Skip to content
Georgia Commons
Menu

Effingham County · Code of Ordinances

Effingham County Code of Ordinances

This document is shown whole, as one text: its source does not cut it into sections.

About this text

  • As published by Municode, current through 2026-08-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Part 3 of 6. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.

On and after a date specified and published by the director of the Georgia Forestry Commission, use of the state-wide notification website or platform shall be mandatory and shall be the sole means of providing the notice required by this article; on and after said date submission of the notice by any of the means listed in subsection 30-273 above shall cease and will no longer be deemed acceptable or in compliance with this article.

(Ord. of 07-18-2023(1)) Sec. 30-275. Bond or letter of credit requirement.

The notice required by this article shall not be or remain effective unless and until the person or firm providing such notice has delivered to the director or its designated agent a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting the county against any damage caused by such person or firm in the amount of $5,000.00; provided, however, that at the option of the person or firm harvesting timber a valid irrevocable letter of credit issued by a bank or savings and loan association, as defined in O.C.G.A. § 7-1-4, in the amount of $5,000.00 may be provided in lieu of a surety bond.

Such bonds or letters of credit shall be subject to the conditions set forth in sections 30-276 and 30-277. No more than one bond or letter of credit shall be required from each person or firm harvesting timber, regardless of the number of tracts harvested in the county for so long as the bond or letter of credit remains in effect. The bond or letter of credit required herein shall be valid only for the calendar year in which it was delivered.

(Ord. of 07-18-2023(1)) Sec 30-276. Bond or letter of credit coverage.

The bond or letter of credit required by section 30-275 shall protect Effingham County against any damage requiring re-ditching or repair of existing ditch structures or the removal of any harvesting residue, including tree tops, debris, logs, pulpwood, and other materials, placed in or around the county's rights-of-way caused by such person or firm tendering the bond or letter of credit. The proceeds of such bond or letter of credit shall be available to reimburse the county for any cost incurred to repair such damages or remove such debris in or around the county's rights-of-way. The proceeds of such bond or letter of credit shall also be available to reimburse the county for any costs incurred to maintain or repair county roads damaged by the ingress or egress of motor vehicles engaged in the harvest operations located within 500 feet of any point of ingress or egress of the timber harvesting operation. The right of Effingham County to call such bond or letter of credit in accordance with the provisions of section 30-277 shall be in addition to any other remedies available to the county at law or in equity for damage to county roads or rights-of-way.

(Ord. of 07-18-2023(1)) Sec. 30-277. Damage claim.

When damage results from a person or firm's harvesting activities, the county manager or the designated agent shall make and provide a written claim to the person or firm causing the damage within 30 business days after the county manager becomes aware of the damage.

Such claim may be given in person, by telefacsimile, email or mail. The claim shall describe the damage in detail and, in compliance with subsection 30-278(a), give the person or firm the opportunity to repair such damage within 30 days of the notification; provided, however, the county shall be authorized to repair the damage immediately if the county manager or its designee determines the conditions present a threat to public safety, health or welfare and, upon making such repairs, shall present to the person or firm and the issuer of the applicable bond or letter of credit an itemized list of expenses incurred as a claim against the responsible party and the issuer of its bond or letter of credit. Upon the issuance of a claim as provided in this section the county manager or its designee shall notify the issuer of the bond or letter of credit that a claim has been made and will be resolved or adjudicated according to the terms of this article.

(Ord. of 07-18-2023(1)) Sec. 30-278. Damage claim procedures.

Within 30 days of receipt of the written claim described in section 30-277, the person or firm against whom the claim is submitted may:

(a) Repair such damage at his or its own expense with the approval and supervision of the county manager or its designee. When repairs are completed to the satisfaction of the county manager or its designee, the county manager or its designee shall provide a written notification of satisfactory completion within five business days to the responsible person or firm and to the surety issuing the bond or the bank issuing the letter of credit, thereby terminating the claim.

(b) In the event of inclement weather or other factors preventing repair of the damage, request a 30-day extension to repair the damage from the county manager, provided that no extensions shall exceed 90 days from the date the claim was tendered.

Approval of any extension shall be at the discretion of the county manager or its designee.

(c) Appeal the claim to the magistrate court of Effingham County. Any such appeal must name the issuer of the bond or letter of credit as a party, who shall be served with all pleadings in the action and shall have the right to appear. The magistrate court will hear evidence and arguments within 30 days of the written appeal and issue a ruling within ten days of such hearing. Any such appeal shall toll the 30-day period, or any extension thereof, required by section 30-277. If the magistrate court rules in favor of the person or firm against whom the claim was made, Effingham County shall have no right to recover any proceeds of the bond or letter of credit. If the magistrate court rules in favor of Effingham County, the court shall determine the amount of damages to which the county is entitled to recover and enter judgment accordingly;

the county manager or designated agent shall be authorized to call the bond or letter of credit and recover from the proceeds thereof an amount equal to the judgment entered by the court, up to the total amount of the bond or letter of credit. The portion of any judgment entered in favor of the county that exceeds the amount of the bond or letter of credit shall be subject to collection by any additional remedies at law or equity.

(d) In the event the person or firm against whom the claim has been submitted fails to take any of the actions allowed under subsections (a), (b) or (c) of this section within the time required therein, such person or firm shall be deemed to have waived any and all rights to contest the call of the bond or letter of credit.

(Ord. of 07-18-2023(1)) Sec. 30-279. Bond or letter of credit renewal.

If the person or firm tendering a bond or letter of credit pursuant to the requirements of this article continues its timber harvesting operation beyond the calendar year in which the bond or letter of credit was issued, the person or firm continuing the timber harvesting operation shall tender a new bond or letter of credit within five business days after the first day of the new calendar year.

(Ord. of 07-18-2023(1)) Sec. 30-280. Bond or letter of credit revocation.

In the event a bond or letter of credit tendered pursuant to the requirements of this article is revoked by the surety or bank, then a valid replacement bond or letter of credit must be delivered to the county manager or the designated agent within five business days after the date of revocation in order for timber harvesting operations to continue. In addition, if the person or firm tendering the bond or letter of credit caused its revocation, the amount of the bond or letter of credit required shall be increased to $7,500.00 after the first revocation, and $10,000.00 after a second revocation caused by the person or firm tendering the bond or letter of credit. The maximum amount of the bond or letter of credit shall not exceed $10,000.00.

(Ord. of 07-18-2023(1))

DIVISION 2. STANDARDS FOR OPERATIONS*

Sec. 30-281. Scope of operations.

