Part II - CODE OF ORDINANCES / Chapter 34 - SUBDIVISIONS / Article IV - REQUIRED IMPROVEMENTS

Sec. 34-316. Storm drainage.

About this text

  • As published by Municode, current through 2022-11-07
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) An adequate drainage system including necessary ditches, curbs, gutters, pipes, culverts, street drains, drip inlets, bridges, and other improvements shall be provided for the conducting of all surface water through the subdivision.

(b) Drains and cross drains shall be provided to accommodate all natural watercourses, as well as water flowing from the site and shall extend beyond the roadway shoulders sufficiently to protect the embankment slopes.

(c) Pipe sizes and slopes shall be determined by acceptable engineering calculations and shall provide for not less than a ten-year return frequency storm. In no case shall cross drains be less than 18 inches in diameter and side drains less than 15 inches in diameter.

History

The history line the source prints at the end of the section.

(Res. of 6-1-1998(2), ch. II, art. IV, § 2.4-4)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:early-county/code/34-316@2022-11-07-d8a3ee0975

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Early County Code of Ordinances, Sec. 34-316. Storm drainage | Georgia Commons