Sec. 3-205. Specifications for stormwater detention facilities.

About this text

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Stormwater detention facilities shall provide adequate capacity to accommodate the stormwater runoff from the subdivision lots or land development(s) it serves, as determined by a registered professional engineer, landscape architect, or registered land surveyor subject to approval by the city.

(b) Unless constructed with 3:1 or lesser slopes and designed as an amenity feature to the subdivision or land development, all stormwater detention facilities shall be surrounded by fencing with a minimum height of four feet with a lockable gate for access. If chain link fencing is utilized, it shall be vinyl coated.

(c) A drainage easement with a minimum width of 20 feet shall be required surrounding all stormwater detention ponds.

History

The history line the source prints at the end of the section.

(Ord. of 5-17-2021(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:woodbury/zoning/3-205@2022-10-28-06e0465f4c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Woodbury Zoning Ordinance, Sec. 3-205. Specifications for stormwater detention facilities | Georgia Commons