Skip to content
Georgia Commons
Menu

Columbia County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 86 - WATER AND SEWERS / Article IV - SEWER USE

Sec. 86-127. Private septic tank systems.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Where the public sewer system is not available, the building sewer shall be connected to a private septic tank system complying with the provisions of this article.

(b) Before commencement of construction of a private septic tank system, the owner shall first obtain a written permit signed by the county board of health. The application for such permit shall be made on a form furnished by the board of health, which the applicant shall supplement by any plans, specifications and other information deemed necessary by the county engineer or board of health.

(c) A permit for a private septic tank system shall not become effective until the installation of the private septic tank system is completed to the satisfaction of the board of health. The board of health shall be allowed to inspect the work at any stage of construction and the applicant for the permit shall notify the board of health when the work is ready for final inspection and before any underground portions of the private septic tank system are covered, excluding the building sewer to the private septic tank system.

(d) The type, capacities, location and layout of a private septic tank system shall comply with all recommendations of the state department of public health, and shall comply with the provisions of this article. No private septic tank or cesspool shall be permitted to discharge to any

natural outlet.

(e) At the time that a public sewer system becomes available to a property served by a private septic tank system, as provided in subsection 86-124(c), a notification to connect to the public sewer system may be made by the director. A direct connection shall be made to the public sewer system in compliance with this

article within 30 days of such notification. If connection is made to the POTW, the private septic tanks shall be abandoned and filled with suitable material.

History

The history line the source prints at the end of the section.

(Code 1979, § 2-7-36)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:columbia-county/code/86-127@2026-02-17-604ddb2198

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Columbia County Code of Ordinances, Sec. 86-127. Private septic tank systems | Georgia Commons