Tifton · Zoning Ordinance
Tifton Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 6 of 6. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
2. The contractor assumes responsibility of environmental damage and cleanup due to inadvertent discharges of slurry or other caused. Additional environmental protection necessary to contain any hydraulic or drilling fluid spills (including, but not limited to, berms, turbidity curtains, and liners) shall be the responsibility of the contractor and shall be provided at no additional cost to the owner. Slurry materials shall be selected based on the soil conditions encountered to minimize the risk of mud returns.
3. Fuel and/or oil may not be stored in bulk containers within 200' of any water body or wetland.
F. Installation:
1. The engineer and the owner shall be notified at least 48 hours in advance of starting the work. The bore shall not begin until the owner's representative is on-site and agrees that proper preparations have been made.
2. In all cases the manufacturer's recommendations and procedures shall be followed regarding the installation of their pipe material by horizontal directional drilling.
3. The entire drill path shall be accurately surveyed with entry and exit stakes place in the appropriate locations as indicated on the drawings.
4. Pilot Hole:
a. The pilot hole shall be drilled on bore path with no deviations greater than 5% of depth over a length of 100'. In the event that the pilot does deviate more than 5%, the Contractor shall notify the engineer and may be required to pull-back and re-drill from the location along bore path before the deviation.
b. In the event that a drilling fluid fracture, inadvertent returns or returns loss occurs during pilot hole drilling operations, the contractor shall cease drilling and notify engineer. Engineer, contractor, and owner shall discuss options and work to proceed accordingly.
5. Reaming—After pilot hole completion, Contractor will ream bore hold to a minimum of 25% greater than the outside diameter of carrier pipe. Contractor will not attempt to ream at one time more than the drilling equipment and mud system are designed to safely handle.
6. Pullback:
a. Pipe shall be hauled and assembled together in one length, if space permits, prior to being placed in the bore hole. If sufficient linear footage of lay down area is not available, the finished pipeline may be assembled in no more than two (2) sections.
b. Joint air testing and hydrostatic pressure testing of the assembled pipe segment(s) shall take place prior to pullback. If the pipeline was assembled in two sections, joint air testing of each section will occur separately with hydrostatic testing occurring when fully assembled as one piece. The contractor shall be responsible for ensuring that the drill rig has adequate pullback capacity to overcome the increased frictional resistance resulting from the stoppage of the pipe pullback to perform the final joining or fusion of pipe sections. The pipe shall be pressure tested for a period of 2 hours at 150 psi. A calibrated pressure recorder or gauge will be used to record the pressure during the test period.
c. Before pulling, pipe will be placed on pipe rollers spaced close enough to prevent excessive sagging
d. Once pull-back operations have commenced, operations must continue until pipe is completely pulled into bore hole, with the exception of the final joint between 2 assembled sections. During pull-back operations contractor will not apply more than the maximum safe pipe pull pressure at any time.
e. In the event that the pipe becomes stuck, contractor will cease pulling and notify engineer. Engineer, contractor and owner will discuss options and then proceed accordingly.
7. Proper connection to the adjoining pipe at each end of the bore shall be done by standard excavation.
G. Site Restoration:
1. Following drilling operations and connection to adjoining pipe, the contractor shall restore the area to original conditions. All excavations will be backfilled and compacted to 95% of original density. Landscaping will be restored to original. All mud shall be disposed of by the Contractor. Grassing, including sod, and other erosion control measures shall be installed as called for in the plans.
2.13 STREAM AND DITCH CROSSING.
A. No work shall take place within the stream buffer of state waters without the appropriate permit or variance. Note that stream crossings for water lines that occur at an angle within 25 degrees of perpendicular (as measured from the point of crossing) and cause a width of disturbance of not more than 50 feet within the buffer do not require an application or approval from EPD. Directional boring under streams is encouraged to prevent stream buffer disturbance.
B. At all points where banks of streams or drainage ditches are disturbed by excavation or where natural vegetation is removed, carefully compact backfill and place bank stabilization products (rip-rap, erosion control matting, and/or vegetation) to prevent subsequent settlement and erosion. Vegetative practices are preferential over rip-rap, however, if rip-rap is used it shall be as specified below.
1. Stone Rip-Rap: Place rip-rap a distance of not less than five feet (5') upstream and five feet (5') downstream from any disturbed area. Extend rip-rap from one foot (1') below streambed to top of bank. Place to conform with the natural slope of the stream bank. Use sound, tough, durable stones resistant to the action of air and water. Slabby or shaley pieces will not be acceptable. Specific gravity shall be two (2.0) or higher.
2. Minimum weight of individual stones shall be fifty (50) pounds. The maximum allowable dimension for an individual stone is 24 inches. The minimum allowable dimension for an individual stone is six inches (6"). At least fifty percent (50%) of the stones shall have a minimum dimension of twelve inches (12").
3. Embed stone rip-rap by and so as to form a compact layer at least twelve inches (12") thick. Place rip-rap in such a way that the smaller stones are not segregated but evenly distributed. Place chinking stones in the crevices between the larger stones so that a dense, well graded mass is produced.
2.14 PRESSURE AND LEAKAGE TESTING.
A. Pressure During Test: Immediately after the pipe has been laid and backfilled, but prior to the placement of pavement, each valved section of newly laid pipe shall be subjected to a leakage and pressure test. The Contractor shall provide all necessary equipment and perform all work required in connection with the tests. For any section being tested, the pressure applied shall be such that at the highest point in the section, the pressure shall be 150 psi or at least 50 psi above the normal operating pressure at this point, whichever is greater. The test shall be witnessed by representatives of the City and recorded on a hydrant data logger provided by the City.
1. Duration of Test: The duration of each pressure test shall be two (2) hours.
2. Procedures: Each valved section of pipe shall be slowly filled with water supplied by means of a pump connected to the pipe in a satisfactory manner. The specified test pressure shall be measured at the point of highest elevation. The pump, pipe connection and all necessary apparatus, gauges and meters shall be furnished by the Contractor. The Contractor shall furnish all necessary labor and assistance in conducting the tests. The Owner will furnish, through connections made by the Contractor to existing mains, water for filling the lines for making the test.
3. Expelling Air Before Tests: Before applying the specified test pressure, care must be taken to expel all air from the pipe. If necessary, the pipe shall be tapped at high points to vent the air. Any taps made shall be tightly plugged after completion of tests.
4. Examination Under Pressure: At intervals during the test, the route of the pipe line shall be inspected to locate any leaks or breaks. Any cracked or defective joints, cracked or defective pipe, fittings or valves discovered in consequence of this pressure test shall be removed and replaced with sound material and the test shall be repeated until satisfactory results are obtained.
5. Permissible Leakage: Leakage shall be defined as the quantity of water that must be supplied into the newly laid pipe of any valved section thereof, to maintain the specified leakage test pressure after the pipe has been filled with water and the air in the pipeline has been expelled. No installation will be accepted if leakage is greater than that determined by the following formula:
Where: L is the allowable leakage in gallons per hour; S is the number of joints in the length of pipeline tested; D is the nominal diameter of the pipe in inches; and P is the average test pressure during the leakage test in pounds per square inch (psi) gauge.
Leakage values determined by the above formula are to be found in the following tables:
ALLOWABLE LEAKAGE FOR PVC PLASTIC
WITH ELASTOMERIC JOINTS IN GALLONS PER HOUR
Nominal Pipe Size Inches Average Pressure in Line - PSI 150 200
ALLOWABLE LEAKAGE PER 1,000 FEET
4" .33 .38 6" .50 .57 8" .66 .76 10" .83 .96 12" .99 1.15 Should any test of pipe laid disclose leakage greater than the above specified, the Contractor shall at his own expense locate and repair the defective joints until leakage is within the specified allowance
2.15 CLEANING AND DISINFECTION OF NEW MAINS. The Contractor shall disinfect all new mains, furnishing all labor, equipment and material necessary for the complete disinfection of the mains as hereinafter provided. All water mains must be cleaned, disinfected, and the water passing through them must be shown safe by laboratory tests results before the system can be placed in service.
Disinfection of all water lines shall be in accordance with AWWA C651 "Standard for Disinfecting Water Mains". Approved methods for the accomplishment of disinfection are as follows:
A. Clean the interior of all pipe by brushing, swabbing, or washing out all debris before laying.
Stop up all branches and other openings with plugs until either capped or connected.
B. Install sufficient number of hydrants to give representative sampling on the newly installed lines. The hydrants should be at least 18 inches higher than main and must discharge toward the ground.
C. Flush the new pipe lines until the water runs clear at the end of all mains and laterals. This should be done after the pressure test and before disinfection. Each valved section of the newly laid pipe should be flushed separately with potable water.
D. Disinfect the pipe lines with chlorine. The preferable point of application of the chlorinating agent is at the beginning of the pipe line extension, or any valved section of it, and through a corporation cock inserted in the horizontal axis of the newly laid pipe.
E. Partially open hydrants or valves on the newly laid line under treatment to prevent the building up of water pressure. Continue treatment until the water flowing from the hydrants at the far end of the main contains sufficient residual chlorine to develop a deep red color (50 parts per million) when orthotolidine reagent is added to a sample of water. Stop the flow of water and chlorine by closing all openings. The chlorine residual after 24 hours shall be not less than 25 parts per million (ppm).
F. During flushing of the line, do not allow heavily chlorinated water to flow directly into waters of the state or wetlands. Employ aeration or de-chlorination at the direction of the Engineer to prevent environmental damage at no additional cost to the Owner.
G. Allow the treated water to remain in the pipe line for at least 24 hours following which period the main must be thoroughly flushed until all the heavily chlorinated water has been removed.
Test water samples with orthotolidine reagent to make sure all chlorine has been flushed out or until the concentration of chlorine in the newly laid lines is no higher than that of a sample taken on the supply line.
H. Chlorine products for disinfecting water pipes are available in several forms as follows:
1. Liquid chlorine (gas) is available in 100 and 150-pound steel cylinders.
2. High test calcium hypochlorite is a powder and is available in 4 pound tins and 100 pound drums. The chlorine content is approximately 65 percent (comparable to commercial products known as "Perchloron", "H.T.H.", "Maxochlor", etc.)
3. Chlorinated lime is a powder and is available in 12 ounce cans and 110 pound drums. The chlorine content varies from 24 percent to 33 percent. Chlorinated lime is also known as chloride of lime and as bleaching powder.
I. Liquid chlorine (gas) may be applied to water mains by means of a solution feed chlorinating device or the gas may be fed directly from the cylinder provided it is equipped with proper devices for regulating the rate of flow and the effective diffusion of gas within the pipe. The former method is preferable to the direct feed method.
J. High test calcium hypochlorite or chlorinated lime must be prepared as a water mixture for introduction into the water mains. Either powder should first be made into a paste and then thinned to about one percent chlorine solution. This requires the following proportions of powder to water:
1. Prepare a one percent chlorine solution in a wooden or plastic barrel and permit solids to settle. Apply the clear supernatant solution to the main though a rubber hose either by gravity, siphonage, injection, or by pumping.
2. The application of small amounts of dry hypochlorite or chlorinated lime to each length of pipe as it is laid will not be permitted.
K. After the new lines have been properly cleaned, sterilized, and flushed, the Contractor shall contact the City of Tifton representatives for sampling. The Contractor shall contact the City of Tifton 48 hours prior to sampling time. Samples of the water shall be taken by City of Tifton representatives and delivered to a state approved lab for bacteriological analysis. Should the analysis show contamination, the system shall be re-chlorinated and further samples taken and submitted for analysis until no contamination is indicated.
2.16 ABANDON EXISTING UTILITIES.
A. All existing lines to be abandoned shall be cut and plugged. All existing lines greater than 6" to be abandoned underneath a GDOT roadbed shall also be filled with grout.
B. All existing hydrants on water mains to be abandoned shall be removed and returned to the City of Tifton - City Complex, 1000 Armour Road, and placed in the inventory yard.
C. All existing valves on water mains to be abandoned shall have the valve box removed and the remaining hole shall be filled with soil, effectively burying the existing valve. In paved areas, the existing pavement around the abandoned valve hole shall be saw cut square and capped by 6" of concrete.
2.17 RESTORATION OF THE WORK AREA. It is the intent of these specifications to return all items and all areas disturbed, directly or indirectly by work under these specifications, to their original condition or better, as quickly as possible after work is complete. The contractor shall be responsible for restoration of fences, walkways, mailboxes, pipelines, drain culverts, power lines, trees, shrubbery, telephone lines and cables, and any other existing facilities that may be encountered in the work.
(Ord. No. 2023-13, (Exh. A), 11-20-2023) Sec. 3 Water service connections.
3.01 SCOPE. This specification shall govern for the installation of new and water connections transferred to new mains. The work shall include furnishing all materials and equipment as well as providing all required labor for new or transferred water services.
3.02 GENERAL.
A. Service Pipe: Unless otherwise noted on city approved, job specific plans and specifications, service pipe shall be follows:
1. " and 1" meters: service line shall be 1" diameter polyethylene tubing per section 3.04, A.
2. 1" and 2" meters: service line shall be 2" diameter polyethylene tubing per section 3.04, A.
3. Services between 2" and 4" in diameter shall be PVC SDR-21 (IPS) per Section No. 3, 3.04.
4. For services 4" in diameter and greater, the line shall be PVC C900 OR ductile iron if required for fire protection. PVC or Ductile Iron piping shall be as specified in Section No.
2, 2.04.
B. Meter Boxes: Meter boxes shall be plastic with cast iron lid unless otherwise noted in city approved, job project specific plans and specifications.
C. Location: Locations shall be directed by the City along the route of the water main. Typically, the meter location shall be at the edge of the public right-of-way.
D. Acceptance of any pipe material will be on the basis of the City's inspection and the manufacturer's written certification that the pipe was manufactured and tested in accordance with the applicable standards, including the National Sanitation Foundation. Additionally, each piece of pipe shall be stamped "NSF Approved".
3.03 SHOP DRAWINGS. Shop drawings shall be submitted on each manufactured item supplied under this specification section along with other information as specified herein.
3.04 MATERIALS.
A. Polyethylene tubing. Polyethylene pipe shall be C.T.S. DR-11 and have a minimum working pressure of 200 psi. Pipe shall be manufactured in accordance with ASTM D 2737and AWWA C901. Polyethylene pipe shall be NSF-61 Certified and shall be so marked.
B. Copper Pipe.
1. No copper pipe shall be allowed on the City side of the water meter.
C. Polyvinyl Chloride (PVC) Pipe.
1. PVC pipe shall be Iron Pipe Size (IPS) conforming to ASTM D2241 for plain end or ASTMD2672 for belled-end. PVC fittings shall conform to ASTM D2466. Pipe and fitting shall be supplied by the same manufacturer. All pipe and fittings shall conform to NSF Standard 61.
2. Unless shown otherwise on the job drawings, pipe shall have a Standard Dimension Ratio (SDR) of 21 and shall be capable of withstanding a working pressure of 200 psi, minimum.
3. Pipe shall be supplied in minimum lengths of twenty (20) feet.
D. Polybutylene (PB) pressure pipe and tubing shall be manufactured in accordance with AWWA C902, with a SDR of 11 or 11.5 for pipe and a SDR of 13.5 for tubing.
E. Meter Boxes.
1. Meter boxes shall be plastic. Material shall meet or exceed the following specifications:
a. Tensile Strength ——————- 3,400 PSI (ASTM D 638)
b. Flexural Modulus —————- 191,000 PSI (ASTM D 790)
c. Impact Strength, Izod ——- 0.6 feet 16/inch (ASTM D 256)
d. Deflection Temperatures — 200 Degrees F (ASTM D 648)
2. Plastic meter boxes shall be equal to Ametek, Plymouth Products Division, Mueller, or Brooks Products, Inc.
3. Meter box shall be fitted with cast iron cover.
F. Backflow Preventer: All services on the City system shall be equipped with a backflow preventer approved by the City.
G. Equipment Supplier: Meters 2" and smaller as well as associated meter boxes and backflow preventers must be purchased from the City of Tifton. Meters larger than 2" and associated backflow preventers may be purchased from the City of Tifton or the developer may provide equipment approved by the City of Tifton. Vaults for meters larger than 2" shall be provided by the developer.
