Coffee County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article III - TECHNICAL STANDARDS FOR MANUFACTURED HOUSING PARKS
Sec. 10. Water supply.
About this text
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
All public or community water utilities, including sewage shall be subject to local approval by the Board of Commissioners upon submission
of appropriate plans and drawings. All such plans and drawings for water or sewer utilities shall be submitted with appropriate certification by a professional engineer along with documentation of preliminary or final approval from the State of
Georgia Department of Natural Resources Environmental Protection Division, as required. If no approval from the Environmental Protection
Division is required, then the applicant shall submit "as-built" drawings identifying the proposed placement of any utilities within or upon public rights-of-way, easements or properties.2
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.