Barrow County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 22 - BUILDINGS AND BUILDING REGULATIONS / Article II - CONSTRUCTION CODES / Division 3 - PERMITS
Sec. 22-99. Certificates.
About this text
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Certificate of occupancy.
(1) Required. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy. The certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the building official.
(2) Issuance. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the technical codes and reviewed plans and specifications and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law and the allowable load per square foot for each floor in accordance with the provisions of the technical codes.
(3) Temporary/partial certificate of occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a building which may safely be occupied prior to final completion of the building.
(4) Existing buildings. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued.
(b) Certificate of completion. Upon satisfactory completion of a building, structure or electrical, gas, mechanical or plumbing system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy.
(c) Connection of service utilities.
(1) Prerequisites for connection. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the technical codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued.
(2) Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy.
(3) Authority to disconnect service utilities. The building official shall have the power to authorize disconnection of utility service to the building, structure or system regulated by the technical codes, in case of emergency, where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility and whenever possible the owner and occupant of the building, structure or service system, of the decision to disconnect, prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter.
History
(Ord. of 11-25-1997(2), att. A, § 3.9)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.