Skip to content
Georgia Commons
Menu

Troup County · Zoning Ordinance

Appendix C - DEVELOPMENT AND PERMITTING / Article 2 - PERMITS AND INSPECTIONS

Sec. 2.7. Contractor responsibilities.

About this text

  • As published by Municode, current through 2026-06-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

It shall be the duty of every contractor who shall make contracts for the installation or repairs of building, structure, electrical, gas, mechanical, sprinkler or plumbing systems, for which a permit is required, to comply with state and local

rules and regulations concerning licensing which the applicable governing authority may have adopted. In such case that the state requires a contractor to have obtained a state license before they are permitted to perform work, the contractor shall supply the local government with their license number before receiving a permit for

work to be performed.

History

The history line the source prints at the end of the section.

(Ord. No. 2025-03, 6-3-2025)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:troup-county/zoning/appendix-c-article-2-2.7@2026-06-16-7b091dfe7d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Troup County Zoning Ordinance, Sec. 2.7 (Appendix C, Article 2). Contractor responsibilities | Georgia Commons