and backfilling have been done, or where the water table is within two (2) feet of the road centerline elevation.

F. Subdrains must be inspected and approved during installation.

6.18 Miscellaneous drainage requirements.

A. The required roadway and developed land drainage shall be directed to a drainage channel within the immediate drainage basin provided the receiving channel has existing sufficient capacity or is improved to provide sufficient capacity for conveyance of the outfall flows. Under extenuating circumstances where this is not feasible, the design engineer shall document a good faith effort of the attempts made to provide the required information to the SDRC in compliance with the above provisions.

B. Damming Structures - No dams or structures serving as dams to impound water, or any portion of such a structure shall be allowed in the right-of-way. This further means that no County road shall pass over such a structure without approval from the appropriate agencies.

C. Drainage Outfall into a Pond or Lake - Where a drainage outfall discharges into a pond or lake, rip rap shall be placed under and around the end joint as needed and on slopes at the end of the pipe. The outfall invert elevation must be above the normal pool elevation of the lake.

D. Drainage Outfall into a Stream or Ditch - Where a drainage outlet is a substantial distance above the bottom of a stream or ditch into which it empties, a drop structure (junction box) with a stub or other approved outfall design must be used. In all other instances, the outfall will be required to have rip rap placed under and around the end joint as needed and on slopes at the end of the pipe. All discharge pipes 36" and over shall have a precast headwall or site-built reinforced concrete or masonry headwall.

E. Stabilization of Open Channels - All open channels used for conveyance of roadway drainage shall be properly stabilized to prevent erosion, and shall require rip rap at all direction changes exceeding 25 degrees or as directed by the SDRC.

F. Drainage Easements - Drainage easements of the following widths shall be provided and dedicated for maintenance and public use:

Table 6.17.a. Drainage Easements Pipe Size (inches) Required Easement Width (feet) 15 - 48 20 48+ 20 + total pipe width At the discretion of SDRC Double pipe systems (greater than 48" width)

1. For minor ditches with open channel flow, the required easement width shall be determined from the equivalent pipe size required to carry the flow and the easement width (listed above) corresponding to that calculated pipe size.

2. For major ditches or channels, the easement width shall be centered on the ditch or channel and be equal to the maximum top width of the ditch plus twenty (20) feet.

6.19 Rip rap.

Stone shall be hard quarry, fieldstone or recycled concrete (see Section 6.20 below) which will withstand exposure to water and weathering. Stone shall vary in size from 6" minimum to 24" maximum, and the gradation shall be such that approximately 60% of the rip-rap is 10" in size. All rip-rap shall be hand placed or satisfactorily machine placed.

6.20 Crushed concrete.

Crushed, recycled concrete may be used in place of stone riprap. The concrete shall be clean and free of foreign materials, reinforcing wire and/or steel. Gradation and size shall meet the requirements of traditional riprap.

6.21 Location.

Drainage facilities shall be located in the road right-of-way where feasible, and shall be constructed in accordance with the GSMM and these standards and specifications. Catch basins shall be located at low points of streets. Where topography or other conditions are such as to make impractical the inclusion of drainage facilities within road rights-of-way, perpetual, unobstructed easements at least twenty (20) feet in width for drainage facilities shall be provided across property outside the road right-of-way and with satisfactory access to the road.

6.22 Discharge.

Drainage shall be designed so as to avoid concentration of storm drainage water from each lot or land development site to adjacent lots, land development sites, or vacant properties. Storm water shall not be discharged directly to streams, lakes, rivers, tidal waters or any other environmentally sensitive area. It shall be directed toward natural overland drainages. If water must be discharged to a stream, or other water body the water quality flowing into the stream must meet or exceed the water quality in the receiving waters. The water quantity flowing into the stream must be evaluated to ensure the stream channel can accommodate the increased flows and not disrupt or degrade the ecology of the water body.

It shall be County policy that an increase in the elevation of flooding on an adjacent property(s) shall be unacceptable. In situations where flood elevations on an adjacent property will be increased due to development and/or construction of a stormwater management system/facility, the required conveyance level of service may be increased by the SDRC to result in no impact to the adjacent property(s).

