Dawson County · Code of Ordinances
Dawson County Code of Ordinances
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2026-09-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Part 8 of 13. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(c) An individual shall not be qualified to be placed on the approved third-party inspectors and plans reviewer list if they have had the authority to revoke third-party plans review affidavits in other jurisdictions. Should an individual previously qualified to be on the approved third-party inspectors and plans reviewer list and subsequently has their authority to issue third-party plans review affidavits revoked. The individual shall be removed from the approved third-party inspectors and plans reviewer list.
(d) An approved third-party plans reviewer may not submit a plan review affidavit if the approved third-party plans reviewer is an officer or employee of the owner, developer, contractor, or other party or if the approved third-party plans reviewer is employed by or a partner in a firm that is affiliated with or financially interested in the owner, developer, contractor, or other party on whose behalf the plans review affidavit is submitted.
(e) Approved third party plans reviewers shall obtain and maintain the following minimum insurance coverages and provisions, evidence of which shall be submitted to the department with the initial application:
(1) Comprehensive general liability insurance for liability and property damage for not less than $1,000,000.00 per occurrence.
(2) Professional liability insurance for errors and omissions in an amount of not less than $1,000,000.00 per occurrence and $1,000,000.00 in aggregate coverage for any project with a construction cost of $5,000,000.00 or less. For any project with a construction cost of more than $5,000,000.00, the amount of professional liability insurance for errors and omissions shall not be less than $2,000,000.00 per claim and $2,000,000.00 in aggregate coverage.
(3) Such insurance may be a practice policy or project-specific coverage. If the insurance is a practice policy, it shall contain prior acts coverage for the private professional provider. If the insurance is project-specific, it shall continue in effect for two years following the issuance of the final certificate of occupancy or certification of completion for the project.
(4) The cancellation provision shall provide for 30 days' cancellation notice.
(5) Dawson County, Georgia, its officers, officials, employees, and representatives shall be named additional insureds on the required insurance policies.
(6) The required insurance coverages shall be provided by an insurance company licensed to do business by and in good standing with the Georgia Department of Insurance at all times.
(7) Approved third-party plan reviewers shall maintain the minimum insurance coverage as required above at all times during which they are listed as approved third-party plan reviewers. Approved third-party plan reviewers shall provide the department with evidence of minimum insurance coverages and provisions annually before any policy or coverage expiration and upon request by the department. Should any insurance coverage or information change, the approved third-party plans reviewer shall provide written notice of any such change to the county within ten business days. If an approved third-party plans reviewer fails to maintain the required insurance coverage, the department may remove them from the approved third-party inspectors and plans reviewer list.
(f) Suspension of approved third-party plans reviewers:
(1) An individual who performs plans review under this article shall be subject to suspension from the approved third-party inspector and plans reviewer list and from submitting plans review affidavits for the following infractions:
a. Providing plan reviews without appropriate license or certification.
b. Failing to identify any noncompliance with any applicable code, as amended, governing individual and public safety and welfare (including, but not limited to, sections 308, 310—312, 314, and 315 of the International Residential Code, section 607 of the International Plumbing Code, sections 406, 502, and 503 of the International Fuel Gas Code, and sections 210, 240, and 250 of the 2020 National Electric Code, etc.) as determined in the sole good faith discretion of the building official of the county.
However, it is the express intent of the county not to impose sanctions on an individual under this article for failing to identify multiple instances of noncompliance in one inspection, such as that each such failure constitutes an individual and separate infraction. Instead, various failures contained in a single inspection under this paragraph shall be treated as a single infraction.
c. Falsifying plans review affidavits.
d. Performing unauthorized types of plan reviews.
(2) Suspension for submitting plans review affidavits for infractions by an approved third-party plans reviewer shall be progressive based on the number of infractions in the previous 12-month period. For any combination of infractions within 12 months, the following actions and suspensions against an approved third-party plans reviewer shall be assessed:
First infraction: A written letter of reprimand from the building official Second infraction: A 10-day suspension from approved third-party inspector and plans reviewer list
Third infraction: A 30-day suspension from approved third-party inspector and plans reviewer list
Fourth infraction: A 90-day suspension from approved third-party inspector and plans reviewer list
Fifth infraction: One-year suspension from approved third-party inspector and plans reviewer list
(3) The county shall send a written notice to the approved third-party plans reviewer for each infraction as contemplated in paragraph (f)(2) above, the purpose of which shall be to inform the approved third-party plans reviewer of the number of infractions accruing under paragraph (f)(2) and so the approved third-party plans reviewer has the opportunity to take any corrective action necessary to prevent future infractions.
(4) Notwithstanding any other provision of this article, in the event an approved third-party plans reviewer is found to have violated subsection (f)(1)c. falsifying plans review affidavits, the progressive actions and suspensions of this article may, at the county's discretion, be bypassed with an immediate suspension and disqualification imposed.
(5) Suspension and disqualification appeals shall be processed through the construction board of appeals at its next meeting as appeals of building official decisions.
(Ord. of 6-20-2024(1)) Sec. 105-57. Procedures for conducting third-party plan reviews.
(a) Any plan review conducted by an approved third-party plan reviewer shall be no less extensive than plan reviews conducted by county personnel.
(b) The following procedures shall apply to all third-party plans reviewed:
(1) To ensure quality control of the third-party inspection program, the department shall receive a copy of all plan review affidavits within five business days of completion.
(2) All plans review affidavits shall certify that:
a. The plans were reviewed by the affiant, who is duly authorized to perform plan review under the third-party inspection and plans review program;
b. The plans comply with all applicable regulatory requirements; and
c. The plans submitted for plan review conform with plans previously submitted to obtain county approvals required in the plan submittal process. Do not change the project reviewed for such approvals.
(Ord. of 6-20-2024(1)) Secs. 105-58—105-80. Reserved.
Chapters 106—108
RESERVED
Chapter 109
ENVIRONMENT AND NATURAL RESOURCES
ARTICLE I. IN GENERAL
Sec. 109-1. Grading permits.
All land disturbance activities, with the exception of agricultural activities such as plowing or harrowing, must have a permit. Permits shall be issued by the department of planning and zoning.
The department of planning and zoning shall develop an application for grading permits which includes, but is not limited to, the size of the lot to be graded, the purpose of the grading, the owner of the lot, the location of the lot, and the erosion control measures to be used. The department of planning and zoning shall develop a fee schedule for issuance of permits not to exceed $50.00 per acre.
(Ord. of 4-14-1997, §§ I—IV) Secs. 109-2—109-20. Reserved.
ARTICLE II. BUFFERS, LANDSCAPING AND TREES
Sec. 109-21. Intent, purpose and title.
(a) Intent. This article shall apply to property or portions thereof located within the unincorporated areas of Dawson County, Georgia. The board of commissioners hereby finds based upon information presented through public input and during public hearings that:
(1) The protection and preservation of trees;
(2) The planting of new trees and other landscape material; and
(3) Buffers between dissimilar uses;
serve a legitimate and valuable public purpose and provide for the public health and general welfare of the citizens of the unincorporated areas of Dawson County.
(b) Purpose.
(1) The purpose of this article is to preserve and enhance Dawson County's natural environment. This purpose will be accomplished through the preservation, protection and planting of trees and other landscape material, particularly those trees recognized herein as canopy and understory trees and the provisions for natural and/or planted buffers between dissimilar uses of land except for activities stated in section 109-25(c), exemptions.
(2) This article is intended to further Dawson County's policy that all development sites where trees are most commonly removed will achieve upon project completion a uniform standard related to tree coverage, landscaping and buffers.
(3) In addition, trees are important for shading and cooling, reducing noise and wind, preventing soil erosion, protecting water quality, producing oxygen, dust infiltration, fostering air quality through carbon dioxide absorption, protecting wildlife habitat, and contributing to the aesthetic and economic value of real property.
(c) Title. This article shall be known as the "Buffer, Landscape and Tree Ordinance of Dawson County, Georgia" and may be referred to generally as "the buffer ordinance" or "the landscape ordinance" or "the tree ordinance" or as used herein "this article."
(Ord. of 11-25-2002, art. I) Sec. 109-22. Definitions.
(a) In construing the provisions hereof and the meaning of each and every word, term, phrase, or part thereof, where the context will permit, the definitions of words as contained in the Land Use Resolution of Dawson County, supplemented by the following definitions shall apply. (All words in this article have customary definition except as specifically defined herein. The words "shall" and "must" are mandatory, and the words "should" and "may" are recommended practices.)
Buffer. Land area used to visibly separate one use from another use through screening and distance to shield or block noise, light, glare, or visual or other conditions, to minimize physical passage to nonsimilar areas, or to reduce air pollution, dust, dirt, and litter.
Buildable area. The portion of a lot that is not located within any minimum required yard setback or buffer; that portion of a lot wherein a building may be located.
Canopy tree. A tree that, under normal forest conditions, will compose the top layer or canopy of vegetation and generally will reach a mature height of greater than 40 feet.
Clear cut. A timber harvest performed in one cutting operation with any remaining trees having no merchantable or forestry management purpose.
Clearing. The removal of vegetation from a property, whether by cutting or other means, but not including grubbing (removal of trees, stumps or roots) activities.
Construction buffer. A type of buffer that is temporary and remains in effect during the construction of a development.
County. Dawson County.
Department. The Dawson County Department of Planning and Development as established by the Dawson County Board of Commissioners, and as operated through the actions and administration of the appointed director of said department.
Development regulations. The county regulations providing for the subdivision and development of real property within Dawson County, Georgia, as amended by the Board of Commissioners of Dawson County.
Diameter, tree. The diameter of a tree is measured as follows:
(1) For existing preserved trees, at a point 4.5 feet above the ground;
(2) For new replaced trees, at a point six inches above the ground.
If a tree splits into multiple trunks below 4.5 feet, then the trunk is measured at its most narrow point beneath the split.
Director. The director of the department of planning and development.
Dripline. A line on the ground established by a vertical plane extending from a tree's outermost branch tips down to the ground; i.e., the line enclosing the area directly beneath the tree's crown from which rainfall would drip.
Floodplain, 100-year. Those lands subject to flooding, which have at least a one percent probability of flooding occurrence in any calendar year; and specifically, the floodplain as shown on the flood boundary and floodway map as prepared by the Federal Emergency Management Agency
(FEMA).
Grading. The placement, removal, or movement of earth by use of mechanical equipment on a property. This includes stripping, cutting, filling, stockpiling, or any combination thereof, and shall include the land itself in its cut or filled condition.
Grubbing. The removal of stumps or roots from a property.
Hardwood tree. Any tree that is not coniferous (not a cone bearing or a needle leaf evergreen).
This definition is based on the colloquialism and does not necessarily reflect any true qualities of the tree.
Hazard tree. Any tree or tree part that poses a risk upon failure or fracture for damage or injury to property, power lines, or people. Generally recognized as a zero (no hazard) to nine (high hazard) score with zero to three points assigned for failure potential, size of part, and target rating.
Historic tree. Any tree or group of trees, which the Georgia Urban Forest Council has included on The Georgia Landmark and Historic Tree Register.
Land development permit. Any permit other than a land disturbance permit or building permit issued by Dawson County that authorizes construction activities on a site or portion of a site. Said permit may be a clearing, or site development permit as defined and authorized under the Development Regulations of Dawson County and/or the Georgia Erosion and Sedimentation Act.
Land disturbance permit. Any permit other than a land development permit or building permit that authorizes clearing and grading activities only on a site or portion of a site. Said permit may be a clearing and grubbing, or grading permit only as defined and authorized under the state environmental law and/or the Georgia Erosion and Sedimentation Act.
Land use resolution. The Land Use Resolution of Dawson County, Georgia, as amended by the Board of Commissioners of Dawson County.
Landscape strip. Land area located within the boundary of a lot and required to be set aside and used for landscaping upon which only limited encroachments are authorized.
Lot building area. The area of a lot encompassed by front, sides and rear yard setbacks or building line as required by the Land Use Resolution of Dawson County.
Modification. A type of administrative appeal that may be granted by the director only if specifically authorized by this article.
Multi-family. Development of property for multi-family purposes (e.g. townhouses, apartments and condominiums).
Nonresidential subdivision. A development intended primarily to provide planned commercial or industrial development.
Overstory tree. Those species of trees that compose the top layer or canopy of vegetation and will generally reach a mature height of greater than 40 feet.
Screening. A method of shielding or obscuring a abutting or nearby structure or use from another use by opaque fencing, walls, berms, or densely planted vegetation.
Shrub. A woody plant of relatively low height, as distinguished from a tree by having several stems rather than a single trunk.
Significant tree. Any historic or specimen tree that has been determined to be of high value because of its species, size, age, or other professional criteria. Criteria for the determination of historic or specimen trees or stands of trees shall be determined by a certified arborist, registered forester, or landscape architect.
Small trees. Any tree that typically grows to a mature height of less than 40 feet. (Reference Landscape Plant Materials for Georgia, Cooperative Extension Service, University of Georgia College of Agriculture, Bulletin No. 625).
Softwood tree. Any coniferous (cone bearing or needle leaf evergreen) tree. This definition is based on the colloquialism and does not reflect any true qualities of the tree.
Street tree. Any self-supporting woody perennial plant, usually having a main stem or trunk and many branches, and at maturity normally attaining a trunk diameter greater than two inches at any point and a height of over ten feet. Trees must be placed in front yard and be visible from the street.
Timber harvesting. The felling, loading and transporting of timber products (pulpwood, etc.). The term "timber harvesting" may include both clear cutting and selective cutting of timber.
Tree density standard. The minimum number of tree density units per acre that must be achieved on a property.
Tree density unit. A credit assigned to a tree based on the diameter of a tree in accordance with tables contained in this article.
Tree protection area. Any portion of a site where existing trees are proposed to be retained in order to comply with this article. The tree protection area shall include no less than the total area beneath the tree canopy as defined by the dripline of a tree or group of trees collectively.
Tree protection plan. A plan that identifies tree protection area(s) where existing trees are to be preserved and where proposed replacement trees are to be planted to meet the minimum requirements of this article, as well as methods of tree protection to be undertaken on the site and other pertinent information.
Tree thinning. Selective cutting of trees only for the clear purpose of good forestry management in order to protect said trees from disease or infestation and in no way shall be construed as clear cutting.
Understory tree. A tree that, under normal forest conditions, grow to maturity beneath overstory trees and will generally reach a mature height of at least ten feet but less than 40 feet.
Zoning buffer. A buffer, as defined in and required by the land use resolution or as a condition of zoning, special use or variance approval for a specific property.
(Ord. of 11-25-2002, art. II) Sec. 109-23. Buffer regulations.
(a) Applicability. Buffers shall be required between dissimilar districts or uses in accordance with the provisions of the land use resolution or as a condition of zoning, special use or variance approval.
Buffers shall meet the minimum requirements contained in the land use resolution, except as authorized to be reduced or increased by the Dawson County Board of Commissioners, or a properly appointed designee.
(b) Screening requirements.
(1) Buffers shall be natural, undisturbed, and free of encroachments except as authorized by a condition of zoning, special use or variance approval, or as authorized herein, and shall contain the existing tree cover and vegetation as well as any supplemental plantings or re-plantings as may be required.
(2) Buffers shall be of such nature and density so as to screen activities, structures and uses on property from view on an abutting lot and shall further provide a year-round effective visual screen.
