Skip to content
Georgia Commons
Menu

Woodbury · Zoning Ordinance

Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 4 - DEVELOPMENT PERMITTING / Article 4-1 - GENERAL REQUIREMENTS

Sec. 4-101. Definitions.

About this text

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Certificate of development conformance: A document evidencing final approval issued by the zoning administrator for completion of land disturbance and development activities for a subdivision or project for which a development permit was issued, certifying that all such disturbances and development activities have been completed in accordance with the approved development permit.

Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface; also known as excavation.

Development: Any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, exca-vating, drilling operations, or permanent storage of materials; any activity which alters the elevation of the land, removes or destroys plant life, or causes structures of any kind to be erected or removed.

Development permit: Written authorization by the zoning administrator to engage in activities associated with the land development process applied for, including clearing, grading, land disturbance and the construction of improvements which may include but are not limited to streets, surface parking areas, water/sewer/stormwater systems and facilities, site planting and landscaping, and the construction of structures requiring the issuance of a building permit.

Development plans: The detailed and professionally prepared plans showing the layout and design, site work and construction activities (other than architectural building plans) proposed for a project.

Forestry: An operation involved in the growing, conserving, and managing of forests and forest lands. Forestry operations or practices include the raising and harvesting of timber, pulp woods, and other forestry products for commercial purposes, the construction of roads, insect and disease control, fire protection, and may include the temporary operation of a sawmill and/or chipper to process the timber cut from the parcel or parcels. This term does not include the cutting of timber associated with approved land development.

Grading: Altering the shape of ground surfaces to a predetermined condition, including stripping, cutting, filling, stockpiling, and shaping or any combination thereof and shall include the land in its cut or filled condition.

Ground elevation: The original elevation of the ground surface prior to cutting or filling.

Impervious surface: A man-made structure or surface which prevents the infiltration of storm water into the ground below the structure or surface. Examples are buildings, roads, driveways, parking lots, decks, swimming pools, and patios.

Land disturbance: Any activity that comprises, facilitates or results in land disturbance, and which may result in soil erosion from water or winds and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, clearing and grubbing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices.

Natural ground surface: The ground surface in its original state before any grading, excavation, or filling.

Project: The entire proposed development project, regardless of the size of the area of land to be disturbed.

Timber harvesting: Harvesting standing timber for delivery as pulpwood, logs, poles, posts, or wood chips to any woodyard or processing plant.

Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed, and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.

History

The history line the source prints at the end of the section.

(Ord. of 5-17-2021(1))

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:woodbury/zoning/4-101@2022-10-28-f1e3e162f7

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Woodbury Zoning Ordinance, Sec. 4-101. Definitions | Georgia Commons