This requirement may be waived at the SDRC's discretion if the adjacent property owner(s) provides a permanent drainage easement between the two property owners. The easement shall provide that the owner of the impacted property acknowledges that an increase in flood elevations will occur on their property as a result of the proposed development. Additionally, the easement shall include at a minimum a map showing the extent of the pre-development and post-development 100-year floodplains. The easement must be recorded with the County as an attachment to the affected property's land deed and shall be binding on all future property owners.

6.23 Grading and site drainage.

Lots or land development sites shall be laid out so as to provide positive drainage away from all buildings, and drainage for individual lots or land development sites shall be coordinated with the general storm drainage pattern for the area. Buildings and parking lots shall be appropriately drained to prevent damage to abutting properties or public streets. All disturbed or graded ground areas of a building site not used for buildings or open storage areas shall be appropriately stabilized and grassed or covered with plants or landscaping materials.

6.24 Stormwater management plan report.

All development projects must submit a stormwater management plan report outlining the hydrologic and hydraulic impacts of the site on the stormwater system. At a minimum, this report must include the following sections:

• Certification by a Qualified Registered Design Professional

• Project Narrative

• Existing Conditions Hydrologic Analysis

• Post-Development Hydrologic Analysis

• Stormwater Management System Design

• Downstream Analysis

• Erosion & Sedimentation Control Plan

• Planting Plan (if applicable)

• Operations & Maintenance Plan The following subsections outline the requirements for each of the elements outlined above.

6.24.1 Professional Certification. Each report should begin with the following statement and be signed and sealed by the professional who prepared the report: "I, (Name of Professional), a Registered (Professional Engineer / Land Surveyor/other qualified design professional) in the State of Georgia, hereby certify that the grading and drainage plans for the project known as (Project Name), lying in Land Lot ( ), of the ( ) District, located at (address), City of Tifton, Georgia, and identified on tax map ( ) as parcel ( ), have been prepared under my

supervision, and, state that in my opinion, the construction of said project will not produce storm drainage conditions that will cause damage or adversely affect the surrounding properties. This (Day) day of (Month), (Year)."

6.24.2 Project Narrative. A brief narrative should be provided with the report outlining the project.

6.24.3 Existing Conditions Hydrologic Analysis. The existing conditions hydrologic analysis should provide the reviewer with a comprehensive evaluation of the site conditions prior to development of the project.

The designer should provide the following information with the Existing Conditions Hydrologic Analysis element of the report:

A. Existing Conditions Narrative

• A written description of the existing conditions found at the site

• Analysis of runoff provided by off-site areas upstream of the project site

• Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology.

B. Existing Conditions Map An existing conditions map should be provided with the report including but not limited to the following:

• Topography (2-ft. or less contour interval) of existing site conditions.

• Perennial/intermittent streams, wetlands, lakes and other surface water and water resources features.

• Natural Resources Inventory and Site Fingerprinting data per the procedures outlined in Section 1.0 of the Green Growth Guidelines (as necessary).

• Drainage basin and sub-basin delineations.

• Drainage basin and sub-basin delineations for each contributing drainage area upstream of the project site on an appropriate map.

• Existing stormwater conveyances and structural control facilities.

• Direction of flow and discharge points from the site including sheet flow areas.

• Any area of significant depression storage.

• Federal, State and local buffers and conservation areas.

The map should provide a clear understanding of the drainage patterns present throughout the site as well as drainage onto the site from upstream/adjacent areas.

C. Existing Conditions Information Pertinent information should be included in the report in table format that will enable the reviewer to understand how various parameters were applied in existing conditions analysis. Additionally, tables should be included documenting the results of the modeling.

• A table listing the acreage, soil types and land cover characteristics for each sub-basin.

• A table listing the total acreage, composite curve number and time of concentration for each sub-basin.

• A table listing the peak runoff rates and total runoff volumes from each sub-basin.

• A table listing the peak runoff rates and total runoff volumes for each drainage area upstream of the project site.

• A table listing the peak runoff rates and maximum water surface elevations for all detention facilities studied as part of the existing conditions analysis.

D. Existing Conditions Model Diagram A diagram of the hydrologic model for the existing site should be provided with the report showing each flow node.