(3) Buffers required alongside property lines shall extend to the street right-of-way line unless otherwise required by the director in order to observe the site distance requirements contained in the land use resolution and the subdivision regulations of Dawson County or as authorized by a condition of zoning, special use, or a variance approval.
(4) In situations where the required buffer width is partially or completely contained within an existing easement (e.g., power or natural gas transmission, etc.), the screening requirements of this article shall be met outside the existing easement if the approval from the utility company cannot be obtained.
(c) Supplemental plantings.
(1) Buffers in which vegetation is nonexistent or is inadequate to meet the screening requirements of this article shall be planted with supplemental plantings so as to provide a year-round effective visual screen.
(2) Supplemental plantings and re-plantings shall consist of evergreen trees, shrubs, or a combination thereof, native or adaptable to the region. All trees planted shall be a minimum of eight feet in height at the time of planting and shall be a species that will achieve a height of at least 20 feet at maturity. Trees shall be a native species of mixed deciduous and evergreen species. All shrubs planted shall be a large growing species, shall be a minimum of three feet in height at the time of planting and shall be a species that will achieve a height of at least ten feet at maturity.
(3) All supplemental plantings shall be installed to allow for proper plant growth, irrigation, and maintenance.
(Ord. of 11-25-2002, art. III; Ord. of 9-18-2025(1), Exh. A, § 16) Sec. 109-24. Landscape regulations.
(a) Nonresidential and multi-family uses.
(1) Nonresidential and multi-family uses shall provide for and maintain landscape plantings on-site as follows:
a. In a landscape strip at least 20 feet in width adjacent to any street right-of-way abutting the property and running the length of the entire property frontage;
b. In areas adjacent or internal to off-street surface parking lot(s) that are required by the land use resolution to contain more than five off-street parking spaces; and
c. As required by a condition of zoning, special use or variance approval.
(2) Landscape strips that are to be 20 feet in width shall contain landscaping and plantings within or adjacent to the strip as follows:
a. As a minimum one tree for each 25 linear feet of strip length shall be provided.
Deciduous trees shall be at least two inches in diameter and evergreen trees shall be eight feet in height at the time of planting. Trees shall be a species native or suitable to this region.
b. As a minimum one shrub for each five linear feet of strip length shall be provided. Each shrub shall be a native species or suitable to this region.
c. Trees and shrubs required herein may be planted and spaced singly or in groups as authorized by the director so long as the total number of plantings is achieved.
d. The remaining ground area shall be sodded, seeded or hydro seeded with grass, and/or planted with ground cover species and/or provided with other landscaping material, or any combination thereof.
(3) Landscape strips that are to be wider than ten feet in width shall contain landscaping and plantings within or adjacent to the strip as follows: Tree and shrub quantities shall be proportional to their landscape width (e.g., a 20-foot wide landscape strip would require two trees and two shrubs for each 25 linear feet of strip length).
(4) Off-street surface parking lot(s) that are required to contain more than five parking spaces shall contain landscaping and planting as follows (see detail No. 1, Frontage Parking Strips):
a. Trees shall be provided and maintained adjacent to, and in the interior portion of, parking lots in a ratio of one tree for each seven parking spaces. In addition, every parking space shall be within 50 feet of the trunk of a tree.
b. Deciduous trees shall be at least two inches in diameter and evergreen trees shall be at least eight feet in height. Trees shall be a canopy or understory tree from the tree species list attached to this article. In addition, at least one in every three trees shall be a canopy tree.
c. The minimum planting area or island for each canopy tree shall be at least 200 square feet. If shared with other trees, 80 square feet for each additional tree shall be added.
d. The minimum planting area or island for each understory tree shall be 100 square feet.
If shared with other trees, 40 square feet for each additional tree shall be added.
e. Each planting area or island shall not be less than four feet in width in any direction.
f. Ground areas shall be sodded, seeded or hydro seeded with grass, and/or planted with ground cover species and/or provided with other landscaping material, or any combination thereof.
g. Paved or striped islands greater than 50 square feet shall not be allowed. These areas shall contain landscape plantings.
h. A planting area or island shall be located at the end of every parking bay and every 150 linear feet of parking spaces. These islands shall be a minimum of ten feet × 20 feet in area.
i. Islands shall be located in such a manner as to divide and break up the expanse of a parking area. A planting area, which intrudes upon or is located wholly within a general rectangular area that is:
1. Devoted to parking; and
2. Either between a lot line and a building or between two buildings will generally serve this purpose.
(b) Residential subdivisions.
(1) Residential subdivisions shall provide for and maintain landscape plantings on-site as set forth below in the following circumstances:
a. In no-access easements that are by the land use resolution along the line of double frontage lots abutting upon a major thoroughfare; and
b. As required by a condition of zoning, special use, modification, variance or waiver approval.
(2) In accordance with the above, screening shall be as follows:
a. Planted with a single line of evergreen trees at least six feet in height and spaced no greater than ten feet apart;
b. Contain a solid or decorative fence at least four feet in height; or
c. Contain such other landscaping treatment or grade changes that will produce a partial screening effect as authorized by the director.
(c) Encroachment into landscape strips. Landscape strips shall not be encroached upon by parking spaces, driveway surfaces or storm water detention facilities except that driveway crossings may traverse such strip as near to a perpendicular alignment as practical. Signs may also be located in such strip.
(d) Tree replacement. Trees that must be removed or that have the tops cut to comply with this section shall be replaced with the equivalent inches of removed trees. However, trees removed due to disease or insect infestation upon the written advice and findings of the county extension service, the Georgia Forestry Commission, or certified arborist shall be replaced in accordance with the minimum standards contained in this article.
(Ord. of 11-25-2002, art. IV; Ord. of 9-18-2025(1), Exh. A, § 16) Sec. 109-25. Applicability and exemptions.
(a) Application of section. This article shall apply to any activity on real property, which requires the issuance of a land development permit except as excluded in this section.
(b) Grandfathered projects.
(1) This article shall not apply to any portion of property included within the limits of a valid land development permit issued prior to the effective date of this article, provided that all time constraints relating to the land development permit issued shall be observed. In no event shall any grandfathered project be extended for a greater time period than 12 months from the date of enactment of this article.
(2) Projects which were included within the limits of a land development permit issued prior to the effective date of this article shall be grandfathered from the requirements of this article to the extent of any time constraints imposed upon said permit by the land use resolution.
(3) The requirements of this article may be waived by the director of the department of planning and development for a land development permit that is to proceed with development of a project over 20 acres residential and over one acre commercial, at least 75 percent of the land area of which has already received a permit or permits initiating development activities prior to the enactment of this article.
(c) Exemptions.
(1) All intra-family transfers.
(2) Individual single-family detached and duplex homes on less than three lots.
(3) The construction of individual single-family detached and duplex dwellings on individual lots.
(4) All plant or tree nurseries and botanical gardens shall be exempt from the terms and conditions of this article in relation to those trees, which are being grown for relocation and continued growth in the ordinary course of business or for some public purpose.
(5) All orchards of trees in active commercial operation shall be exempt from the terms and provisions of this article for bona fide agricultural purposes only.
(6) Land clearing or clearing and grubbing activities for agricultural purposes shall be exempt from the provisions of this article.
(7) Timber harvesting (selective cutting or clear-cutting) for pulpwood or saw timber shall be exempt from the provisions of this article.
(8) Public utility companies conducting operation on public and utility rights-of-way and easements or on sites for electric substations and similar facilities.
(9) All government agencies conducting operations on public right-of-way and easements for the purpose of governmental services.
(10) Subdivisions without any new internal subdivision roads (subdivisions without any land disturbing activity for road purposes).
(d) Removal of disease or insect infestation or natural disaster. At the time of development upon written advice of the county extension service or the Georgia Forestry Commission or certified arborist in accordance with commonly accepted forestry practices and upon a finding of disease, insect infestation, or a natural disaster, the director may authorize the removal of trees to prevent the transmission of disease or infestation, to prevent the danger of trees falling, or to prevent potential injury to life and property. The owner/developer, prior to removal of these trees, shall notify the director, identifying the location of the property, and shall submit to the director the written findings of the county extension service or Georgia Forestry Commission or the certified arborist.
(e) Tree thinning and timber harvesting.
(1) Tree thinning. For the thinning of trees solely for the purpose of good forestry management all property owners should consult with the Georgia Forestry Commission.
(2) Timber harvesting.
a. All persons or firms harvesting standing timber in any unincorporated area of Dawson County for delivery as pulpwood, logs, poles, posts, or wood chips to any wood yard or processing plant located inside or outside this state shall provide notice of such harvesting operations to the Dawson County Board of Commissioners or the designated agent thereof prior to entering onto the property if possible, but in no event later than 24 hours after entering onto the property. Further, such persons shall give notice of cessation of cutting within 24 hours after the job is completed. The notice of harvesting operations required by this section shall be provided for each separate tract to be harvested. Such notice shall be made in such form as prescribed by rule or regulation of the director of the Georgia Forestry Commission, and shall include the following information:
1. A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road. If multiple points of ingress and/or ingress will be used, all such points shall be identified;
2. A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under
O.C.G.A. § 48-5-7.5;
3. The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and
4. The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber.
b. State website.
1. Subject to the provisions of subsection (2)c.5., upon notification published by the director of the Georgia Forestry Commission that a state-wide notification website or platform is available for public use, persons or firms wishing to utilize said website or platform to provide the notice required by this section may do so at their option, and Dawson County will accept notifications submitted in this manner.
2. On and after a date specified and published by the director of the Georgia Forestry Commission, use of the state-wide notification website or platform shall be mandatory and shall be the sole means of providing the notice required by this section; on and after said date submission of the notice by any of the means listed in subsection (2)a.3. above shall cease and will no longer be deemed acceptable or in compliance with this section.
c. Bonds, letters of credit and damages.
1. The notice required by this section shall not be or remain effective unless and until the person or firm providing such notice has delivered to the board of commissioners of Dawson County or its designated agent a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting Dawson County against any damage caused by such person or firm in the amount of $5,000.00; provided, however, that at the option of the person or firm harvesting timber a valid irrevocable letter of credit issued by a bank or savings and loan association, as defined in O.C.G.A. § 7-1-4, in the amount of $5,000.00 may be provided in lieu of a surety bond. No more than one bond or letter of credit shall be required from each person or firm harvesting timber, regardless of the number of tracts harvested in the county for so long as the bond or letter of credit remains in effect. The bond or letter of credit required herein shall be valid only for the calendar year in which it was delivered. Such bonds or letters of credit shall be subject to the conditions set forth in the following:
2. The bond or letter of credit shall protect Dawson County against any damage requiring re-ditching or repair of existing ditch structures or the removal of any harvesting residue, including treetops, debris, logs, pulpwood and other materials, placed in or around the county's rights-of-way caused by such person or firm tendering the bond or letter of credit. The proceeds of such bond or letter of credit shall be available to reimburse the county for any cost incurred to repair such damages or remove such debris in or around the county's rights-of-way. The proceeds of such bond or letter of credit shall also be available to reimburse the county for any costs incurred to maintain or repair county roads damaged by the ingress or egress of motor vehicles engaged in the harvest operations located within 500 feet of any point of ingress or egress of the timber harvesting operation. The right of Dawson County to call such bond or letter of credit in accordance with the provisions of subsection (2)c.2. shall be in addition to any other remedies available to the county at law or in equity for damage to county roads or rights-of-way.
3. When damage results from a person or firm's harvesting activities, the board of commissioners of Dawson County shall make and provide a written claim to the person or firm causing the damage within 30 business days after the board of commissioners becomes aware of the damage. Such claim may be given in
person, by facsimile, email or mail. The claim shall describe the damage in detail and give the person or firm the opportunity to repair such damage within 30 days of the notification; provided, however, the county shall be authorized to repair the damage immediately if the board of commissioners or its designee determines the conditions present a threat to public safety, health or welfare and, upon making such repairs, shall present to the person or firm and the issuer of the applicable bond or letter of credit an itemized list of expenses incurred as a claim against the responsible party and the issuer of its bond or letter of credit. Upon the issuance of a claim as provided in this section the board of commissioners of Dawson County or its designee shall notify the issuer of the bond or letter of credit that a claim has been made and will be resolved or adjudicated according to the terms of this section.
4. Within 30 days of receipt of the written claim described in subsection (2)c.8., the person or firm against whom the claim is submitted may:
i. Repair such damage at his or its own expense with the approval and supervision of the board of commissioners of Dawson County or its designee. When repairs are completed to the satisfaction of the board of commissioners or its designee, the board of commissioners or its designee shall provide a written notification of satisfactory completion within five business days to the responsible person or firm and to the surety issuing the bond or the bank issuing the letter of credit, thereby terminating the claim.
ii. In the event of inclement weather or other factors preventing repair of the damage, request a 30-day extension to repair the damage from the board
of commissioners of Dawson County, provided that no extensions shall exceed 90 days from the date the claim was tendered. Approval of any extension shall be at the discretion of the board of commissioners of Dawson County or its designee.
iii. Appeal the claim to the magistrate court of Dawson County. Any such appeal must name the issuer of the bond or letter of credit as a party, who shall be served with all pleadings in the action and shall have the right to appear. The magistrate court will hear evidence and arguments within 30
days of the written appeal and issue a ruling within ten days of such hearing. Any such appeal shall toll the 30-day period, or any extension thereof. If the magistrate court rules in favor of the person or firm against whom the claim was made, the county shall have no right to recover any
proceeds of the bond or letter of credit, and judgment shall be entered against the county. If the magistrate court rules in favor of the county the court shall determine the amount of damages to which the county is entitled to recover and enter judgment accordingly; the board of commissioners of Dawson County shall be authorized to call the bond or letter of credit and recover from the proceeds thereof an amount equal to the judgment
entered by the court, up to the total amount of the bond or letter of credit.
The portion of any judgment entered in favor of the county that exceeds the amount of the bond or letter of credit shall be subject to collection by any additional remedies at law or equity.
iv. In the event the person or firm against whom the claim has been submitted fails to take any of the actions allowed under subsections (a), (b) or (c) of this section within the time required therein, such person or firm shall be deemed to have waived any and all rights to contest the call of the bond or letter of credit.
5. If the person or firm tendering a bond or letter of credit pursuant to the requirements of this section continues its timber harvesting operation beyond the calendar year in which the bond or letter of credit was issued, the person or firm continuing the timber harvesting operation shall tender a new bond or letter of credit within five business days after the first day of the new calendar year.
6. In the event a bond or letter of credit tendered pursuant to the requirements herein is revoked by the surety or bank, then a valid replacement bond or letter of credit must be delivered to the board of commissioners of Dawson County within five business days after the date of revocation in order for timber harvesting operations to continue. In addition, if the person or firm tendering the bond or letter of credit caused its revocation, the amount of the bond or letter of credit required shall be increased to $7,500.00 after the first revocation, and $10,000.00 after a second revocation caused by the person or firm tendering the bond or letter of credit. The maximum amount of the bond or letter of credit shall not exceed $10,000.00.
7. Submission of the notice required by this section shall authorize the person or firm submitting same to undertake the timber harvesting operation described in the notice and shall remain in effect until such time as the person or firm gives notice that the harvesting operation is complete; provided, however, that any change in the facts required to be provided for purposes of such notice, including but not limited to a change in the scope or extent of the operation, must be reported to the board of commissioners of Dawson County within three business days after such change.
