Bulloch County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 6.5 - ENVIRONMENTAL PROTECTION / Article V - STORMWATER CONTROL / Division 3 - ASSURANCES
Sec. 6.5-91. Assurance for construction and other improvements.
About this text
- As published by Municode, current through 2026-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) The stormwater maintenance and drainage plan (SDP) permitee shall construct all drainage features and/or structures required in the approved SDP. The county engineer or his/her designee shall review and inspect all work associated with the SDP.
(b) County road right-of-way including ditches, curbs and gutter storm drain systems, cross drain culverts, roadway drainage easements, creeks, streams, etc. shall be maintained free of silt, soil, and other debris produced by permitee's construction activities which restricts drainage flow.
(c) Any persons requesting to change an existing county ditch line or other drainage way or work within the county right-of-way (i.e. utility installation, if approved) shall request a permit prior to beginning work. If proposed change is acceptable, then the county engineer shall issue an encroachment permit in accordance with other county policies and ordinances.
The encroachment permittee shall make changes to the drainage way or county right-of-way in accordance with written county standards or other approved standards as deemed appropriate. The county engineer or his/her designee shall review and inspect all work associated with the encroachment permit.
History
(Amd. of 4-4-23(3))
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.