Submission of the notice required by this article shall authorize the person or firm submitting same to undertake the timber harvesting operation described in the notice and shall remain in effect until such time as the person or firm gives notice that the harvesting operation is complete; provided, however, that any change in the facts required to be provided for purposes of such notice, including but not limited to a change in the scope or extent of the operation, must be reported to the county manager or the designated agent within three business days after such change.

(Ord. of 07-18-2023(1)) Sec. 30-282. Violations.

Any person or firm that engages in a timber harvesting operation in the unincorporated portion of Effingham County without complying with the notice requirements of this article or Georgia's Best Management procedures for forestry shall be subject to a citation and trial, and upon conviction shall be fined in an amount not to exceed $1,500.00 for each violation.

(Ord. of 07-18-2023(1)) Sec. 30-283. Authority.

This article applies to activities which qualify as forestry land management practices or agricultural operations under O.C.G.A. § 12-7-17 (5) and (6) on land that is zoned for or used for forestry, silvicultural or agricultural purposes. It shall not authorize land disturbing activities incidental to development in conflict with the limitations set forth in O.C.G.A.

§ 12-7-17(6).

(Ord. of 07-18-2023(1)) Sec. 30-284. Governance and administration.

Consistent with O.C.G.A. § 12-6-24:

(a) No fee shall be charged to provide and submit the notice required by this article; and

(b) Persons and firms providing the notice required by this article may be asked to consult with county manager or designated agent for the purpose of minimizing damage to the county's roads, rights of way and infrastructure, and are urged to follow recommendations from county officials, including without limitation:

(1) Signage posted at each ingress/egress point on a county road with four 48-inch orange "trucks entering highway" advance warning signs placed on the shoulder of the road at 500 feet and 1,000 feet intervals from both directions;

(2) All such signs and posts shall conform to the current edition of the manual for uniform traffic control devices;

(3) No harvester equipment or vehicle(s) may be parked on a county right-of-way;

and

(4) The county right-of-way shall not be used as a loading facility.

Notwithstanding the forgoing, the person or firm conducting the timber harvest operation bears ultimate responsibility for their actions, and nothing in this article shall preclude the county from taking any and all legal action necessary to protect its property and the health, safety, and welfare of its citizens.

(Ord. of 07-18-2023(1)) Sec. 30-285. Validity and effectiveness.

The provisions of this article are severable, and the invalidity of any phrase, clause, section, or part of this article shall not affect the validity or effectiveness of the remainder of this ordinance.

(Ord. of 07-18-2023(1)) Secs. 30-286—30-290. Reserved.

DIVISION 3. ENFORCEMENT

Sec. 30-291. Violations.

(a) Violations. Each violation of the requirements of this article shall be punishable by a fine of $500.00, each day any violation under this article continues shall be considered a separate offense.

(b) Road ban order. In the event there is an ongoing violation of the provisions of this division, or if a road is deemed to be unsafe or impassable due to timber operations, the county administrator, or their designee, may issue a road ban order requiring all uses of county roads cease until such time as the operator comes into compliance with this division or road conditions improve. In the event of inclement weather, a temporary road ban order may be placed upon a timber operator if the public road is unsafe or impassable by designation of the county administrator or their designee.

(c) Withholding future permits. The county will not accept or approve additional notifications or issue permits where a company, firm or individual has an unresolved violation or has received notice of a violation, until the violation has been addressed to the satisfaction of the county. The firm may submit a corrective action plan with a timeline to complete or remediate any violations or the payment of any and all fines. The county administrator or their designee will determine if subsequent permits shall be authorized if a violation is pending.

(d) Injunctive relief. In the event that any provision of this article is violated the notice shall cease to be effective. In addition to any other remedies, the county may seek injunctive, mandamus or other appropriate action to prevent or abate such violation in court of competent jurisdiction and the timber operator shall be liable for such court costs and attorney fees incurred by the county. In addition to or in lieu of any other civil remedy, the county may seek civil fines in Effingham County Superior Court up to the maximum amounts authorized by this division for any violations. Each day a violation exists shall authorize an additional civil penalty.

(Ord. of 7-23-13, Art. V(§ 5.1); Ord. of 6-23-15) Secs. 30-292—30-300. Reserved.

ARTICLE IX. POST-CONSTRUCTION STORMWATER MANAGEMENT*

DIVISION 1. GENERAL PROVISIONS

Sec. 30-301. Findings of fact.

It is hereby determined that:

(1) The land development process significantly alters the hydrologic response of development sites, increasing stormwater runoff rates, volumes and pollutant loads, and increases flooding, channel erosion and pollutant transport and deposition in rivers and streams;

(2) The land development process significantly alters the hydrologic response of development sites, increasing stormwater runoff rates, volumes and pollutant loads, and alters water levels and fluctuations and increases pollutant transport and deposition in wetlands;

(3) The land development process significantly alters the hydrologic response of development sites, increasing stormwater runoff rates, volumes and pollutant loads, and alters salinity concentrations and fluctuations and increases primary productivity and pollutant transport and deposition in estuaries;

(4) The land development process significantly alters the hydrologic response of development sites, increasing stormwater runoff rates, volumes and pollutant loads, and increases bacteria transport and deposition in near coastal waters, which leads to beach contamination and poses a serious threat to human health;

(5) The land development process significantly alters the hydrologic response of development sites, increasing stormwater runoff rates and volumes, and decreases the amount of rainfall that is available to recharge shallow groundwater aquifers;

(6) The negative impacts of the land development process on local aquatic resources can adversely affect the health, safety and general welfare of the general public;

(7) The negative impacts of the land development process can be controlled and minimized through the management of stormwater runoff rates, volumes and pollutant loads;

(8) Communities located within Georgia's Coastal Non-point Source Management Area and Area of Special Interest are required to comply with a number of state and federal regulations that require the adverse impacts of the land development process to be controlled and minimized; and,

(9) Therefore, Effingham County has determined that it is in the public interest to control and minimize the adverse impacts of the land development process and has established this set of local stormwater management regulations to control postconstruction stormwater runoff rates, volumes and pollutant loads on development and redevelopment sites.

(Ord. of 1-06-15, § 1.1) Sec. 30-302. Purpose and intent.

The purpose of this article is to protect and maintain the integrity of local aquatic resources and, consequently, the health, safety and welfare of the general public, by establishing local stormwater management regulations that control and minimize the adverse impacts of the land development process. The article seeks to achieve these goals by:

(1) Comply[ing] with the Georgia Department of Natural Resources (DNR) and federal Environmental Protection Agency (EPA) stormwater regulations developed pursuant to the Clean Water Act. These requirements include:

a. Control the discharge of stormwater and contribution of pollutants to the municipal storm sewer system (MS4) by stormwater discharged from sites' impervious area;

b. Prohibit illicit connections and/or discharges to the MS4;

c. Control discharge to municipal storm sewers of spills, dumping or disposal of materials other than stormwater; and

d. Control, through intergovernmental agreements, contribution of pollutants from one municipal/county system to another.

