Woodbury · Zoning Ordinance
Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 3 - UTILITIES AND DRAINAGE / Article 3-2 - DRAINAGE AND STORMWATER REQUIREMENTS
Sec. 3-215. Riprap.
About this text
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Provide riprap at all downstream discharge points of storm drains. The area of riprap required shall be six times the pipe diameter for the length and two times the pipe diameter for the width.
History
(Ord. of 5-17-2021(1))
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.