Skip to content
Georgia Commons
Menu

Woodbine · Zoning Ordinance

Appendix A - ZONING / Article XI - SCHEDULE OF FEES

Sec. 11.1. The following fees have been set by the woodbine planning commission for services listed below.

About this text

  • As published by Municode, current through 2026-04-10
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Schedule of Fees Type of Permit Application Fee Process Fee Engineering

Review Fee Legal Review Fee Wall 30 70 0 0 Ground 30 70 0 0 Pylon (7 to 75 Feet) 30 95 0 0 Pylon (75 to 100 Feet) 30 145 0 0 Pylon (Over 100 Feet) 30 170 0 0 Rezoning Permit Residential/Commercial/Industrial/Planned Development (0 s.f.—19,999 s.f.)

160 140 140 150 Schedule of Fees Type of Permit Application Fee Process Fee Engineering

Review Fee Legal Review Fee Residential/Commercial/Industrial/Planned Development (20,000 s.f.—74,999 s.f.)

260 190 235 150 Residential/Commercial/Industrial/Planned Development (75,000 s.f.—99,999 s.f.)

330 245 235 150 Residential/Commercial/Industrial/Planned Development (100,000 s.f.—149,000 s.f.)

335 240 330 300 Residential/Commercial/Industrial/Planned Development (150,000 s.f. - 299,999 s.f.)

385 290 425 450 Residential/Commercial/Industrial/Planned Development (over 299,999 s.f.)

550 225 565 750 Rezoning Permits for Uses Not Listed Above 160 140 140 150 Special Use Permit 160 140 140 150 Variance Permit 100 150 0 150 Home Occupation Permit 155 145 140 150 Temporary Use Permit 150 0 140 150 Building Fees Type: Fee:

Building—New, Addition, Pools, etc. 1/2 of 1% of Total Building Cost, net of following Building—Accessory, Greater than 100 square feet 1/2 of 1% of Total Building Cost, net of following Plumbing 2% of Plumbing Cost

Electrical 2% of Electrical Cost Low Voltage Electrical 2% of Low Voltage Electrical Cost HVAC 2% of HVAC Cost

Gas 2% of Gas Cost Fire Suppression System 2% of Fire Suppression System Cost Underground Utilities 2% of Underground Utilities Cost

* A flat fee of $50.00 shall be charged if the total permit fee for any of the above permits is less than $50.00 Flat Fees

Type: Fee:

Temporary Power Pole $25.00 Permanent Power $25.00 Flat Fees Above Ground Pools $25.00 Mobile Homes $70.00 Demolition $300.00 Land Disturbing Activities $100.00 Culvert/Additional Driveway Installation $100.00 Inspection of Culvert (Must be 18-inch elliptical.

Three eight-foot sections equaling 24 feet long that must be concrete.)

$300.00 Penalty Fees Type: Fee:

Reinspection Fee $20.00 If any person or organization commences work prior to obtaining a permit will incur an additional charge.

$60.00 (Ord. of 01-06-2020(2); Memo. of 1-8-2026)

Meetings that refer to this section

Found 1: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:woodbine/zoning/11.1@2026-04-10-043143b14f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Woodbine Zoning Ordinance, Sec. 11.1. The following fees have been set by the woodbine planning commission for services listed below | Georgia Commons