Skip to content
Georgia Commons
Menu

Coweta County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 78 - UTILITIES / Article II - SEPTIC TANKS

Sec. 78-39. Alternative on-site sewage management system.

About this text

  • As published by Municode, current through 2026-05-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

In addition to those requirements listed in section 78-38, all alternative on-site management system, as defined in this article shall meet the following requirements:

(1) The building site must have 100 percent replacement area of the alternative system if a reduction in linear footage is proposed and a 100 percent conventional replacement area.

(2) The site evaluation must be accompanied by an individual soil report by an approved soil scientist before reduction in linear feet will be considered.

(3) Warranties for alternative products will be supplied by the manufacturer for a minimum of two years for each installation and will be signed and dated by new property owner at closing. The product manufacturer shall sign and file with the Environmental Health Department an affidavit acceptable to the Environmental Health Department stating that a manufacturers representative will deliver and review the warranty with the property owner.

History

The history line the source prints at the end of the section.

(Ord. of 7-15-97; Ord. of 3-17-98)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:coweta-county/code/78-39@2026-05-19-2d3b7b14d3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.