H. Valves and Accessories:
1. Valves: Gate valves shall be bronze, heavy duty, rising stem, wedge type with screwed or union bonnet. Valve ends shall be threaded or solder type as appropriate. Valves shall have a minimum 200 PSI working pressure for water. Valves shall be made in the U.S.A.
Gate valves shall be equal to Crane No. 428 (threaded) or Crane No. 1334 (solder end).
2. Corporation Stops:
a. A Corporation stop shall be provided at each tapped point required for "—1" water services.
b. Corporation stops shall be manufactured and tested to ANSI/AWWA C800 Standards.
They shall be ball type with compression connection.
c. Corporation stops may be manufactured by Mueller, Ford, or approved equal and shall be suitable for the type of pipe being tapped.
3. Curb Stops:
a. Curb stops shall be manufactured and tested to ANSI/AWWA C800 standard.
b. Curb stop shall be ball type blow-off with compression connection and shall be provided with a meter swivel.
c. Curb stops shall be manufactured by Mueller, Ford, Watts, Kurns, or approved equal.
d. All curb stops must be lockable.
4. Tapping Saddle: Tapping saddles shall be double strap brass tapping saddle, Ford 202B, H-10517 Mueller or equal.
5. Service Clamps:
a. Clamp body shall be of epoxy coated ductile iron.
b. The strap shall have a minimum width of 3- inches and shall be made of epoxy coated stainless steel.
c. Service clamps shall be equal to Ford FC 202.
I. Connections to Water Mains:
1. Connections to ductile iron pipe water mains shall be by the direct tap method or service clamp, as detailed in full accordance with AWWA requirements.
2. Connections to polyvinyl chloride pipe water mains shall be made by using a full body service clamp or a double strap service saddle.
3. Pressure ratings shall be as required for the installation.
3.04 CONSTRUCTION METHODS. All service connections on new mains shall be made before the new pipe has been tested and sterilized. Installation of corporation cocks on pipe shall be made with the use of a service clamp of the proper size to fit the main. Water taps shall be ten feet (10') apart minimum.
A. Transfer of an existing water service shall consist of digging down to the existing main, closing the corporation cock, cutting/plugging the existing service, tapping the new main, installing a new corporation cock, running new service pipe to the existing or relocated meter, tying the new pipe into the existing meter and backfilling all ditches.
B. New services shall consist of tapping the new main, installation of corporation cock, installation of service pipe to meter location and installation of curb stop.
C. Location of Services: Services shall generally be located in the center of proposed residential lots. Services may be shifted to avoid a proposed driveway or other permanent structure. Ten foot (10') separation is required between the water service and sanitary sewer service.
D Marking for Future Reference: New water service lines shall be marked for future reference with six foot (6') 4"×4" pressure-treated posts installed plumb. Four feet (4') of the post shall be above finish grade and painted "blue". Post shall be within 3 feet of the end of the service.
E. All one inch (1") or smaller water service lines under pavement shall be installed in a two inch (2") diameter Schedule 40 PVC casing. The casing shall extend two (2) feet beyond the pavement edge or back of curb two feet (2') on each end.
F. Where required, the Contractor shall relocate existing meter and box.
G. The Contractor may free bore or open cut paved driveways, sidewalks and curbing for the placement of services. The Contractor must bore services under all city streets and federal or state highways.
H. Where services are to be transferred to the new main and the existing main lies within a paved street, a new water service shall be run from the new main to the existing meter box and terminate with a curb stop. The existing service pipe shall then be abandoned by shutting it off at its source.
I. Whenever sanitary sewers cross existing or proposed water mains, a minimum vertical separation of eighteen inches (18") must be maintained between the two (2) pipes (measured edge to edge). If vertical separation cannot be achieved, concrete encasement or other methods of water line protection shall be installed.
Sec. 4. Water service requirements.
4.01 BACKFLOW PREVENTION.
A. Backflow Prevention Devices: The law requires the installation of backflow prevention devices on all connections to the City of Tifton Water System. As mandated, the City of Tifton will install and maintain backchecks (equal to a Watts No. 7-10-U-2) on all new 1" and smaller services immediately past the water meter. The customer shall install and maintain all other pipe and accessories on the customer side of the meter, which includes any isolation valves on the inlet and/or outlet of the backflow device. All costs associated with the installation (i.e.
tapping fees) shall be the responsibility of the customer.
B. Customers planning backflow prevention installations greater than 1" (OR 1" and smaller "testable" units) shall meet with the City of Tifton Utilities/ESG Operations to discuss the proper design and installation of the backflow preventer assembly before work can begin.
C. For backflow preventers over 1" (OR 1" and smaller "testable" units), a City approved backflow preventer may be provided and installed by the City (at a negotiated fee) or the owner/ developer. After installation, the device will be the property of the customer along with all other pipe and accessories on the customer side of the meter. It will be the customer's responsibility to have the backflow preventer tested annually.
D. In those instances where it is determined by the City of Tifton that a reduced pressure zone (RPZ) type backflow preventer is required, the customer shall be responsible for installation and maintenance. This applies to all sizes of water taps.
E. Customers shall contact the City of Tifton Utilities/ESG Operations to inspect the installation of the backflow prevention device before water service can be activated. If the assembly does not meet required specifications, water usage cannot begin.
F. Thermal Expansion: As mandated by Section 613.2 of the State of Georgia Plumbing Code (1994 Standard Plumbing Code), a thermal expansion control device is required in addition to the backflow device due to the system now being a closed system. The customer is responsible for installation and maintenance of the thermal expansion device. The logical location for this device is at the water heater.
4.02 CUSTOMER WATER SERVICE VALVE. All water service lines up to 1" in size may have an American made bronze gate valve installed immediately past the backflow preventer on the customer's side. This is recommended but is not required. This valve will serve as the customer's water service isolation valve. The valve and all piping downstream of the backflow preventer shall be installed by the customer and the customer will be responsible for maintenance of these materials.
4.03 WATER METERS.
A.
G.
The City of Tifton will be responsible for all water meter installations in sizes from %4 " to 2".
The customer shall be responsible for the installation of all water meters above 2". The cost of City installation will be borne by the customer in the form of tapping fees and costs associated with larger installation shall be the sole responsibility of the customer.
Customers planning water meter installations greater than 2" shall meet with the City of Tifton Utilities Director to discuss the proper design and installation of the meter assembly before work can begin. If desired by the customer, the City of Tifton can provide the water meter and strainer only for these installations. The fee for meter and strainer paid to the City will be agreed upon prior to ordering.
The customer shall use an experienced contractor to make any water tap. The tapping contractor shall provide evidence of his competency to perform the work and have pre-approval from the City of Tifton Utilities Director before any tap on a City main can begin.
The customer shall provide 24 hours advance notice to the City of Tifton Utilities Director prior to any installation. A City of Tifton representative shall inspect all materials and tapping equipment prior to commencement of work to verify compliance with specifications and be present during the installation procedure.
The City of Tifton periodically contracts with a certified testing company to test all water meters 2" and larger for accuracy. The water supply is turned off for a period of thirty (30) minutes or more to test and/or repair the meters. If in the opinion of the Utilities Director this procedure will create a hardship for the customer, a locking by-pass of adequate size shall be required.
Inspection of the complete water meter assembly and pit by the City of Tifton Utility Department is required before water service can be activated. If the assembly does not meet specifications, water usage cannot begin.
In accordance with City of Tifton Specifications, repair of all pavement cuts is the responsibility of the party installing the meter.
4.04 OWNERSHIP OF FACILITIES.
A.
%4"to 1" Installations: The City of Tifton owns all material and equipment from the water main, including meter, meter box, & stops, up to and including the backflow preventer. The customer owns all material on the customer's side of the backflow preventer. Testing and maintenance is the responsibility of the respective owner. However, in the event a RPZ or "testable" backflow preventer is required, the customer shall own the device and be responsible for testing and maintenance. RPZ's shall be installed above ground.
1%" and Larger Installations: The City of Tifton owns all material and equipment from the water main up to the outlet side of the water meter including the meter & meter box/vault. The customer owns all material and equipment on the customer's side of the water meter including the backflow preventer and backflow preventer vault/cabinet. Testing and maintenance is the responsibility of the respective owner.
(Ord. No. 2023-18, (Exh. A), 11-20-2023) Sec. 5. Removal and replacement of pavement.
5.01 DESCRIPTION. This item shall govern for the removal, salvaging, disposal of excess materials and replacement of base and surface paving removed in connection with the construction pipe lines and appurtenances.
5.02 TYPES OF PAVEMENT AND SIDEWALKS. There are several types of pavement and sidewalks which may be cut and replaced; Asphalt Pavement, Concrete Pavement and Concrete Sidewalks.
5.03 CONSTRUCTION METHODS.
A. Asphalt Pavement—Class A: Where the installation of pipe involves the cutting of a street or driveway, such cutting shall be within the right-of-way or the limits shown on the detailed drawings. All cutting of streets or driveways shall be done by a pavement saw. Backfill shall be thoroughly compacted prior to concrete placement. Asphalt pavement patch shall include 8 inches of concrete overlain by 2 inches of 9.5 mm or 12.5 mm asphalt pavement. The concrete shall have a minimum compressive strength of 3000 psi at 28 days and extend at least 12 inches beyond the trench edge to bear on undisturbed soil. Asphalt patches shall be thoroughly rolled or tamped with a mechanical roller or tamper. Rolling of patches with truck tires will not be permitted.
B. Concrete Pavement: Concrete pavement shall be eight inches (8") on all roads and driveways and four inches (4") on all sidewalks. All cutting of concrete pavement shall be done by a masonry saw. Backfill shall be thoroughly compacted and all broken concrete disposed of by the Contractor. Where the installation of pipe involves the cutting of concrete pavement or curb and gutter, the material removed shall be disposed of properly and the section replaced shall be equal to or better than that which was removed. Replacement concrete shall have a minimum compressive strength of 3,000 psi in 28 days.
(Ord. No. 2023-13, (Exh. A), 11-20-2023)
APPENDIX 5. WASTE WATER SPECIFICATIONS
Sec. 1.01 Sewers and accessories.
1.01 SCOPE: This section of the Specifications describes material and equipment to be incorporated into the sewers and piping systems and the requirements for the installation and use of these systems.
Where the term "Contractor" is used, this term shall refer to the City of Tifton forces as well as to Contractors and/or Subcontractors employed by the City.
1.02 GENERAL: All materials shall be supplied and all work performed in accordance with applicable American Society for Testing and Materials (ASTM), American Water Works Association (AWWA), American National Standards Institute (ANSI), or other recognized standards. Latest revisions of all standards shall be applicable. Manufacturers of materials shall submit evidence, if requested by the Engineer, of having consistently produced materials of satisfactory quality and in service performance results for a period of at least over two years.
1.03 PIPE and ACCESSORIES: Pipe, joint material, and made up joints shall be tested by an independent testing laboratory approved by the Engineer. Materials, absorption, crushing (where applicable), and hydrostatic leakage tests shall be conducted on pipe of each size and type in accordance with applicable specifications. Each length of concrete pipe shall be stamped by a regular employee of the approved testing laboratory. Independent of the laboratory test, all pipe shall be subject to the inspection of the Engineer at the pipe plant, trench, or other point of delivery for the purpose of culling and rejecting pipe which does not conform to the requirements of these specifications. Inspection items shall include but not be limited to; laboratory stamp, shape, cracks, uniformity, blisters and imperfect surfaces, harruner test, damaged ends and gasket grooves. Repaired pipe or patched pipe or repairs to or patching of gasket grooves or shoulders will not be permitted.
(a) Reinforced Concrete Pipe: Reinforced concrete pipe shall be supplied in lengths of at least six feet.
(1) Pipe: Pipe shall be reinforced concrete bell and spigot conforming to ASTM C 76, Wall B pipe. For pipe with a diameter of 30 inches or greater, acceptance shall be on the basis of material tests and inspection of manufactured pipe for defects and imperfections as defined in Paragraph 4.1.2 of ASTM C 76. Acceptance of smaller pipe shall be on the basis of plant load bearing tests, material tests, and inspection of manufactured pipe for visual defects and as described in Paragraph 4.1.1 of ASTM C 6.
(2) Joints: Pipe shall have rubber gasket type joints conforming to ASTM C 443. A rectangular groove shall be supplied in the spigot end to receive the rubber gasket, and it shall be so formed that when the joint is complete the gasket will be deformed to a rectangular shape and confined on all four sides. Bell and spigot surfaces shall be accurately formed and smooth to provide a close sliding fit with a nominal clearance of 1/16 of an inch.
(b) Vitrified Clay Pipe: Delete this section in its entirety.
(c) Ductile Iron Pipe: Ductile iron pipe may be utilized in force mains, stream crossings, highway and railroad crossings, and other applications (such as casings) as may be shown on any job specific drawings. All pipe shall be furnished in lengths of at least 18 feet.
(1) Pipe: Ductile iron pipe shall conform to AWWA C 151 and shall be class 50 unless otherwise specified or shown on job specific drawings. Pipe and fittings shall be cement lined in accordance with AWWA C 104. Fittings shall conform to AWWA C 110 with a rated working pressure of 150 PSI. Pipe and fittings shall be furnished with a bituminous outside coating.
(2) Joints: Joints shall be push-on type for pipe and standard mechanical joints for fittings.
Joints shall conform to ASA 21.11. Restrained joint pipe shall be American "LOCK-FAST", U.S. Pipe "LOK-TYTE", "Clow SUPER-LOCK," or approved equal.
(d) Polyvinyl Chloride Gravity Sewer Pipe: PVC gravity sewer pipe shall be utilized in various diameters and shall be supplied in lengths not longer than 20 feet. When installed in a casing, the pipe shall be supported by wooden skids strapped to the pipe barrel (or some similar arrangement acceptable to the Engineer) to preclude contact between the pipe bell or coupling and the casing wall. All PVC gravity sewer pipe shall be laid with a minimum of Class "B" bedding. The installation- shall conform to the requirements of ASTM 2321.
(1) Pipe: PVC gravity sewer pipe shall be SDR 35 pipe, manufactured in accordance with ASTM D 3034. Acceptance shall be on the basis of certification by the manufacturer that the pipe supplied conforms to these requirements.
(2) Joints: Joints for pipe and fittings shall be of the bell and spigot type with a confined elastomeric gasket having the capability of absorbing expansion and contraction without leakage. The joint system shall be subject to the approval of the Engineer and shall be identical for pipe and fittings. Fittings for pipe eight inches and less in diameter shall be one piece with no solvent-welded joints. Fittings for pipe ten inches in diameter and larger may be fabricated using solvent welding; however, no field fabrication of fittings will be allowed.
All such fabrication shall be performed at the factory and the fittings delivered ready for use.
(e) Polyvinyl Chloride Pressure Pipe: PVC pressure pipe shall be utilized in force mains and in certain other applications specifically shown on the job drawings, but shall not be substituted for cast or ductile iron pipe specified for stream crossings. When installed in a casing, the pipe shall be supported by wooden skids strapped to the pipe barrel (or some similar arrangement acceptable to the Engineer) to preclude contact between the pipe bell or coupling and the casing wall.
(f) Pipe: All PVC pressure pipe shall conform to ASTM D 2241. PVC used in the manufacture of the pipe shall be PVC 1120. The pipe shall have SDR of 21 and shall be capable of withstanding a working pressure of 200 PSI or greater. Pipe shall be supplied in lengths of at least eighteen (18) feet.
