Dade County · Código de ordenanzas
Part II - CODE / Chapter 38 - ROADS / Article V - DRIVEWAY PIPE INSTALLATION
Sec. 38-103. Permit conditions.
Sobre este texto
- As published by Municode, current through 2024-09-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
A permit shall be issued under this article subject to the following terms:
(1) Applications for a permit for a driveway and/or driveway pipe installation shall be made with the county building official or public works department.
(2) The application shall include the name and telephone number of the applicant, the exact address or detailed description of the location for which access to the county road right-of-way is requested, and such other information as may be requested by for the public works director or county building official in the furtherance of the required duties under this article.
(3) The applicant shall be advised that two (2) inspection phases, as required by this article, shall be as follows:
a. Initial investigation of the site to determine the proper pipe size and installation procedures required; and
b. Final inspection prior to pouring or laying the permanent driveway surface.
Historia
(Ord. No. 05-03-07, § III, 5-3-2007)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.