Sec. 18-167. Permit issuance.

About this text

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

When the building official issues a permit that requires plans to be submitted, he shall endorse, in writing or by stamp, both sets of plans "Reviewed for Issuance of Construction Permit." One set of drawings so reviewed shall be retained by the building official and the other set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative. In the event the particular permit does not require plans to be submitted, only a copy of the permit shall be kept by the building official.

History

The history line the source prints at the end of the section.

(Ord. of 1-3-2007(1))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bartow-county/code/18-167@2026-09-02-177e2d44d5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Bartow County Code of Ordinances, Sec. 18-167. Permit issuance | Georgia Commons