12.5.1 General application requirements. Application for a permit for any telecommunications facility shall be made to the administrator by the person, company, organization, or duly authorized agent thereof, that will own and operate the telecommunications facility. An application will not be considered until it is complete. The administrator is authorized to develop application forms to assist in providing the required information and facilitate the application process. Except for a co-location information submittal under subsection 12.5.2 of this article, the following information shall be submitted when applying for any permit required by this article and must be submitted for an application to be considered complete:
(a) Site plan or plans to scale specifying the location of telecommunications facility, transmission building and/or other accessory use, access, parking, fence, landscaped area, and adjacent land uses. Applicants shall submit both a paper location map and, if requested by the administrator, a digitized location map in a format compatible with the GIS software utilized by Liberty County, Georgia.
(b) Landscaped plan to scale indicating size, spacing and type of plantings required in subsection 12.4.7.
(c) A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors.
(d) A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise or safety impacts of such maintenance.
(e) Report from a professional qualified engineer licensed in the State of Georgia, or other appropriate qualified industry expert, documenting the following:
(i) Tower or antenna type, height, and design;
(ii) Engineering, economic, and other pertinent factors governing selection of the proposed design;
(iii) Total anticipated capacity of the telecommunications facility, including numbers and types of antennas which can be accommodated;
(iv) Evidence of structural integrity of the tower or alternative tower structure;
(v) Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris; and
(vi) Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC.
(f) Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network (i.e., whether such antenna or tower is needed for coverage or capacity).
(g) If the proposed site is zoned R-1 through R-4, B-1, B-2, or PUD, applicants must describe why an alternate site zoned A-1, AR-1 or I-1 was not proposed by identifying:
(i) What good faith efforts and measures were taken to secure such an alternate site;
(ii) Why such an alternate site was not technologically, legally or economically feasible and why such efforts were unsuccessful; and
(iii) How and why the proposed site is essential to meet service demands for the geographic service area.
The administrator will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease or similar agreement. The administrator shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
(h) The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power line easements impacting the proposed tower site.
(i) The applicant must provide any other information which may be requested by the administrator to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.
12.5.2 Tower co-location information submittals. Any person or entity co-locating an antenna or antennas which will add no more than ten (10) feet to the height of the tower and related equipment or appurtenances on or around a tower for which a permit has already been issued shall submit the following information only:
(a) The name of the person or entity co-locating the antenna.
(b) The name of the owner of the tower.
(c) The tower's permit number.
(d) The location of the tower.
(e) The remaining structural capacity of the tower.
(f) Certification that the antenna(s) and related equipment or appurtenances comply with all current regulations of the FCC.
(g) Such other information identified in subsection 12.5.1 as may reasonably be required by the administrator.
12.5.3 Inventory of existing sites. To facilitate the co-location of antennas, each applicant seeking to locate a new tower, alternative tower structure or antenna, or modify any such existing structure, shall provide to the administrator an inventory of it's existing towers or alternative tower structures. The inventory shall include all such structures that are within the jurisdiction of the governing authority; within a municipality located, in whole or in part, within Liberty County; or, within one mile of the border of Liberty County, and shall include specific information about the location (latitude and longitude coordinates), height, design, tower type and general suitability for antenna co-location of each tower, and other pertinent information as may be required by the administrator. The administrator may make such information available to members of the public, to include, without limitation, other organizations seeking to locate towers or antennas within Liberty County, and in such form and manner as the administrator deems appropriate; provided, however that the administrator is not, by sharing such information, in any way representing or warranting that such sites are available or otherwise suitable.
History
(Ord. No. 2000-002, § I, 10-3-2000)