(1) Joints for pipe and fittings shall be of the bell and spigot-type with a confined elastomeric gasket having the capability of absorbing expansion and contraction without leakage. The joint system shall be subject to the approval of the Engineer and shall be identical for pipe and fittings. Fittings for pipe eight inches and less in diameter shall be one piece with no solvent-welded joints. Fittings for pipe ten inches in diameter and larger may be fabricated using solvent welding; however, no field fabrication of fittings will be allowed. All such fabrication shall be performed at the factory and the fittings delivered ready for use. Special adaptors shall be provided as recommended by the manufacturer to adapt the PVC pipe to mechanical jointing with cast iron pipe, fittings, or valves.
(g) Steel Pipe: Steel pipe shall be fabricated electrically welded steel water pipe manufactured in accordance with AWWA C 201. Steel plate used in the fabrication shall be ASTM A 283 Grade "B".
Inside diameter and wall thickness are shown on the appropriate job drawings. Sections of steel pipe shall be joined with couplings equal to Dresser Style 38. Pipe shall be coated and wrapped in accordance with AWWA C 203. All joints, couplings, and abraded areas shall be touched-up before backfilling the trench.
(h) Materials and Manholes: Materials for construction of manholes should be as follows:
(1) Precast Concrete Sections: Manholes shall be constructed of precast concrete sections which meet the requirements of ASTM C 473. The minimum compressive strength of the concrete in precast sections shall be 4000 PSI. The minimum shell thickness shall be one twelfth of the inside diameter of the riser of the largest cone diameter. Joints between precast sections shall be sealed by means of rubber "O" ring gaskets or flexible plastic gaskets as manufactured by Ram-Nek or approved equal.
(2) Brick and Mortar: Brick shall be whole and hardburned conforming to ASTM C 32 Grade MS. Mortar shall be made of one part Portland cement and two parts clean sharp sand.
Cement and sand shall conform to requirements of Paragraph 1.11.
(3) Iron Castings: Cast iron manhole frames, covers, and steps shall be gray iron, conforming to ASTM A 48 for Class 25B gray iron and all applicable local standards. All castings shall he tough, close grained, smooth and free from blow holes, blisters, shrinkage, strains, cold shots, and other imperfections. No casting will be accepted which weighs less than 95% of the design weight. Shop drawings shall indicate the design weight and provide sufficient dimensions to permit checking. All castings shall be thoroughly cleaned in the shop and given two coats of approved bituminous paint before rusting begins. Manhole frames and covers shall be equal to the following: Standard - 350# - Neenah R-1700 Traffic - 450# Neenah R-1712B Watertight - 370# - Neenah R-1915-H2 Watertight Traffic - 440# - Neenah R-1915-G. All frames and covers shall have machined horizontal bearing surfaces. Boltdown covers shall be equipped with four 1/2 inch stainless steel bolts and a 1/8 inch red rubber or rubber "O" ring gasket. Covers shall be rotatable and interchangeable. Bolt holes shall be bored through so that debris entering the bolt hole will fall into the manhole. All manholes shall have standard frames and covers except where specifically shown otherwise on the job drawings.
(4) Manhole steps of polypropylene molded around a steel rod, manufactured by M.A.
Industries or equal may be used.
1.04 LOCATION and GRADE: The line and grade of the sewer and the position of the manholes and other appurtenances will be as shown on the job drawings. The grade line shown on the profile and/or called for in the specifications is the grade of the invert of the pipe. The Contractor shall cooperate with the Engineer in the following sequence of events relative to the location and grade of the sewer line:
(a) The Contractor will provide for the location and identify the centerline of the sewer in a manner which will allow the clearing of the construction area.
(b) After clearing is completed, the Contractor will provide for a temporary bench mark in the vicinity of each manhole or other major structure and a hub at the centerline of each manhole and at all other locations where the alignment of the sewer changes.
(c) Prior to beginning construction of any section of the sewer line, the Contractor shall prepare cut sheets and submit them to the Engineer for approval.
(d) During the construction, the Contractor shall be responsible for the following:
(1) Protection of the bench marks and verifying their location if the surrounding area is disturbed.
(2) Preserving the location of the hubs in order to maintain accurate sewer alignment.
(3) Providing all other construction lines and grades.
(e) Recommended Minimum Slopes:
(1) 8 Inch 00.40 %
(2) 10 Inch 00.28 %
(3) 12 Inch 00.21 %
(4) 15 Inch 00.18 %
(5) 18 Inch 00.15 %
(6) 24 Inch 00.12 %
(7) 30 Inch 00.09 %
(8) 36 Inch 00.06 %
(f) High Velocity Protection: Where velocities greater than 15 feet per second are attained, due to high slopes, special provisions shall be made to protect displacement of solids.
(g) Steep Slope Protection: Sewers on 20% slopes or greater shall be anchored securely with concrete, or equal, with anchors spaced as follows:
a. Not over 36 feet center to center on grades 20% and up to 35%.
b. Not over 24 feet center to center on grades 35% and up to 50%; and
c. Not over 16 feet center to center on grades 50% and greater.
1.05 EXISTING UNDERGROUND UTILITIES and OBSTRUCTIONS: Before beginning any construction work, the Contractor shall call the Georgia Utilities Location group (1-800-282-7411 or
811) a minimum of forty eight (48) working hours prior to beginning construction for locates on all utilities in the construction area. Certain existing water lines, sewer lines, gas lines, underground telephone lines, underground electric lines, underground fiber optic cables, culverts, and cross drains are shown on the Drawings, according to the best information available to the Owner. The Drawings indicate the pipe lines to be laid over, under, or around underground utilities or obstructions that are known to exist. Where these or unforeseen underground utilities are encountered, the location and alignment of the proposed sewer line may be changed, upon written approval of the Engineer, to avoid interference.
(a) Electronic Pipe and Cable Locator: The Contractor shall furnish and have available at all times an Electronic Pipe and Cable Locator in working order, for the purposes of locating existing pipe lines or other obstructions in the way of or along the route of the new work.
(b) Relocation of Services: Before the sewer line is laid, the Contractor shall locate water and other utility services to avoid interference with such services or to determine whether services should be relocated. The Contractor shall be responsible for and shall repair any damage done to utilities services or pipe lines resulting from the work of locating services or resulting from the construction operation. The Engineer shall have the right to determine the services which are to remain in place and the services which shall be relocated. Where the Engineer determines that the services shall be relocated, the Utility will make the necessary changes without cost to the Contractor.
1.06 CONSTRUCTION ALONG HIGHWAYS, STREETS, and ROADWAYS: The Contractor shall install sewer lines and appurtenances along highways, streets, and roadways in accordance with applicable regulations and requirements of the Georgia Department of Transportation, Tift County, and the City of Tifton with reference to construction operations, safety, traffic control, road maintenance, and repair. The Contractor shall provide required signs, barricades and lights for protection of traffic in locations where traffic may be endangered by construction operations. All highway signs removed for construction shall be replaced as soon as the condition which warranted their removal has been cleared. No highway, street or roadway shall be closed without first obtaining permission from the proper authorities. Any portion of the trench excavated shall be backfilled and tamped during the same work day and no portion shall be allowed to remain open overnight. Sufficient barricades and warning lights shall be provided and at least one traffic lane will remain unobstructed during construction. Flagmen shall be provided by the Contractor as required.
1.07 EXCAVATION: All excavation shall be by open cut. The top portion of the trench may be excavated with vertical or sloping sides to any width within the construction easement which will not cause unnecessary damage to adjoining structures, roadways, pavements, utilities, trees, or private property. The slope of the sides of an un-shored trench and the size and spacing of members used to shore a trench excavated with vertical sides shall be in accordance with the Occupational Safety and Health Act of 1970 (PL 91596). The width of the lower portion of the trench to a height of two feet above the top of the pipe shall not exceed the outside diameter of the pipe plus eighteen (18) inches. If trenches are excavated to width in excess of the above limitations or collapse because of inadequate or improperly placed bracing or sheeting, pipe shall be laid in accordance with the requirements of at least the next better class of bedding at the expense of the Contractor. Excavation in excess of the depths required for manholes and other structures shall be corrected by pouring a sub foundation of concrete at the Contractor's expense.
(a) Bracing and Sheeting: The sides of all trenches and excavation for structures shall be securely held by stray bracing, or by skeleton or solid sheeting and bracing, as required by soil conditions encountered.
(1) Timber: Timber for shoring, sheeting, or bracing shall be sound and free of large or loose knots and in good serviceable condition. Size and spacing shall be in accordance with OSHA requirements as cited above. Bracing and sheeting may be removed in units when the level of the backfilling has reached the point necessary to protect the pipe and adjacent property.
When in the opinion of the Engineer sheeting and bracing cannot be safely removed, it shall be left in place. Sheeting so left in place shall be cut off at least two feet below the surface.
(2) Steel Sheet Piling: Continuous lock joint steel sheet piling may be substituted for timber sheeting when approved by the Engineer. Steel piling may be removed, without cutting, provided the rate of removal is kept in pace with the tamping and backfilling operations to assure complete filling of the void created by the withdrawal of the piling. Complete withdrawal of the piling in advance of tamping and backfilling will not be permitted. Piling, where ordered to be left in place by the Engineer for reasons of safety, will be cut off where directed.
(b) Dewatering Trenches: All excavation shall be dewatered immediately prior to laying pipe.
Where running sand is encountered, dewatering shall be done by well pointing wherever possible. Where soil conditions are not favorable for use of well point, french drains of crushed stone or gravel shall be constructed to suitably located sumps and the water removed by bailing or pumping.
(c) Crushed Stone Stabilization: Wherever the sub grade is by nature too soft or mucky, in the opinion of the Engineer, for the proper installation of the sewer, he may order the Contractor to undercut the trench and backfill with crushed stone or gravel (No. 57 or equal). The stone so placed shall be brought to the sub grade required by the class of bedding specified for the particular location and compacted.
1.08 BEDDING OF SEWER: Stone or gravel bedding materials shall consist of crushed stone or gravel, (No. 57 or equal). Bedding material shall be placed on a flat bottom trench and thoroughly compacted by tamping or slicing with a flat bladed shovel.
(a) Classes of Pipe Bedding: All pipe shall be laid on foundations prepared in accordance with the various classes of bedding required by the trench width and depth for the size of the pipe to be laid. Bell holes shall be provided in all classes of bedding so as to relieve pipe bells of all load, but small enough to insure that support is provided throughout the length of the pipe barrel. All pipe shall be laid with minimum Class "C" bedding unless specified otherwise.
(1) Class "A": Bedding shall be concrete cradle. The trench shall excavated to a depth of one-fourth the nominal diameter of the pipe below grade and the pipe laid to line and grade on concrete blocking. Class "C" concrete shall then be poured to the full width of the trench to a height of one-fourth the outside diameter of the pipe above the invert.
(2) Class "B": Bedding shall be placed in the following manner. The bottom of the trench shall be excavated flat at a level a minimum distance, as shown on the job drawings, below the bottom of the pipe barrel. The pipe bed shall be brought to the proper grade and then to the bottom one-half of the outside pipe diameter with compacted crushed stone or gravel.
(3) Class "C": Bedding shall be placed in the following manner. The bottom of the trench shall be excavated flat at a level a minimum distance, as shown on the job drawings, below the bottom of the pipe barrel. The pipe bed shall be brought to the proper grade and then to the bottom one-fourth of the outside pipe -diameter with compacted crushed stone or gravel.
(b) Bedding of Manholes: Excavation for manholes shall extend a minimum of twelve (12) inches below the planned elevation of the base of the manhole. The bed shall then be brought to proper grade with crushed stone or gravel.
1.09 MANHOLES: Manholes shall be constructed in accordance with the job specific detail drawings at locations shown on the plans and where directed by the Engineer.
(a) Precast Concrete: Riser sections shall be handled carefully to prevent cracking or chipping.
Particular attention shall be paid to achieving a uniform seating of the bottom riser on the bedding to prevent the development of cracks as further riser sections are added. If preformed openings must be enlarged or altered, or if new openings must be made in the field, care shall be taken to minimize the amount of material removed in order to provide closely matched surfaces for grouting. Gaskets shall be utilized in accordance with manufacturer's recommendations when placing riser and cone sections to produce a watertight structure.
(b) Brick Manholes: The bottom of each manhole shall be constructed of concrete as depicted on the job drawings. Every brick shall be embedded in mortar on its bottom and sides, and the walls shall be thoroughly plastered on the outside with a smooth coat of mortar, 3/4-inches thick.
Inverts shall be carefully constructed, with special care exercised in laying the channels and adjacent pipes to grade. Channels shall be properly formed and rounded and shall be troweled smooth. The connection of the sewer with the wall and channel of the manhole shall be tight and smooth. Where shown on the plans, the first length of pipe for future lateral sewers of such size as may be designated shall be laid to proper grade and alignment and shall be plugged with a suitable pipe stopper. The top of manholes outside of streets, roads, and highways shall be built 13 inches above ground unless otherwise shown on the plans or directed by the Engineer.
Manholes in streets, roads, etc., shall be built to existing grades. Manholes requiring drop connections are to be shown on the job drawings. Drop connections shall be constructed of the same type and class of materials as the upstream sewer and in accordance with the details shown on the job specific drawings.
1.10 LAYING PIPE: All sewer pipe shall be laid upgrade with the spigots pointing downgrade. The pipe shall be so laid that after the sewer is completed, the invert line shall conform accurately to the grades and alignment fixed or given by the Engineer.
(a) Handling: Tools and equipment suitable for the safe and convenient-handling and laying of pipe shall be used and great care shall be taken to prevent the pipe from being damaged. All pipe shall be carefully examined for cracks and other defects, and no pipe or fitting shall be laid which is known to be defective. If any pipe or fitting is discovered to be cracked, broken, or defective after being laid, it shall be removed and replaced with sound material without further charge.
(b) Placing and Jointing: The interior of all pipes shall be cleaned of dirt and other foreign material as pipe laying proceeds. Prior to jointing, the surfaces of the pipe to be jointed, as well as the molded surfaces of the joint, shall be wiped free of dust, dirt, gravel, and other foreign substances. After thorough cleaning, the mating surfaces of the joint shall be brushed with the proper type of lubricant sealer as supplied by and in accordance with the recommendations of the manufacturer. The spigot end shall then be centered on grade into the bell of the preceding pipe and shoved home and properly seated with the application of a moderate force by a pry or lever device. Joints shall be made no later than five minutes after the application of the sealer. In the event that there is a delay of longer than five minutes between sealing and jointing, the lubricant sealer shall be applied again. Immediately after jointing, the lubricant sealer shall be applied again. Immediately after jointing, the last pipe shall be brought-to final alignment and grade.
Defective joints discovered after laying shall be repaired and made tight.
(c) Force Mains: Provisions of (a) and (b) are applicable to laying force mains. In addition, the following requirements apply:
(1) All mechanical joints shall be made in accordance with the manufacturer's recommendations.
(2) The Contractor shall take special precautions to prevent damage to the cement lining of the pipe.
(3) The Contractor shall insure that the force main is installed at a flat or positive grade as shown on the Drawings. Pipe laid incorrectly at negative grade shall be removed and correctly placed at the Contractor's expense.
(4) Bedding for force mains shall be as shown on the job drawings.
1.11 CONCRETE ENCASEMENT COLLARS AND BLOCKING:
(a) Placement of Concrete: Where called for on the plans, or where otherwise directed by the Engineer, the pipe shall be completely encased with concrete. The trench shall first be excavated not less than 6 inches below the bell of the pipe and the pipe laid to line and grade on concrete blocking. Concrete then shall be poured to the full width of the trench, but ill no case less than 6 inches from the pipe bell on either side of the trench, and to a height of not less than 6 inches above the top of the pipe bell. No backfill material shall be placed in the trench for a period of at least 24 hours after the concrete encasement has been poured. Where called for on the plans and where required by the Engineer, reaction blocking shall be placed in a manner similar to encasement but to the thicknesses shown on the job drawings or specified by the Engineer.
Collars shall be constructed in accordance with and in locations shown on the job drawings.
