Turin · Zoning Ordinance
Article 8 - QUALITY CONTROL OVERLAY DISTRICT
8.5. Development Regulations.
About this text
- As posted on the city's website, retrieved 2026-11-11
A. Streetscape. A streetscape plan for all development in the Overlay shall be subject to approval by the Council. Front yard landscaping areas shall be as provided herein along the entire property frontage, except where driveways or other openings may be required.
Landscaping shall utilize fences, berms, walls, sidewalks, trees and other such methods subject to approval by the Council. The streetscape plan shall accommodate an undisturbed, natural buffer along the frontage of Highway 16 and Highway 54 as provided herein. All development on Highway 16 and Highway 54 shall maintain a landscaped buffer having a minimum horizontal dimension of 20 feet along all property lines abutting these roadways.
B. Underground Utilities. All on site utilities shall be located underground.
C. Site Development. Mass grading of a site shall be prohibited and all clearing shall be subject to Sec. 8.5 of this Article. Projects to be developed in phases shall be issued land disturbance permits for only those phases or portions of phases to be built within a subsequent 12-month period.
D. Site Inspection. All required silt fence and tree protection fencing shall be installed and inspected before land disturbance commences.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.