6.24.4 Post-Development Hydrologic Analysis. The proposed conditions hydrologic analysis should provide the reviewer with a comprehensive evaluation of the site conditions following development of the project. The designer should provide the following information with this element of the report:

A. Proposed Conditions Narrative A written description of the proposed site conditions after construction should be provided.

The narrative should describe the pertinent information and assumptions as to how the proposed conditions were analyzed by the designer.

B. Proposed Conditions Map A proposed conditions map should be provided with the report including but not limited to following:

• Topography (2-ft or less contour interval) of proposed site conditions.

• Perennial/intermittent streams, wetlands, lakes and other surface water features.

• Drainage basin delineations showing the location of each drainage sub- basin.

• Proposed stormwater conveyances and structural control facilities.

• Direction of flow and discharge points from the site including sheet flow areas.

• Location and boundaries of proposed natural resources feature protection areas.

• The map should provide an overview of the various drainage patterns proposed for the site as well as drainage onto the site from upstream areas.

C. Proposed Conditions Tables Tables should be included in the report that will allow the reviewer to understand how the applicable parameters were developed and utilized in modeling the proposed conditions for the site. Additionally, tables should be included documenting the results of the modeling.

• A table listing the acreage, soil types and land cover characteristics for each sub-basin.

• A table listing the total acreage, composite curve number and time of concentration for each sub-basin.

• A table listing the peak runoff rates and total runoff volumes from each sub-basin.

• A table listing the peak runoff rates and total runoff volumes for each drainage area upstream of the project site.

• A table listing the peak runoff rates and maximum water surface elevations for all detention facilities studied as part of the proposed conditions analysis.

D. Proposed Conditions Model Diagram A diagram of the hydrologic model for the proposed site should be provided with the report showing each flow node.

6.25 Stormwater management system design.

The stormwater management system design should provide the reviewer with a comprehensive description of the proposed stormwater management system components on site. The designer should provide the following information in the report:

6.25.1 Stormwater Management System Map.

• The stormwater management system map should document the various components of the stormwater runoff system for the site.

• Location of all structural and non-structural stormwater controls

• Location of all existing stormwater controls to remain after development

• Location of all proposed stormwater controls

• Location of all proposed impoundment type controls (i.e. detention ponds, stormwater ponds, stormwater wetlands, etc.)

• Location of all natural resource areas that will be incorporated into the stormwater management plan for the site.

• Location of all conveyance structures

• All impoundment type controls should be labeled with the following information as a minimum:

maximum water surface elevations; depth and storage volumes for the design storm(s); and depth of maximum water surface if the design storm event is exceeded (i.e. top of dam) as well as volume calculations.

• All inlets to conveyance structures should be labeled with the following information: maximum design water surface and maximum potential water surface elevations.

• All pipes should be labeled with the following: length, diameter, material of construction and slope.

• Map showing all contributing drainage areas/sub-basin delineations.

• Soils Map, NWI Map (if necessary), USGS Quad Map, FEMA Map.

• Geotechnical information from the Natural Resources Conservation Service (NRCS) for the site indicating soil types, seasonal high ground water, and percolation rates (if necessary).

6.25.2 Narratives. The following narrative information should be provided:

• Narrative describing that the proper structural stormwater controls have been selected for the site conditions.

• Design calculations and elevations for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales, areas of overland flow, etc.

• Design calculations and elevations for all structural water quality controls to be utilized for water quality improvement.

• Design calculations showing that the design meets the applicable requirements as set forth herein.

• Type of storm routing software utilized for design (if applicable).

6.25.3 Downstream Analysis. The downstream analysis should provide the reader with a comprehensive picture of the downstream areas and their capacity to accommodate stormwater runoff from the proposed development.

• Maps

a. Drainage basin delineations showing the point at which the contributing area of the project represents 10% of the total drainage basin area as defined in Section 2.1.9.2 of the Georgia Stormwater Management Manual (latest edition).

b. Identify culverts, channels and other structural stormwater controls that the stormwater runoff from the site will eventually pass through prior to the 10% point as identified above.

• Narratives

a. Provide a narrative with associated calculations to how the demonstrate was performed and to show that no adverse impacts will occur after construction of the proposed site.

6.25.4 Planting Plan. A planting plan should be included in the report for all water quality controls that utilize vegetation as a pollutant removal method.