(b) Materials: Materials for use in concrete shall be in accordance with the following:
(1) Cement: All cement shall be on brand of Portland cement, shall be Type I, and shall meet the requirements of ASTM C 150. One bag shall be considered to weigh 94 lbs. Minimum cement content shall be 376 lbs. (4 bags)/cu. yd.
(2) Aggregates: Aggregates shall conform to requirements of ASTM C 33.
(aa) Fine Aggregate: Fine aggregate shall be clean natural sand free of Sulphate or other injurious substances.
(bb) Coarse Aggregate: Coarse aggregate shall be clean gravel or crushed stone. Sizes of coarse aggregate shall be the largest which are obtainable from the producer and which are readily workable.
(3) Water: Mixing water for concrete shall be fresh, clean and potable.
(aa) Mixing: The water cement ratio of the mix shall be established in the design and shall be based on the established relationship between the water cement ratio and the strength of the concrete, and shall be such as to produce the required strength of the concrete with the least amount of water consistent with the workability of the mix.
Surface water contained in the aggregate shall be included as part of the mixing water in computing the water content. The design shall provide for a slump of 3" minimum, 5" maximum.
1.12 BACKFILLING: Backfill underlying pavement and backfill under dirt and gravel roads shall be compacted to 95% of the maximum, dry density as determined by the Standard Proctor Compaction Test (ASTM D 698).
(a) Selected: Selected backfill material shall consist of finely selected earth, stone dust, sand or other approved material, carefully placed about the pipe in uniform 6-inch layers to a depth of at least 18 inches above the pipe bell. Each layer shall be thoroughly compacted with proper hand tools in such a manner as not to disturb or damage pipe. Backfilling shall be carried on simultaneously on both sides of the pipe so that damaging side pressures do not occur. If suitable select materials are not available from trench excavation, the Contractor will be required to obtain them elsewhere at his own expense.
(b) General: After selected backfill material has been placed and tamped, the remainder of the trench may be backfilled with general excavated -material, provided such material shall not contain more than-1/3 broken rock, of which no single stone or boulder shall weigh more than 50 pounds. Backfill material shall be placed in uniform layers thoroughly compacted with heavy duty power tamping tools of the "Wacker" type, to the full satisfaction of the Engineer. Whenever the trenches have not been properly filled or settlement occurs, they shall be refilled, smoothed off and finally made to conform to the surface of the ground. Backfilling shall be carefully performed and the original surface restored to the full satisfaction of the Engineer. Surplus material shall be disposed of as directed by the Engineer.
1.13 SEQUENCE OF WORK: Excavation, cleaning, laying, jointing, and backfilling shall be performed as promptly as possible upon completion of the previous operation. In no case shall pipe be left in the trench over- night without completing jointing. Trenches shall be backfilled immediately after pipes are laid and joints inspected by the Engineer, unless other protection of the pipeline is directed. Normally, back- filling shall not follow jointing and final alignment of pipe by more than three lengths of pipe. The completed pipe line shall never be left exposed in the trench unnecessarily. Each day at the close of work, and at all times when laying is not in progress, the exposed end of the pipe line in the trench shall be closed by the use of an approved head or barrier of wood or metals. If at any time it becomes necessary to cover the end of an uncompleted pipe line with backfill, the end of the pipe shall be closed using a mechanical joint plug for ductile iron pipe or a suitable closure for concrete or clay pipe.
1.14 REMOVING AND REPLACING PAVEMENT:
(a) Removing Pavement: The Contractor shall remove existing pavement as necessary for installing the new sewer lines and appurtenances.
(1) Marking: Before removing any pavement, the pavement shall be marked for cuts neatly paralleling pipe lines and existing street lines. The marks shall be spaced the width of the trench.
(2) Breaking: Asphalt pavement shall be broken along the marked lines 9Y use of jack hammers or other suitable tools. The concrete pavement within the limits of the trench may be broken along the marked cuts by use of jack hammers or by scoring to a depth of approximately 1-1/2 inches with a rotary saw and breaking below the score by the use of jack hammers or other suitable tools.
(3) Machine Pulling: No pavement shall be machine pulled until completely broken and separated along the marked Cuts.
(4) Damage to Adjacent Pavement: The pavement adjacent to pipe line trenches must not be disturbed or damaged. If the adjacent pavement is disturbed or damaged, due to any cause such a caving ditch banks, indiscriminate use of construction machinery, etc., the Contractor shall remove the damaged pavement and shall replace it at his own expense.
(5) Sidewalk: Sidewalks shall be removed and replaced for their full width.
(6) Curbs: The Contractor shall remove and replace or tunnel under any curb encountered.
(b) Replacing Pavement: Upon completion of backfilling and consolidation of backfill, the Contractor shall promptly replace all pavements, sidewalks and curbs removed for construction of the pipe lines and appurtenances, and restore all pavements adjacent to pipe trenches which may have been disturbed or damaged as the result of construction operations.
(1) Supervision and Approval: State Highway pavement restoration shall be under the supervision of the Highway Division of the Department of Transportation. It shall be the Contractor's responsibility to obtain from the Highway Division approval of pavement restorations, before final payment is made under this Contract. County road pavement restoration shall be under the supervision of the County Engineer. It shall be the Contractor's responsibility to obtain from the County Engineer approval of pavement restorations before final payment is made under this Contract. County road pavement restoration shall be under the supervision of the County Engineer. It shall be the Contractor's responsibility to obtain from the County Engineer approval of pavement restorations before final payment is made under this Contract. All other pavement restoration shall be under supervision of and meet the approval of the Owner and Engineers. Pavement restoration shall follow the backfilling operation as closely as is practicable. If, in the opinion of the Engineers, the repaving program is allowed to lag, the Engineers shall order work stopped on other sections of the Contract until the repaving operation shows adequate progress.
(2) Replacement: Prior to replacing pavement, the Contractor shall make a final cut in concrete pavement nine inches back from the edge of damaged pavement. The cut shall be made using a rotary saw. Asphalt pavement shall be removed similarly using jack hammers or other suitable tools. This pavement shall be removed to provide a firm bench for placement of the new pavement. All street and roadway replacement shall be as detailed on the Drawings. Driveways, sidewalks, and curbs shall be replaced with the same material and to the same dimensions as existing.
(3) Failure of Pavement: Should any pavement restoration or repairs fail or settle during the life of the contract, including the bonded period, the Contractor shall promptly restore or repair such pavement to the satisfaction of the Engineers.
1.15 ROADWAY CROSSING: The Contractor shall furnish and install tunnel liner and pipe casing and install the sewer line therein in accordance with the drawings and the following specifications:
(a) Tunnel: The Contractor shall install the tunnel liner in strict accordance with The Department of Transportation (DOT) and/or Railroad Company requirement. The Contractor shall submit evidence of his experience with shop drawings for review by the Engineer. Tunnel excavation shall be by full face, heading and bench, or multiple drift procedures. Any procedure utilizing a full or partial shield, a tunneling machine or other equipment which exerts a force on the liner plates for the purpose of propelling, steering or stabilizing the equipment will not be allowed.
Prior to any work involving explosives, the Contractor shall make application to DOT for a special permit which will be in addition to any tunneling permit not involving explosives. The Contractor shall comply with all requirements and conditions of the permit and shall be responsible for submission of all required data. The Contractor shall schedule his work so as not to interfere with or in any way endanger traffic flow on the highway or railway. The Contractor shall also provide all required safety measures as specified in the Georgia Manual on Uniform Traffic Control Devices.
(1) Materials: Tunnel liner plates shall be manufactured from steel conforming to ASTM A 569 with the following mechanical properties before cold forming: Minimum tensile strength= 42,000 psi, Minimum yield strength = 28,000 psi, Elongation, 2 inches= 30 % Liner plates shall be 10 gauge with the neutral axis diameter shown on the Drawings for each crossing.
All plates shall be formed to provide circumferential flanged joints. Longitudinal joints may be flanged or offset lap seam type. All plates shall be punched for bolting on both longitudinal and circumferential seams and joints. Bolt spacing in circumferential flanges shall be in accordance with the manufacturer's standard spacing and shall be a multiple of the plate length so that plates having the same curvature shall be interchangeable and will permit staggering of the longitudinal seams. Bolt spacing at flanged longitudinal seams shall be in accordance with the manufacturer's standard_ spacing. For lapped longitudinal seams, bolt size and spacing shall be in accordance with the manufacturer's standard but not less than that required meeting the longitudinal seam strength requirements of Section 13 of AASHO Standard Specifications for Highway Bridges. All liner plates in one tunnel shall be the same type. Liner plates shall be hot-dip galvanized in accordance with ASTM A 123 abd bituminous coated. Bolts shall conform to ASTM A 307 Grade A, and shall be hot-dip galvanized in accordance with ASTM A 153. Grout nipples shall be 2-inch minimum diameter tapped couplings welded into place over holes cut in the liner plate. Grout shall consist of 1 part Portland cement, 1 parts masonry lime, 4 parts mortar sand, 2% of an approved admixture, i.e. Bentonite, Septamine Stearex, or Hydrocide Liquid, and where required, a retardant. The quantity of mixing water used shall be that which will produce a workable mixture of grout capable of being pumped into the voids created by the tunneling. Brick and mortar shall meet the requirements for Manhole Materials.
(2) Construction of Tunnel: Tunnel construction shall be accomplished so that no settlement of the over passing roadway or railway section will occur. In order to prevent such settlement, the use of poling plates, [breast] boards, shields, and soil solidification or a combination of these methods may be necessary. Steel liner plates shall be installed as soon as possible, but no more than 5 feet of tunnel shall remain unlined while tunneling operations are in progress. Not more than 1 foot of tunnel shall be left unlined at the end of the day's operation. Liner plates shall be installed in accordance with the manufacturer's recommendations and shall be self-supporting. The tunnel excavation shall have a diameter essentially the same as the outside diameter of the liner plates. Liner plates with grout couplings shall be located at the top of the tunnel at intervals not to exceed 10 feet.
Additional plates with grout coupling shall be installed on each side of the tunnel between the top couplings. All voids in the area outside the plates shall be pressure grouted every 10 feet; at the end of the work shift; or more frequently if soil conditions dictate. Before grouting any segment of tunnel liner, that segment shall be sealed sufficiently between the liner plates and the surrounding soil to retain the grouting pressure. These seals shall be located as follows: at the entrance of the tunnel; between grout couplings, and within one foot of the end of the tunnel at the end of the work shift. Pumping equipment shall be provided 'for grouting operations. Pump horsepower and the resulting pressure in the grouting line shall be sufficient to completely fill the voids without buckling or shifting the liner plates or damaging the roadway. The Contractor shall operate well points or drainage systems in the vicinity of the tunnel construction to prevent the accumulation of flood water in the tunnel-and to maintain the ground water table below the tunnel invert. Damaged spelter coating shall be repaired in accordance with DOT Specifications Section 645. Any plates having damaged spelter or bituminous coatings which, in the opinion of the Engineer cannot be satisfactorily repaired shall be replaced at no additional cost.
(3) Installation of Sewer: Upon completion of tunnel, the sewer line shall be installed by a method which has received prior approval of the Engineer. Tie-downs shall be installed as shown on the Drawings. The ends of the tunnel shall be closed with 3 course Brick walls, plastered with Portland Cement mortar and waterproofed with asphaltic roofing cement.
The lowest closure shall have a 4" x 8" opening left at the bottom for drainage.
(4) Safety: The tunneling operation is to begin in a pit, sheeted and shored as necessary and begins at and proceeds from one end. All applicable requirements of DOT and Railroad regulations shall be observed. The Contractor shall conduct his operations in such a manner that all work will be performed below the level of the roadbed. The Contractor shall be responsible for coordinating and scheduling all work with the DOT. All tunneling work at one particular location shall be completed before work is started at another location. If, in the opinion of the Engineer, the tunnel installation work is being conducted in a manner detrimental to the over passing roadway or to the safety of the traveling public, all operations of tunneling shall cease until the necessary corrections have been made. In the event that distress occurs to-the roadway due to the tunneling, the Contractor shall be required to submit plan to repair the roadway. The plan must be acceptable to both DOT and the Engineer. A temporary bulkhead against the face of the excavation shall be provided and well braced during each cessation of work while the heading is within 20 feet of railroad tracks of highway pavement.
(b) Pipe Casing: The Contractor shall furnish all material and equipment and perform all labor required to install steel pipe casing at locations indicated on the Drawings and as specified.
(1) Boring: The steel casing pipe shall be Schedule 30 steel pipe manufactured from steel conforming to ASTM Designation A 139, Grade B. Size and thickness shall be as required by the Regulatory Agency in control of the right-of-way in which the casing is to be installed but in no case shall the wall thickness be less than 0.25 inch or the casing size less than the outside diameter of the carrier pipe plus two inches. The outside of the casing pipe shall be primed and coated with hot coal tar enamel a minimum of 3/32- inches thick. Only new primed and coated pipe shall be used. The steel pipe casing shall be installed by the dry boring method. The hole shall be bored and cased through the soil by a cutting head on a continuous auger mounted inside the casing pipe. The boring of the hole and installation of the casing pipe shall be simultaneous. Lengths of casing pipe shall be fully welded to the preceding section in accordance with AWS recommended procedures. After the boring and installation of the casing is complete, a cleaning plug shall be installed on the rig and the casing cleaned.
(2) Installation of Sewer: After installation of the casing is complete the sewer line shall be installed by a method which has received prior approval of the Engineer. The ends of the casing shall be closed with 4-inch brick walls, plastered with Portland Cement mortar and water proofed with asphaltic roofing cement. The lowest closure shall have 4" x 8" opening left at the bottom for drainage.
(3) Safety: The Contractor shall provide all necessary bracing bulk- heads, and shields to ensure complete safety to all traffic at all times during the work, and he shall perform the work in such a manner as to not permanently damage the roadbed or interfere with normal traffic over it. If in the opinion of the Engineer the installation is being conducted in an unsafe manner, the Contractor will be required to stop work and bulkhead the heading until suitable agreements are reached between the Contractor and the Engineer. The Owner will not be responsible and shall be saved harmless in the event of delays to the Contractor's work resulting from any cause whatsoever.
1.16 STREAM AND DITCH CROSSING:
(a) Rip Rap: At all points where banks of streams or drainage ditches are disturbed by excavation or where natural vegetation is removed, the Contractor shall carefully compact backfill and place rip rap to prevent subsequent settlement and erosion. This requirement applies equally to construction alongside a stream or drainage ditch as well as crossing stream or drainage ditch.
Rip rap shall be placed a distance of not less than 10 feet upstream and 10 feet downstream from any disturbed area. Rip rap shall extend from 1 foot below streambed to top of bank and shall be placed to conform to the natural slope of the stream bank. The Contractor shall have the option as to using Method (1) or (2). Only one method shall be used throughout the job.
(1) Stone Rip Rap: All stone for rip rap shall be sound, tough, durable pieces, resistant to the action of air and water. Slabby or shaley pieces will not be acceptable. Specific gravity shall be 2.0 or higher. Minimum weight of individual stones shall be 50 pounds; dimensions of the smaller pieces having the least dimension a maximum size need not exceed 24n and 1211 for the two larger and a minimum of 6u. At least 50% of the pieces shall have a minimum dimension of 12". Stone rip rap shall be imbedded into place by hand so as to form a compact layer at least 12" thick. It shall be placed in such a way that the smaller stones are not segregated but evenly distributed. Chinking stones shall be placed in the crevices between the larger stones so that a dense, well graded ma s is produced.
(2) Sand-Cement Bag Rip Rap: The bags shall be cement sacks or burlap bags having a capacity of from 1 to 2 cubic feet. Bags previously used for sugar or chemicals shall not be used. The bags shall be filled with a mixture of one part Portland Cement to five parts sand.
The bags shall be imbedded into place so as to form a compact layer at least 12' thick. The bags shall be placed by hand, laid with over lapping joints. The finished surface shall not deviate from that specified by more than 3 inches at any point.
