Coffee County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 66 - UTILITIES / Article I - MANUFACTURED HOMES
Sec. 5. Minimum requirements for purposes of obtaining an occupancy permit.
About this text
- As published by Municode, current through 2024-10-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The designated Coffee County Inspecting Official shall inspect all Manufactured Homes prior to residential occupancy. A previously inspected
unit shall be required to be re-inspected on being moved to a new location within the county.
Coffee County Code Enforcement shall be granted a final inspection to each home, after set-up, to verify facilities required. Inspections shall include:
a. Proper setbacks.
b. Sufficient off-street parking.
c. Installation of an approved septic tank or an approved sewer system.
d. Inspection of electrical wiring.
e. Inspection of anchoring and tie-down installations.
f. Inspection for proper utilities connections.
g. Inspection for proper sewage connections.
h. Adherence to all applicable Coffee County Codes.
i. Reinspection of the required facilities to ensure that no change in condition or function occurred during transport.
j. All Manufactured Homes that are located in Coffee County, and change ownership, but are not relocated must be inspected on site prior to issuance of
occupancy permit.
k. Individuals purchasing Manufactured Homes that require repairs must understand that if the home fails inspection, Coffee County will not issue an occupancy permit.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.