Sec. 6-4-406. Requirements for solar energy production facilities (solar farms).

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Section 6-4-404(a) through (d) shall also apply to solar energy production facilities.

(b) Solar energy production facilities as a principal use shall be permitted by special exception in the following zoning districts: industrial and agricultural (not in residential districts), provided that requirements of this article are met. The standards for special exception review, per section 6-4-332, shall apply. The local government shall not take final action on the application until it has received a recommendation from the planning commission.

(c) The design of the solar energy production facility shall conform to applicable local, state, and national solar codes and standards, and to all local government regulations. All design and installation work shall comply with all applicable provisions in the National Electrical Code (NEC), the International Residential Code (IRC), the International Commercial Building Code, the state fire code, and any additional requirements set forth by the local utility (for grid-connected solar energy production facilities) or by the local government.

(d) All applicable building permits shall be secured prior to beginning construction of a solar energy production facility.

(e) On-site power lines and interconnections shall be placed underground, to the greatest extent possible.

(f) A solar energy production facility connected to the utility grid shall provide evidence from the applicable electric utility acknowledging the solar energy production facility will be interconnected to the utility grid in order to sell electricity to the utility.

(g) Solar energy production facilities shall not be permitted in the floodway. All solar energy production facilities shall comply with title 10, as applicable.

(h) Minimum lot size. The minimum lot size for a solar energy production facility (solar farm) as a principal use is two acres.

(i) Setbacks. Solar energy production facilities shall have a minimum setback of the underlying zoning district. Power inverters, transformers, and other related equipment related to the inversion of power shall have a setback of 50 feet from all property lines.

(j) Height of collector. The height of ground-mounted collectors and mounts shall not exceed 20 feet in height. Components of solar energy production facilities are not exempt from height requirements.

(k) Airports. Any solar energy production facility proposed within a two-mile radius of an airport shall present evidence that they have gone through a review process with the Federal Aviation Administration (FAA). This review from the FAA shall indicate that the proposed facility shall not interfere with the normal operation of aircraft in the area.

(l) Fencing. A security fence of chain-link or similar material at a minimum height of six feet with a gate and locking mechanism shall enclose the perimeter of the solar energy production facility to deny access to any individuals not authorized to be on the property and for public safety. Signage should be included on the property alerting individuals to the risk from high voltage on the site.

(m) Buffer. Areas that abut residentially zoned or residential uses shall be buffered by at least one of the following:

(1) A double row of offset evergreens absent mature vegetation, installed at a height of five feet achieving opaqueness at time of installation and a minimum height of ten feet in five years.

(2) On-site mature vegetation existing at a minimum height of ten feet and a depth of 75 feet between the on-site security fence and adjacent properties or rightof-way.

(3) A single row of evergreens in combination with mature vegetation installed at a height of five feet achieving opaqueness and a minimum height of ten feet in five years.

(4) The above requirement may be met by existing vegetation subject to administrative approval, as long as sufficient opaqueness and the required height are achieved.

(5) Maintenance of the buffer shall be the responsibility of the property owner.

(n) Decommissioning. The application to establish a solar energy production facility must include a decommissioning plan, containing the following:

(1) The name, address, telephone number, and e-mail address of the person or entity responsible for implementing the decommissioning plan;

(2) A statement of conditions that require the decommissioning plan to be implemented;

(3) Identification of all components of the solar energy production facility;

(4) A plan with timeline for removing all components of the solar energy production facility from the property in the event of decommissioning;

(5) A plan for recycling or otherwise reusing all components to the greatest extent practicable.

History

The history line the source prints at the end of the section.

(Res. of 11-3-2020, att.(art. XIX, § 6))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:twin-city/zoning/6-4-406@2026-11-11-98da0e55cb

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Twin City Zoning Ordinance, Sec. 6-4-406. Requirements for solar energy production facilities (solar farms) | Georgia Commons