Sec. 40-122. Stormwater management concept plan.

About this text

  • As published by Municode, current through 2025-04-03
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Prior to the preparation and submittal of a stormwater management design plan and permit application, the owner or developer shall submit to Brantley County for review and approval, a stormwater management concept plan illustrating the layout of the proposed development project and showing, in general, how post-construction stormwater runoff will be managed on the development site.

Green infrastructure practices (i.e., better site planning techniques, better site design techniques, low impact development practices) are encouraged, but not required, to be used during the creation of a stormwater management concept plan. Green infrastructure practices include, but are not limited to, protecting primary and secondary conservation areas, reducing clearing and grading limits, reducing roadway lengths and widths, reducing parking lot and building footprints, soil restoration, site reforestation/revegetation, vegetated filter strips and rain gardens.

History

The history line the source prints at the end of the section.

(Ord. of 9-14-2010, § 3.2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:brantley-county/code/40-122@2025-04-03-62ee95ae04

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Brantley County Code of Ordinances, Sec. 40-122. Stormwater management concept plan | Georgia Commons