8. This section applies to activities which qualify as forestry land management practices or agricultural operations under O.C.G.A. § 12-7-17(5) and (6) on land that is zoned for or used for forestry, silvicultural or agricultural purposes. It shall not authorize land disturbing activities incidental to development in conflict with the limitations set forth in O.C.G.A. § 12-7-17(6).
d. Consistent with O.C.G.A. § 12-6-24:
1. No fee shall be charged to provide and submit the notice required by this section;
and
2. No permit, including a driveway permit, shall be required of the person or firm engaged in a timber harvesting operation as defined by said Code section.
Persons and firms providing the notice required by this section may be asked to consult with county officials responsible for roads and public works for the purpose of minimizing damage to the county's roads, rights-of-way and infrastructure, and are urged to follow recommendations from county officials. Notwithstanding the forgoing, the person or firm conducting the timber harvest operation bears ultimate responsibility for their actions, and nothing in this section shall preclude the board of commissioners of Dawson County from taking any and all legal action necessary to protect its property and the health, safety and welfare of its citizens.
(f) Zoning buffer exclusion. The existing trees proposed to be retained or preserved and new trees proposed to be planted in order to meet the buffer requirements of the land use resolution or conditions of zoning, special use or variance approval shall not be considered in fulfilling the requirements of this article.
(g) Easement exclusion.An owner of a tract of land with easements for natural gas, petroleum or electric power transmission or major sanitary sewer mains (greater than eight inches in diameter) or water distribution lines mains (greater than 16 inches in diameter) may exclude the land area contained in the easement from the total acreage of the property in fulfilling the tree density standard provided that no improvements (e.g. parking lots, tennis courts, driveways, or storm water detention facilities) are proposed within the easement. If any improvements are proposed within the easement area, then the land so utilized within the easement for the improvements, plus an additional ten feet of land area surrounding the improvements shall be used to fulfill the tree density standard.
(h) Lake and pond exclusion. An owner of a tract of land with a proposed lake or pond greater than one acre in size may exclude the land area contained in the lake or pond from the total acreage of the property in fulfilling the tree density standard.
(Ord. of 11-25-2002, art. V; Ord. of 08-19-2021(1), § 1(Exh. A)) Sec. 109-26. Tree preservation and/or replacement plan.
(a) Permit required prior to beginning land development activities. Land development activities shall not commence until such activities have been authorized by issuance of an appropriate land development permit under the provisions of the Land Use Resolution of Dawson County. Once a final plat has been recorded, development activities on residential lots shall not occur until a building permit has been obtained.
(b) Requirements. For developments not exempt from the provisions of this article, a tree preservation and/or replacement plan shall be submitted along with the other documents required by the land use resolution for the issuance of a clearing, clearing and grubbing, land disturbance or land development permit.
(1) Tree preservation and/or replacement plans and related documentation shall be reviewed by the department for conformance to the provisions of this article along with and at the same time as all other plans required for a requested land development permit under the provisions of the land use resolution.
(2) Clearing, grading and development activities shall conform in all respects with the approved tree preservation and/or replacement plan. Any revisions to the proposed development of a property, and any changes reflected in a subsequently submitted permit application, shall be shown on a revised tree preservation and/or replacement plan and be approved as part of the new or revised permit prior to the commencement of such changed activities.
(c) Limited land development. Projects, which propose only limited development activities, may be issued a land development permit without a tree preservation and/or replacement plan under the following circumstances:
(1) Residential, commercial and industrial subdivisions if the proposed land development activities are strictly limited to the provision of the streets, storm water drainage and detention facilities, placement of erosion and sedimentation controls, and the installation of utilities.
(2) Individual multi-family residential single-family residential projects if the proposed land development activities are strictly limited to clearing only and not trees, stumps, or roots shall be disturbed.
(d) Residential subdivisions.
(1) Owners and/or developers of residential subdivisions (except as stated in section 109- 25(c)) shall comply with this article as follows:
a. Individual lot trees. A minimum of two trees, at least two inches in diameter, shall be planted or preserved on each individual lot prior to the issuance of a certificate of occupancy. Roots within the dripline area of preserved trees shall remain undisturbed or the tree cannot be counted as a required tree.
b. Street trees. Street trees shall be at least two inches in diameter at the time of planting.
The quantity of trees shall be equivalent to one tree per 50 linear feet of street for both sides of the street. Trees shall not be planted in the right-of-way.
c. Tree protection areas. A tree preservation plan shall be prepared and approved indicating compliance with the tree density standard of 20 tree density units per acre.
Preserved trees shall be grouped together in tree protection areas consisting of at least three trees. Preserved individual 12 inch or greater diameter trees may also receive credit provided a tree protection area protects them.
d. Significant trees. When a choice is available as to which existing historic or specimen trees to save on a property, emphasis shall be given to the preservation of these significant trees, even isolated individual trees over the retention of other trees.
Nonsignificant trees, however, should be saved in stands rather than as individual trees scattered over a site.
(2) For significant trees, the tree protection and preservation requirements are as follows:
a. Overstory, hardwoods: 18 inch diameter, with a life expectancy of 15+ years.
b. Overstory, softwoods: 18 inch diameter, with a life expectancy of 8+ years.
c. Understory/small trees: 8 inch diameter, with a life expectancy of 15+ years.
d. All trees are to have a sound trunk, with less than 20 percent radial trunk dieback.
e. No more than one major and several minor dead limbs (hardwood only) are allowed.
f. No major insect or pathological problems are present.
g. Smaller trees can be considered specimen trees if rare or of unusual quality, species or historical interest.
(3) For street trees developers shall enter into a performance surety agreement with the department guaranteeing tree planting within one year of the date of recording the final plat.
The performance surety shall be provided at the time of recording the final plat. In addition, a street tree planting plan shall be submitted to and approved by the department prior to planting by the developer. Street tree planting shall be delayed from June through August.
(4) Street trees shall be maintained and cared for by the property owners association.
Maintenance shall include replacement and trimming as necessary. A maintenance responsibility statement shall be provided on the final plat.
(e) Multi-family, commercial and industrial sites.
(1) Owners and/or developers of multi-family, commercial and industrial sites shall comply with this article using the following:
a. Individual landscape strip trees. As a minimum one tree for each 25 linear feet of strip length shall be planted or preserved on each individual lot prior to the issuance of a certificate of occupancy. Roots within the dripline area of preserved trees shall remain undisturbed or the tree cannot be counted as a required tree.
b. Tree protection area. A tree preservation plan shall be prepared and approved indicating compliance with the tree density standard of 20 tree density units per acre.
Preserved trees shall be grouped together in tree protection areas consisting of at least three trees. Preserved individual 12 inch or greater diameter trees may also receive credit provided a tree protection area protects them.
c. Significant trees. When a choice is available as to which existing historic or specimen trees to save on a property, emphasis shall be given to the preservation of these significant trees, even isolated individual trees over the retention of other trees.
Nonsignificant trees, however, should be saved in stands rather than as individual trees scattered over a site.
(2) For significant trees the tree protection and preservation requirements shall be the same as for residential lots and subdivisions as above.
(f) Tree density standard.
(1) On each property (multi-family, commercial, industrial and residential) for which a tree preservation plan and/or replacement plan is required, existing trees shall be retained and/or new trees planted such that the property shall attain or exceed a tree density standard of 20 tree density units per acre, exclusive of any acreage within a zoning buffer, any trees required to be preserved or planted within a zoning buffer, and any other land area allowed to be excluded by this article.
(2) Trees both existing and new shall be reasonably distributed throughout the property, with emphasis on tree groupings to achieve aesthetic results following professional landscaping standards.
(g) Tree density standard calculation. The tree density standard shall be calculated by adding the following credits and dividing the total acreage of the project included within the limits of the permit application, but excluding any acreage included within a zoning buffer and any other land area excluded by this article.
(1) a. Credit for existing trees proposed to be preserved on the site shall be calculated by multiplying the number of trees (by diameter) by the units assigned in appendix A, credit for existing trees, of this article. Credit shall be given for all trees preserved on a property having a diameter of three inches or more, except trees located in a zoning buffer.
b. Multi-trunked trees shall only be given credit by measuring the largest single trunk and not the cumulative total of the various trunks. Tree-form shrubs shall not be given credit for satisfying the required tree density standard.
(2) a. Credit for new trees proposed to be replaced on the site shall be calculated by multiplying the number of trees (by diameter) by the units assigned in the appendix B, credit for replacement trees. Credit shall be given for all new trees replaced on a property (except for new trees less than one inch in diameter and new trees planted in a required zoning buffer).
b. Multi-trunked trees shall only be given credit by measuring the largest single trunk and not the cumulative total of the various trunks. Tree-form shrubs shall not be given credit for satisfying the required tree density standard.
(3) Additional credits shall be granted under the following circumstances:
a. A total tree density credit not to exceed two times the units shown in appendix A, credit for existing trees, shall be granted by the department for existing trees 12 inches in diameter or greater for trees to be preserved.
b. Existing trees to be preserved within a 100-year flood plain shall be granted a bonus credit of 50 percent of the units assigned in appendix A, credit for existing trees, unless the tree is located within a required zoning buffer.
c. Existing trees to be preserved that are significant or specimen trees will receive a density credit not to exceed two times the units shown in appendix A, credit for existing trees.
(h) Tree preservation requirements. The following guidelines and standards shall apply to trees proposed to be preserved for credit towards meeting the minimum required tree density standards on a tract of land.
(1) Tree protection areas. The root system within the dripline is generally considered to be the critical root zone. To protect these critical root zones, a tree protection area shall be established around each tree or group of trees to be retained. The tree protection area shall include no less than the total area the tree canopy as defined by the dripline of the tree or group of trees collectively. Layout of the project site utility and grading plans shall avoid disturbance of the tree protection area. Construction site activities such as parking, materials of storage, concrete washout, burnhole placement, etc., shall be arranged so as to prevent disturbance within the tree protection areas.
(2) Protective barriers. Protective tree fencing shall be installed between buffers. Tree protection areas are areas proposed to be cleared, graded, or otherwise disturbed on the site before any land development. All tree protection areas are recommended to be designated as such with "tree save area signs" posted in addition to the required protective fencing. All tree protection areas must be protected from soil sedimentation intrusion through the use of silt screens or other acceptable measures placed up-slope from the tree protection area. All protective tree fencing and all erosion control barriers shall be installed prior to, and maintained throughout, the land development and construction process and shall not be removed until final landscaping is installed.
(3) Encroachment. If encroachment into a tree protection area occurs which causes irreparable damage to the trees, the tree preservation and/or replacement plan shall be revised to compensate for the loss as per section 109-29. Under no circumstances shall the developer be relieved of responsibility for compliance with the provisions of this article, nor shall plan revision activities stop the department from instituting action for violation of this article.
(i) Tree replacement requirements. Replacement trees proposed to be planted for credit toward meeting the minimum required tree density standard on a property shall comply with the following requirement guidelines:
(1) The spacing of replacement trees must be compatible with spatial site limitations and with responsible consideration towards species size when mature.
(2) Trees selected for planting shall be a species listed on appendix C, canopy tree list and appendix D, understory tree list of this article. Standards for transplanting shall be in keeping with those established by the International Society of Arboriculture, as included in the "Tree and Shrub Transplanting Manual," latest edition, or similar publications. Refer to the American Association of Nurseryman publication "American Standard for Nursery Stock" (ANSI Z60, 1973) for plant material quality specifications. Refer to the "Manual of Woody Landscape Plants" (Michael Dirr, 1983, Castle Books) or similar publications for information on tree species site requirements.
(3) Trees selected for planting must be free from injury, pests, disease, nutritional disorders or root defects, and must be of good vigor so as to assure a reasonable expectation of survivability.
(4) Trees must be replaced with at least 50 percent overstory trees.
(5) Replacement trees shall not be more than one-third in number of one genus (e.g. oak, maples, etc.) unless approved by the county arborist or designee.
(j) Tree species list. Tree species lists are found in appendix C, canopy tree list, and appendix D, understory tree list, of this article. The director is authorized to administratively add or delete species to both lists with notice to be provided to the planning commission and board of commissioners at the next available meeting for ratification by consent. Except as specifically approved by the director as a modification, only the trees listed shall be given credit towards meeting the requirements of this article.
(Ord. of 11-25-2002, art. VI) Sec. 109-27. Buffer and landscape plan specifications.
(a) Generally. A buffer and landscape plan shall be prepared for any development wherein buffer areas or other landscaping areas or treatment are required by this article, the land use resolution, conditions of zoning, special use or variance approval, or other regulations of Dawson County and shall be approved before the issuance of a land development permit. While the plan shall cover, at a minimum, the required buffer and landscape areas, the plan can be combined with a general landscaping plan for the entire project and/or a tree preservation and/or replacement plan at the developer's option. The buffer and landscape plan shall be shown on a site plan or boundary survey to the same or larger scale as the other plan documents prepared for the land development permit and shall cover the same area.
(b) Plan specifications. The buffer and landscape plan shall provide sufficient information and detail to clearly demonstrate that all applicable requirements and standards of this article will be fully satisfied. The buffer and landscape plan shall contain but need not be limited to the following information:
(1) Project name and land district, land lot, and acreage.
(2) Developer's name and telephone number, with 24-hour contact person.
(3) The name, address and telephone number of the registered landscape architect, urban forester, arborist, or other individual authorized by the director responsible for preparation of the plan and the seal or statement of professional qualifications of said person. The performance of professional services in the preparation of plans required herein shall comply with Georgia law governing the practice of the applicable profession.
(4) Boundary lines of each buffer or other landscape area to be appropriately labeled.
(5) Delineation of undisturbed buffer areas, and any other area wherein trees are proposed to be retained to meet Dawson County requirements, along the driplines of the trees or group of trees contained therein. These areas shall be treated in accordance with the tree protection area requirements contained in this article, and labeled as such. Protective barriers and signage as required by this article shall be shown as to location and detailed.
(6) General location of all proposed trees, shrubs, vines, groundcovers, mulching, and other features proposed within the buffer/landscape area. A scale sufficient to clearly indicate all details shall be used. A north arrow and graphic scale of the selected scale shall also be depicted on the plan.
(7) Within areas involving or adjacent to land form changes, existing and finish grade topographic lines at an interval of no more than two feet will be required.
(8) For new plant materials to be installed, a plant material list including but not limited to:
a. Common and botanical names of all proposed plants.
b. Plant quantities.
c. Size and condition of plants. (Example: one-inch diameter, six feet height, balled and burlapped).
d. Spacing.
e. Remarks as necessary to insure proper plant selection upon installation.
(Ord. of 11-25-2002, art. VII) Sec. 109-28. Tree preservation/replacement plan specifications.
(a) A professional landscape architect, urban forester, certified arborist, or individual authorized by the director shall prepare tree preservation and/or replacement plans in accordance with the specifications for such plans contained herein. Other licensed professionals (e.g. architects, engineers, etc.) may be authorized by the director provided that such professional demonstrates, competency and knowledge in the principles and practices of arboriculture. The performance of professional services in the preparation of plans required herein shall comply with Georgia law governing the practice of the applicable profession.