(b) Concrete Piers: Piers shall be constructed as shown on the Drawings and in accordance with the following requirements:
(1) Material: Concrete used in the piers shall be 3000 psi concrete, containing not less than 5.5 bags/ cu. yd. Concrete shall meet or exceed applicable requirements of Paragraph 1.11.
Reinforcing steel shall conform to the requirements of ASTM A 615 for Grade 40 deformed billet steel reinforcing bars.
(2) Bearing:
(aa) Earth: Where excavation reveals undisturbed earth subsurface, footings shall be constructed in accordance with the job drawings.
(bb) Rock: Where excavation reveals or benched rock having a minimum safe bearing value of 20,000 Psi, piers shall bear directly on rock. No less than four dowels shall be grouted into holes drilled into rock under each pier. Dowels shall be Number 4 reinforcing bars and shall extend a minimum of 4 feet into holes a minimum of 6 inches in diameter. Holes shall be grouted from the bottom up using a grout pump. Extreme care shall be taken to insure that the entire hole is filled with grout prior to insertion of the dowel.
(3) Installation: Concrete form work shall be constructed by experienced form work carpenters and shall be sufficiently strong to resist movement or distortion during pouring and to protect the pier from caving in or lateral movement. Before placing concrete, the bottom of the hole shall be dewatered and cleaned of mud, loose earth and extraneous matter. Pier forms shall be filled with concrete as soon as possible after the forms have been approved.
Excavation shall not be left open for prolonged periods of time and shall be adequately protected during rain. Water shall not be allowed to accumulate in the excavation or in surrounding areas. The Contractor shall take all necessary precautions to protect the work and personnel on the site. Open holes shall be kept covered while not in the actual process of construction. The Contractor shall examine all surrounding excavations and embankments and shall not commit his personnel into a situation that he considers dangerous.
Concrete shall not be placed in a hole while personnel are in holes less than forty feet away.
(4) Inspection: A consulting soil and foundation engineer will be selected by the Contractor, subject to approval by the Engineer, and paid by the Contractor, subject to approval by the Engineer, and paid by the Contractor from the "soils testing" cash allowance. The duties of the foundation engineer shall include, but not be limited to, the following:
(aa) Inspection of the bearing material and evaluation of its suitability.
(bb) Inspection of pneumatically drilled grout holes where applicable.
(cc) Checking dimensions and plumbness of forms to insure conformity with Drawings and specifications.
(dd) Evaluation of material penetrated by excavation with regard to lateral stability and uplift resistance.
(ee) Recommending remedial measures should insufficient lateral stability or uplift resistance exist.
1.17 INSPECTION AND TESTING: Before acceptance of any sewer or system of sewers, the lines shall be cleaned and tested to the satisfaction of the Engineer. Where any obstruction is met, the Contractor will be required to clean the sewers by means of rods, swabs, or other instruments. Lines and manholes shall be flushed and washed down before final inspection at the request of the Engineer.
(a) Gravity Sewers: Pipe lines shall be straight and show a uniform grade between manholes. The Contractor will be required to correct any discrepancies which may be disclosed during inspection. The Contractor shall install suitable weirs in manholes selected by the Engineer to determine the leakage of ground water into the sewer. Leakage shall be measured only when all visible leaks have been repaired and the ground water is above the top of the pipe. If leakage in any section of the sewer line exceeds acceptable standards as defined by the Engineer, the Contractor shall locate and repair leaks by a method approved by the Engineer until a satisfactory leakage rate can be achieved. The Contractor shall furnish, install, and remove the necessary weirs, plugs, and bulkheads required to perform the leakage test. Where continuous monitoring of flow level is required, the Owner will provide and operate monitoring equipment.
PVC gravity sewer shall be tested for excessive deflection by passing a "pig" through the line with a diameter equal to 95% of the inside diameter of the pipe. Any section of pipe not passing this test shall be excavated, reinstalled properly, and retested until it passes. Video camering of the mains will be required as designated by the Engineer.
(b) Force Mains: Force mains shall be pressure tested at 150 psi. Leakage shall not exceed 0.12 gph/in. dia./1000 ft. Minimum test period shall be two hours. However, if in the opinion of the Engineer additional testing -is required, such additional testing shall be performed by the Contractor at no additional expense to the Owner. The Contractor shall furnish, install, and remove all temporary bulkheads; flanges or plugs required to perform the pressure tests and shall furnish all equipment and labor to carry out the tests. If joints or materials are found to be defective, they shall be remade and replaced until the line passes the specified test.
1.18 PROTECTION AND RESTORATION OF WORK AREA:
(a) General: It is the intent of these Specifications to return all items and all areas disturbed, directly or indirectly by work under these Specifications, to their original condition or better, as quickly as possible after work is started.
(b) The Contractor shall be responsible for obtaining all permits with regards to Soil Erosion and Sedimentation and Storm Water Run-off and to comply with all requirements of the Soil Erosion and Sedimentation plans for the related work.
(c) Man-Made Improvements: The Contractor shall be responsible for protecting, removing and replacing, with the Engineer's approval, all fences, piers, docks, walkways, mail boxes, pipe lines, drain culverts, power and telephone lines and cables, and other improvements that may be encountered in the work.
(d) Cultivated Growth: Cultivated trees or shrubbery shall not be disturbed unless absolutely necessary, subject to the approval of the Engineer. Any such trees or shrubbery which must be removed shall be heeled in and replanted. Heeling in and replanting shall be done under the direction of an experienced nurseryman.
(e) Cutting Trees: No trees shall be cut for the performance of the work except as absolutely necessary. Trees that remain in the vicinity of the work shall be protected from damage from equipment and shall not have spoil from excavation stored against the trunks. Where excavated material is stored over the root system of trees, it shall be removed within 30 days to allow proper natural watering of the root system. Any tree over 3-inches in diameter, not to be removed, that is damaged in the work will be repaired under the direction of an experienced nurseryman. All trees and brush that require removal shall be promptly and completely removed from the work area and disposed of by the Contractor. No stumps, wood piles, or trash piles will be permitted on the work site.
(f) Grassing: Grass removed or damaged in residential areas shall be replanted using the same variety of grass and at the first appropriate season. Outside of residential areas, the entire area disturbed by the work shall be planted in rye, fescue, bermuda, clover or other suitable ground cover on completion of work in any area. In all areas, the Contractor shall be responsible for promptly establishing successful stands of grass. Contractor is required to install all required erosion and sedimentation control measures prior to initiation of any construction or clearing.
(g) Erosion Control: The Contractor shall so plan his excavation work to prevent erosion and the washing of soil into adjacent streams. This shall be accomplished by limiting the amount of open excavation at any one time, by placing spoil in the proper place and by keeping natural water routes open.
(h) Disposal of Rubbish: All materials cleaned and grubbed during the construction of the project will be disposed of by the Contractor in accordance with the applicable codes and rules of the appropriate regulatory agencies, county, state and federal.
1.19 ACCEPTANCE OF WORK: Piping and appurtenances will not be considered ready for acceptance until all provisions of these Specifications have been complied with, until all tests have been satisfactorily completed, and until final inspection of the work has been made. Flow shall not be diverted into piping until after final inspection of the lines has been made by the Engineer and permission granted therefore.
APPENDIX B
SUBDIVISIONS*
6-3 Curbs and gutter.
6-4 Monuments/pins.
ARTICLE I. SHORT TITLE, PURPOSE,
AND JURISDICTION
1-1 Short title.
This ordinance shall be known as the "Land Subdivision Ordinance of the City of Tifton, Georgia."
1-2 Purpose.
This Ordinance is enacted pursuant to the authority contained in the Constitution of the State of Georgia, as amended for the following purposes:
a. To encourage economically sound and stable land development.
b. To assure the provision of required streets, utilities, and other facilities and services to land developments.
c. To assure the adequate provision of safe and convenient traffic access and circulation, both vehicular and pedestrian, in land developments.
d. To assure the provision of needed public open spaces and building sites in land developments through the dedication or reservation of land for recreational, educational and other public purposes.
e. To assure that land is developed in conformity with the 2010 Greater Tift County Comprehensive Plan.
1-3 Jurisdiction.
This Ordinance shall govern the subdivision of land within the incorporated area of the City of Tifton, Georgia.
ARTICLE II. DEFINITIONS
2-1 General.
When used in this Ordinance, the following words and phrases shall have the meaning given in this section. Terms not herein defined shall have their customary dictionary definitions where not inconsistent with the context. The term "shall" is always mandatory. When not inconsistent with the context, words used in the singular number include the plural, and those used in the plural number include the singular. Words used in the present tense include the future. The mayor and council's interpretation shall be final as to the meaning of any definition, statement, requirement, symbol, and/or abbreviation used in connection with these regulations and/or their application.
Abutting property. Any property that is immediately adjacent or contiguous to property proposed to be subdivided or that is located immediately across any road or public right-of-way.
Alleys. A public right-of-way, not intended to be a vehicular arterial or to provide the primary means of access to abutting property, but used for service access to the rear or side properties otherwise abutting a public street.
Applicant. Any person who submits subdivision plans to the city for the purpose of obtaining approval thereof.
Architect. A qualified person registered and currently licensed or otherwise authorized to practice architecture in the State of Georgia.
Building line. A line beyond which no foundation wall or part of the structure of any building shall project, with the exception of roof overhang,
walkways, and the subsurface projection of footAPPENDIX B—SUBDIVISIONS 2-1 ings; provided, however, that such overhang does
not exceed six feet and does not encroach upon the adjacent property or right-of-way.
Chairman. The Chairman of the Greater Tift County Planning and Zoning Commission.
City. City of Tifton, Georgia.
City engineer. A public official appointed by the city manager who has specialized training in engineering and state certification.
Comprehensive Plan. The 2010 Greater Tift County Comprehensive Plan, as duly amended, reviewed by the planning commission and/or the Tifton Mayor and Council, which may consist of the Major Thoroughfare Plan, General Land Use Plan, Street and Road Classification Plan, and other maps, data, and descriptive matter for the physical development of the city or any portions thereof, including any amendments, extensions, or additions thereto as adopted by the planning commission and/or the mayor and council.
Consultant. The licensed design or engineering professional or firm hired by the subdivider to oversee all aspects of the subdivision and design process.
Crosswalk. A right-of-way within a block dedicated to public use for pedestrian use only and so designed as to provide access to adjacent streets
or lots.
Cul-de-sac. A street having only one end open for access to another street, the other end being terminated by a turnaround as specified in this Ordinance.
Developer. Same as subdivider.
Development. The act or process of erecting buildings, structures, or of making improvements to property, or laying out and dividing land.
Easement. A grant by the owner of land for the use of such land by others, including public usage, for a specific purpose or purposes.
Exempt subdivision. Any subdivision that has approved zoning and has had a plat submitted for approval by the Tifton City Engineer, the Greater Tift County Planning and Zoning Commission and the mayor and council of the City of Tifton prior to the adoption of this Ordinance shall be declared an exempt subdivision and acted upon under the conditions of the ordinances that were in place at the time such plat was submitted.
Floodprone areas. An area identified as having a potential flood hazard pursuant to the City of Tifton Floodplain Management Ordinance, as amended.
Guarantee. A maintenance bond, in the amount of 15 percent, required by this Ordinance, which guarantees to the City of Tifton all materials and workmanship of any minimum improvements installed in a subdivision.
Hardship. A situation arising as the result of extraneous or unique circumstances which deprives the developer of the reasonable use of his land if the strict application of the various provisions of this Ordinance are applied. (See Variance.)
Improvement plan. The second stage of plat or subdivision plan review, as described in section 4-2 of this Ordinance. For the purpose of the enforcement of this Ordinance, the improvement plan must include the Soil Erosion and Sedimentation Control Plan and Land Disturbance Permit Application.
Landscape architect. A design professional registered and currently licensed or otherwise authorized to practice landscape architecture in the State of Georgia, as defined in O.C.G.A. § 43-23-1,
providing the services therein defined.
Lot. A portion or parcel of land separated from other portions or parcels by description. As on a subdivision plat or record of survey map or as described by metes and bounds and intended for transfer of ownership or for building development. For the purpose of this Ordinance, the term does not include any portion of a dedicated rightof-way.
Lot, corner. A parcel of land at the junction of and fronting on two or more streets.
Lot of record. A lot which is part of a subdivision recorded in the office of the clerk of superior court, or a parcel described by metes and bounds,
the description of which has been so recorded prior to the adoption of this Ordinance.
Lot width. The distance measured straight between the side lot lines, measured at the intersection of the building line, which shall be paralleled to the street right-of-way line.
M.S.L. Mean sea level.
Planning commission. The Greater Tift County Planning and Zoning Commission.
Performance bond. A legal instrument made payable to the City of Tifton which a developer may post with the City of Tifton to permit recording of a final plat prior to completion of the required minimum improvements.
Plat. A map, generally of a subdivision, showing the location, boundaries and ownership of individual properties.
1. Plat, preliminary. The first stage of plat or subdivision plan review, as described [in] section 4-1 of this Ordinance.
2. Plat, final. The final stage of plat or subdivision plan review, as described in section 4-3 of this Ordinance.
Private right-of-way. A portion of land being used or to be used as a street, road, thoroughfare, crosswalk, pipeway, drainage canal, and/or other similar uses and designated by means of right-ofway but not deeded to the governing authority.
Protective covenant. A private contract existing between the land subdivider or developer and subsequent property owners of a particular defined area limiting design and usage of similarly situated properties. These instruments are generally publicly recorded with a particular land subdivision, and maintenance and enforcement of
the contract is between the private parties.
Public right-of-way. A portion of land being used or to be used as a public street, road, thoroughfare, crosswalk, pipeway, drainage canal, and/or other similar uses and designated by means of right-of-way deed to the governing authority.
Public water and sewage systems. A system owned and operated by the City of Tifton or Tift County.
Secretary. The respective secretaries of the Greater Tift County Planning and Zoning Commission, as duly appointed by their respective local governments.
Staff development review committee. A committee of public employees with specific technical expertise who are officially responsible to the city
manager for various public management functions. Under this Ordinance, the staff development review committee shall assist the planning commission and mayor and council in the review
of the numerous technical functions associated with the land subdivision process. This committee shall be appointed by the city manager.
Streets and/or roads. Streets and/or roads may be designated as public or private. A street is considered public when the county, city, state or federal government owns the right-of-way and is responsible for maintenance; a street or road is designated private when the right-of-way is owned by the developer, a homeowners' association or other nongovernmental body and such owner is responsible for liability, improvement and maintenance.
Private streets or roads shall conform to all specifications included in this Ordinance.
It is understood that the city will accept no substandard, unpaved streets.
1. Arterial street. A street which is designated as such on the Major Thoroughfare Plan and which is intended to provide
swift and safe movement of traffic through the city.
2. Collector street. A street which is designated as such on the Major Thoroughfare Plan and which is intended to collect
traffic from local streets and direct it safely to arterial streets.
3. Dead-end street. A street having only one end open for access to another street and the other end being abruptly terminated with no turnaround.
4. Marginal access street. A street generally parallel to and adjacent to an arterial street providing access to abutting properties and protection from through traffic.
5. Local street. A street used for local circulation in areas providing access to abutting property.
Subdivider. Any person, firm, corporation, association or partnership or any agent thereof who undertakes or proposes to undertake the subdivision of land so as to constitute a subdivision as herein defined.
Subdivider's engineer/surveyor. Any professional engineer or land surveyor as defined in O.C.G.A. § 43-15-02 providing the services therein
defined.
Subdivision. All divisions of a tract or parcel of land into two or more lots, tracts, parcels, building sites, or other divisions for the purpose, whether immediate or future, for sale, legacy, or building
development including all division of land involving a new street or a change of width or alignment in existing street(s), and including resubdivision
and, where appropriate to the context, relating to the process of subdividing or to the land or area subdivided; provided, however, that the following are not included within this definition:
a. Where located on an existing public road or street, the combination or recombination of previously platted lots, where the total number of lots is not increased, and
the resultant lots are equal to the current standards of the city.
b. The public acquisition of land.
c. The sale of public land.
d. The subdivision of land into parcels of ten acres or more where located on an existing public (city-maintained) road. Each ten-acre or larger parcel must abut a
public road a minimum of 80 feet.
e. A division or sale of land among heirs by judicial decree, provided that all lots created by the subdivision must front existing state or city roads or an approved private road, and lot size, frontage, and
access requirements dictated in the Zoning Ordinance have been met.
