Skip to content
Georgia Commons
Menu

Colquitt County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 70 - WATERAND SEWERS / Article II - COUNTY BOARD OF / Division 2 - ON-SITE SEWAGE MANAGEMENT SYSTEMS

Sec. 70-58. Sewage ftow.

About this text

  • As published by Municode, current through 2025-02-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Where sizing of the on-site sewage management system is determined by sewage flow, estimates of the daily sewage flow shall not be less than the volume derived from the population to be

served. Daily sewage flow shall be determined from the department's current manual; however, the flow for establishments not listed shall be determined by the county board of health after due consideration of data submitted by the owner or his agent on design criteria. Calculations will be made on the basis of peak flow loads and not on longterm averages.

(Co. Bd. Health Rule 290-5-26.13)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:colquitt-county/code/70-58@2025-02-04-7fa1144b3f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.