(b) The tree preservation and/or replacement plan shall be shown on a copy of a preliminary plat or site plan, as appropriate to the proposed development, drawn to the same scale as the other plan documents prepared for a land development permit application on the property and shall cover the same area. The plan may be combined with a required buffer and landscape plan for the project at the option of the developer.
(c) Plan specifications. The tree preservation and/or replacement plan shall provide sufficient information and detail to clearly demonstrate that all applicable requirements and standards of this article will be fully satisfied. The tree preservation and/or replacement plan shall contain, but need not be limited to, the following information:
(1) Project name, land district, land lot, north arrow, and graphic scale.
(2) Developer's name, address and telephone number, with 24-hour contact person.
(3) The name, address and telephone number of the professional landscape architect, urban forester, or certified arborist or other authorized individual responsible for preparation of the plan, and the seal or statement of professional qualifications of said person. The performance of professional services in the preparation of plans required herein shall comply with Georgia law governing the practice of the applicable profession.
(4) Delineation of all buffers and landscape areas as required by the land use resolution or condition of zoning, special use or variance approval.
(5) Total acreage of the site and total acreage exclusive of all zoning buffers areas.
(6) Delineation of all existing tree areas located within a 100-year flood plain.
(7) Existing trees to be retained in tree protection areas. Trunk location and size of individual trees proposed to remain for credit toward meeting the minimum tree density standard on the property. Groups of three or more trees whose driplines combine into a single tree protection area may be outlined as a group and their number, by diameter, shown in a summary table. If the number and size of all existing trees to remain on site exceeds the required tree density standard for the entire site, only those tree required to meet the minimum tree density standard must be shown. All tree protection areas must be outlined and labeled.
(8) Tree protection measures.
a. A detail of description of the protective tree fencing to be installed, and the location of such measures, which at a minimum shall follow the dripline of all trees to be retained along adjoining areas of clearing, grading or other construction activity.
b. Measures to be taken to avoid soil sedimentation intrusion into tree protection areas, and the location of such devices.
c. Proposed location of temporary construction activities such as equipment or working parking, materials storage, burn holes, equipment washdown areas, and entrance pads.
d. Proposed type and location of any trees save areas signs or other pertinent signage.
(9) If replacement trees are proposed to be planted in order for the property to achieve the required tree density standard, the replacement trees shall be shown and their spacing and diameter identified, to the extent needed to achieve the minimum requirements. Trees grouped together in tree planting areas may be listed on a summary table by total number in the grouping, by size.
(10) A summary table of the number of existing trees to remain and new trees to be planted, by diameter to the nearest inch at 4.5 feet above the ground for preserved trees and at six inches above the ground for replaced trees, shall be shown along with the calculations showing the tree density achieved for the site. Additional credits shall be noted where applicable. Groupings of trees in tree protection areas and areas for new tree planting may be keyed to the summary table by area rather than having each individually labeled on the plan.
(11) The plan sheet, which shows the grading plan, including existing and proposed contour lines, shall indicate the dripline location of all tree protection areas through the use of shading on the plans. The exact location of each tree is not to be desired to be shown, only the limits of the tree protection area and any other areas, which are not to be disturbed.
(d) Tree protection devices.
(1) Tree detection devices are necessary to eliminate activities detrimental to trees, including but not limited to the following activities:
a. Soil compaction in the critical root zone resulting from heavy equipment, vehicular or excessive pedestrian traffic, or storage of equipment or materials;
b. Root disturbance due to cuts, fills or trenching;
c. Wounds to exposed roots, trunks or limbs by mechanical equipment;
d. Other activities such as chemical storage, cement truck cleaning, fire, etc.
(2) Tree detection devices are to be installed surrounding the critical zone of all trees to be preserved. The development plans shall indicate whether the tree protection device is to be active or passive.
(3) Active protection is required where tree save areas are located in proximity to construction activity. Active tree protection shall consist of chain link, orange laminated plastic, wooden post and rail fencing, wooden stake and ribbon, or other equivalent restraining material (See details 2 and 3, active tree protections).
(4) Passive protection may be used in more remote locations and in all protected zones not designated as tree save areas. Passive tree protection shall consist of heavy mil plastic flagging of a bright color tied round a tree or trees to delineate the bounds of any tree protection or save areas.
(5) The location and installation of all tree protection devices shall be installed prior to or concurrent with the issuance of the land disturbance permit for clearing or clearing and grading. The department may inspect any installation of tree protection devices.
(6) Once approved tree protected areas are established, any changes are subject to review and approval of the director.
(Ord. of 11-25-2002, art. VIII) Sec. 109-29. Compliance.
(a) All artificial plants, trees, shrubs, grass or other vegetation shall be prohibited from fulfilling the requirements of this article.
(b) Upon final installation of new trees, shrubs or other landscape material planted to meet the requirements of this article and following inspection and acceptance by the department in accordance with the procedures set forth in the land use resolution, the owner shall either provide proof of warranty or post a maintenance bond or other acceptable surety, warranting the new trees, shrubs or landscape material for a period of no less than one year. This stipulation shall not apply to individual residential lot trees.
(c) The department shall perform a warranty inspection of the plantings and landscape material required by this article prior to the expiration of the one-year warranty or maintenance period. The owner shall be notified of any replacements or restoration that must be made to maintain compliance with this article. Required landscape material found to be dead or near death shall be replaced before release by the department of the warranty or maintenance surety. In no case shall replacement be delayed greater than 45 days from notification.
(d) If the new trees proposed to be planted to achieve the tree density standard as set forth in the tree regulations contained herein, or other trees or landscape material required to be planted as set forth in the buffer or landscape requirements contained herein, are not installed upon application for a certificate of occupancy or final plat approval as appropriate to the project, then a performance bond or other acceptable surety in the amount equal to 110 percent of the value of the new trees or landscape material and their installation shall be posted with the department in accordance with the performance bonding requirements and provisions of the land use resolution. The surety shall be drawn in favor of Dawson County, be in a form satisfactory to the county attorney and specify the time for completion of the landscaping, which shall not be longer than three months following approval of the certificate of occupancy or final plat approval or be in accordance with such other time table for completion acceptable to the department of planning and development.
(e) An owner of a tract of land who must obtain a permit to conduct land development activities, but does not need to obtain a certificate of occupancy or the approval of final plat, or if such activities as authorized are completed or if the permit expires, then the owner shall comply with the tree density standard of this article as follows:
(1) Replacement trees proposed to be planted to achieve the tree density standard of this article which are not planted upon completion or prior to expiration of a clearing, clearing and grubbing, or grading only permit, shall be planted within 30 days of the completion or expiration of said permit unless a performance bond is posted with the department.
(2) Replacement trees proposed to be planted to achieve the tree density standard of this article which are not planted upon expiration, as opposed to completion, of a development permit shall be planted within 30 days of expiration of said permit unless a performance bond is posted with the department.
(Ord. of 11-25-2002, art. IX) Sec. 109-30. Continuing maintenance.
(a) The owner, occupant, tenant, and respective agent of the owner, occupant, or tenant of each property, if any, shall be jointly and severally responsible for the perpetual maintenance and protection of buffers, trees and landscaping plantings required by this article. Homeowners are exempt from this maintenance requirement for individual lots unless the trees are protected by a conservation easement.
(b) The department is hereby authorized to order diseased, infested, dying, dead or damaged landscaping required herein to be replaced.
(c) A buffer that, over a period of time, loses the screening ability shall be replanted to meet the requirements of this article.
(d) Replacement trees and landscaping shall be in accordance with the applicable provisions of this article.
(Ord. of 11-25-2002, art. X) Sec. 109-31. Enforcement, violation and appeals, etc.
(a) Appeals are identified for process in accordance with the procedures set forth in the land use resolution. The director shall enforce this article. The director shall have the authority to revoke, suspend, or void any clearing, land development or building permit or to withhold issuance of a certificate of occupancy or approval of a final plat and shall have the authority to suspend all work on a site or a portion thereof if tree removal or damage occurs in violation of this article or the provisions of the approved tree preservation and/or replacement plan for the site.
(b) Any person violating this article shall be guilty of violating a duly adopted ordinance of Dawson County, and upon conviction by a court of competent jurisdiction, may be punished either by a fine of not less than $100.00 per day and not to exceed $1,500.00 per day (or $500.00 per day if violating timber harvesting notification), or confinement in the Dawson County jail not to exceed 60 days, or both. The court shall have the power and authority to place any person found guilty of a violation of this article on probation and to suspend or modify any fine or sentence. As a condition of said suspension or modification, the court may require payment of restitution or impose other punishment allowed by law, which may include mandatory attendance at an educational program regarding tree preservation.
(c) The preservation of trees may be considered as a condition peculiar to a piece of property in support of a request for a variance from the literal application of the provisions of the land use resolution under the procedure and requirements contained therein.
(d) Appeals of the interpretation of the requirements of this article by the director, waiver requests and modification requests shall be filed and processed in accordance with the appeals procedure as set forth in the land use resolution.
(Ord. of 11-25-2002, art. XI; Ord. of 08-19-2021(1), § 2(Exh. B)) Sec. 109-32. Adoption and amendment.
This article may be amended from time-to-time by resolution of the Board of Commissioners of Dawson County. Such amendments shall be effective as specified in the adopting resolution.
(1) Lots of record for which a building permit shall have been issued prior to the effective date of an amendment to this article shall be considered "grandfathered" and may proceed to completion under the terms of the permit and regulations in place prior to the amendment.
(2) Subdivision or projects for which a land development permit shall have been issued prior to the effective date of an amendment to this article shall be considered "grandfathered" and may proceed to completion under the terms of the permit and regulations in place prior to the amendment.
(3) Subdivisions or projects for which only a clearing, clearing and grubbing, or grading only permit shall have been issued prior to the effective date of an amendment to this article shall be made to comply with requirements of the amendment prior to the issuance of a land development permit.
(4) Subdivisions or projects for which a valid and complete application for a land development permit shall have been received prior to the effective date of an amendment to this article shall be considered "grandfathered" and may proceed to completion under the regulations in place prior to the amendment, provided that a land development permit is obtained within 90 calendar days of the effective date of the amendment and subject to the time limitations of the permit.
(Ord. of 11-25-2002, art. XII(1202)) Secs. 109-33—109-52. Reserved.
APPENDIX A. CREDIT FOR EXISTING TREES CREDIT FOR EXISTING TREES
CONVERSION FROM TREE DIAMETER IN INCHES TO TREE DENSITY UNITS FOR TREES
REMAINING ON SITE
DIAM UNITS DIAM UNITS DIAM UNITS DIAM UNITS
3 0.05 15 1.20 27 4.00 39 8.30 4 0.10 16 1.40 28 4.30 40 8.70 5 0.15 17 1.60 29 4.60 41 9.20 6 0.20 18 1.80 30 4.90 42 9.60 7 0.30 19 2.00 31 5.20 43 10.1 8 0.40 20 2.20 32 5.60 44 10.6 9 0.50 21 2.40 33 5.90 45 11.0 10 0.60 22 2.60 34 6.30 46 11.5 11 0.70 23 2.90 35 6.70 47 12.0 12 0.80 24 3.10 36 7.10 48 12.6 13 0.90 25 3.40 37 7.50 49 13.1 14 1.10 26 3.70 38 7.90 50 13.6
APPENDIX B. CREDIT FOR REPLACEMENT TREES
CREDIT FOR REPLACEMENT TREES CONVERSION FROM TREE DIAMETER IN INCHES
TO TREE
DENSITY UNITS FOR PROPOSED REPLACEMENT TREES
DIAMETER UNITS DIAMETER UNITS
1 0.40 8 1.30 2 0.50 9 1.50 3 0.60 10 1.70 4 0.70 11 1.90 5 0.90 12 2.10 6 1.00 13 2.30 7 1.20 14 2.50
APPENDIX C. CANOPY TREE LIST
(40 TO 100 FEET IN HEIGHT AT MATURITY)
BOTANICAL NAME COMMON NAME
NATIVE
TREE
DROUGHT
TOLERANT
Acer floridanum Florida Maple Yes No Acer negundo Boxelder Yes Acer pensvlvanicum Striped Maple Yes Acer rubrum Red Maple Yes Yes Acer saccharinum Silver Maple Yes Acer saccharum Sugar Maple No Yes Acer spicatum Mountain Maple Yes No Aesculus glabra Ohio Buckeye Yes Aesculus octandra Yellow Buckeye Yes Betula allegheniansis Yellow Birch Yes Betula Nigra River Birch Yes Yes Carya cordiformis Bitternut Hickory Yes Carya glabra Pignut Hickory Yes Carya laciniosa Shellbark Hickory Yes
NATIVE
TREE
DROUGHT
TOLERANT
Carya ovata Shagbark Hickory Yes No Carya pallida Sand Hickory Yes Carya tomentosa Mockernut Hickory Yes Catalpa bignonioides Southern Catalpa Yes Celtis laevigata Sugarberry Yes Celtis occidentalis Hackberry Yes Cryptomeria japonica Cryptomeria No Fagus grandifolia American Beech Yes No Fraxinus Americans White Ash Yes Fraxinus caroliniana Carolina Ash Yes Fraxinus pennsylvanica Green Ash Yes Yes Fraxinus profunda Pumpkin Ash Yes Ginkgo biloba Ginko No Yes Juglans cinera Butternut Yes Juglans nigra Black Walnut Yes Liquidamber styraciflua Sweetgum Yes No Liriodendron tulipifera Yellow Poplar No No Magnolia acuminata Cumcumbertree Yes Magnolia fraseri Fraser Magnolia Yes Magnolia grandiflora Southern Magnolia Yes No Magnolia tripetala Umbrella Magnolia Yes Metasequoia glyptostroboides Dawn Redwood No No Pinus echinata Shortleaf Pine Yes Pinus pungens Table-Mountain Pine Yes Pinus rigida Piitch Pine Yes Pinus strobes Eastern White Pine Yes No Pinus taeda Loblolly Pine Yes Yes Pinus virgininiana Virginia Pine Yes Yes Platanus occidentalis American Sycamore Yes Yes Populus deltoids Eastern Cottonwood Yes Prunus serotina Black Cherry Yes Quercus alba White Oak Yes No Quercus coccinea Scarlet Oak Yes Yes Quercus durandii Durand Oak Yes Quercus falcata var.