(2) Establishing decision-making processes that can be applied during the site planning and design process to help protect the integrity of local aquatic resources;

(3) Establishing post-construction stormwater management and site planning and design criteria to help protect natural resources from the direct impacts of the land development process and preserve existing hydrologic conditions on development sites;

(4) Establishing post-construction stormwater management and site planning and design criteria to help reduce flooding, channel erosion and pollutant transport and deposition in local aquatic resources;

(5) Establishing design guidelines for green infrastructure and stormwater management practices that can be used to meet the post-construction stormwater management and site planning and design criteria;

(6) Encouraging that green infrastructure practices, which include better site planning techniques, better site design techniques and low impact development practices, be used to the maximum extent practical on development sites;

(7) Establishing provisions for the long-term inspection and maintenance of green infrastructure and stormwater management practices to ensure that they continue to function as designed and pose no threat to public safety; and

(8) Establishing administrative procedures for the submittal, review, approval and disapproval of stormwater management plans and for the inspection of approved development projects.

(Ord. of 1-06-15, § 1.2) Sec. 30-303. Definitions.

Accidental discharge shall mean a discharge prohibited by this article into the county separate stormwater system which occurs by chance and without planning or consideration prior to occurrence.

Agricultural practices shall mean practices involving the establishment, cultivation, or harvesting of products of the field or orchard; the preparation and planting of pastureland, farm ponds; and the construction of farm buildings.

Applicant means a property owner or agent of a property owner who has submitted an application for a post-construction stormwater management development plan review.

Aquatic buffer means an area of land located around or near a stream, wetland, or waterbody that has intrinsic value due to the ecological services it provides, including pollutant removal, erosion control and conveyance and temporary storage of flood flows.

Aquatic resource protection means measures taken to protect aquatic resources from several negative impacts of the land development process, including complete loss or destruction, stream channel enlargement and increased salinity fluctuations.

Better site design techniques means site design techniques that can be used during the site planning and design process to minimize land disturbance and the creation of new impervious and disturbed pervious cover. Better site design techniques include reducing clearing and grading limits, reducing roadway lengths and widths and reducing parking lot and building footprints.

Better site planning techniques means site planning techniques that can be used during the site planning and design process to protect valuable aquatic and terrestrial resources from the direct impacts of the land development process. Better site planning techniques include protecting primary and secondary conservation areas.

Building means any structure, either temporary or permanent, having walls and a roof, designed for the shelter of any person, animal or property and occupying more than 100 square feet of area.

Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.

Coastal stormwater supplement (CSS) means a technical design supplement to the Georgia Stormwater Management Manual (GSMM) that was developed for coastal Georgia. The CSS addresses stormwater management practices and BMPs that are specific and applicable to coastal stormwater quantity and quality issues. The CSS can be found on the Internet by using the following link: http://www.mpcnaturalresources.org/pdf/2009-05-05/Georgia-CSS-Final-Apr09.pdf.

Conservation areas means permanently protected areas of a site that are preserved, in perpetuity, in an undisturbed, natural state.

Conservation easement means a legal agreement between a land owner and a local, state or federal government agency or land trust that permanently protects conservation areas on the owner's land by limiting the amount and type of development that can take place within them but continues to leave the conservation areas in private ownership.

Conveyance shall mean stormwater facilities designed for the movement of stormwater through the drainage system, such as concrete or metal pipe, ditches, depressions, swales.

Dedication means the deliberate appropriation of property by its owner for general public use.

Detention means the temporary storage of stormwater runoff in a stormwater management practice for the purpose of controlling the peak discharge rates and providing gravitational settling of pollutants.

Developer means a person who undertakes a land development project.

Development shall mean:

The division of a lot, tract or parcel of land into two or more lots, plots, sites, tracts, parcels, or other divisions by plat or deed;

The construction, installation, or alteration of a structure, impervious surface, or drainage facility;

Clearing, scraping, grubbing, or other activities that significantly disturb the soil, vegetation, mud, sand or rock of a site; or Adding, removing, exposing, excavations, leveling, grading, digging, burrowing, dumping, piling, dredging, or otherwise disturbing the soil, vegetation, mud, sand or rock of a site.

Development project means a new development or redevelopment project.

Development site means a parcel of land where land disturbing activities have been or will be initiated to complete a land development project.

Discharge shall mean the release of stormwater to the county separate stormwater system.

Drainage shall mean the removal of stormwater from a given area either by gravity or by pumping.

Drainage easement means a legal right granted by a land owner to a grantee allowing the grantee to convey, treat or manage stormwater runoff on the private land subject to the drainage easement.

Easement means a legal right granted by a land owner to a grantee allowing the use of private land for conveyance, treatment and management of stormwater runoff and access to green infrastructure and stormwater practices.

Employee shall mean any county employee as designated by the county administrator to have authority in stormwater management, planning, maintenance, or construction.

Erosion and sediment control plan means a plan that is designed to minimize and control the accelerated erosion and increased sediment loads that occur at a site during land disturbing activities.

Evapotranspiration means the loss of water to the atmosphere through both evaporation and transpiration, which is the evaporation of water from the aerial parts of plants.

Exempt shall mean the release of the obligation to comply with specific sections of this article.

Extended detention means the temporary storage of stormwater runoff in a stormwater management practice for an extended period of time, typically 24 hours or greater.

Extreme flood protection means measures taken to protect downstream properties from dangerous extreme flooding events and help maintain the boundaries of the existing 100-year floodplain.

Fee in lieu contribution means a payment of money in place of meeting all or part of the stormwater management criteria required by a post-construction stormwater management ordinance.

Flood shall mean a general and temporary condition of partial or complete inundation of normally dry land areas from:

The overflow of inland or tidal water; or The unusual and rapid accumulation or runoff of surface waters from any source.

Flooding means a volume of stormwater runoff that is too great to be confined within the banks of a stream, river or other aquatic resource or walls of a stormwater conveyance feature and that overflows onto adjacent lands.

Green infrastructure practices means the combination of three complementary, but distinct, groups of natural resource protection and stormwater management practices and techniques, including better site planning and design techniques and low impact development practices, that are used to protect valuable terrestrial and aquatic resources from the direct impacts of the land development process, maintain pre-development site hydrology and reduce postconstruction stormwater runoff rates, volumes and pollutant loads.

Georgia Stormwater Management Manual (GSMM) means a technical guidance document governing stormwater management design, construction and long-term maintenance activities in Georgia. The GSMM can be found on the Internet by using the following link: http:// www.georgiastormwater.org/.

