Skip to content
Georgia Commons
Menu

Woodbury · Zoning Ordinance

Article 3-2. DRAINAGE AND STORMWATER REQUIREMENTS

22 sections

Search the Woodbury codes

Machine-readable https://georgiacommons.org/code/local/woodbury/zoning/~appendix-b/~chapter-3/~article-3-2.md · https://georgiacommons.org/code/local/index.md · MCP https://mcp.georgiacommons.org/mcp

Contents

  1. Sec. 3-201. Findings
  2. Sec. 3-202. Definitions
  3. Sec. 3-203. System maintenance
  4. Sec. 3-204. Location of stormwater detention facilities
  5. Sec. 3-205. Specifications for stormwater detention facilities
  6. Sec. 3-206. Design responsibility
  7. Sec. 3-207. Storm drainage pipe slope
  8. Sec. 3-208. Reference to state standards
  9. Sec. 3-209. Drainage formula
  10. Sec. 3-210. Storm events to be utilized
  11. Sec. 3-211. Catch basin location
  12. Sec. 3-212. Subdrainage
  13. Sec. 3-213. Certification
  14. Sec. 3-214. Bridges
  15. Sec. 3-215. Riprap
  16. Sec. 3-216. Exit velocities
  17. Sec. 3-217. Breach analysis
  18. Sec. 3-218. Cross drainpipes
  19. Sec. 3-219. Stormwater ditches
  20. Sec. 3-220. Storm drainage materials and installation
  21. Sec. 3-221. Minimum pipe specifications
  22. Sec. 3-222. Driveway culverts

Georgia Commons is independent and is not affiliated with any of these cities or their publishers. Nothing here is legal advice.

Woodbury: Zoning Ordinance, Article 3-2. DRAINAGE AND STORMWATER REQUIREMENTS | Georgia Commons