Dade County · Code of Ordinances
Part II - CODE / Chapter 38 - ROADS / Article V - DRIVEWAY PIPE INSTALLATION
Sec. 38-103. Permit conditions.
About this text
- As published by Municode, current through 2024-09-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A permit shall be issued under this article subject to the following terms:
(1) Applications for a permit for a driveway and/or driveway pipe installation shall be made with the county building official or public works department.
(2) The application shall include the name and telephone number of the applicant, the exact address or detailed description of the location for which access to the county road right-of-way is requested, and such other information as may be requested by for the public works director or county building official in the furtherance of the required duties under this article.
(3) The applicant shall be advised that two (2) inspection phases, as required by this article, shall be as follows:
a. Initial investigation of the site to determine the proper pipe size and installation procedures required; and
b. Final inspection prior to pouring or laying the permanent driveway surface.
History
(Ord. No. 05-03-07, § III, 5-3-2007)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.