Troup County · Ordenanza de zonificación
Appendix C - DEVELOPMENT AND PERMITTING / Article 2 - PERMITS AND INSPECTIONS
Sec. 2.7. Contractor responsibilities.
Sobre este texto
- As published by Municode, current through 2026-06-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
It shall be the duty of every contractor who shall make contracts for the installation or repairs of building, structure, electrical, gas, mechanical, sprinkler or plumbing systems, for which a permit is required, to comply with state and local
rules and regulations concerning licensing which the applicable governing authority may have adopted. In such case that the state requires a contractor to have obtained a state license before they are permitted to perform work, the contractor shall supply the local government with their license number before receiving a permit for
work to be performed.
Historia
(Ord. No. 2025-03, 6-3-2025)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.