6.25.5 Operations & Maintenance Plan. A narrative of what maintenance tasks will be required for the stormwater controls specified for the site as well as the responsible party(s). The designer should consult the Georgia Stormwater Management Manual (latest edition) for additional insight on this issue.

APPENDIX 2. FATS, OIL AND GREASE MANAGEMENT PROGRAM

Sec. 1. Purpose.

The Purpose for this program is to minimize the introduction of Fats, Oil, Grease and Grit from food service facilities, repair shops and carwashes into the city of Tifton's wastewater collection system. The main components of the program are the proper sizing, installation, and maintenance of grease interceptors, sand/grit separators and oil/water separators. In order to ensure efficient sewage treatment, protect the sanitary sewer system and to prevent sanitary sewer system overflows, the Tifton-Tift County Utilities Department has developed a Fats, Oil and Grease Management Program.

Sec. 2. Definitions.

Unless otherwise expressly stated or the context clearly indicates a different intention, the following terms shall, for the purpose of this document, have the meaning indicated in this section.

a. City. The City of Tifton

b. Domestic Water. Wastewater from sanitary fixtures such as toilets and urinals.

c. Food Service Facility. Any facility, which cuts, cooks, bakes, prepares, or serves food, or which disposed of food related wastes.

d. Garbage Grinder. A device that shreds or grinds up solid or semisolid waste materials into smaller portions for discharge into the sanitary sewer.

e. Grease. A material composed primarily of fats, oil and grease from animal or vegetable sources.

The terms fats, oil and grease shall be deemed as Grease by definition. Grease may also include petroleum-based products.

f. Hauler or Transporter. One who transfers waste from the site of a user to an approved site for disposal for treatment. The hauler is responsible for assuring that all Federal, State and local regulations are followed regarding waste transport.

g. Interceptor or Separator or Trap. A device so constructed as to separate, trap and hold fats, oil, grease, sand and grit substances from the wastewater discharge by a facility to prevent these substances from entering the sanitary sewer.

h. "Under-Sink" or Inline Grease Trap. A device placed under or in close proximity to sinks or other facilities likely to discharge grease in an attempt to separate, trap or hold oil, and grease substances to prevent their entry into the sanitary sewer system.

i. User. A source of discharge to the sanitary sewer of City of Tifton.

j. Waste or Wastewater. The liquid and water-carried domestic or industrial wastes form dwellings, commercial establishments, industrial facilities and institutions, whether treated or untreated, contributed to the sanitary sewer system.

Sec. 3. General criteria.

a. Installation Requirements for New food Service Facilities - All proposed or newly remodeled food service facilities connected to the City of Tifton's Sanitary Sewer System shall be required to install an approved properly operated and maintained grease interceptor. All interceptor units shall be installed outdoors of the Food Service Facility building unless the user can demonstrate to the City of Tifton that an outdoor interceptor would not be feasible. All interceptor units shall be of the type and capacity approved by the City of Tifton.

b. Requirements for Existing Food Service Facilities - All existing food service facilities connected to the City of Tifton's Sanitary Sewer System are expected to conduct their operations in such a manner that grease is captured on the user's premises and then properly disposed. Existing Food Service Faculties will be handled under the City of Tifton's Fats, Oil and Grease Management Program in the following manner:

i. City of Tifton will periodically inspect each Food Service Facilities on an as-needed basis to assure that each facility is complying with the intent of the Grease Management Program. The as needed inspection shall be determined by the Tifton-Tift County Utilities Department.

ii. Each Food Service Facility in the Vicinity of any problem areas will be inspected. The facilities' grease control practices and the adequacy of their grease control interceptor/equipment will be assessed. The inspections will typically result in one of the following actions:

1. Facilities equipped with an appropriate and adequately sized grease interceptor who are meeting the intent of the Grease Management Program through effective grease control practices will be commended for their compliance.

2. After written notice and an opportunity to defend, facilities not in compliance shall be required to develop and submit, to the City of Tifton, a proposed plan designed to achieve compliance through improved housekeeping and/or increased maintenance and pumping of the existing grease interceptor/equipment.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:tifton/zoning/whole@2026-11-11-87b38d8a5b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.