pagodaefolia Cherrybank Oak Yes Quercus georgiana Georgia Oak Yes Quercus laurifolia Laurel Oak Yes Yes Quercus lyrata Overcup Oak Yes Quercus marilandica Blackjack Oak Yes
NATIVE
TREE
DROUGHT
TOLERANT
Quercus michauxii Swamp Chestnut Oak Yes Quercus muehlenberrgii Chinapin Oak Yes Quercus nigra Water Oak Yes No Quercus palustris Pin Oak Yes Quercus phellos Willow Oak Yes Yes Quercus prinus Chestnut Oak Yes Yes Quercus rubra Northern Oak Yes Quercus shumardi Shumard Oak Yes Yes Quercus stellata Post Oak Yes Quercus velutina Black Oak Yes Robinia pseudoacacia Black Locust Yes Yes Sassafras Albidum Sassafras Yes Yes Sophora Japonica Japanese Pagodatree No No Taxodium disticum Common Bald Cypress Yes No Tilia caroliniana Carolina Basswood Yes Tilia heterophylla White Basswood Yes Tsuga canadensis Eastern Hemlock Yes Ulmus alata Winged Elm Yes Ulmus americana American Elm Yes Ulmus rubra Slippery Elm Yes Ulmus serotina September Elm Yes Zelkova serrata Japanese Zelkova No No (Ord. of 11-25-2002, app. C)
APPENDIX D. UNDERSTORY TREE LIST
(10 TO 40 FEET IN HEIGHT AT MATURITY)
BOTANICAL NAME COMMON NAME
NATIVE
TREE
DROUGHT
TOLERANT
Acer buergerianum Trident Maple No Yes Acer ginnala Amur Maple No Acer palmatum Japanese Maple No Aesculus pavia Red Buckeye Yes Aesculus sylvatica Painted Buckeye Yes Amerlanchier arborea Downy Serviceberry Yes No Asimina triloba Pawpaw Yes Carpinus betulus European Hombean Yes Carpinus caroliniana American Hornbeam Yes No
NATIVE
TREE
DROUGHT
TOLERANT
Castanea pumila Allegheny Chinkapin Yes Ceridiphyllum japonicum Katsuratree Yes Cercis canadensis Eastern Redbud Yes Yes Chionananthus virginicus Fringe Tree Yes No Cornus alternifolia Alternate Leaf Dogwood Yes No Cornus florida Flowering Dogwood Yes No Cornus kousa Chinese Dogwood No No Continue obovatus American Smoketree No No Cupressocyparis leylandii Leyland Cypress No Yes Diospyros virginiana Persimmon Yes Gleditsia triacanthos Honeylocust Yes Halesia carolina Silverbell No No Hamamelis virginiana Witch Hazel No No Ilex opaca American Holly No No Juniperus virginia Eastern Red Cedar Yes Yes Koelreuteria paniculata Golden Raintree No No Maclurap pomifera Osage Orange No Yes Magnolia macrophylla Bigleaf Magnolia Yes Magnolia soulangiana Saucer Magnolia No No Malus angustifolia Southern Crabapple Yes Malus coronaria Sweet Crabapple Yes Malus floribunda Japanese Flowering Crabapple No No Morus rubra Red Mulbeery Yes Nyssa sylvatica Blackgum Yes Ostrya virginiana Eastern Hophornbeam Yes Oxydendron Arboreum Sourwood Yes No Pistacia chinensis Chinese Pistache No Yes Prunus americana American Plum Yes Prunus angustifolia Chicksaw Plum Yes Prunus pensylvanica Fire Cherry Yes Prunus serrulata Japanese Flowering Cherry No No Prunus yedoenais Yoshino Flowering Cherry No No Pyrus callaryana capitol Capitol Pear No No Salix nigra Black Willow Yes (Ord. of 11-25-2002, app. D) Dawson County Tree Preservation Standards Detail No. 1 Frontage Planting Strips Dawson County Tree Preservation Standards Detail No. 2 Active Tree Protection/Critical Root Zone
ARTICLE III. SOIL EROSION AND SEDIMENTATION CONTROL*
Sec. 109-53. Title.
This article shall be known as the "Dawson County Soil Erosion and Sedimentation Control Ordinance."
(Ord. of 5-6-2010, § 1; Ord. of 6-4-2015(2), § 1) Sec. 109-54. Definitions.
Best Management Practices (BMPs): These include sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia" published by the Commission as of January 1 of the year in which the land-disturbing activity was permitted.
Board: The Board of Natural Resources.
Buffer: The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel: A person who has successfully completed the appropriate certification course approved by the Georgia Soil and Water Conservation Commission.
Commission: The Georgia Soil and Water Conservation Commission (GSWCC).
CPESC: Certified Professional in Erosion and Sediment Control with current certification by Certified Profession in Erosion and Sediment Control Inc., a corporation registered in North Carolina, which is also referred to as CPESC or CPESC, Inc.
Cut: A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation.
Dawson County Planning and Development Department: The Department within Dawson County Government responsible for the implementation and enforcement of this ordinance.
Department: The Georgia Department of Natural Resources (DNR).
Design professional: A professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by Certified Professional in Erosion and Sediment Control Inc.
Director: The Director of the Environmental Protection Division or an authorized representative.
District: The Upper Chattahoochee Soil and Water Conservation District.
Division: The Environmental Protection Division (EPD) of the Department of Natural Resources.
Drainage structure: A device composed of a virtually nonerodible material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for storm water management, drainage control, or flood control purposes.
Erosion: The process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, Sedimentation and Pollution Control Plan: A plan required by the Erosion and Sedimentation Act, O.C.G.A. Chapter 12-7, that includes, as a minimum protections at least as stringent as the State General Permit, best management practices, and requirements in section 109-56(c) of this article.
Fill:A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or an excavation.
Final stabilization: All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or equivalent permanent stabilization measures (such as the use of rip rap, gabions, permanent mulches or geotextiles) have been used. Permanent vegetation shall consist of: planted trees, shrubs, perennial vines; a crop of perennial vegetation appropriate for the time of year and region;
or a crop of annual vegetation and a seeding of target crop perennials appropriate for the region.
Final stabilization applies to each phase of construction.
Finished grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading: Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
Ground elevation: The original elevation of the ground surface prior to cutting or filling.
Land-disturbing activity: Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices as described in section 109-55(5).
Larger common plan of development or sale: A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this paragraph, "plan" means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority: The governing authority of any county or municipality which is certified pursuant to subsection (a) O.C.G.A. 12-7-8. For the purposes of this article, the local issuing authority is Dawson County. The Dawson County Planning and Development Department shall perform duties required unless such duties are otherwise assigned by Dawson County.
Metropolitan River Protection Act (MRPA): A state law referenced as O.C.G.A. 12-5-440 et.seq.
which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.
Natural ground surface: The ground surface in its original state before any grading, excavation or filling.
Nephelometric Turbidity Units (NTU): Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
NOI: A Notice of Intent form provided by EPD for coverage under the State General Permit.
NOT: A Notice of Termination form provided by EPD to terminate coverage under the State General Permit.
Operator: The party or parties that have: (A) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or (B) day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall: The location where storm water in a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.
Permit: The authorization necessary to conduct a land-disturbing activity under the provisions of this ordinance.
Person: Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
Phase or phased: Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
Project: The entire proposed development project regardless of the size of the area of land to be disturbed.
Properly designed: Designed in accordance with the design requirements and specifications contained in the "Manual for Erosion and Sediment Control in Georgia" (Manual) published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the Manual as approved by the Commission up until the date of NOI submittal.
Roadway drainage structure: A device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment: Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation: The process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.
Soil and Water Conservation District Approved Plan: An erosion, sedimentation and pollution control plan approved in writing by the Upper Chattahoochee Soil and Water Conservation District.
Stabilization: The process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
State General Permit: The National Pollution Discharge Elimination System (NPDES) general permit or permits for storm water runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., and subsection (f) of Code Section 12-5-30.
State waters: Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of Georgia which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices: Practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures and sediment traps, etc. Such practices can be found in the publication "Manual for Erosion and Sediment Control in Georgia".
Trout streams: All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A. 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.gaepd.org. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout.
Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.
Vegetative erosion and sedimentation control measures: Measures for the stabilization of erodible or sediment-producing areas by covering the soil with:
a. Permanent seeding, sprigging or planting, producing long-term vegetative cover, or
b. Temporary seeding, producing short-term vegetative cover; or
c. Sodding, covering areas with a turf of perennial sod-forming grass.
Such measures can be found in the publication "Manual for Erosion and Sediment Control in Georgia".
Watercourse: Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Wetlands: Those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
(Ord. of 5-6-2010, § 2; Ord. of 6-4-2015(2), § 2) Sec. 109-55. Exemptions.
This article shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
(1) Surface mining, as the same is defined in O.C.G.A. 12-4-72, "The Georgia Surface Mining Act of 1968";
(2) Granite quarrying and land clearing for such quarrying;
(3) Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, and other related activities which result in minor soil erosion.
(4) The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A. 12-7-6 and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to Article 2 of Chapter 5 of the Georgia Water Quality Control Act. In any such buffer zone, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the Director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of subsection (b) of O.C.G.A. 12-7-6 and the buffer zones provided by this paragraph shall be enforced by the local issuing authority;
(5) Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions", to include raising, harvesting or storing of products of the field or orchard; feeding, breeding or managing livestock or poultry; producing or storing feed for use in the production of livestock, including but not limited to cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chickens, hens and turkeys; producing plants, trees, fowl, or animals; the production of aqua culture, horticultural, dairy, livestock, poultry, eggs and apiarian products; farm buildings and farm ponds;
(6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in subsections (15) and (16) of section 109-56(c) of this article, no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
(7) Any project carried out under the technical supervision of the Natural Resources Conservation Service of the United States Department of Agriculture;
(8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainageways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves less than one acre, which involves land disturbing activity, and which is within 200 feet of any such excluded channel or drainageway, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the Local Issuing Authority from regulating any such project which is not specifically exempted by subsections (1), (2), (3), (4), (5), (6), (7), (9) or
(10) of this section;
(9) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the state tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the Department of Transportation or the state tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. 12-7-7.1; except where the Department of Transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
(10) Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. 36-18-1, or any agency or instrumentality of the United states engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
(11) Any public water system reservoir.
(Ord. of 5-6-2010, § 3; Ord. of 6-4-2015(2), § 3) Sec. 109-56. Minimum requirements for erosion and sedimentation control using best management practices.
(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land-disturbing activities if requirements of the ordinance and the NPDES General Permit are not met. Therefore, plans for those land-disturbing activities which are not exempted by this ordinance shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of section 109-56(b) and (c) of this article. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with requirements of this ordinance and the NPDES General Permit.
(b) Minimum requirements/BMPs.
(1) Best management practices as set forth in section 109-56(b) and (c) of this article shall be required for all land-disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with paragraph (2) of this subsection or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to subsection (f) of Code Section 12-5-30, the "Georgia Water Quality Control Act".
As used in this subsection the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. 12-7-6 subsection (b).
(2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land-disturbing permit issued by a local Issuing Authority or by the Division or of any general permit for construction activities issued by the Division pursuant to subsection (f) of Code Section 12-5-30, the "Georgia Water Quality Control Act", for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the Director. This paragraph shall not apply to any land disturbance associated with the construction of single family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
(3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land-disturbing permit issued by a local Issuing Authority or by the Division or any general permit for construction activities issued by the Division pursuant to subsection (f) of Code Section 12-5-30, the "Georgia Water Quality Control Act", for each day on which such failure occurs.
(4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.
(5) The LIA may set more stringent buffer requirements than stated in subsection (c)(15) and (16), in light of O.C.G.A. § 12-7-6 (c).
(c) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A. 12-7-1 et.
seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia" published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, as well as the following:
(1) Stripping of vegetation, regrading and other development activities shall be conducted in a manner so as to minimize erosion;
(2) Cut-fill operations must be kept to a minimum;
(3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;
(4) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(6) Disturbed soil shall be stabilized as quickly as practicable;
(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(9) To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized.
As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et. seq.;
(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(11) Cuts and fills may not endanger adjoining property;
(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods as not feasible, provided, in any case that such crossings are kept to a minimum;
(14) Land-disturbing activity plans for erosion and sedimentation control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in section 109-56(b)(2) of this article;
(15) Except as provided in paragraph (20) of this subsection, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director pursuant to O.C.G.A. § 12-2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the "Georgia Water Quality Control Act", shall remain in force unless a variance is granted by the Director as provided in this paragraph. The following requirements shall apply to any such buffer:
a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land-disturbing activities, provided they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or (ii) stream crossings for sewer lines; and
(16) There is established a 50 foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action along the banks of any state waters classified as "trout streams" pursuant to Article 2 of Chapter 5 of Title 12, the "Georgia Water Quality Control Act", except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25 foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:
a. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed: provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land-disturbing activities, provided they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or (ii) stream crossings for sewer lines.
(17) Construction site operators shall control waste at the construction site, such as discarded building materials, concrete truck washout, chemicals, litter, and sanitary waste.
(d) Nothing contained in O.C.G.A. 12-7-1 et. seq. shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in section 109-56(b) and (c) of this article.
(e) The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this ordinance or the terms of the permit.
(Ord. of 5-6-2010, § 4; Ord. of 6-4-2015(2), § 4) Sec. 109-57. Application/permit process.
(a) General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the area surrounding such tract and the zoning ordinance, storm water management ordinance, subdivision ordinance, flood damage prevention ordinance, this ordinance, and any other ordinances, rules, regulations or permit, that regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the property owner is the only party who may obtain a permit.
(b) Application requirements.
(1) No person shall conduct any land-disturbing activity within the jurisdictional boundaries of Dawson County without first obtaining a permit from the Planning and Development Department of Dawson County to perform such activity.
(2) The application for a permit shall be submitted to of the Dawson County Planning and Development Department and must include the applicant's erosion and sedimentation control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in section 109-57(c) of this article. Soil erosion and sedimentation control plans shall conform to the provisions of section 109-56(b) and (c) of this article. Applications for a permit will not be accepted unless accompanied by three copies of the applicant's soil erosion and sedimentation control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan or that such a visit was not required in accordance with rules and regulations established by the board.
(3) Fees shall be charged in accordance with the Dawson County Planning and Development Fee Schedule.
(4) In addition to the local permitting fees, fees will also be assessed pursuant to paragraph (5) subsection (a) of O.C.G.A. 12-5-23, provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land-disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to subsection (a) of O.C.G.A. 12-7-8 half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to paragraph (9) or (10) of O.C.G.A. 12-7-17 shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
(5) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. A district shall approve or disapprove a plan within 35 days of receipt. Failure of a district to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the district, and any variances required by section 109-56(c)(15) and (16) and bonding, if required as per section 109-57(b)(7), have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.
(6) If a permit applicant has had two or more violations of previous permits, this ordinance section, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing of the application under consideration, the local issuing authority may deny the permit application.
(7) The issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does not comply with this ordinance or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
(c) Plan requirements.
(1) Plans must be prepared to meet the minimum requirements as contained in section 109-56(b) and (c) of this article, or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The "Manual for Erosion and Sediment Control in Georgia" is hereby incorporated by reference into this ordinance. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and storm water management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. 12-7-20.
(2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the land-disturbing activity was permitted.
(3) Maintenance of all soil erosion and sedimentation control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner.
(d) Permits.
(1) Permits shall be issued or denied as soon as practicable but in any event not later that 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.
(2) No permit shall be issued by the local issuing authority unless the erosion and sedimentation control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this ordinance, any variances required by section 109-56(c)(15) and (16) are obtained, bonding requirements, if necessary, as per section 109-57(b)(7) are met and all ordinances and rules and regulations in affect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this ordinance, and any other ordinances relating to land development, as are applied to private persons and the division shall enforce such requirements upon the local issuing authority.
(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this ordinance. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
(6) The LIA may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. 12-7-7 (f) (1).
(7) No permit shall be issued unless the applicant provides a statement by the tax commissioner's office certifying that all ad valorem taxes levied against the property and due and owing have been paid.
(Ord. of 5-6-2010, § 5; Ord. of 6-4-2015(2), § 5) Sec. 109-58. Inspection and enforcement.