Hotspot shall mean the same as "stormwater hotspot," described elsewhere in these definitions.

Hydrologic Soil Group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff.

Illicit connection shall mean an unauthorized or illegal connection to a county separate stormwater system which results in discharge that is not composed entirely of stormwater runoff.

Impaired waters means those streams, rivers, lakes, estuaries and other water bodies that currently do not meet their designated use classification and associated water quality standards under the Clean Water Act.

Impervious cover means a surface composed of any material that greatly impedes or prevents the natural infiltration of water into the underlying native soils. Impervious surfaces include, but are not limited to, rooftops, buildings, sidewalks, driveways, streets and roads.

Indirect discharge shall mean any discharge to the county's separate stormwater system via another conveyance system that is not owned, operated, or maintained by the city.

Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries that regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.

Infill development means land development that occurs within designated areas based on local land use, watershed and/or utility plans where the surrounding area is generally developed, and where the site or area is either vacant or has previously been used for another purpose.

Infiltration means the process of allowing stormwater runoff to percolate into the underlying native soils.

Infiltration practice means a green infrastructure or stormwater management practice designed to provide infiltration of stormwater runoff into the underlying native soils. These stormwater management practices may be above or below grade.

Inspection and maintenance agreement and plan means a written agreement and plan providing for the long-term inspection and maintenance of all green infrastructure practices, stormwater management practices, stormwater conveyance features and stormwater drain infrastructure on a development site.

Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.

Land development means any project undertaken to change or improve a site that involves one or more land disturbing activities.

Land disturbing activity means any activity that changes stormwater runoff rates, volumes and pollutant loads on a site. These activities include, but are not limited to, the grading, digging, cutting, scraping, or excavating of soil, the placement of fill materials, paving, construction, substantial removal of vegetation and any activity that bares soil or rock or involves the diversion or piping of any natural or man-made watercourse.

Land owner means the legal or beneficial owner of land, including those holding the right to purchase or lease the land, or any other person holding proprietary rights in the land.

LDM or local design manual means the manual of design practices and approval process prescribed by the county.

Low impact development practice means small-scale stormwater management practices that are used to disconnect impervious and disturbed pervious surfaces from the storm drain system and reduce post-construction stormwater runoff rates, volumes and pollutant loads.

Low impact development practices include soil restoration, site reforestation/revegetation, green roofs, vegetated filter strips and rain gardens.

Maintenance shall mean any action necessary to preserve stormwater facilities in proper working condition, in order to serve the intended purposes set forth in this article.

Maximum extent practicable (MEP) shall mean the discharge standards and controls necessary for the reduction of pollutants discharged into the municipal separate stormwater system. These standards and controls may consist of a combination of best management practices, control techniques, system design and engineering methods, and such other provisions for the reduction of pollutants discharged from the municipal separate stormwater system.

Municipal Separate Stormwater System (MS4) shall mean a conveyance or system of conveyances (including roads with drainage systems, highways, rights-of-way, city streets, catchbasins, curbs, gutters, ditches, both natural and manmade channels, storm drains, detention ponds, drainage easements, other stormwater facilities) which meets all the following criteria:

Owned or maintained by Effingham County;

Designed or used for collecting or conveying stormwater;

Not a known combined sewer; and Not part of a publicly owned treatment works (POTW).

National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit means a permit issued by the EPA, or by a state under authority delegated pursuant to 33 USC § 1342(b), that authorizes the discharge of pollutants to waters of the State, whether the permit is applicable on an individual, group, or general area-wide basis.

New development means a land development project undertaken on a previously undeveloped or unimproved site.

Nonpoint source pollution means pollution from any source other than from a discernible, confined and discrete conveyance, such as a wastewater treatment plant or industrial discharge. Sources of nonpoint source pollution include, but are not limited to, agricultural, silvicultural, mining and construction activities, subsurface disposal and urban stormwater runoff.

Nonstructural stormwater management practice means any natural resource protection or stormwater management practice or technique that uses natural processes and natural systems to intercept, convey, treat and/or manage stormwater runoff. Nonstructural stormwater management practices include, but are not limited to, protecting primary and secondary conservation areas, reducing clearing and grading limits, reducing roadway lengths and widths, reducing parking lot and building footprints, soil restoration, site reforestation/ revegetation, green roofs, vegetated filter strips and rain gardens.

Off-site stormwater management practice means a green infrastructure or stormwater management practice located outside the boundaries of a development site.

On-site stormwater management practice means a green infrastructure or stormwater management practice located within the boundaries of a development site.

Overbank flood protection means measures taken to protect downstream properties from damaging overbank flooding events.

Owner means the legal or beneficial owner of a piece of land, including, but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm, or corporation in control of the site.

Permanent stormwater management practice means a green infrastructure or stormwater management practice that will be operational after the land disturbing activities are complete and that is designed to become a permanent part of the site for the purposes of managing post-construction stormwater runoff.

Permit means the permit issued by a local development review authority to an applicant, which is required for undertaking any land development project or land disturbing activities, typically referred to as a land disturbance activity (LDA) permit.

Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision, any interstate body, or any other legal entity.

Pollutant shall mean any substance contributing to the contamination or alteration of stormwater's physical, chemical or biological properties, including change in temperature, taste, color, turbidity, or odor; by the discharge of nay liquid, gaseous, solid, radioactive, or other substance into any such waters that will or is likely to create a nuisance or have a detrimental impact on the county's stormwater system which would preclude the legitimate use of such a system.

Post-development hydrology refers to the set of hydrologic conditions that may reasonably be expected to exist on a development site, after the completion of all land disturbing and construction activities.

Pre-development hydrology refers to the set of hydrologic conditions that exist on a development site prior to the commencement of any land disturbing activities and at the time that plans for the land development project are approved by the local development review authority.

Private property shall mean property or facilities owned by individuals, corporations, and organizations other than the city, state, or federal government.

Quality shall mean those parameters of stormwater that relate to the physical, chemical, biological or radiological integrity of stormwater.

Quantity shall mean those characteristics of stormwater that relate to the rate, volume, and duration of concentration of stormwater runoff.

Receiving stream or receiving aquatic resource means the body of water or conveyance into which stormwater runoff is discharged.

Recharge means the replenishment of groundwater aquifers.

Redevelopment means a change to previously existing, improved property, including but not limited to the demolition or building of structures, filling, grading, paving, or excavating, but excluding ordinary maintenance activities, remodeling of buildings on the existing footprint, resurfacing of paved areas and exterior changes or improvements that do not materially increase or concentrate stormwater runoff or cause additional nonpoint source pollution.

