Douglas County · Code of Ordinances

Chapter 14 - ROADS, STREETS AND SIDEWALKS / Article III - USE OF PUBLIC RIGHT-OF-WAY

Sec. 14-45. Minimum distances from curb and street centerline of underground lines and poles.

About this text

  • As published by Municode, current through 2026-03-31
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Gas. All gas lines must be installed at a minimum of thirty-six (36) inches from the curb and seventeen (17) feet from the centerline of a county road, highway, street, etc., and must be installed a minimum of eighteen (18) inches from any other public utility line, pipe, etc.

(b) Water. All waterlines must be installed a minimum of sixty (60) inches from the curb or eighteen and one-half (18.5) feet from the centerline of any county road, highway, street, etc., and must be installed a minimum of eighteen (18) inches from any other public utility line, pipe, etc.

(c) Telephone. All telephone lines must be installed a minimum of eighteen (18) inches from the curb or fifteen and one-half (15.5) feet from the centerline of a county road, highway, street, etc., and must be installed a minimum of twelve

(12) inches from any other public utility line, pipe, etc.

(d) Electrical. All electrical lines must be installed a minimum of ninety-six (96) inches from the curb or twenty-two (22) feet from the centerline of any county road, highway, street, etc., and must be installed a minimum of twentyfour (24) inches from any other public utility line, pipe, etc.

(e) Cable television. All cable television lines must be installed a minimum of six (6) inches from the curb or fourteen and one-half (14.5) feet from the centerline of any county road, highway, street, etc., and must be installed a minimum of twelve (12) inches from any other public utility line, pipe, etc.

(f) Sanitary sewer. All sanitary sewer main lines must be installed a minimum of six (6) feet deep in any county right-of-way. All sanitary sewer service lines must be a minimum of five (5) feet deep in any county right-of-way.

(g) Poles. All poles for overhead utilities must be installed with pole centerline a minimum of twenty (20) feet from the centerline of any county road, highway, street, etc.

(h) Small wireless facilities. CSP equipment and connecting lines must be located at a depth and within a distance from the centerline of any county street so as to be consistent with the standards set forth in section 14-105 and so as to prevent conflict with any other allocated above or underground facilities.

History

The history line the source prints at the end of the section.

(Ord. of 9-17-19, § 1(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:douglas-county/code/14-45@2026-03-31-e3bb33da65

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Douglas County Code of Ordinances, Sec. 14-45. Minimum distances from curb and street centerline of underground lines and poles | Georgia Commons