(a) The Planning and Development Department or designee will periodically inspect the sites of land-disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities. If, through inspection, it is deemed that a person engaged in land-disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this ordinance, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be in violation of this article.
(b) The Planning and Development Department or designee shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this ordinance, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
(c) No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
(d) The districts or the commission or both shall periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. 12-7-8 (a).
The districts or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion and sedimentation control program. The districts or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
(e) The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. 12-7-8 (a).
The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The district or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
(f) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to Code Section 12-7-8 (a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. 12-7-8 (a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. 12-7-7 (e), the Division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority.
(Ord. of 5-6-2010, § 6; Ord. of 6-4-2015(2), § 6) Sec. 109-59. Penalties and incentives.
(a) Failure to obtain a permit for land-disturbing activity. If any person commences any landdisturbing activity requiring a land-disturbing permit as prescribed in this ordinance without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
(b) Stop-work orders.
(1) For the first and second violations of the provisions of this article, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land-disturbing activities be stopped until necessary corrective action or mitigation has occurred; provide, however, that, if the violation presents and imminent threat to public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director or local issuing authority shall issue an immediate stop-work order in lieu of a warning;
(2) For a third and each subsequent violation, the director or local issuing authority shall issue an immediate stop-work order; and,
(3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred.
(4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the local issuing authority or by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
(c) Bond forfeiture. If, through inspection, it is determined that a person engaged in landdisturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land-disturbing activity fails to comply within the time specified, he shall be deemed in violation of this ordinance and, in addition to the other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 109-57(b)(7). The local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land-disturbing activity and bring it into compliance.
(d) Monetary penalties.
(1) Any person who violates any provisions of this ordinance, the rules and regulations adopted pursuant hereto, or any permit condition or limitation established pursuant to this ordinance or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this ordinance shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this ordinance, notwithstanding any provisions in any city charter to the contrary, municipal courts shall be authorized to impose penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this ordinance under county ordinances approved under this ordinance shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
(Ord. of 5-6-2010, § 7; Ord. of 6-4-2015(1), § 7) Sec. 109-60. Education and certification.
(a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A.
§ 12-7-20.
(b) For each site on which land-disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this ordinance.
(d) If a state general permittee who has operational control of land-disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(1)(b), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-19(4)(b) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.
(Ord. of 5-6-2010, § 8; Ord. of 6-4-2015(2), § 8) Sec. 109-61. Administrative appeal judicial review.
(a) Administrative remedies. The suspension, revocation, modification or grant with condition of a permit by the local issuing authority upon finding that the holder is not in compliance with the approved erosion and sediment control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of any ordinance; shall entitle the person submitting the plan or holding the permit to a hearing before the Dawson County Planning Commission within 30 days after receipt by the local issuing authority of written notice of appeal. Appeals are identified for process in accordance with the procedures set forth in the land use resolution.
(b) Any person, aggrieved by a decision of the planning commission, within 30 calendar days of the date of decision, may appeal the decision to the Dawson County Board of Commissioners in accordance with the procedures set forth in the land use resolution.
(Ord. of 5-6-2010, § 9; Ord. of 6-4-2015(2), § 9; Ord. of 9-18-2025(1), Exh. A, § 17) Sec. 109-62. Effective, validity and liability.
(a) Effective. This article shall become effective on the 4th day of June, 2015.
(b) Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decision shall not affect the remaining portions of this article.
(c) Liability.
(1) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property.
(2) The fact that a land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.
(3) No provision of this article shall permit any persons to violate Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.
(d) Repealer. All resolutions or ordinances or parts thereof in conflict with the terms of this article are hereby repealed.
(Ord. of 5-6-2010, § 10; Ord. of 6-4-2015(2), § 10) Secs. 109-63—109-82. Reserved.
ARTICLE IV. WATERSHED PROTECTION*
Sec. 109-83. Purpose and intent.
(a) These regulations aim to establish the protection of drinking water supply watersheds. This protection is necessary for enhancing public health, safety, and welfare and ensuring that surface drinking water sources are of high quality to be treated to meet all state and federal drinking water standards.
(b) Under O.C.G.A. § 12-2-8, these regulations establish criteria to allow the development of a water supply watershed without contaminating the water source to a point where it cannot be treated to meet drinking water standards. These criteria accomplish this by establishing buffer zones around streams and specifying allowable impervious surface densities within watersheds. The requirements also include the protection of water supply reservoirs by buffer zones and management practices to be established by reservoir owners and approved by the department of natural resources (DNR).
Sec. 109-84. Definitions.
Aquifer. Any stratum or zone of rock beneath the earth's surface capable of containing or producing water from a well.
Buffer. A natural or enhanced vegetated area with no or limited minor land disturbances, such as trails and picnic areas.
Buffer, planted. A buffer area is cleared in the construction process and has specified vegetation purposely replanted for environmental protection and from encroachment of conflicting uses.
Buffer, undisturbed. An undisturbed buffer is left in a natural state or augmented with plantings to achieve the goal of buffering.
Buffer area, natural vegetative. A river corridor containing the flora native to that area. The natural floras for specific areas are described in Georgia Geologic Survey Bulletin 114, "The Natural Environments of Georgia." Habitats for endangered and threatened species may require river corridor management to maintain those species.
Corridor. All land within the buffer and other setback areas.
DRASTIC. The standardized system for evaluating groundwater pollution potential using the hydrogeologic settings described in U.S. Environmental Protection Agency document EPA-600/287- 035.
Governmentally-owned. Dawson County and Water and Sewer Authorities that provide public water and sanitary sewer services.
Hazardous waste. Any solid waste defined as hazardous in regulations promulgated by the United States Environmental Protection Agency administrator under the federal Act, which is in force and effect on February 1, 1998, codified as 40 CFR Section 261.3.
Impervious surface. A manufactured structure or surface that prevents stormwater infiltration into the ground below the structure or surface.
Land-disturbing activity. Any grading, scraping, excavating, or filling of land; clearing of vegetation; and any construction, rebuilding, or alteration of a structure. Land-disturbing shall not include ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs, additions, or minor modifications to a single-family dwelling, and firewood cutting for personal use.
Local government. The governing authority of a political subdivision.
Lot of record. Whenever a lot or plat has been legally and duly recorded with the county clerk of Superior Court before February 23, 1998, and exists as shown or described, it shall be deemed a lot of record. In addition, lots legally recorded that met zoning standards in place at the time of recordation but do not meet standards currently in place are also considered lots of record. Although said lot may not contain a sufficient land area or lot frontage to meet the minimum lot size requirements of the current zoning, such a lot may be used as a building site provided that all other requirements of the district are met and that building plans are consistent with all state and local health codes.
Overlay district. A land use district that encompasses one or more underlying zones and imposes additional requirements above that are required by the underlying zone(s). An overlay district can be coterminous with existing zoning districts or contain only parts of one or more such districts.
Perennial river. A river or section of a river that flows continuously throughout the year.
Perennial stream. A stream with normal stream flow consisting of base flow (discharge that enters the stream channel mainly from groundwater) or both base flow and direct runoff during any period of the year.
Plans or comprehensive plans. Any plan by a county or a municipality covering such county or municipality or any plan by a regional development center covering the center's region proposed or prepared pursuant to the minimum planning standard and procedures for preparation of comprehensive plans and for implementation of comprehensive plans, established by the department of community affairs in accordance with O.C.G.A. §§ 50-8-1 through 50-8-12.
Pollution susceptibility. The relative vulnerability of an aquifer to being polluted from spills, discharges, leaks, impoundments, applications of chemicals, injections, and other human activities in the recharge area.
Pollution susceptibility maps. Maps of relative vulnerability to pollution prepared by the department of natural resources, using the DRASTIC methodology. Pollution susceptibility maps categorize the land areas of the state into areas having high, medium, and low groundwater pollution potential.
Protected river. As determined by appropriate U.S. Geological Survey documents, any perennial river or watercourse with an average annual flow of at least 400 cubic feet per second. However, those segments of river covered by the Metropolitan River Protection Act or the Coastal Marshlands Protection Act are specifically excluded from the definition of a protected river.
Public utility or utilities. A service or services provided by a public utility company or a private entity that provides or services and all equipment and structures necessary to provide such services.
Quadrangle map. The most recently published U.S. Geological Survey 7.5-Minute Topographic Map prepared at a scale of 1:24,000.
Recharge area. Any portion of the earth's surface where water infiltrates the ground to replenish an aquifer.
Reservoir boundary. The edge of a water supply reservoir is defined by its normal pool level.
Riverbank. The rising ground borders a river and confines the water to the natural channel during the normal flow. For horizontal measurements, the riverbank shall be considered the point of wrested vegetation.
River corridor. All the land, inclusive of islands, not regulated under the Metropolitan River Protection Act (O.C.G.A. §§ 12-5-440 through 12-5-457) or the Coastal Marshlands Protection Act (O.C.G.A. §§ 12-5-280 through 12-5-293), in areas of a protected river and being within 100 feet horizontally on both sides of the river as measured from the riverbanks. The 100-foot buffer shall be measured horizontally from the uppermost part of the riverbanks, usually marked by a break in slope.
Although not within the measured 100-foot-wide buffer, the area between the top of the bank and the edge of the river shall be treated by the local governments in the same manner as the river corridor and included within the river corridor protection plan. Because stream channels move due to natural processes such as meandering, riverbank erosion, and jumping of channels, the river corridor may shift with time. For these standards, the river corridor shall be considered fixed at its position at the beginning of each review period for comprehensive local plans. Any shift in the location of the protected river after the start of the review period will require a revision of the boundaries of the river corridor at the time of the next review by the department of community affairs.
River corridor protection plan. That part of the Dawson County Code addresses the river corridor protection requirements.
Sensitive natural areas. Any area, as identified now or hereafter by the department of natural resources, which contains one or more of the following: Habitat, including nesting sites, occupied by rare or endangered species; rare or exemplary natural communities: significant landforms, hydroforms, or geological features; or other areas designed by the department of natural resources that are sensitive or vulnerable to physical or biological alteration.
Significant recharge areas. Those areas were mapped by the department of natural resources in Hydrologic Atlas 18 (1989 edition). Mapping of recharge areas is based on outcrop area, lithology, soil type thickness, slope, density of lithologic contacts, geologic structure, the presence of karst, and potentiometric surface.
Single-family dwelling. A dwelling structure that is designed for the use of one family.
Utility. Public or private water or sewer piping systems, water or sewer pumping stations, electric power lines, fuel pipelines, telephone lines, roads, driveways, bridges, river/lake access facilities, stormwater systems, and railroads or other utilities identified by a local government.
Water quality critical area. The water quality critical area shall comprise all lands within seven miles upstream from a public water supply reservoir boundary and all lands within a seven-mile radius of a public water supply intake.
Water supply reservoir. A water impoundment to provide water to one or more public water systems. This excludes the multipurpose reservoirs owned by the U.S. Army Corps of Engineers.
Water supply watershed. The land area upstream of a public drinking water intake.
Water supply watershed protection plan. A land use plan adopted by local governments or authorities to protect the quality of drinking water obtained from the watershed.
Wetland protection plan. The Environmental Sensitive Lands Map indicates all wetlands within Dawson County as "wetlands providing significant wildlife habitat and/or which may be subjected to extensive mitigation."
Wetlands, freshwater. Those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. (33 CFR 32.93). The ecological parameters for designating wetlands have hydric soils, hydrophytic vegetation, and hydrological conditions involving a temporary or permanent water source to cause soil saturation. Freshwater wetlands do not include any areas defined as "coastal marshlands" by the State Coastal Marshlands Protection Act of 1980 (O.C.G.A. § 12-5-280 et seq.).
(Ord. of 3-7-2024(5)) Sec. 109-85. Overlay district provisions.
(a) Purpose. The purpose of this overlay district article is to conserve natural resources and realize development objectives. The current land use provisions may adequately regulate the relevant overlay district. Specific and targeted provisions in an overlay district are needed to accomplish land use objectives related to protecting fragile natural resources. The resources include, but are not limited to, groundwater recharge areas, water supply, watersheds, protected river corridors, reservoirs, and wetlands.
(b) Applicability. The overlay district provisions of this article apply to those parcels within unincorporated Dawson County that have particular development constraints:
(1) The Etowah River water supply watershed protection overlay district is designated and shall consist of land areas that drain to the public water supply intake on the Etowah River. The boundaries of this overlay are defined by the ridge lines of the respective watersheds and the boundary of a radius of seven miles upstream of the individual public water supply intake. This overlay shall be further delineated and defined on the Etowah River Water Supply Watershed Protection Overlay District Map of Dawson County, which is hereby incorporated and made a part of this article by reference.
(2) The protected groundwater recharge area overlay district is designated and shall consist of all lands within the jurisdiction of Dawson County, Georgia, mapped as significant recharge areas by the Georgia Department of Natural Resources in Hydrologic Atlas 18, 1989 edition.
These districts shall be further delineated and represented on the Environmentally Sensitive Areas Map of Dawson County, which is hereby incorporated and made a part of this article by reference.
(3) The Etowah River Corridor protection overlay district is designated and shall consist of all areas within 100 feet horizontally on both sides of the Etowah River in Dawson County.
These districts shall be further delineated and defined on the Etowah River Corridor on the Environmentally Sensitive Areas Map of Dawson County, which is hereby incorporated and made a part of this article by reference.
(4) The wetland protection overlay district is designated and shall consist of all wetlands within the wetland protection district as defined herein and located within Dawson County's jurisdiction. These districts shall be further delineated and represented on the Environmentally Sensitive Areas Map of Dawson County, which is hereby incorporated and made a part of this article by reference.
(5) The Russell Creek Reservoir watershed protection overlay district is designated and shall consist of the land areas that drain to the Russell Creek public water supply intake and water supply reservoir. The overlay boundaries are further delineated and depicted on the Russell Creek Reservoir Watershed Protection Overlay District Map.
(Ord. of 3-7-2024(5)) Sec. 109-86. Delineation of boundaries.
Dawson County has several watersheds delineated on the Dawson County Watershed Map. All watersheds are different, and not all are a resource for drinking water. All lands within water supply watersheds are designated as watershed protection areas and include all that drains from the stream bank from the ridgeline of each watershed. The boundary of the water supply watershed is defined by the ridgeline of the watershed or by the political boundaries of the county, where those boundaries occur within the watershed. Small water supply watersheds within the county jurisdiction include Etowah River and Russell Creek Reservoir. The City of Dawsonville operates four groundwater wells and a spring. Etowah Water and Sewer Authority has a primary public water intake on the Etowah River and a primary public water intake at the Russell Creek Reservoir.
(Ord. of 3-7-2024(5)) Sec. 109-87. Etowah River water supply watershed overlay; restrictions in general.
(a) Protected watershed areas; exemptions.
(1) Silvicultural. Notwithstanding other provisions of this article, forestry practices, in accordance with a forest management plan that incorporates best management practices (BMPs) approved by the Georgia Forestry Commission, shall be permissible within watershed protection areas.
(2) Agricultural. Notwithstanding other provisions of this article, the continued cultivation of crops shall be permissible within watershed protection areas, provided that the best management practices (BMPs) of the Georgia Department of Agriculture are followed.
(3) Lot of record. Notwithstanding other provisions of this article, on the date of adoption of the lot size standards in the Etowah River Corridor and the Russell Creek Reservoir protection overlay.