Regional stormwater management practice means a stormwater management practice designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may participate in providing land, financing, design services, construction services and/or maintenance services for the practice.

Regulation shall mean any local, state, or federal rule, ordinance, design directive or other policies adopted by the the county board of commissioners pursuant to the requirements of this article.

Responsible party means any individual, partnership, co-partnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or any other legal entity; or their legal representatives, agents, or assigns that is named on a stormwater inspection and maintenance agreement and plan as responsible for the long-term operation and maintenance of one or more green infrastructure or stormwater management practices.

Sanitary sewer system means the complete sanitary sewer system of the county which discharges sewage directly or indirectly into the sewage treatment plant, including sanitary sewer pipelines, manholes and flushing inlets and appurtenances.

Sediment shall mean solid particulate matter, both mineral and organic, that has been or is being transported by water, air, ice or gravity from its origin.

Site means development site.

Stop work order means an order issued that requires that all land disturbing activity on a site be stopped.

Stormwater shall mean precipitation runoff, snowmelt runoff, and surface runoff.

Stormwater hotspot means an area where land use or pollution generating activities have the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater runoff. Stormwater hotspots include, but are not limited to, fueling stations (including temporary fueling stations during construction), golf courses, public works yards and marinas.

Stormwater management means the interception, conveyance, treatment and management of stormwater runoff in a manner that is intended to prevent increased flood damage, channel erosion, habitat degradation and water quality degradation and to enhance and promote the public health, safety and general welfare.

Stormwater management facilities shall mean any and all components of a stormwater drainage system, designed to perform a particular function, or multiple functions, including, but not limited to, pipe, swales, ditches, culverts, streets, detention basins, retention basins, constructed wetlands, infiltration devices, catchbasins, oil/water separators, sediment basins, natural systems, modular pavement and pump stations.

Stormwater management plan means a written document that details how stormwater runoff will be managed on a development site and that shows how the stormwater management criteria that apply to the development project have been met.

Stormwater management practice means a practice or technique, either structural or nonstructural that is used to intercept stormwater runoff and change the characteristics of that runoff. Stormwater management practices are used to control post-construction stormwater runoff rates, volumes and pollutant loads to prevent increased flood damage, channel erosion, habitat degradation and water quality degradation.

Stormwater management system means the entire suite of green infrastructure and stormwater management practices and stormwater conveyance features that are used to intercept, convey, treat and manage stormwater runoff on a development site.

Stormwater retrofit means a green infrastructure or stormwater management practice designed for an existing development site that previously had no green infrastructure or stormwater management practice in place or had a practice that was not meeting local stormwater management criteria.

Stormwater runoff means surface water resulting from precipitation.

Stormwater runoff reduction means providing for the interception, evapotranspiration, infiltration, or capture and reuse of stormwater runoff to help maintain pre-development site hydrology and help protect aquatic resources from several indirect impacts of the land development process, including decreased groundwater recharge, decreased baseflow and degraded water quality.

Subdivision means the division of a parcel of land to create one or more new lots or development sites for the purpose, whether immediately or in the future, of sale, transfer of ownership, or land development, and includes divisions of land resulting from or made in connection with the layout or construction of a new street or roadway or a change in the layout of an existing street or roadway.

Water quality protection means adequately treating stormwater runoff before it is discharged from a development site to help protect downstream aquatic resources from water quality degradation.

Watercourse means a permanent or intermittent stream or other body of water, either natural or man-made, which gathers or carries surface water.

Watershed management plan or subwatershed management plan means a document, usually developed cooperatively by government agencies and other stakeholders, to protect, restore and/or otherwise manage the water resources found within a particular watershed or subwatershed. Watershed or subwatershed management plans commonly identify threats, sources of impairment, institutional issues and technical and programmatic solutions or projects to protect and/or restore water resources.

Wetland hydroperiod means the pattern of fluctuating water levels within a wetland caused by the complex interaction of surface water, groundwater, topography, soils and geology within a wetland.

Variance shall mean the modification of the minimum stormwater management requirements for specific circumstance where strict adherence of the requirements would result in unnecessary hardship and not fulfill the intent of this article.

(Ord. of 1-06-15, § 2.0) Sec. 30-304. Criteria for variance.

The county engineer, or his designee, may grant a variance from the requirements of this article when exceptional circumstances applicable to a site exist such that strict adherence to the provisions of the article will result in unnecessary hardship and will not fulfill the intent of the article. The county engineer, or his designee, may grant a variance from requirements of this article if the proposed development activity will not:

(1) Increase the rate, volume, or concentration of runoff to the existing downstream storm sewer system;

(2) Increase the base flood elevation upstream or downstream;

(3) Have a negative impact on any wetland, watercourse, or water body; or

(4) Contribute to degradation of water quality.

A written request for a variance shall be required and shall state the specific variance sought and the reasons, with supporting data, a variance should be granted. The request shall include all information necessary to evaluate the proposed variance. The county engineer, or his designee, will conduct a review of the request for a variance within ten working days of receiving the request.

(Ord. of 1-06-15, § 1.3) Sec. 30-305. Applicability and exemptions.

(a) This article shall be applied to all land disturbing activities, unless exempt pursuant to applicable provisions of this article. The stormwater management regulations presented within shall be applied to any new development or redevelopment activity that meets one or more of the following criteria:

(1) New development that involves the creation of 5,000 square feet or more of impervious cover or that involves other land disturbing activities of one acre or more;

(2) Redevelopment that involves the creation, addition or replacement of 5,000 square feet or more of impervious cover or that involves other land disturbing activities of one acre or more;

(3) New development or redevelopment, regardless of size, that is part of a larger common plan of development, even though multiple, separate and distinct land disturbing activities may take place at different times and on different schedules; and

(4) New development or redevelopment, regardless of size, that involves the creation or modification of a stormwater hotspot, as defined by this article.

(b) The following activities are exempt from this article:

(1) New development or redevelopment that involves the creation, addition or replacement of (less than 5,000 square feet) of impervious cover and that involves (less than one acre) of other land disturbing activities;

(2) New development or redevelopment activities on individual residential lots that are not part of a larger common plan of development and do not meet any of the applicability criteria listed above;

(3) Additions or modifications to existing single-family homes and duplex residential units that do not meet any of the applicability criteria listed above;

(4) Development projects that are undertaken exclusively for agricultural or silvicultural purposes within areas zoned for agricultural or silvicultural land use;

(5) Maintenance and repairs of any green infrastructure or stormwater management practices deemed necessary by the county administrator (or his designee);

(6) Any part of a land development project that was approved by the county board of commissioners prior to the adoption of this article; and

(7) Redevelopment activities that involve the replacement of impervious cover when the original impervious cover was wholly or partially lost due to natural disaster or other acts of God occurring after January 6, 2015.

