Skip to content
Georgia Commons
Menu

Whitfield County · Zoning Ordinance

Appendix C - STORMWATER LOCAL DESIGN MANUAL

3.2.3. Wet detention ponds.

About this text

  • As published by Municode, current through 2026-05-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Wet detention ponds may be constructed if the facilities are designed to the criteria outlined in section 4.25 of the GSMM (Volume 2). However, the designer will be required to submit a water balance simulation as part of the hydrologic and hydraulic report submittal.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:whitfield-county/zoning/3.2.3@2026-05-11-70d9ace1c9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Whitfield County Zoning Ordinance, 3.2.3. Wet detention ponds | Georgia Commons