(b) Development permit required. Within a water supply watershed, no land-disturbing activity, construction, or other development, other than certain exempted activities identified in this article, may be conducted without a permit from Dawson County, and any development or activities must be in full compliance with the terms of this article and other applicable regulations. All activities not permissible as of right or as special use permit shall be prohibited.
(c) Site plan required. Applications for a development permit within a water supply watershed shall include a site plan and a lot grading plan in accordance with the permits and procedures section of the Land Use Code. Except for the exemptions listed in this section, all forms of development within the water supply watershed shall be required to prepare a site plan and a lot grading plan before any building permits or other development-related permits may be issued or any landdisturbing activity may occur.
(d) Restrictions in stream corridors; all watersheds.
(1) Street runoff and drainage. New streets that cross perennial streams within the water supply watershed areas shall be designed in such a way as to prevent direct runoff from the paved surface into the streams they cross. The site and lot grading plans will show such design features.
(2) Septic tanks and drain fields. Septic tanks and septic tank drain fields are prohibited in all stream corridors' setback and buffer areas within water supply watershed areas.
(3) Utilities. Utilities, including sanitary sewers that cannot be practicably located outside the stream buffer or setback area, must be as far from the stream bank as reasonably possible.
Such utilities must be installed and maintained to protect the integrity of the stream buffer and setback areas as best as reasonably practicable and must not impair the quality of the drinking water in the stream.
(Ord. of 3-7-2024(5)) Sec. 109-88. Etowah River water supply watershed protection overlay district; restrictions.
Small water supply watersheds; restrictions.
(1) Stream buffer; small water supply watersheds.
a. The perennial stream corridors within seven miles radius upstream of a governmentally owned public drinking water supply intake are protected by the following criteria:
1. No impervious surface shall be constructed within a 150-foot setback area on both sides of the stream as measured from the stream banks for all perennial streams unless a greater distance is required specifically by the Dawson County Code.
2. For all perennial streams within the limited development area, no impervious surface shall be constructed within a 100-foot buffer area on both sides of the stream as measured from the stream banks unless a greater distance is required specifically by the Dawson County Code.
3. Septic tanks and septic tank drain fields are prohibited in the setback area of subsection (1)a.1. above.
b. The perennial stream corridors outside a seven-mile radius upstream of a governmentally owned public drinking water supply intake are protected by the following criteria:
1. No impervious surface shall be constructed within a 75-foot setback area on both sides of the stream as measured from the stream banks for all perennial streams unless a greater distance is required specifically by the Dawson County Code.
2. For all perennial streams within the limited development area, no impervious surface shall be constructed within a 50-foot buffer area on both sides of the stream as measured from the stream banks unless a greater distance is required specifically by the Dawson County Code.
3. Septic tanks and septic tank drain fields are prohibited in the setback area of subsection (1)b.1. above.
(2) Land use restrictions; small water supply watersheds.
a. New hazardous waste treatment or disposal facilities are prohibited.
b. New sanitary landfills are prohibited.
c. Any new facility that handles hazardous materials listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) is prohibited.
d. Impervious surface area restricted. The impervious surface area, including all public and private structures, utilities, or facilities, of the entire watershed protection area shall be limited to 25 percent. The Dawson County Planning Commission, by means of the variance process in accordance with the procedures set forth in the land use resolution, must approve any individual development resulting in more impervious surface than 25 percent of the property's total area.
(Ord. of 3-7-2024(5); Ord. of 9-18-2025(1), Exh. A, § 18) Sec. 109-89. Protected groundwater recharge area overlay.
(a) Permitted uses. All uses allowed in the underlying zoning districts as established by the article, except those listed in prohibited uses below, are permitted in a protected groundwater recharge area overlay, subject to the following conditions and standards:
(1) No permits shall be issued for new sanitary landfills.
(2) No permits shall be issued for land disposal of hazardous wastes.
(3) No permit for new facilities to treat, store, or dispose of hazardous waste.
(4) No new above ground chemical or petroleum storage tanks.
(5) No new agricultural waste impoundment sites.
(6) New homes served by septic tank/drain field systems shall be on lots having the following minimum size limitations as identified in Table MT-1 of the Georgia Department of Health Manual for on-site sewage management systems ("DPH Table MT-1"), as amended.
(7) New mobile home parks served by septic tank/drain field systems shall have lots or spaces having the following size limitation as identified in Table MT-2 of the Georgia Department of Health Manual for on-site sewage management systems (hereinafter DPH Table MT-2), as amended.
(8) Dawson County requires a larger lot size than that required by subsection (a)(6) of this section for homes or by subsection (a)(7) of this section for mobile homes; the larger lot size shall be used.
(9) Construction may not proceed on a building or mobile home to be served by a septic tank unless the Dawson County Health Department first approves the proposed septic tank installation as meeting the requirements of the DHR Manual, as amended, and subsections (a)(6), (7), and (8) of this section.
(10) New facilities that handle hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground storage tanks) and amounts of 10,000 pounds on any one day or more shall perform their operations on impervious surfaces in conformance with applicable federal spill prevention requirements and the requirements of the International Fire Code.
(11) The department of natural resources shall require conservation design in any new permits for wastewater spray irrigation or the land spreading of wastewater sludges in areas with high pollution susceptibility. This shall be accomplished by comparing the department's criteria for slow rate land treatment (February 1986 or latest edition) with amendments and other technical publications to site-specific information submitted by a registered professional engineer for each project.
(12) Permanent stormwater infiltration basins shall not be constructed in areas having high pollution susceptibility.
(13) Exclusive of mining settling basins, new wastewater treatment basins shall have an impermeable liner in areas with high pollution susceptibility.
(Ord. of 3-7-2024(5)) Sec. 109-90. The Etowah River Corridor protection overlay district.
(a) Applicability. These provisions shall apply to all areas of land in unincorporated Dawson County within 100 feet horizontally from the riverbank of the Etowah River in Dawson County.
(b) Permitted use. All uses allowed in the underlying zoning districts as established by the article, except those uses listed in prohibited uses below, are permitted in the Etowah River Corridor protection overlay district, subject to the following conditions and standards.
(c) Protected criteria.
(1) The Etowah River Corridor protection plan shall provide for maintaining a natural vegetative buffer, except as otherwise provided herein.
(2) The Etowah River Corridor protection plan shall not prohibit the construction of a singlefamily dwelling, including the usual appurtenances, within the buffer area, subject to the following conditions:
a. The dwelling shall comply with all Dawson County zoning regulations.
b. The dwelling shall be located on a tract of land containing at least two acres;
c. The size of the tract of land shall not include any area that lies within the protected river; that is, for tracts of land that contain portions of a protected river, the area between the riverbanks cannot be counted towards the two-acre minimum size);
d. Only one dwelling on each two-acre or larger tract of land;
e. A septic tank or tanks serving such a dwelling may be located within the buffer area;
and
f. Septic tank drain fields shall not be in the buffer area.
(3) Within the river corridor, industrial and commercial land uses existing prior to the promulgation of these provisions are exempt from these criteria provided that:
a. Industrial and commercial uses of river corridors shall not impair the drinking quality of the river; and
b. Industrial and commercial activity within the river corridor shall meet all state and federal environmental rules and regulations.
(d) Except as expressly provided for in the provisions of these criteria (dealing with single-family dwellings within the river corridor), septic tanks and drain fields are prohibited within river corridors.
(e) The Etowah River Corridor protection plan shall provide for the construction of road crossings and utility crossings of the river corridor, provided that construction of such road and utility crossings shall meet all requirements of the Erosion and Sedimentation Control Act of 1975 (O.C.G.A. § 12-7-1 et seq.), and the Dawson County Soil Erosion and Sedimentation Control Ordinance and any other applicable local ordinances on soil erosion and sedimentation control.
(1) The Etowah River Corridor protection plan shall provide the following acceptable uses of river corridors, provided that such uses do not impair the long-term functions of the protected river or river corridor:
a. Timber production and harvesting, subject to the following conditions:
1. Forestry activity shall be consistent with best management practices established by the Georgia Forestry Commission; and
2. Forestry activity shall not impair the drinking quality of the river water as defined by the federal Clean Water Act, as amended.
(2) Wildlife and fisheries management activities consistent with the purposes of O.C.G.A.
§ 12-2-8.
(3) Recreational usage is consistent with maintaining a natural vegetative buffer or riverdependent recreation. For example, a boat ramp would be consistent with this criterion, but a hard surface tennis court would not. Parking lots are not compatible with this criterion.
(4) Paths and walkways within the river corridor are consistent with this criterion.
(5) Natural water quality treatment or purification.
(6) Agricultural production and management, subject to the following conditions:
a. Agricultural activity shall be consistent with best management practices established by the Georgia Soil and Water Conservation Commission;
b. Agricultural activity shall not impair the drinking quality of the river water as defined by the federal Clean Water Act, as amended; and
c. Agricultural activity shall be consistent with all state and federal laws and all regulations promulgated by the Georgia Department of Agriculture.
(7) Other uses permitted by the department of natural resources or under Section 404 of the Clean Water Act.
(8) Handling areas for the receiving and storing of hazardous waste is prohibited within the river corridor.
(9) Hazardous waste or solid waste landfills are prohibited within river corridors.
(f) The natural vegetative buffer shall be restored as quickly as possible following any landdisturbing activity within the river corridor. The natural vegetative buffer restoration plan shall be included in the erosion and sedimentation control plan. Dawson County must approve this plan before land disturbance activities. Commercial and industrial uses are prohibited within the river corridor.
(g) Except as noted above, all construction within the buffer area shall be prohibited.
(Ord. of 3-7-2024(5); Ord. of 9-18-2025(1), Exh. A, § 19) Sec. 109-91. Wetlands protection district overlay.
(a) Permitted uses. All uses allowed in the underlying zoning districts as established by the ordinance, except for those listed in prohibited uses below, are permitted in the wetland protection district overlay, subject to the following conditions and standards:
(1) No development permit will be issued on a project that appears to contain wetlands until a determination has been made by the Corps of Engineers or a formally trained wetland delineator from the Corps of Engineers' list of approved consultants on whether jurisdictional wetlands exist on the site. If there are jurisdictional wetlands on the site that will be disturbed by the proposed development, the applicant must:
a. Obtain a wetlands alteration Section 404 permit from the Corps of Engineers; or
b. Provide documentation indicating that coordination with the Corps of Engineers regarding a Section 404 permit is in effect.
(b) If a project appears to contain wetlands, the following note must be printed in boldface type on all development plans: This site contains wetlands. The applicant will first obtain a wetland alteration Section 404 permit from the Corps of Engineers before disturbing any jurisdictional wetlands.
(c) Prohibited uses of wetland areas include:
(1) Receiving areas for toxic or hazardous waste or other contaminants;
(2) Hazardous or other waste landfills;
(3) Wastewater treatment;
(4) Other uses unapproved by Dawson County.
(d) Use of wetland areas without long-term impairment is permitted. Acceptable uses may include:
(1) Timber production and harvesting activities consistent with the best management practices established by the Georgia Forestry Commission;
(2) Natural water quality treatment or purification; and
(3) Other uses permitted under Section 404 of the Clean Water Act.
(Ord. of 3-7-2024(5)) Sec. 109-92. Russell Creek Reservoir watershed protection overlay.
The Russell Creek Reservoir is within the Alabama-Coosa-Tallapoosa Basin within the Etowah River watershed.
(1) Applicability. These provisions shall apply to all areas within the Russell Creek Reservoir watershed protection overlay district and as defined below.
(2) Buffer criteria.
a. A natural stream buffer shall be established and maintained within 150 feet of the banks of the Russell Creek Reservoir boundary within any protected watershed area.
Vegetation, land disturbance, and land uses shall be controlled by the provisions of the applicable reservoir management plan, as approved by the Georgia Department of Natural Resources (DNR).
b. The perennial stream corridors within a seven-mile radius upstream of the Russell Creek Reservoir are protected by the following criteria:
1. A natural undisturbed buffer shall be maintained for 100 feet on both sides of the stream, measured from the stream banks.
2. No impervious surface shall be constructed within a 150-foot setback area on both sides of the stream (as measured from the stream banks).
3. Septic tanks and septic tank drain fields are prohibited in the 150-foot setback.
c. The following land use criteria apply in the Russell Creek supply watershed overlay:
1. New sanitary landfills are prohibited.
2. New hazardous waste treatment or disposal facilities are prohibited.
3. No silvicultural activities shall be permitted within stream buffers and setbacks.
4. Impervious surface area restricted. The impervious surface area, including all public and private structures, utilities, or facilities, of the entire watershed protection area shall be limited to 25 percent. The Dawson County Planning Commission, by means of the variance process in accordance with the proceENVIRONMENT AND NATURAL RESOURCES § 109-92 dures set forth in the land use resolution, must approve any individual development resulting in more impervious surface than 25 percent of the property's total area.
5. Any new facility that handles hazardous materials listed in Section 312 of the Resource Conservation and Recovery Act of 1976 (excluding underground
storage tanks) is prohibited.
6. Adjoining lots to the boundary of the reservoir are subject to the following criteria:
i. The creation of lots on which there is not sufficient area for construction is prohibited.
ii. All lots shall have a permanent 150-foot protection buffer adjoining the reservoir property.
iii. No septic tanks, septic tank absorption field, related structure or feature, substantial structure, or other feature that may adversely impact the reservoir or may occupy any portion of this 150-foot buffer.
iv. The 150-foot buffer area shall remain a natural vegetated buffer.
7. Access the Russell Creek Reservoir to conform to the Etowah Water and Sewer Authority policies.
(3) Water supply reservoir management plan.
a. Etowah Water and Sewer Authority shall develop and update a reservoir management plan for approval by the department of natural resources. A reservoir management plan protects the Russell Creek Reservoir. All properties within these areas shall have a permanent 150-foot protection buffer adjoining the reservoir property from the normal full-pool elevation.
b. No septic tanks, septic tank drain fields, related structure or feature, substantial structure, or other feature, which may adversely impact the reservoir, may occupy any portion of this 150-feet buffer. Additionally, this area should be a natural, vegetated buffer when the requirements of this section conflict with the requirements within itself or any other lawfully adopted rules, regulations, resolutions, deed restrictions, or covenants, the more restrictive or that imposing higher standards shall govern.
c. The reservoir management plan shall include a buffer maintained 150 feet from the reservoir boundary.
(4) Recreational use of the reservoir and maintaining a buffer around the reservoir. Any recreational uses shall protect the reservoir's water quality for drinking water purposes. The recreational uses shall be outlined in the reservoir management plan.
(Ord. of 3-7-2024(5); Ord. of 9-18-2025(1), Exh. A, § 20) Sec. 109-93. Buffer requirements.
The buffers required in this section protect the county's drinking water source and are intended to be left in their natural, undisturbed state.