Subdivision plans. Subdivision plans are interpreted to be all plans required for delineation of rights-of-way, easements, lots, preservation areas, etc., and all construction plans required for the development of all physical facilities pertaining thereto.
Tax assessor. The Tift County Board of Tax Assessors.
Tift County Health Department. The Tift County Board of Health, the Tift County Health Department and/or the State of Georgia Department of Human Resources. The words "Tilt County Health
Department" and/or "Tilt County Environmental Officer" are used in this Ordinance to denote the fact that all matters pertaining to health regulations shall be directed to that official or his staff.
Tract. A portion of land with definite and ascertainable limits or boundaries. (See definition of Lot.)
Utility. Any community service available to the public by means of an overhead or underground distribution or collection system such as electricity, telecommunications, water, gas, and sewage disposal.
Variance. The relaxation of a dimensional requirement or design standard described within this Ordinance as it applies to the development of
a particular tract or parcel of land reviewed by the Greater Tift County Planning and Zoning Commission and approved by the mayor and council of the City of Tifton on an individual basis, after proper public hearing.
Zoning administrator. The person or persons appointed by the city manager of the City of Tifton to coordinate among various agencies involved in review and approval of subdivision plans and ensuring compliance of subdividers to
administrative requirements of this Ordinance.
Zoning Ordinance. The Zoning Ordinance enacted by the mayor and council of the City of Tifton, Georgia as duly amended.
ARTICLE III. GENERAL [PROVISIONS]
3-1 Platting authority.
From and after the passage of this Ordinance, the planning commission shall be the official platting authority, and no plat of a land subdivi2-1 TIFTON CODE sion shall be recorded in the office of the clerk of the Superior Court of Tift County unless it has the approval of the planning commission inscribed thereon. The filing or recording of a plat of a subdivision without the approval of the appropriate reviewing agencies and/or authorities as required by this Ordinance is declared to be a
violation of this Ordinance.
3-2 Use of plat.
The transfer of, sale of, agreement to sell, or negotiation to sell land by reference to, exhibition of, or other use of a plat of a subdivision that has not been given final approval by the planning commission and recorded in the office of the clerk of the Superior Court of Tift County is prohibited, and the description by metes and bounds in such an instrument of transfer or other document shall not exempt the transaction from prescribed penalties.
3-3 Opening and improving public streets.
The mayor and council of the City of Tifton shall not accept, lay out, open, improve, grade, pave, or light any street, or lay any utility lines in any street which has not attained the status of a public street prior to the effective date of this Ordinance, unless such street corresponds to the street location shown on an approved subdivision plat or the Major Thoroughfare Plan; provided, that the mayor and council of the City of Tifton may accept, lay out, open, and improve any street not so platted if it first submits such proposed action to the planning commission for its review and comment and approves the same as an amendment to the Major Thoroughfare Plan. Developers of subdivisions will be solely responsible for acquiring all rights-of-ways so that in the event that the City of Tifton needs to perform maintenance
rights-of-ways will be in place.
3-4 Issuance of building permits.
The City of Tifton will not issue building permits for a parcel of land, lot, tract, or building site subject to this Ordinance that has not been designated and recorded as required by this Ordinance. Lots of record are not subject to this requirement. (See [section] 4-7.)
3-5 Zoning Ordinance compliance.
No final plat of a subdivision shall be accepted for review which does not conform with the City of Tifton Zoning Ordinance. Proposed subdivisions must conform with the zoning district classification requirements applicable to the land for which it is proposed.
3-6 Official interpretation.
The requirement(s) of this Ordinance, as they may apply to a proposed land subdivision, shall be officially interpreted by the staff development review committee. In cases where the subdivider disagrees with the official interpretation of these regulations, the developer may appeal to the planning commission and the mayor and council of the City of Tifton pursuant to the guidelines established in section 9-4.
3-7 Nonconforming lots.
Any lot for which a plat or legal description (i.e., metes and bounds) has been recorded in the office of the clerk of the Superior Court of Tift County which was recorded prior to the adoption of the City of Tifton Zoning Ordinance shall be recognized as a nonconforming lot of record and may be utilized for any of the uses permitted by the City of Tifton Zoning Ordinance in its respective zoning district, subject to current zoning ordinance limitations.
3-8 Variances.
All variances shall be recommended by the planning commission on a case-by-case basis. Any request for variance shall be based on circumstances unique to the subject property and proposed alternate design or improvements must follow accepted engineering practices and principles. Final decisions on variances are made by the mayor and council pursuant to section 9-4.
3-9 Appeal to the mayor and council.
Any party aggrieved because of alleged error in any order, requirement, decision, or determination made by the zoning administrator, planning commission, or any other party in enforcement of
this Ordinance may appeal in writing to the city clerk of the City of Tifton for an interpretation of the pertinent ordinance provision. The appeals procedure shall be the same as used [in] appeals from the planning commission to the city council on zoning cases. In exercising this power of interpretation, the mayor and council may, in conformity with the provisions of this Ordinance, reverse or affirm any order, requirement, decision, or determination made by the zoning administrator, planning commission, or any other party. (See [section] 9-4.)
3-10 Appeal from the mayor and council.
Any party aggrieved by any decision of the mayor and council may seek review of such decision by a court of record, as provided by law.
ARTICLE IV. APPROVAL OF
SUBDIVISIONS
Preapplication procedure. The subdivider may visit with the City of Tifton Staff Development Review Committee and discuss the effect of the Major Thoroughfare Plan, the 2010 Greater Tift County Comprehensive Plan, and other official plans on the subdivision, as well as general design standards, zoning, and related matters. The subdivider may submit preapplication plans and
data for review, advice, and assistance by the staff development review committee. Professional assistance at this early stage may save time and effort during later stages.
Preapplication plans and data should include:
a. Location sketch map, showing site in relation to the section of the city in which it is located.
b. A simple sketch plan on a topographic survey (ten-foot intervals; i.e., quad sheets) showing general layout of lots, streets, major drainageways, and other features, including streams, creeks, wetlands or potential wetlands, in relation to existing conditions on the site and the surrounding street system.
c. General subdivision information including data on proposed or existing covenants, wooded areas, available and proposed community facilities, and utilities, typical lot size, etc.
The staff development review committee and other affected city agencies will review all data submitted and advise the subdivider/developer of significant items which should be considered prior to submittal of the preliminary plat or the Master Development Plan.
Subdivisions shall be officially reviewed and approved in three stages as follows in this article.
4-1 Preliminary plat.
[The following provisions shall apply to preliminary plats:]
4-1.1 Purpose. The purpose of the preliminary plat is to safeguard the subdivider from unnecessary loss of time and expense in preparation of a subdivision plat which does not conform with the specifications of this Subdivision Ordinance. The preliminary plat requires only approximate accuracy of scale and dimension. Public
agencies having jurisdiction will review preliminary plats regarding matters within their jurisdiction. During the review process, the subdivider or his agent may be called upon for consultation.
4-1.2 Subdivisions requiring no new street, water, or sewer facilities. All subdivisions which do not involve the platting, construction, or opening of new streets, water or sewer facilities may be accepted by the
City of Tifton Zoning Administrator in the form of a final plat, provided that essential data required by the reviewing agencies to insure compliance with the intent of this Ordinance is submitted.
4-1.3 Filing. Any person desiring to subdivide land shall file with the City of Tifton Zoning Administrator five copies of the preliminary plat accompanied by a letter of application. The letter of application will describe the proposed subdivision at length and will also state for what purposes easements may be utilized for such as water, streets, power or telecommuni3-9 TIFTON CODE
cations maintenance. There will not be any restrictions on the use of easements.
The letter of application shall contain the name and address of the developer(s) and his agent(s), the zoning of the property to be subdivided, whether or not the subdivision will be developed in phases, plans for annexation, and plans for serving the
proposed subdivision with sewer and water facilities. The plat shall be prepared in accordance with this Ordinance and with
applicable city specifications by a registered land surveyor, who is licensed under the laws of the State of Georgia. The
preliminary plat shall be deemed filed with the planning commission when it is filed with the City of Tifton Zoning Administrator. At the time of filing, a certificate of filing shall be provided to the subdivider and shall include the time and
date of filing. The zoning administrator shall have authority to reject the preliminary plat if he or she finds it does not comply with this Ordinance. If rejected,
the zoning administrator shall provide the subdivider with a written statement specifying all the respects in which the plat fails to comply. The subdivider may appeal to the planning commission from such rejection. Filing of the preliminary plat shall be accomplished at least 30 days prior to the regular planning commission meeting at which it is to be considered. The preliminary plat shall include:
a. Title block and north arrow. The plat will show the name of the proposed subdivision, its location, the name, address and registration number of the surveyor preparing the plat and the date of the plat. A north arrow shall be included with a notation referencing the bearings to magnetic north, astronomical north or grid north.
b. General layout. The plat shall show information as to the proposed street layout and widths, layout of lots with a notation
as to the minimum size and width of lots and proposed open space if any. Any lands to be dedicated will be clearly identified.
Plat scale shall be one inch equals 100 feet. Scale, total acreage of the site and total number of lots created shall be indicated. Lot and block identification and building setback lines shall also be indicated.
c. Topography. The plat shall show existing contour lines dashed and any proposed contour lines solid, both set of lines to be at ten-foot intervals (quad sheets), mean sea level (M.S.L.). Prominent drainage features such as lakes, depressions, streams, etc., which could affect the design of the subdivision shall be shown.
Engineering data showing the high water elevation and how it was established shall be submitted with the plat.
d. Existing features. The plat shall show the locations and names of existing and platted property lines, streets (and their rightsof-way), railroads (and their rights-ofway), public and private rights-of-ways, sanitary sewer (and size), water mains
(and size), bridges, culverts, storm drainage (and size), easements, parks and other public open spaces, land lot and land
district lines, city limits lines, and names of adjoining property owners or subdivisions. Groups of trees and wetland areas shall also be indicated.
e. Location map. The plat shall include a small scale map of sufficient clarity so that the location of the proposed subdivision can be readily determined.
f. Water and sewer. A statement from the subdivider shall be submitted with the preliminary plat which will describe the method by which sanitary sewer and water facilities will be provided.
g. Future tract plan. In cases where a subdivision is to be developed in stages with additional plats being filed with the planning commission at a later date(s), the filing of the initial plat will be accompanied by [a] future tract plan, a reasonably accurate plat in sketch form of the entire
tract which will show the future street system and topography (quad sheets) for the entire tract. Once the required tract plan has been given approval by the planning commission, five copies of the approved future tract plan must be provided for distribution to the various reviewing
agencies and the inspections office.
h. Wetlands. Approximate location of wetlands boundaries shall be delineated on the preliminary plat. All preliminary plats delineating wetlands shall have on the face of said preliminary plat the note "No fill or work shall be permitted within jurisdictional wetlands without a prior permit from the U.S. Army Corps of Engineers." All minimum lot areas per designated zoning classification requirements shall be calculated upland of any wetlands
boundaries within or contiguous to the project 4-1.4 Completeness. If any of the above-required information is omitted or misrepresented on the plat, the City of Tifton Zoning Administrator may refuse to review the plat and shall return the plat to the subdivider to be completed or revised.
4-1.5 Approval by individual agencies. No preliminary plat shall be approved by the planning commission unless it is approved by the staff development review committee. Said agencies shall, with or
without modification, approve or disapprove the preliminary plat to the extent that each has jurisdiction. If the plat is
rejected, the respective reviewing agency shall provide the planning commission with a written statement specifying all aspects where the plat fails to comply.
4-1.6 Staff development review committee. Upon receipt of the filing of the preliminary plat, the zoning administrator shall prepare those materials for presentation to the staff development review committee.
The staff development review committee shall review the preliminary plat for technical compliance with the City of Tifton Land Subdivision Ordinance, Zoning Ordinance, Comprehensive Plan, and other city ordinances that might impact the
proposed land subdivision. The staff development review committee shall recommend in writing approval, conditional approval, postponement or disapproval within 30 days of submission.
4-1.7 Coordination. It shall be the responsibility of the zoning administrator to insure that the respective reviews of the staff
development review committee are brought together in a timely fashion for proper presentation to the planning commission.
4-1.8 Review by planning commission. The planning commission shall review the preliminary plat, giving due consideration to the review of the staff development review
committee. The director of pubic works, the planning commission, and staff development review committee shall then recommend to the mayor and council of the City of Tifton for preliminary approval,
conditional approval, postponement or disapproval within 30 days of submission.
The subdivider may waive in writing this requirement and consent to an extension of such period.
a. Preliminary approval. The developer is now authorized to proceed with the preparation of the required improvement plans, outlined in detail under section 4-2. No developer shall proceed with any construction or any other work in the proposed subdivision before obtaining preliminary approval of these improvement plans in writing. Lots shall not be sold nor shall building construction begin at this time. Preliminary approval grants the developer a maximum time of 18 months within which
he shall submit his improvements plan and final plat for approval unless a time extension is granted by the planning commission before the expiration of the 18-month period. If such time extension is granted, it shall be for not more than 12 additional months. Failure to submit improvement plans and final plat within this time period, including extension
if any, shall invalidate preliminary plat approval and require resubmission of preliminary plat. Additionally, if, in the opinion of the staff development review committee, substantial changes have been made to
the approved preliminary plat, the revised plat shall be resubmitted as a new preliminary plat.
b. Conditional approval. The developer may proceed after written notice from the zoning administrator, as outlined under "preliminary approval," but only after he has submitted at least five copies of the corrected preliminary plan to the zoning administrator, noting thereon the condition or changes required by the approval of the planning commission.
c. Postponement. Action is delayed for specific reasons which shall be noted and transmitted in writing to the developer by the zoning administrator. Postponed preliminary plans may be reconsidered by the planning commission without resubmittal to the staff development review committee and the Tift County Health Department.
d. Disapproval. Denial of the application for subdivision because the developer's plans are not in compliance with this Ordinance. For further consideration, the developer must rework and resubmit his plans
as though they were a completely new preliminary plan. The specific reasons for disapproval shall be stated to allow for correction.
4-2 Improvement plans.
[The following provisions shall apply to improvement plans:]
4-2.1 General requirements. Subdivision plats receive their second official consideration as "improvement plans." These plans shall be approved by the city engineer who shall certify that the improvement plans are in conformance with this Ordinance, official city specifications, and with the requirements of the approved preliminary plan. No developer shall proceed with any construction work in the proposed subdivision before obtaining this approval. This process of improvement plans approval is
between the city engineer and the developer and is not subject to planning commission review and approval.
4-2.2 Professional engineer or consultant (if applicable) required. Should certain design calculations be required to resolve flow problems, possible erosion or drainage problems, or other detailed design problems which might be encountered in
the process of preparing the required improvement plan, the city engineer shall be authorized to require the services of a
professional engineer or consultant in the improvement plan design process. Should such services be required, such plans shall reflect the engineer or consultant's state registration. All professional surveying, engineering or consultant service costs shall be the sole responsibility of the applicant.
4-2.3 Filing. To secure formal review of his improvement plans, the developer shall file with the zoning administrator three certified white background prints of the improvement plans signed and sealed by the developer's registered consultant. The zoning administrator will then distribute the improvements plan to the staff development review committee which shall jointly review the proposed improvement
plans and shall approve or deny the proposed improvement plans. The zoning administrator shall notify the planning commission of the committee's action, in writing.
a. Approval. The developer is now authorized to proceed with the physical improvements in the subdivision, after securing any required construcAPPENDIX B—SUBDIVISIONS 4-2 tion permits, and may proceed with
the preparation of the final subdivision plat.
b. Conditional approval. The developer may proceed as outlined in the preceding paragraph, but only after he submits three certified copies of the corrected improvement plans to the city engineer for his review and approval.
c. Denial. Disapproval of the improvement plans. For further consideration, the developer must rework his plans to conform to the requirements of this Ordinance, and then
submit the reworked plans to the zoning administrator as though they were a completely new set of plans.
