Cobb County · Code of Ordinances
Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 50 - ENVIRONMENT / Article IV - POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT / Division 1 - GENERALLY
Sec. 50-106. Exemptions from stormwater management standards.
About this text
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The following development activities are exempt from the provisions of this article and the requirements of providing stormwater management:
(1) Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs;
(2) Land disturbing activity that consists solely of cutting a trench for utility work and related pavement placement.
(3) Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration.
(4) Residential developments consisting of singlefamily dwellings, each on a lot of 80,000 square feet or more, so long as the total
impervious area on each lot is less than 5,000 square feet.
(5) Repairs to any stormwater management facility or practice deemed necessary by the county manager;
(6) Agricultural practices as described O.C.G.A.
12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the
threshold in section 50-105(b)(1) or (2);
(7) Silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities with exception of buildings or permanent structures that exceed the threshold in section 50-105(b)(1) or (2)
(8) Installation or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped ramps and parking, and enlarged entrances or exits; and
(9) Linear transportation projects being constructed by the county to the extent the administrator determines that the stormwater management standards may be infeasible to apply, all or in part, for any portion of the
linear transportation project. For this exemption to apply, an infeasibility report that is compliant with the county linear feasibility
program shall first be submitted to the administrator that contains adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.
History
(Ord. of 9-28-93; Code 1977, § 3-22.5A-5; Ord. of 4-13-04; Amd. of 2-9-21)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.