(1) Buffer exceptions from county. Variances required in this section will only be issued in cases where, owing to special conditions, a literal enforcement of the provisions of this article will result in unnecessary hardship only upon a finding by the county administrator and approved by the board of commissioners.
a. A variance to the buffers established in the adopted ordinance only when:
1. Some hardships prevent compliance with the buffer widths and required practices. An opportunity for meaningful public notice of, comment upon, and administrative appeal of all decisions relating to action upon an application for a variance shall be provided. Hardships shall be evaluated in accordance with the following:
i. If the applicant complies with the buffer widths and required practices, they can secure no reasonable return from, nor make good use of, their
property. Merely proving that the variance would permit a more significant profit from the property shall not be considered adequate justification for a variance. Moreover, the local government shall consider whether the
variance is the minimum possible deviation from the buffer widths that shall make reasonable use of the property possible;
ii. The hardship results from the application of the buffer widths to the property rather than from other factors, such as unrelated deed restrictions;
iii. The hardship is due to the physical nature of the applicant's property, such as its size, shape, or topography;
iv. The applicant did not cause the hardship;
v. The variance is in harmony with the general purpose and intent of the riparian buffer widths and required practices and preserves the meaning
thereof.
2. In granting the variance, the public safety and welfare have been assured, and the quality of downstream water, including, but not limited to, water used to supply public drinking water, has been maintained or improved; and
3. The applicant certifies that the applicant has not and does not intend to apply for a variance from the minimum buffer requirements of the Georgia Erosion and Sedimentation Control Act for the same perennial stream or streams for which a variance is sought according to this paragraph.
(2) Buffer exceptions from the state. Any encroachment into the 25-foot undisturbed state water buffer will require a buffer variance from the Georgia Environmental Protection Department.
(3) Conditions. The county administrator could, as a condition of the variance to specific provisions of this article, require that alternative measures be taken by the applicant such that the purpose of this article may be achieved through alternative means.
(Ord. of 3-7-2024(5)) Secs. 109-94—109-110. Reserved.
ARTICLE V. PROHIBITING ILLICIT DISCHARGE AND ILLEGAL CONNECTION TO THE
STORM SEWER SYSTEM
Sec. 109-111. General provisions.
(a) Purpose and intent. The purpose of this article is to protect the public health, safety, environment and general welfare through the regulation of non-stormwater discharges to the Dawson County Separate Storm Sewer System to the maximum extent practicable as required by law. This article establishes methods for controlling the introduction of pollutants into the Dawson County Separate Storm Sewer System in order to comply with requirements of the National Pollutant Discharge Elimination System (NPDES) permit process. The objectives of this article are to:
(1) Regulate the contribution of pollutants to the Dawson County Separate Storm Sewer System by any person;
(2) Prohibit illicit discharges and illegal connections to the Dawson County Separate Storm Sewer System;
(3) Prevent non-stormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to the Dawson County Separate Storm Sewer System; and
(4) Establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to ensure compliance with this article.
(b) Applicability. The provisions of this article shall apply throughout the unincorporated area of Dawson County.
(c) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation, other provision of law. The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.
(d) Responsibility for administration. The Dawson County Stormwater Management Office shall administer, implement, and enforce the provisions of this article unless otherwise noted herein.
(Ord. of 4-14-2015, § 1) Sec. 109-112. Definitions.
Accidental discharge means a discharge prohibited by this article which occurs by chance and without planning or thought prior to occurrence.
Clean Water Act means the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto.
Construction activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES general construction permits. These include construction projects resulting in land disturbance. Such activities include, but are not limited to, clearing and grubbing, grading, excavating, and demolition.
Dawson County Separate Storm Sewer System means any facility designed or used for collecting and/or conveying stormwater, including, but not limited to, any roads with drainage systems, highways, Dawson County streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and man-made or altered drainage channels, reservoirs, and other drainage structures, and which is:
(1) Owned or maintained by Dawson County;
(2) Not a combined sewer; and
(3) Not part of a publicly-owned treatment works.
Illegal connection means either of the following:
(1) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the storm drain system including, but not limited to, any conveyances which allow any non-stormwater discharge including sewage, process wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or
(2) Any pipe, open channel, drain or conveyance connected to the Dawson County Separate Storm Sewer System which has not been documented in plans, maps, or equivalent records and approved by an authorized enforcement agency.
Illicit discharge means any direct or indirect non-stormwater discharge to the Dawson County Separate Storm Sewer System, except as exempted in section 109-113 of this article.
Industrial activity means activities subject to NPDES industrial permits as defined in 40 CFR, Section 122.26(b)(14).
National Pollutant Discharge Elimination System (NPDES) stormwater discharge permit means a permit issued by the Georgia EPD under authority delegated pursuant to 33 U.S. Code § 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis.
Non-stormwater discharge means any discharge to the storm drain system that is not composed entirely of stormwater.
Person means, except to the extent exempted from this article, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; non-hazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables;
pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens;
dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter of any kind.
Pollution means the contamination or other alteration of any water's physical, chemical or biological properties by the addition of any constituent and includes, but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any liquid, gaseous, solid, radioactive, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life.
Premises means any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips.
State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface and subsurface water, natural or artificial, lying within or forming a part of the boundaries of the State of Georgia which are not entirely confined and retained completely upon the property of a single person.
Stormwater runoff or stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation.
Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow.
(Ord. of 4-14-2015, § 2) Sec. 109-113. Prohibitions.
(a) Prohibition of illicit discharges. No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into the Dawson County Separate Storm Sewer System any pollutants or waters containing any pollutant, other than stormwater.
The following discharges are exempt from the prohibition provision above:
(1) Water line flushing performed by a government agency, other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising ground water, ground water infiltration to storm drains, uncontaminated pumped ground water, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air conditioning condensation, non-commercial washing of vehicles, swimming pools (if dechlorinated, typically less than one PPM chlorine), springs, natural riparian habitat or wetland flows, and any other water source not containing pollutants;
(2) Dye testing is an allowable discharge, but requires a verbal notification to the authorized enforcement agency prior to the time of the test;
(3) Discharges or flows from firefighting, and other discharges specified in writing by Dawson County as being necessary to protect public health and safety;
(4) The prohibition provision above shall not apply to any non-stormwater discharge permitted under an NPDES permit or order issued to the discharger and administered under the authority of the state and the federal Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and provided that written approval has been granted for any discharge to the Dawson County Separate Storm Sewer System.
(b) Prohibition of illegal connections. The construction, connection, use, maintenance or continued existence of any illegal connection to the Dawson County Separate Storm Sewer System is prohibited.
(1) This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection.
(2) A person violates this ordinance if the person connects a line conveying sewage to the Dawson County Separate Storm Sewer System or allows such a connection to continue.
(3) Improper connections in violation of this ordinance must be disconnected and redirected, if necessary, to an approved onsite wastewater management system or the sanitary sewer system upon approval of Etowah Water and Sewer Authority or any other governing authority or agency.
(4) Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from Dawson County requiring that such locating be completed. Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be completed, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or other discharge point be identified. Results of these investigations are to be documented and provided to Dawson County.
(Ord. of 4-14-2015, § 3) Sec. 109-114. Industrial or construction activity discharges.
Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to Dawson County prior to allowing discharges to the Dawson County Separate Storm Sewer System.
(Ord. of 4-14-2015, § 4) Sec. 109-115. Access and inspection of properties and facilities.
Dawson County shall be permitted to enter and inspect properties and facilities at reasonable times as often as may be necessary to determine compliance with this article.
(1) If a property or facility has security measures in force which require proper identification and clearance before entry into its premises, the owner or operator shall make the necessary arrangements to allow access to representatives of Dawson County.
(2) The owner or operator shall allow Dawson County ready access to all parts of the premises for the purposes of inspection, sampling, photography, videotaping, examination and copying of any records that are required under the conditions of an NPDES permit to discharge stormwater.
(3) Dawson County may set up on any property or facility devices necessary to conduct monitoring and/or sampling of flow discharges.
(4) Dawson County may require the owner or operator to install monitoring equipment and perform monitoring as necessary and make the monitoring data available to Dawson County. This sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the owner or operator at his/her own expense. All devices used to measure flow and quality shall be calibrated to ensure accuracy.
(5) Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled shall be promptly removed by the owner or operator at the request of Dawson County and shall not be replaced. The costs of clearing such access shall be borne by the owner or operator.
(6) Unreasonable delays in allowing Dawson County access to a facility is a violation of this article.
(7) If Dawson County has been refused access to any part of the premises from which stormwater is discharged and Dawson County is able to demonstrate probable cause to believe that a violation of this ordinance exists or occurred or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this ordinance or any order issued hereunder or to protect the overall public health, safety, environment and welfare of the community, then Dawson County may seek issuance of a search warrant from any court of competent jurisdiction.
(Ord. of 4-14-2015, § 5) Sec. 109-116. Notification of accidental discharges and spills.
(a) Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of pollutants or non-stormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, the Dawson County Separate Storm Sewer System, state waters, or waters of the U.S., the person so responsible shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge.
(b) Such person shall notify the Dawson County Stormwater Management Office in person, by phone, or facsimile no later than 24 hours of the nature, quantity and time of occurrence of the discharge. Notifications in person or by phone shall be confirmed by written notice addressed and mailed to Dawson County within three business days of the phone or in person notice. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three years. The owner or operator shall also take immediate steps to ensure no recurrence of the discharge or spill.
(c) In the event of a release of hazardous materials, emergency response agencies and/or other appropriate agencies shall be immediately notified.
(d) Failure to provide notification of a release as provided herein is a violation of this ordinance.
(Ord. of 4-14-2015, § 6) Sec. 109-117. Suspension of access.
(a) Suspension due to illicit discharges in emergency situations. Dawson County may, without prior notice, suspend discharge access into the Dawson County Separate Storm Sewer System to a person when such suspension is necessary to stop an actual or threatened discharge which presents or may present imminent and substantial danger to the environment, or to the health or welfare of persons, or to the Dawson County Separate Storm Sewer System, Waters of the State, or Waters of the United States. If the violator fails to comply with a suspension order issued in an emergency, Dawson County may take such steps as deemed necessary to prevent or minimize damage to the Dawson County Separate Storm Sewer System, Waters of the State, Waters of the United States, or to minimize danger to persons.
(b) Suspension due to the detection of illicit discharge. Any person discharging to the Dawson County Separate Storm Sewer System in violation of this ordinance may have access terminated if such termination abates or reduces an illicit discharge. The Dawson County Stormwater Manager will notify a violator of the proposed termination of access. The violator may petition Dawson County for reconsideration and a hearing in accord with section 109-118 of this article.
(c) Illegal reinstatement of access. A person commits an offense by reinstating Dawson County Separate Storm Sewer System access to premises terminated pursuant to this section without the prior approval of Dawson County.
(Ord. of 4-14-2015, § 7) Sec. 109-118. Requirement to prevent, control, and reduce stormwater pollutants by the use of BMPs.
Best Management Practices for any activity, operation, or facility which may cause or contribute to pollution or contamination of storm water, the Dawson County Separate Storm Sewer System, or Waters of the State of Georgia and or Waters of the U.S. shall be observed by the owner of any property discharging into the Dawson County Separate Storm Sewer System. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the Dawson County Separate Storm Sewer System or watercourses through the use of these structural and nonstructural BMPs. Further, any person responsible for a property or premise, which is, or may be, the source of an illicit discharge, may be required to implement, at said person's expense, additional structural and non-structural BMPs to prevent the further discharge of pollutants to the Dawson County Separate Storm Sewer System. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of storm water associated with industrial activity, to the extent practicable, shall be deemed compliance with the provisions of this section. These BMPs shall be part of a stormwater pollution prevention plan (SWPP) as necessary for compliance with requirements of the NPDES permit.
(Ord. of 4-14-2015, § 8) Sec. 109-119. Watercourse protection.
Every person owning property through which a watercourse passes, or such person's lessee, shall keep and maintain that part of the watercourse within the property free of trash, debris, and other obstacles that would pollute, contaminate, or significantly retard the flow of water through the watercourse. In addition, the owner or lessee shall maintain existing privately owned structures within or adjacent to a watercourse, so that such structures will not become a hazard to the use, function, or physical integrity of the watercourse.
(Ord. of 4-14-2015, § 9) Sec. 109-120. Violations, enforcement and penalties.
(a) Violations. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this article. Any person who has violated or continues to violate the provisions of this ordinance, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or otherwise abated in a manner provided by law.
In the event the violation constitutes an immediate danger to public health or public safety, Dawson County is authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the property. Dawson County is authorized to seek costs of the abatement as outlined in section 109-120(e).
(b) Notice of violation. Whenever Dawson County finds that a violation of this ordinance has occurred, Dawson County may order compliance by written notice of violation.
(1) The notice of violation shall contain:
a. The name and address of the alleged violator;
b. The address when available or a description of the building, structure or land upon which the violation is occurring, or has occurred;
c. A statement specifying the nature of the violation;
d. A description of the remedial measures necessary to restore compliance with this ordinance and a time schedule for the completion of such remedial action;
e. A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed.
(2) Such notice may require without limitation:
a. The performance of monitoring, analyses, and reporting;
b. The elimination of illicit discharges and illegal connections;
c. That violating discharges, practices, or operations shall cease and desist;
d. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property;
e. Payment of costs to cover administrative and abatement costs; and,
f. The implementation of pollution prevention practices.
(c) Appeal of notice of violation. Any person receiving a notice of violation may appeal such determination. The notice of appeal must be received by the stormwater manager within ten days from the date of the notice of violation. Hearing on the appeal before the Dawson County Board of Commissioners shall take place on the next available hearing date following submission of the notice of appeal. The decision of the board of commissioners shall be final.
(d) Enforcement measures after appeal. If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or in the event of an appeal, within ten days of the decision of the appropriate authority upholding the decision of Dawson County, then representatives of Dawson County may enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of any premises to refuse to allow Dawson County or its designated contractor to enter upon the premises for the purposes set forth above.
(e) Costs of abatement of the violation. Within 30 days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs. The property owner may file a written protest objecting to the assessment or to the amount of the assessment within 30 days of such notice. If the amount due is not paid within 30 days after receipt of the notice, or if an appeal is taken, within 30 days after a decision on said appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment.
Any person violating any of the provisions of this article shall become liable to Dawson County by reason of such violation.
(f) Civil penalties. In the event the alleged violator fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as Dawson County shall deem appropriate, after Dawson County has taken one or more of the actions described above, Dawson County may impose a civil penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation.
(g) Criminal penalties. The Dawson County Stormwater Manager may request, at his discretion, the Dawson County Marshal's Office to issue a citation to the alleged violator requiring such person to appear in court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
(h) Violations deemed a public nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this ordinance is a threat to public health, safety, welfare, and environment and is declared and deemed a nuisance, and may be abated by injunctive or other equitable relief as provided by law.
(i) Remedies not exclusive. The remedies listed in this ordinance are not exclusive of any other remedies available under any applicable Federal, State or local law and Dawson County may seek cumulative remedies.
(j) Recovery of fees. Dawson County may recover attorney's fees, court costs, and other expenses associated with enforcement of this ordinance, including sampling and monitoring expenses.
(Ord. of 4-14-2015, § 10) Sec. 109-121. Repealer.
All resolutions or ordinances or parts thereof in conflict with the terms of this article are hereby repealed. (Ord. of 4-14-2015, § 12)
Secs. 109-122—109-140. Reserved.
ARTICLE VI. REGULATING STORM WATER MANAGEMENT
Sec. 109-141. General provisions.
(a) Purpose and intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare of the public, and protect water and aquatic resources. This article seeks to meet that purpose through the following objectives:
(1) Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources;
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.