(Ord. of 1-06-15, § 1.4) Sec. 30-306. Designation of article administrator.

The county administrator (or his designee) is hereby appointed to administer, implement and enforce the provisions of this article. Section 30-372 further elaborates on the issues of enforcement and penalties.

(Ord. of 1-06-15, § 1.5) Sec. 30-307. Compatibility with other regulations.

This article is not intended to interfere with, modify or repeal any other ordinance, rule, regulation or other provision of law. The requirements of this article should be considered minimum requirements, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.

(Ord. of 1-06-15, § 1.6) Sec. 30-308. Severability.

If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be judged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article.

(Ord. of 1-06-15, § 1.7) Secs. 30-309—30-315. Reserved.

DIVISION 2. DESIGN STANDARDS

Sec. 30-316. Minimum stormwater system design standards.

(a) There shall be no increase in the base flood elevation within the special flood hazard area (SFHA), as delineated by the latest National Flood Insurance Program (NFIP) maps, or in any areas that are known to have flooded repetitively, or areas where a hydrologic model predicts flooding will occur in the 100-year, 24-hour event. Where hydrologic model results are conflicting, the county engineer, or his designee shall decide which model will be used.

(b) Finished floor elevations for structures not included in the special flood hazard area shall be equal to or higher than that shown on the original subdivision plat or neighborhood grading and drainage plan or as determined by a registered civil engineer.

(c) The post development peak rate of runoff shall not exceed the predevelopment peak rate of runoff for the one, two, five, ten, twenty-five, fifty and one hundred year, 24-hour events.

(d) If drainage calculations indicate that post-development runoff will exceed predevelopment runoff, then on-site detention for the one, two, five, ten, twenty-five, fifty and one hundred year, 24-hour events is required at a discharge rate equal to the pre-developed 24-hour peak rate of discharge for all storm events for the one, two, five, ten, twenty-five, fifty and one hundred year event.

(e) All stormwater management systems shall be designed to comply with the requirements of the latest Effingham County Local Design Manual and comply with the latest edition of the Coastal Stormwater Supplement to the Georgia Stormwater Management Manual.

(Ord. of 1-06-15, § 3.0) Sec. 30-317. Stormwater management local design manual (LDM).

The county will utilize the information presented in the latest edition of the Coastal Stormwater Supplement (CSS) to the Georgia Stormwater Management Manual (GSMM), and the Effingham County Stormwater Management Local Design Manual (LDM), to assist in the proper implementation of this article. The LDM shall serve as an addendum to the CSS and the GSMM. The LDM shall endeavor to accomplish the following: (1) clarify discrepancies between the CSS and any section of this article and other related development regulations; (2) provide guidance to supplement information contained in this article and other related development regulations; (3) establish minimum stormwater management related design standards and criteria; and (4) further describe the stormwater management design preparation, submittal, review and approval requirements. The criteria within the LDM shall be considered minimum design standards and, in the event of a conflict, supersede design standards set forth in the CSS and/or the GSMM. A copy of the addendum shall be available from the engineering department.

In addition, the county encourages the application of the practices and concepts contained in the Green Growth Guidelines to meet the goals and objectives of this article.

The county also requires the use and application of the "Georgia-CSS-Site-Planning-DesignWorksheet" spreadsheet tool to evaluate compliance with the CSS design guidelines.

These references and assistance tools may be updated and expanded periodically, based on additional information obtained through scientific research, performance monitoring and local experience.

(Ord. of 1-06-15, § 3.1) Secs. 30-318—30-325. Reserved.

DIVISION 3. STORMWATER MANAGEMENT DESIGN PROCEDURES AND

REQUIREMENTS

Sec. 30-326. Development plan submittal review requirements.

No owner or developer shall undertake any development activity without first meeting the requirements of this article and receiving county approval for the proposed land development activity from the county. Unless specifically exempted by this article, any owner or developer proposing a development project shall submit to the county the required information in a format specified by Effingham County. Unless otherwise exempted by this article, the following items shall accompany the submittal package:

(1) Stormwater management concept plan prepared in accordance with section 30-327;

(2) Stormwater management design plan prepared in accordance with section 30-329;

(3) Stormwater management system inspection and maintenance agreement and plan prepared in accordance with section 30-330;

(4) Application and development plan review fees prepared in accordance with sections 30-331 and 30-332; and

(5) Performance bond (or other means of security acceptable to the county) be provided in accordance with applicable requirements of the county subdivision regulations.

The LDM provides additional details and requirements pertaining to the preparation, submittal, review and approval process associated with stormwater management design and development plans.

(Ord. of 1-06-15, § 4.1) Sec. 30-327. Stormwater management concept plan.

Prior to the preparation and submittal of a stormwater management design plan review and approval request, the owner or developer shall submit to the county a stormwater management concept plan illustrating the layout of the proposed development project and showing, in general, how post-construction stormwater runoff will be managed on the development site.

Green infrastructure practices (i.e., better site planning techniques, better site design techniques, low impact development practices) shall be used to the maximum extent practical during the creation of a stormwater management concept plan. Green infrastructure practices include, but are not limited to, protecting primary and secondary conservation areas, reducing clearing and grading limits, reducing roadway lengths and widths, reducing parking lot and building footprints, soil restoration, site reforestation/revegetation, green roofs, vegetated filter strips and rain gardens. Section 7.1 of the LDM provides additional detail regarding the requirements for the stormwater management concept plan.

(Ord. of 1-06-15, § 4.2) Sec. 30-328. Consultation meeting.

All applicants are encouraged to hold a consultation meeting with the county to discuss the proposed development project, the stormwater management concept plan and the approach that was used to satisfy the post-construction stormwater management and site planning and design criteria that apply to the development site.

(Ord. of 1-06-15, § 4.3) Sec. 30-329. Stormwater management design plan.

Subsequent to approval of the stormwater management concept plan, the owner or developer shall submit to the county for review and approval, a stormwater management design plan that details how post-development stormwater runoff will be controlled or managed on the development site. The stormwater management design plan shall detail how the proposed development project will meet the post-construction stormwater management and site planning and design criteria that apply to the development site.

A copy of the stormwater management concept plan shall be included with the submittal of the stormwater management design plan. The stormwater management design plan should be consistent with the stormwater management concept plan. If any significant changes were made to the plan of development, the county engineer, or his designee may ask for a written statement providing rationale for any of the changes that were made. Section 7.2 of the LDM provides additional detail regarding the requirements for the stormwater management design plan.

(Ord. of 1-06-15, § 4.4) Sec. 30-330. Stormwater management system inspection and maintenance agreement and plan.

