Skip to content
Georgia Commons
Menu

Columbia County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 34 - ENVIRONMENT / Article IV - STORMWATER MANAGEMENT / Division 2 - STORMWATER CONCEPT MANAGEMENT PLANS

Sec. 34-151. Exemptions.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Stormwater concept plans and stormwater management plans shall not be required for the following activities:

(1) Mining operations or oil and gas exploration, production, processing or treatment operations or transmission facilities, provided the stormwater runoff from such operations is composed entirely of flows which are from conveyances or systems of conveyances used for collecting and conveying precipitation runoff, and which are not contaminated by contact with, or that has not come into contact with, any overburden, raw material, intermediate products, finished product or byproduct located on the site of such operations.

(2) Such minor development activities as home gardens, individual home landscaping, individual residential repairs, individual residential maintenance work and other individual residential activities which result in minor soil erosion as determined by the

director.

(3) The construction or improvement of singlefamily residences, or their accessory buildings, when such are constructed by or under contract with the owner for his own

occupancy; provided, however, that construction of any such residence, not otherwise exempt, does not conflict with an approved stormwater management plan

for the existing subdivision, is conducted in accordance with the best management practices specified in the stormwater management design manual, and the residence is not within 200 feet of the bank of any state waters. For the purpose of this

subsection, "state waters" excludes channels and drainageways which have water in them only during and immediately after rainfall events, and intermittent streams which do not have water in them yearround; provided, however, that any person responsible for a project which is within 200 feet of any such excluded channel or drainageway must prevent sediment and pollutants from moving beyond the boundaries of the property on which

such project is located and, provided, further, that nothing contained in this subsection shall prevent the county from regulating any such project which is not specifically exempted otherwise in this

section.

(4) Agricultural practices which follow the best management practices identified in the stormwater management design manual, except that the construction of an agricultural structure, such as a boiler house, machine sheds or repair shops, which require issuance of a building permit, shall require the submittal and approval of a stormwater management plan prior to the start of the land disturbing

activity.

(5) Land disturbing activities undertaken on forest land for the production and harvesting of timber and timber products which follow the best management practices identified in the stormwater management design manual.

History

The history line the source prints at the end of the section.

(Ord. No. 00-5, § 2-6.1-159, 6-20-2000)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbia-county/code/34-151@2026-02-17-0bcc9d842e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbia County Code of Ordinances, Sec. 34-151. Exemptions | Georgia Commons