Skip to content
Georgia Commons
Menu

Columbia County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 34 - ENVIRONMENT / Article IV - STORMWATER MANAGEMENT / Division 2 - STORMWATER CONCEPT MANAGEMENT PLANS

Sec. 34-150. Stormwater concept management plan and development activity requirements.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) No person shall conduct a development activity without a land disturbing activity permit issued by the county planning and development services division in accordance with article III of this chapter. No permit shall be issued without the following:

(1) An approved stormwater management plan or granted variance;

(2) Any off-site easements needed;

(3) In addition to all plans and permits required from the county, applicants shall obtain all state and federal permits required for the proposed development.

(b) The requirement for a stormwater concept plan applies to activities involving five acres or more of land, unless exempted in section 34-151.

(c) The following requirements for a stormwater management plan apply to developments of or within subdivisions:

(1) Individual lots in a residential subdivision development shall not be considered to be separate land disturbing activities

and shall not require individual permits.

Instead, the residential subdivision development, as a whole, shall be considered to be a single land disturbing activity. Hydrologic parameters that reflect the ultimate subdivision development shall be used in all engineering calculations.

(2) If individual lots or sections in a residential subdivision are being developed by different property owners, all land disturbing activities related to the residential subdivision shall be covered by the approved stormwater management plan for the residential subdivision. Individual lot

owners or developers shall sign a certificate of compliance (see stormwater management design manual) that all activities on the lot will be carried out in accordance with the approved stormwater

management plan for the residential subdivision.

(3) Residential subdivisions which were approved prior to the effective date of the ordinance from which this division is derived are exempt from the requirements of this subsection (c), along with the corresponding development of individual lots as set forth in subsection (c)(2) of this

section. Development of new phases of existing subdivisions which were not previously approved shall comply with the provisions of this division.

(d) The requirement of a stormwater management plan applies to all land disturbing activities, except for those activities specifically exempted in

section 34-151, or granted a variance as set forth in section 34-152, or determined to be not applicable as set forth in subsection (c) of this section.

History

The history line the source prints at the end of the section.

(Ord. No. 00-5, § 2-6.1-158, 6-20-2000)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbia-county/code/34-150@2026-02-17-a8c8397e5a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.