Prior to the issuance of a LDA permit for any new development or redevelopment activity that requires one, the applicant or owner of the development site, if different, must execute an inspection and maintenance agreement and plan that shall be binding on all subsequent owners of the site, unless the stormwater management system is dedicated to and accepted by the county. A sample copy of the stormwater management maintenance agreement is included in the Effingham County Stormwater Management LDM. Section 7.6 of the LDM provides additional detail regarding the requirements for the stormwater management system inspection and maintenance plan and agreement.

(Ord. of 1-06-15, § 4.5) Sec. 30-331. Stormwater management design submittal and approval procedure.

(a) Stormwater management design review and approval requests shall be filed with Effingham County in a format specified by the County.

(b) Stormwater management design review and approval requests shall include the items set forth herein.

(c) The county engineer, or his designee shall inform the applicant whether the stormwater management design plan and the inspection and maintenance agreement and plan are approved or disapproved.

(d) If the design package; stormwater management design plan; and/or the inspection and maintenance plan and agreement are disapproved, the county engineer, or his designee shall notify the applicant of that fact in writing. The applicant may then revise any item not meeting the requirements of this article and resubmit the package.

(e) Upon a finding by the county administrator (or his designee) that the stormwater management design package; stormwater management design plan; and the inspection and maintenance agreement and plan (if applicable) meet the requirements of this article, the county engineer, or his designee may approve the stormwater management design for the development or redevelopment project, provided that all other applicable legal requirements for the issuance of a LDA Permit have been met.

(f) Notwithstanding approval of the stormwater management design, in undertaking the new development or redevelopment activity, the applicant or other responsible person shall be subject to the following requirements:

(1) The applicant shall comply with all applicable requirements of the approved stormwater management design plan and the provisions of this article;

(2) The development project shall be conducted only within the area specified in the approved stormwater management design plan;

(3) The county engineer, or his designee shall be allowed to conduct periodic inspections of the development project in accordance with applicable sections of this article;

(4) No changes may be made to an approved stormwater management design plan without review and written approval by the county engineer, or his designee; and

(5) Upon completion of the development project, the applicant shall submit as built plans for the stormwater management system, as required under the applicable sections of this article.

Sections 1.0 and 7.0 of the LDM provide additional detail regarding the procedures and requirements for the stormwater management design plan submittal and approval process.

(Ord. of 1-06-15, § 4.6) Sec. 30-332. Application review fees.

A non-refundable development review fee may be collected at the time the stormwater management design package is submitted to the county for initial review. Any development review fees that are collected shall be used to support the administration and management of the plan review and approval process and the inspection of all development projects subject to the requirements of this article. The county may develop a fee schedule based on the area of land disturbed by the project and may amend the fee schedule from time to time.

(Ord. of 1-06-15, § 4.7) Sec. 30-333. Performance bonds.

The county shall require, from the owner, a surety or maintenance bond, letter of credit (or other means of security acceptable to the county) prior to the issuance of a LDA Permit for any new development or redevelopment activity in accordance with applicable sections of the county subdivision regulations and the county erosion and sedimentation control ordinance.

(Ord. of 1-06-15, § 4.8) Sec. 30-334. Compliance through off-site stormwater management practices.

All stormwater management design plans shall include on-site green infrastructure and stormwater management practices, unless arrangements are made with the county engineer, or his designee to manage post-construction stormwater runoff in an off-site or regional stormwater management practice. The off-site or regional stormwater management practice must be located on property legally dedicated to that purpose, be designed and sized to meet the post-construction stormwater management criteria presented in the Effingham County LDM, provide a level of stormwater quality and quantity control that is equal to or greater than that which would be provided by on-site green infrastructure and stormwater management practices and have an associated inspection and maintenance agreement and plan. In addition, appropriate stormwater management practices shall be installed, where necessary, to protect properties and drainage channels that are located between the development site and the location of the off-site or regional stormwater management practice.

To be eligible for compliance through the use of off-site stormwater management practices, the applicant must submit a stormwater management design plan to the county that shows the adequacy of the off-site or regional stormwater management practice and demonstrates, to the satisfaction of the county engineer, or his designee, that the off-site or regional stormwater management practice will not result in the following impacts:

(1) Increased threat of flood damage or endangerment to public health or safety;

(2) Deterioration of existing culverts, bridges, dams and other structures;

(3) Accelerated streambank or streambed erosion or siltation;

(4) Degradation of in-stream biological functions or habitat; and

(5) Water quality impairment in violation of state water quality standards and/or violation of any other state or federal regulations.

(Ord. of 1-06-15, § 4.9) Secs. 30-335—30-339. Reserved.

DIVISION 4. CONSTRUCTION INSPECTION OF STORMWATER MANAGEMENT

SYSTEMS

Sec. 30-340. Construction inspection of stormwater management systems.

Section 5.0 of the LDM provides additional information and details regarding approved construction materials and practices regarding stormwater management controls and systems.

(Ord. of 1-06-15, § 5.0) Sec. 30-341. Notice of construction commencement.

The applicant must notify the county prior to the commencement of construction on a development site. In addition, the applicant must notify the county engineer, or his designee in advance of the installation of critical components of the stormwater management system shown on the approved stormwater management design plan. The county engineer, or his designee may, at his discretion, issue verbal or written authorization to proceed with the installation of critical components of the stormwater management system, such as permanent green infrastructure and stormwater management practices, based on the stabilization of contributing drainage areas and other factors.

(Ord. of 1-06-15, § 5.1) Sec. 30-342. Inspections during construction.

Periodic inspections of the green infrastructure and stormwater management practices shown on the approved stormwater management design plan shall be conducted by staff or representatives of the county engineer, or his designee during construction. Construction inspections shall utilize the approved stormwater management design plan for establishing compliance with the provisions of this article. All inspections shall be documented in written reports that contain the following information:

(1) The date and location of the inspection;

(2) The name of the inspector;

(3) Whether construction is in compliance with the approved stormwater management design plan;

(4) Violations of the approved stormwater management design plan; and

(5) Any other variations from the approved stormwater management plan.

If any violations are found, the applicant shall be notified in writing about the nature of the violation and the remedial measures that are required to bring the action or inaction into compliance with the approved stormwater management design plan. In the event that the remedial measures described in such notice have not been completed by the date set forth in the notice, any one or more of the enforcement actions outlined in this article may be taken against the applicant.

(Ord. of 1-06-15, § 5.2) Sec. 30-343. Final inspection and as built plans.