4-2.4 Plans and data required for improvement plan submission. The plans for the required public improvements shall be
prepared for the approval by the staff development review committee prior to the construction and only after approval of the preliminary plat. Such improvement plans shall show the proposed locations, sizes, types, grades and general design features of each facility and shall
be based on reliable field data. Improvement plan approvals are good for 24 months. If the subdivision is sold prior to
completion and final platting, a mandatory review by the staff development review committee shall be required. Failure to comply may result in revocation of
construction permit after notice and hearing before the planning commission. The developer shall receive a minimum of ten
days' written notice of said hearing.
The improvement construction drawing shall be submitted on white background prints. The sheet size shall be 24 inches by 36 inches unless another size is approved by the city engineer. The drawing shall be include the following information:
a. Construction plans. The developer shall provide the plan and profile of each proposed street (indicating the existing ground surface elevation and proposed street grade surface elevation including extensions, except where street runs into an existing street, for a distance of 100 feet to 300 feet beyond the tract boundary) as required by the city engineer. Design shall be in accordance with good engineering practices.
b. Street-typical sections. A typical section of each proposed street shall be submitted, showing the width of pavement and the rights-of-way.
c. Water supply, sanitation systems, and stormwater drainage. The plan and profile of proposed water and sanitation, storm drainage or other drainage systems, with grade and sizes indicated are required. Stormwater
drainage shall be consistent with applicable city ordinances and other applicable governmental agencies.
Water and sewer systems shall be approved by the staff development review committee and all relevant state agencies. The plat shall not be recorded until the developer submits to the zoning administrator all final permits required for the construction of all improvements from other state, local or federal agencies.
d. Utility service agreement. A developer's agreement for utilities service shall be required before final improvement plan approval is granted.
e. Other public improvements. A plan shall be prepared for parks, recreation or other public use areas and improvements if included in the approved preliminary plat.
f. "As built drawings." The designing surveyor or engineer shall submit to the city engineer two sets of white background prints of certified "as built" drawings prior to recording of the final plat.
4-3 Final plat.
[The following provisions shall apply to final plats:]
4-3.1 Conformance. The final plat shall conform with the approved preliminary plat.
If desired by the subdivider, he may submit only that portion of the preliminary plat he proposes to record and develop at
that time, provided that such portion conforms with all requirements of this Ordinance. The record plat (final plat) is to be prepared and sealed by a registered land
surveyor licensed in the State of Georgia.
No plat of a land subdivision shall be recorded unless the plat conforms to City of Tifton Zoning Ordinance requirements and the city's Land Subdivision Ordinance, and the mayor and council have formally accepted dedication of any proposed streets and encroachments.
4-3.2 Filing. Filing the final plat with the zoning administrator shall include the following:
a. A letter of application shall contain:
1) The name and address of the persons developing the subdivision and his agent(s).
2) Zoning of the property to be subdivided.
3) Whether or not the subdivision will be developed in phases.
4) Plans for serving the proposed subdivision with sewer and water facilities.
b. A complete list of deviations, if any, from the approved preliminary plat.
c. A copy of the agreement for providing the necessary water and sewer facilities.
d. A fee to cover the cost of investigation and review of the preliminary plan, construction plans, the final
plat, and final recording costs will be charged at time of application. The fees are as set by the mayor and council.
e. The original reproducible on plastic or linen and five blueline prints of the final plat, which will include the following:
1) Sheet design. The final plat shall conform to the items listed under the preliminary plat (4- 1.3a, 4-1.3b, 4-1.3d, 4-1.3e, 4-1.3g) and the requirements thereof, as set forth in this Ordinance and shall be drawn in black India ink on one or more sheets of linen tracing cloth or mylar film measuring 18 inches by 22 inches. When two or more sheets are used, a key map shall be shown on each sheet. There shall be a two-inch margin on the left end of the plat and a one-half-inch margin on the remaining three sides. A revision to a recorded plat shall be drawn in black India ink on the same type cloth or film as mentioned above.
The final plat shall be drawn on the scale (stated and graphical) of 1″ = 100′. If necessary, more than one sheet may be used as long as a key map is provided to relate each sheet to the entire platted area.
_________________________________________________________________________________________________
2) Surveyor certificate. The following certificate shall be entered on the face of the plat as shown in Figure 1. Placement of this certificate may vary as necessary:
I certify that all measurements are correct and were prepared from an actual survey of the property made under my supervision; the field data upon which this plat is based has a closure precision of 1 (one) foot in feet and an angular error of per angle point, and was adjusted using rule; the plat has been calculated for closure and is found to be accurate within 1 (one) foot in feet; monument and pin locations are correctly shown by the symbols and the pins are (type of metallic material and
length).
Signed ___________________________________ (Seal) (Date) ___________________________________ Surveyor, Georgia Registration No. ________________________________________________________
a) The surveyor must certify whether or not the property is located in a special flood hazard zone and indicate the informational source and zone of the property. If the property is located within a flood hazard zone, then the limits of the zone must be shown.
b) Proposed lots located in any flood zone will require certification of elevation to insure future construction meets applicable city ordinances regarding the floodplain.
c) Any identified wetlands must be indicated on the final plat, and proof of compliance with any U.S. Army Corp of Engineers requirements for wetlands must be submitted prior to recording of the final plat.
3) Owner certificate. The following certificate shall be entered on the face of the plat as shown in Figure 1. Placement of this certificate may vary as necessary:
We, the undersigned owner(s) and/or mortgagee(s) of the subdivision, hereby offer to dedicate and/or reserve for public use the rights-of-way, easements and other public areas as designated on this plat.
Owner Date Mortgagee Date _____________________ _____________________ _____________________ _____________________ _____________________ _____________________ _____________________ _____________________
4) Approvals. The following spaces shall be provided (as shown in Figure 1) in the form listed below for approval by all agencies having jurisdiction.
Placement on plat may vary:
Approved by the Tift County Health Department, Tift County, Georgia.
Date __________ Signed _________________________________________________________________ Health Department
Representative Approved by City Engineer, City of Tifton, Georgia.
Date __________ Signed _________________________________________________________________ City Engineer
Approved by the Greater Tift County Planning and Zoning Commission.
Date __________ Signed _________________________________________________________________ Planning Commission
Chairman Approved by the Mayor and Council, City of Tifton.
Date __________ Signed _________________________________________________________________ City Manager
5) Surveying data. The final plat shall contain the location, bearing and length of every street line, lot line and boundary line whether curved or straight. A note will be made on the plat as to whether curved or straight. A note will be made on the plat as to whether curved dimensions are arc or chord distances. Easement lines (and width), land lot and land district lines will be shown.
The final plat shall also identify each tract within the proposed subdivision by block and lot number.
All dimensions shall be shown in feet and decimals to the nearest 1/100 of a foot, and all angles shall be shown to the nearest second. The error of closure shall not exceed one in 10,000, or as defined by the technical standards required by O.C.G.A. § 15-6-67, of the Law Governing the Practice of Professional Engineering and Surveying, as amended. The final plat shall have a note listing the following:
Total Acres Total Lots
6) Monuments. The final plat shall show the accurate location, material and description of all monuments. A permanent master bench mark shall be established (subject to the approval of the city engineer) within or adjacent to the site by transfer of levels, not less than third order accuracy, from the nearest approved bench mark of known mean sea level (M.S.L.) elevation showing its location on the final plat and recording its elevation on the final plat to the nearest 1
/100 of a foot.
7) Easements. In addition to the requirements for the preliminary plat as set forth in section 4-1.3
d. of this Ordinance, the final plat shall show the location and width of all public utility easements and drainage easements where required.
_________________________________________________________________________________________________ 4-3.3 Filing certificate. The final plat shall be
deemed filed with the planning commission when it is filed with the zoning administrator. At the time of filing, a
certificate of filing shall be furnished to the applicant which will include the time and date of filing. The final plat shall be prepared in accordance with this Ordinance and applicable city requirements by a registered land surveyor, who is
licensed under the laws of the State of Georgia. The zoning administrator and city engineer shall have authority to reject the final plat if they find that it does not conform with the approved preliminary plat or this Ordinance. If the plat is rejected, the zoning administrator shall
provide the subdivider with a written statement specifying all the respects in which it does not conform. Filing the final plat shall be accomplished at least 30 days prior to the regular planning commission meeting at which it is to be considered.
4-3.4 Approval by individual agencies. No final plat shall be approved unless the planning commission first obtains approval of the Tift County Health Department and the city engineer. Said agencies shall approve, with or without modification, or disapprove the final plat to the extent to which each has jurisdiction.
Within ten days of time of submittal, the developer will be notified of approval or disapproval. If disapproved, reasons for denial shall be noted.
4-3.5 Staff development review committee. Upon receipt of the filing of the final plat, the zoning administrator shall prepare those materials for presentation to the staff development review committee. The staff development review committee shall review the final plan for technical compliance with the City of Tifton Land Subdivision Ordinance, Zoning Ordinance, Comprehensive Plan, and other city ordinances that might have an impact on the proposed land subdivision. The staff development review committee shall recommend in writing, approval, conditional approval, postponement or disapproval.
4-3.6 Coordination. It shall be the responsibility of the zoning administrator to insure that the respective reviews of the city
engineer, Tift County Health Department and staff development review committee are brought together in a timely fashion for proper presentation to the planning commission.
4-3.7 Review by planning commission. The planning commission shall review and approve the final plat, giving due consideration to the reviews of the staff development review committee and the
Tift County Health Department. The planning commission shall vote for final approval, conditional approval, postponement or disapproval. No plat shall be acted upon by the planning commission
without a hearing, and due notice of the time and place of such hearing shall be provided to the applicant.
4-3.8 Recording a plat. Upon satisfactory compliance with this Ordinance, and after acceptance by the mayor and council of
any proposed streets and improvements, and the required guarantee has been posted, the city manager shall release the plat to the zoning administrator for recording. After a subdivision has been recorded, the subdivider may petition the mayor and council for permission to remove the subdivision plat from the land records of Tift County. The mayor and
council may permit such removal providing that no lot in the subdivision has been sold.
4-3.9 Revision to a recorded plat. Proposed revisions to a recorded plat which do not affect platted rights-of-way may be submitted for administrative approval in accord with the provisions of section 4-3.12.
In addition, a revision to a recorded plat shall show the name, phase (if any), date of the recorded subdivision plat being revised, and the exact citation with regard to the county land records and the book and page number wherein said plat
is recorded. Revisions to a recorded plat which involve platted rights-of-way or other major changes shall be submitted as a preliminary plat.
4-3.10 Distribution. The zoning administrator shall make the following distribution of prints and reproducibles:
City engineer One reproducible and one print Clerk of court (recording copy) One print Director of public works One print Building inspector One print City utilities department One print City fire department One print City police department One print County tax assessor One reproducible and One print Tift County Health Department One print E-911 One print Servicing telecommunications company One print Servicing electrical utility company One print Servicing Cable TV company One print Board of education One print Planning commission One reproducible and One print 4-3.11 Administrative approval of small subdivisions and resubdivisions. Where located on an existing road or street, the combination of previously platted lots, where the total number of lots does not increase
and the resultant lots are equal to the current standards of the city as determined by the staff development review committee, shall be subject to administrative approval. Such plats shall conform fully to the requirements of this Ordinance. It shall be the responsibility of the zoning administrator to coordinate said
administrative review responsibilities.
4-3.12 Exempt plat process. Any plat submitted for recording to the office of the Clerk of Superior Court of Tift County that is
not subject to this Ordinance shall comply with O.C.G.A. § 15-6-67(d), as amended.
All plats exempt from the standard review process must be assigned a map and parcel number by the Tift County Board
of Tax Assessors if a new lot is being created. All exempt plats must be submitted on a mylar plus five prints. The mylar will be retained by the zoning administrator. Resurveys of existing parcels which do not involve a map and parcel change
must be verified by the zoning administrator and the tax assessor's office.
All exempt plats, which include resurveys of lots of record, exempt resubdivisions and exemptions by definition must be stamped as exempt prior to recording. All plats submitted for exemption must be submitted on a mylar plus five black line or blue line copies. The mylar will be retained by the zoning administrator. The copies will be stamped, signed and dated to allow recording.
ARTICLE V. MINIMUM DESIGN
STANDARDS
5-1 Blocks.
[The following shall apply to the design of blocks:]
5-1.1 Nonresidential. Blocks for other than residential use shall be of such length and width as may be suitable for their prospective use including adequate provisions for off street parking and maneuvering space.
5-1.2 Residential. The length of residential blocks shall not exceed 1,200 feet nor be less than 400 feet. Blocks of more than 1,200 feet will be permitted if natural or manmade barriers such as streams and railroads require blocks of greater size.
The depth of residential blocks shall be sufficient to allow two tiers of lots, unless prohibited by natural or manmade barriers or unless one tier backs onto a line of another person's property, except as provided for in section 5-3.4. The foregoing shall not prevent the inclusion of blocks of
greater width and length, when public use areas such as parks and playgrounds are included in the project design. These areas shall be covered by adequate maintenance agreements if not dedicated and accepted for public maintenance.
5-1.3 Crosswalks. Rights-of-way for pedestrian crosswalks shall be provided when in the opinion of the planning commission
crosswalks are necessary for direct pedestrian access to schools, shopping centers, and parks. A crosswalk right-of-way shall
not be less than 20 feet wide.
5-2 Easements.
[The following provisions shall apply to easements:]
5-2.1 Utility. Utility locations, where feasible, shall be located within the platted street right-of-way; if easements are required, they shall be a minimum width of 20 feet.
Where possible (as determined by the city engineer), water and gas lines shall be located on the same side of the street and sewer lines shall be on the other side.
Telecommunications and electric lines may be located on the same side or opposite sides of the streets. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they
shall be platted within said subdivision or phase thereof.
5-2.2 Drainage. No subdivision plat shall be accepted or approved unless it includes a hydrology plan and a sedimentation and soil erosion control plan certified by a professional engineer or registered land surveyor. The plan shall provide a means of detaining storm and surface water runoff on-site, up to and including a 25-year flood event, with such runoff to be released from the property at the same rate of flow that existed prior to the development of property. The engineer or surveyor shall certify that the designed stormwater detention system for the development will fully satisfy these provisions. The city engineer will verify the accuracy of the drainage plans and may
call upon the services of other design professionals for review at the expense of the developer should on-site conditions warrant more detailed review. The developer is solely responsible for the accuracy of all the submitted plans.
5-3 Lots.
[The following shall be the minimum design standards for lots:]
5-3.1 Minimum lot elevation. The lot area contained within and contiguous to the building walls and for minimum distance of ten feet measured from all sides of said building shall have a minimum elevation of three feet above the 100-year flood stage
of streams or canals in the particular area being developed based on acceptable engineering procedure and approved by the city engineer. Said minimum elevation
shall be subject to approval by the Tift County Health Department. A change in elevation necessary to meet this requirement will be permitted by filling within a designated flood hazard zone, only if all
other applicable permits are obtained prior to any fill work being done.
(a) Floodprone areas. All preliminary and final plats shall clearly delineate identified floodplain areas in conformance with the City of Tifton Floodplain Management Ordinance.
(b) Wetlands. All final and preliminary plats shall clearly delineate any identified wetlands in conformance with the Georgia Department of Environmental Protection's Part V, Environmental Planning Standards (Georgia Planning Act of 1989, as amended). See section 9-A of the
City of Tifton Zoning Ordinance.
5-3.2 Lot width and lot area requirements.
Lots hereafter established within a subdivision shall conform to the lot area and lot width requirements set forth in the Zoning Ordinance for the City of Tifton or in other sections of this Ordinance.
