Skip to content
Georgia Commons
Menu

Cook County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 46 - ROADS AND BRIDGES

Sec. 46-2. Pond and dam requirements.

About this text

  • As published by Municode, current through 2020-04-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) All ponds and pond dams that are hereafter constructed in the county will have at least a 20-foot setback requirement from all existing county road rights-of-way, and the spillway and runaround will be constructed and maintained to handle all water flowing therefrom.

(b) Should a pond be built which requires the county to install pipes, culvert, bridge or construction for handling the water, the expense will be borne by the landowner constructing the pond.

History

The history line the source prints at the end of the section.

(Res. of 10-7-1991)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:cook-county/code/46-2@2020-04-06-611e57d5e1

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.