Bulloch County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 6.5 - ENVIRONMENTAL PROTECTION / Article V - STORMWATER CONTROL / Division 3 - ASSURANCES
Sec. 6.5-91. Assurance for construction and other improvements.
Sobre este texto
- As published by Municode, current through 2026-02-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) The stormwater maintenance and drainage plan (SDP) permitee shall construct all drainage features and/or structures required in the approved SDP. The county engineer or his/her designee shall review and inspect all work associated with the SDP.
(b) County road right-of-way including ditches, curbs and gutter storm drain systems, cross drain culverts, roadway drainage easements, creeks, streams, etc. shall be maintained free of silt, soil, and other debris produced by permitee's construction activities which restricts drainage flow.
(c) Any persons requesting to change an existing county ditch line or other drainage way or work within the county right-of-way (i.e. utility installation, if approved) shall request a permit prior to beginning work. If proposed change is acceptable, then the county engineer shall issue an encroachment permit in accordance with other county policies and ordinances.
The encroachment permittee shall make changes to the drainage way or county right-of-way in accordance with written county standards or other approved standards as deemed appropriate. The county engineer or his/her designee shall review and inspect all work associated with the encroachment permit.
Historia
(Amd. of 4-4-23(3))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.