Twin City · Zoning Ordinance
Part II - CODE OF ORDINANCES / Title 6 - PLANNING AND DEVELOPMENT / Chapter 4 - ZONING / Article S - SOLAR ENERGY SYSTEMS AND SOLAR ENERGY PRODUCTION FACILITIES
Sec. 6-4-407. Abandonment and removal.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) The following requirements shall be met for decommissioning solar farms:
(1) Each applicant for a permit must submit decommissioning plans that describe the anticipated life of the solar project, the party responsible for decommissioning, the estimated decommissioning costs in current dollars, and the method for ensuring by bond that funds will be available for decommissioning and restoration.
(2) Solar farms which have not been in active and continuous service for a period of one year shall be removed at the owner's or operator's expense.
(3) The site shall be restored to as natural condition as possible within six months of the removal.
(4) A site will be considered decommissioned when, after inspection and approval by the city, all structures and equipment are removed and the site is re-vegetated.
If a ground-mounted solar energy system is removed, any earth disturbance as a result of the removal shall be landscaped in accordance with local regulations.
(b) If a solar energy system or facility is removed, all components shall be recycled or reused to the greatest extent practicable.
History
(Res. of 11-3-2020, att.(art. XIX, § 7))
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.