Skip to content
Georgia Commons
Menu

Bartow County · Code of Ordinances

Chapter 34 - ENVIRONMENT / Article II - FLOODPLAIN MANAGEMENT/FLOOD DAMAGE PREVENTION / Division 5 - STANDARDS FOR DEVELOPMENT

Sec. 34-76. Definition of floodplain boundaries.

About this text

  • As published by Municode, current through 2026-09-02
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Studied "A" zones, as identified in the FIS, shall be used to establish base flood elevations whenever available.

(b) For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be provided by the engineering department. If future-conditions elevation data is not available from the engineering department, then it shall be determined by a registered professional engineer using a method approved by FEMA and the engineering department. See section 34-77 for further requirements.

(3) The boundaries or limits of the floodplain are shown within 0.5 feet vertical accuracy on the development plan containing existing topographic information.

History

The history line the source prints at the end of the section.

(Ord. of 10-10-2007, § 501)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:bartow-county/code/34-76@2026-09-02-5a12297b97

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.