5-3.3 Corner lots. Corner lots shall be of such size and dimensions that will permit the location of buildings so as to conform with the building setback lines as prescribed in the Zoning Ordinance. Corner property lines at street intersections shall have a minimum of a 30-foot deeded radius or a 30-foot permanent miter easement.
5-3.4 Double and reverse frontage. Lots having street frontage both to the front and rear shall be prohibited (unless allowed by variance) except to provide for separation of residential development from railroad right-of-way or arterial or collector street rights-of-way. Where the aforementioned abuts or runs through any portion of the subdivision, the subdivision plan shall provide for lots backing on said railroad or right-of-way or arterial or collector street right-of-way. All lots shall have a minimum depth adequate to provide for the rear yard setback required by the respective zoning district, plus an additional 30 feet, ten feet of which shall be a planted,
nonencroachable buffer strip separating the lots from the right-of-way. The buffer zone shall be landscaped with hedges or closely planted small trees to provide a visual screen and shall be planted at the time of development. Said planted, nonencroachable buffer strip shall be clearly indicated on the final plat.
5-4 Building lines.
All building setback lines shall be as specified in the Zoning Ordinance of the City of Tifton.
5-5 Commercial and industrial use buffer zones.
When a portion of the subdivision is to be devoted to commercial and/or industrial purposes and when the commercial and/or industrial area adjoins residential lots or when a portion of a proposed subdivision adjoins an area zoned for commercial or industrial use, a buffer zone not less than 20 feet in width shall be provided. Said buffer strip shall be landscaped with hedges or closely planted small trees so as to provide visual screening. No building or portion thereof may be constructed in said buffer zone. Said buffer zone shall be labeled as such on the subdivision plat and shall be planted at the time of development and screening installed at the time of the installation of the required minimum improvements.
5-6 Streets.
The street and road system of any subdivision shall give due consideration to the Major Thoroughfare Plan. A right-of-way will not be accepted that is determined to be limiting the growth or
traffic flow of an area.
5-6.1 Access. Every lot of every subdivision shall abut a public or an approved private street a minimum of 60 feet which is or shall be maintained by the appropriate governing body. Where the subdivision does not immediately adjoin a public street, the subdivider shall provide a public street from the subdivision to a public or private street.
5-6.2 Alignment and continuation. Streets within the subdivision shall be so arranged as to provide for the alignment and continuation of or projection of existing public or private streets.
5-6.3 Cul-de-sacs. Cul-de-sacs shall terminate in a circular turnaround having a rightof-way of not less than 160 feet in diameter. Paving within the turnaround shall have an outside radius of not less than 70
feet. Temporary cul-de-sacs, approved by the planning commission, may be surfaced with gravel.
5-6.4 Dead-end streets. Dead-end streets and dead-end alleys shall be prohibited unless terminated with a cul-de-sac.
5-6.5 Half streets. Half streets shall be prohibited. Half streets are streets and alleys with substandard rights-of-way.
5-6.6 Intersections. The centerline of no more than two streets shall intersect at any one point. No street shall intersect another street at less than 80 degrees and shall as nearly as possible intersect at 90 degrees 5-6.7 Right-of-way radius. The right-of-way radius at street intersections shall be not less than 30 feet except where Georgia
Department of Transportation standards shall prevail.
5-6.8 Curved streets. The centerline radius shall not be less than 350 feet for arterial streets and 120 feet for collector and local streets. Centerline tangents between reverse curves shall be not less than 200 feet for arterial streets and 100 feet for
collector streets and local streets.
5-6.9 Right-of-way extension. Where the proposed subdivision abuts undeveloped properties, it is essential that appropriate extensions of streets be left available to provide for future growth and development. Such street rights-of-way to facilitate future development shall be extended by dedication and improved to the boundary of the proposed subdivision.
5-6.10 Street jogs. Street jogs at intersections shall be not less than 120 feet between rights-of-way. This provision shall not negate the design intent of section 5-6.2.
5-6.11 Street names. The subdivider shall indicate on the subdivision plat the proposed name of all streets within the subdivision.
Streets and roads that are obviously in alignment with and are extensions of existing previously named or numbered streets shall bear that name. The names
of all new streets within the subdivision shall be subject to the review and approval of the mayor and council. New street names shall not duplicate or closely
resemble the names of streets already in existence within Tift County or any incorporated city within Tift County.
5-6.12 Alleys. Public alleys shall not be allowed in single-family residential subdivisions.
5-6.13 Street right-of-way and pavement width.
Street rights-of-way shall be measured between lot lines and shall be prescribed in this section. The pavement width shall be as prescribed below:
Street Classifications Minimum Rightof-Way (In Feet) Minimum Pavement Width (In Feet) Arterial 100 48 Collector 80 24 Marginal Access 70 24 Local Street 60 22 Easements ** ** **As appropriate for the proposed development, with approval required by the city engineer.
5-6.14 Additional rights-of-way. If the subdivision boundary line lies adjacent to the right-of-way line of an existing street of
less than minimum right-of-way width, the required extra right-of-way to bring the street to current standards shall be dedicated, except in those cases wherein the existing street was constructed to then-current standards, all reasonable efforts shall be made to acquire such additional rights-of-way.
5-6.15 Provisions for public use. In subdividing land, due consideration should be given to suitable sites for schools, parks, playgrounds, and other common areas for public use. Such land should be located in accordance with the Comprehensive Plan.
The acquisition of such land shall rest with the appropriate public authority.
ARTICLE VI. MINIMUM IMPROVEMENTS
6-1 General [provisions].
The subdivider shall provide all public improvements as required by this Ordinance and by applicable city specifications and requirements.
6-1.1 The design of all minimum improvements shall be under the direction of a registered consultant registered in the State of Georgia and all plans shall bear his seal.
(See section 4-2.2.)
6-1.2 A letter of approval from the city engineer shall accompany all water and sewer plans.
6-2 Paving and drainage.
Within the incorporated area of the City of Tifton, the subdivider shall install paving with centerline striping and proper drainage, which includes ditch slopes and grassing requirements.
Proper drainage control structures which may include paved ditches and canals, canals, and retention areas. The city also requires established grass cover on road shoulders, front and back slopes of ditches and erosion control devices at outfall locations are required in subdivisions within the incorporated areas of City of Tifton.
All streets and roads shall be paved according to standards set by the Georgia Department of Transportation Standard Specifications for Roads and Bridges. The city engineer will determine the type of base material to be used on each and all subdivisions based on conditions and sound engineering judgment prior to beginning any grading work. These materials shall be applied according
to established construction methods and shall be subject to inspection by and final approval by the city engineer prior to acceptance for public maintenance.
6-3 Curbs and gutter.
ARTICLE VII. ACCEPTANCE AND
GUARANTEE OF COMPLETED MINIMUM
IMPROVEMENTS
7-1 Completion of improvements.
Before the plat is signed by the Tifton City Manager, all developers shall be required to complete, in accordance with this Ordinance and to the satisfaction of the city engineer, all minimum
improvements as required by article VI of this Ordinance, specified on the final plat, and as approved by the planning commission, and to dedicate same to the City of Tifton.
7-1.1 In lieu of completion of the minimum improvements as required under this Ordinance prior to recording of the final plat, the developer may post an irrevocable letter of credit or a performance bond.
This instrument shall be made payable upon demand to the City of Tifton to insure the completion of the required minimum improvements and shall be in an amount of not less than 110 percent of the
estimated cost of all required minimum improvements. Cost estimates shall be prepared by the subdivider's registered engineer or consultant and shall be subject to the review and approval of the city manager and city engineer.
7-1.2 Bonds and/or cash posted pursuant to this alternative shall be released after formal acceptance of improvements by the mayor and council.
7-2 Acceptance.
Upon written notification of completion of minimum improvements, the Tifton City Manager, within 30 days after such notice, accept or reject,
in writing, the completed improvements stating the deficiencies, if any.
7-2.1 The required minimum improvements shall not be accepted unless they conform to this Ordinance and officially adopted city specifications.
7-2.2 a. Upon completion of construction of improvements required and/or regulated by this Ordinance, the subdivider's engineer, surveyor or consultant shall deliver to the city engineer:
1. All required test data not previously forwarded to the city engineer.
2. Two complete sets of as built plans, each sheet of which is clearly marked as built in the lower right corner. As built plans shall depict actual construction on the date of submittal of said plats. One set shall be reproducible and one set shall be prints. For the purpose of this Ordinance "set" does not imply one sheet.
b. The city engineer is authorized to reject any construction which fails to conform to the approved plans and specifications and this chapter.
c. The city shall bill the subdivider the city's cost for any subsequent inspections necessitated by the subdivider's failure to construct improvements in
accordance with approved plans and specifications of this chapter. Said costs shall be based on a schedule of fees established as 21 /2 times the inspector's hourly rate.
7-3 Guarantee.
The subdivider shall guarantee for one year after acceptance by the City of Tifton all materials and workmanship in the form of a bond which shall be a 15 percent of the total improvement cost.
7-4 Recording of plat.
Upon acceptance of all improvements installed by the developer and posting of the required guarantee as provided in section 7-3, the office of the city manager shall release the final plat for recording. Said plat shall be returned to the zoning administrator, who shall record said plat in a timely manner and distribute appropriate copies thereof in accordance with the directives of section 4-3.11.
7-5 Release of guarantee.
Release of guarantee shall be made by the city manager one year after completion of all required improvements. At the end of one year, the city manager shall arrange for a maintenance/warranty inspection by the city engineer with said inspection expenses to be solely the responsibility
of the subdivider. Any bonded maintenance of the minimum improvements shall be determined by the city engineer, and said work shall be required of the developer or his contractor prior to release of any guaranteed funds by the city manager.
ARTICLE VIII. VIOLATION AND
PENALTIES
8-1 Violations.
[The following shall apply to the violation of provisions hereof:]
8-1.1 [Conveyance or improvement of property not approved and recorded prohibited.] It shall be unlawful to convey or improve property by the construction of buildings on lots of any land subdivision which has not been approved and recorded as provided in this Ordinance, except those parcels recorded prior to the effective date of this Ordinance.
8-1.2 [Recording or altering subdivision plats without prior approval of planning commission prohibited.] It shall be unlawful to record a subdivision plat which has not
been approved by the Greater Tift County Planning and Zoning Commission and signed by the chairman of that commission. It shall be unlawful to alter recorded subdivision plats without prior approval
of the planning commission, unless the purpose of such alteration is to combine or increase the size of existing lots.
8-1.3 Each day's violation a separate offense.
After due notice has been given, each and every day's violation of any provision of this Ordinance shall constitute a separate offense.
8-2 Violation and penalty.
Any person who violates any provision of this Subdivision Ordinance shall, upon conviction in municipal court, be penalized by the imposition of a fine not exceeding $500.00 per day and/or imprisonment for a period not greater than 60 days.
ARTICLE IX. LEGAL STATUS
9-1 Effect of invalidity of part of resolution.
Should any section or provision of this Ordinance be decided by the courts to be invalid, such decision shall not affect the validity of this Ordinance as a whole or any other part thereof.
9-2 Conflict with other laws.
All ordinances or parts of ordinances in conflict herewith are hereby repealed.
9-3 Amendment.
This Ordinance may be amended from time to time by the mayor and council of the City of Tifton, and all amendments shall be submitted to the planning commission for its review and recommendation. Prior to enacting an amendment to this Ordinance, the city shall hold a public hearing thereon at least 15 days but not more than 45 days. Notice of the time and place of hearing shall
be published in the official legal organ of the City of Tifton.
9-4 Variances.
In cases of undue hardship under this Ordinance, or on questions of official interpretation (see section 3-6), any property owner may petition
the planning commission for a variance, and where the planning commission concurs, it will prepare and send to the mayor and council a recommendation for a variance when considered necessary and equitable. In case the planning commission fails to concur, the property owner may appeal to the mayor and council for relief. All variance requests will require a public hearing in the same manner as an amendment. None of the items listed in article VI, Minimum Improvements, of this Ordinance shall be subject to variance.
9-5 Effective date.
This Ordinance shall take effect and be in force from and after the date of adoption.
ARTICLE X. SCHEDULE OF FEES
10-1 Plat review fee schedule.
All plats to be reviewed, including phases, shall adhere to a fee schedule as approved from time to time by the mayor and council of the City of Tifton.
10-2 Variance requests.
All variance requests shall be accompanied by an application fee and costs to cover all publications of required public notices and staff review costs as approved from time to time by the mayor
and council of the City of Tifton.
Date of Adoption: May 1, 2000 /s/ Paul O. Johnson Mayor, City of Tifton
ATTEST:
/s/ Carla D. Cooper City Clerk
(SEAL)
LAND DEVELOPMENT CODE (Appendix
A) (Cont'd.)
LAND DEVELOPMENT CODE (Appendix
A) (Cont'd.)
LAND DEVELOPMENT CODE (Appendix
A) (Cont'd.)
LIBRARIES
Offenses and miscellaneous provisions Library rules and regulations adopted . 46-1
LICENSES AND PERMITS
Adult entertainment establishments . . . . . 10-31 et seq.
See: AMUSEMENTS AND
ENTERTAINMENTS
Alcoholic beverages Licenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-61 et seq.
See: ALCOHOLIC BEVERAGES
Body art establishments . . . . . . . . . . . . . . . . 10-46 et seq.
See: BODY ART ESTABLISHMENTS
Buyers of precious metals Coin operated amusement machines . . . . . 10-200 et seq.
See: AMUSEMENTS AND
ENTERTAINMENTS
Construction codes Demolition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18-141 et seq.
See: BUILDINGS AND BUILDING
REGULATIONS
Excavations and street cuts . . . . . . . . . . . . . 70-61 et seq.
See: STREETS, SIDEWALKS AND
OTHER PUBLIC PLACES
Section Section
REPAIRS
Land development regulations. See: LAND DEVELOPMENT CODE (Appendix A) Traffic and vehicles Operation of vehicles Stopping, standing and parking Parking for certain purposes
REPORTS. See: RECORDS AND REPORTS
RESIDENCE
RESIDENTIAL. See: HOUSING
RESOLUTIONS. See: ORDINANCES,
RESOLUTIONS, ETC.
RESTAURANTS
Utilities Rates and charges Utility bond required for hotels,
RESURFACING AND RESTORATION
RIGHT OF ENTRY
Body art establishments Nuisances Mosquito control Sewer use Compliance monitoring Right of entry; inspection and Use of public sewers required Entry of city personnel permitted . . . 62-60 Solid waste Private disposal sites Utilities
ROLLER SKATES, ROLLER BLADES. See:
COASTER WHEELED DEVICES
S
SAFETY
Public safety . . . . . . . . . . . . . . . . . . . . . . . . . . . 58-31 et seq.
See: PUBLIC SAFETY
Taxicabs Safe mechanical condition of taxicabs Truck routes, enforcement Traffic safety department maintains
SALARIES. See: COMPENSATION
SALES
Alcoholic beverages Sales permitted and sales prohibited . . 6-4 Land development regulations. See: LAND DEVELOPMENT CODE (Appendix A) Oakridge Cemetery Offenses against public peace Weapons Archery—Sale, use of hunting arrows 46-83 Sale of certain weapons prohibited, Offenses and miscellaneous provisions Sale of literature advocating abuse of Police department Traffic and vehicles Operation of vehicles Stopping, standing and parking Parking for certain purposes
SAMPLING
Sewer use Compliance monitoring Right of entry; inspection and Reporting requirements Notice of violation/repeat sampling
SANITATION. See: HEALTH AND SANITATION
SCAVENGING
Environment Nuisances Litter Removing material from commercial container without permission from owner/ Solid waste Public disposal sites
SCHEDULE OF FEES AND CHARGES
SCHOOLS
Curfew for minors during school hours . . . 46-9 Land development regulations. See: LAND DEVELOPMENT CODE (Appendix A) Speed regulations Specific speed limits
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.