Subsequent to the final installation and stabilization of all green infrastructure and stormwater management practices shown on the approved stormwater management design plan, and before the issuance of a certificate of occupancy, the applicant is responsible for submitting as built plans for all green infrastructure and stormwater management practices shown on the approved stormwater management design plan. The as built plans must show the final design specifications for all green infrastructure and stormwater management practices and must be certified by a licensed design professional such as a landscape architect, professional surveyor or professional engineer. A final inspection shall be conducted by the county administrator (or his designee) to confirm the accuracy of the as built plans.

(Ord. of 1-06-15, § 5.3) Sec. 30-344. Ongoing inspection and maintenance of stormwater management systems.

A sample copy of the stormwater management maintenance agreement is included in the Effingham County Stormwater Management LDM. Section 7.6 of the LDM provides additional detail regarding the requirements for the stormwater management system inspection and maintenance plan and agreement. The maintenance responsibility imposed by this section shall apply to any new stormwater management systems constructed after the effective date of this article.

(Ord. of 1-06-15, § 6.0) Sec. 30-345. Maintenance responsibility.

The responsible party named in the recorded stormwater management system inspection and maintenance agreement and plan, shall maintain in good condition and promptly repair and restore all green infrastructure and stormwater management practices, maintenance access routes and appurtenances, including, but not limited to surfaces, walls, drains, dams, structures, vegetation, erosion and sediment control practices and other devices. Such repairs and restoration and maintenance activities shall be performed in accordance with an approved inspection and maintenance agreement and plan.

If the responsible party named in the recorded inspection and maintenance agreement and plan is a homeowner's association or other owner's association, such as a unit owner's association, the responsible party shall submit to the county administrator (or his designee) a copy of a recorded declaration that provides:

(1) That green infrastructure and stormwater management practices are part of the common elements of the development site and shall be subject to the requirements of the stormwater management system inspection and maintenance agreement and plan;

(2) That membership in the association shall be mandatory and automatic for all homeowners or unit owners of the development site and their successors;

(3) That the association shall have lien authority to ensure the collection of dues from all members;

(4) That the requirements of the inspection and maintenance agreement and plan shall receive the highest priority for expenditures by the association except for any other expenditures that are required by law to have a higher priority;

(5) Reserved;

(6) Reserved;

(7) That, to the extent permitted by law, the association shall not enter into voluntary dissolution unless responsibility for the green infrastructure and stormwater management practices is transferred to an appropriate successor.

(Ord. of 1-06-15, § 6.1) Sec. 30-346. Maintenance inspections.

Inspections of the green infrastructure and stormwater management practices shown on an approved stormwater management design plan, and subject to the terms and conditions of an approved inspection and maintenance agreement and plan, may be conducted by staff or representatives of the county to document repair and maintenance needs and ensure compliance with the requirements of the approved inspection and maintenance agreement and plan and provisions of this article. Any inspections shall be documented in written reports that contain the following information:

(1) The date and location of the inspection;

(2) The name of the inspector;

(3) The condition of:

a. Vegetation and filter media;

b. Fences and other safety devices;

c. Spillways, valves and other hydraulic control structures;

d. Embankments, slopes and safety benches;

e. Reservoirs and permanent pools;

f. Inlet and outlet channels and structures;

g. Underground drainage structures;

h. Sediment and debris accumulation in storage and forebay areas; and,

i. Any other item that could affect the proper function of the stormwater management system; and

(4) A description of any repair, restoration and maintenance needs.

Please refer to applicable sections of the GSMM and the CSS to obtain tools for utilization when performing maintenance inspections.

If any repair, restoration or maintenance needs are found, the responsible party named in the recorded stormwater management system inspection and maintenance agreement and plan shall be notified in writing about the repair, restoration or maintenance needs and the remedial measures that are required to bring the stormwater management system into compliance with the approved stormwater management system inspection and maintenance agreement and plan. In the event that the remedial measures described in such notice have not been completed by the date set forth in the notice, any one or more of the enforcement actions outlined in this article may be taken against the responsible party named in the approved stormwater management system inspection and maintenance agreement and plan.

(Ord. of 1-06-15, § 6.2) Sec. 30-347. Records of maintenance activities.

The responsible party shall make and maintain records of all inspections, maintenance and repairs, and shall retain the records for a minimum of five years. These records shall be made available to the county during inspections and at other reasonable times upon request of the county.

(Ord. of 1-06-15, § 6.3) Sec. 30-348. Failure to maintain.

If the responsible party fails or refuses to meet the terms and conditions of an approved stormwater management system inspection and maintenance agreement and plan and/or the requirements of this article, the county, after 30 days written notice (except, that in the event the violation constitutes an immediate danger to public health or safety, 24 hours notice shall be sufficient), may correct a violation by performing the work necessary to place the green infrastructure or stormwater management practice in proper working condition. The county may assess the responsible party for the cost of the repair work, which shall be a lien on the property, and may be placed on the ad valorem tax bill for such property and collected in the ordinary manner for such taxes.

(Ord. of 1-06-15, § 6.4) Secs. 30-349—30-355. Reserved.

DIVISION 5. ILLICIT DISCHARGE PROHIBITION

Sec. 30-356. General provisions.

The purpose of this article is to provide for the health, safety, and general welfare of the citizens of the county through the regulation of non-stormwater discharges to the storm drainage system to the maximum extent practicable. The objectives of this article are:

(1) To regulate the contribution of pollutants to the municipal separate storm sewer system (MS4) by stormwater discharges by any user;

(2) To prohibit illicit connections and discharges to the MS4;

(3) To prohibit illicit connections and discharges to Waters of the United States; and

(4) To establish legal authority to carry out all inspection; surveillance and monitoring;

and enforcement procedures as necessary to ensure compliance with this article.

(Ord. of 1-06-15, § 7.1) Sec. 30-357. Applicability.

This article shall apply to all non-stormwater discharges entering the storm drain system generated on any developed or undeveloped lands unless explicitly exempted by the county under section 30-358 of this article.

(Ord. of 1-06-15, § 7.2) Sec. 30-358. Discharge prohibitions.

No person shall discharge or cause to be discharged into the MS4 or watercourses any materials, including but not limited to pollutants or waters containing any pollutants that cause or contribute to a violation of applicable water quality standards, other than stormwater.

The commencement, conduct or continuance of any illegal discharge to the storm drain system is prohibited except as described as follows:

(1) The following discharges are exempt from discharge prohibitions established by this article: water line flushing or other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising ground water, ground water infiltration to storm drains, uncontaminated pumped ground water, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air conditioning condensation, springs, non-commercial washing of vehicles, natural riparian habitat or wetland flows, swimming pools (if dechlorinated - typically less than one PPM chlorine), fire fighting activities, and any other water source not containing pollutants.

(2) Discharges specified in writing by the county engineer, or his designee as being necessary to protect public health and safety.

(3) Dye testing is an allowable discharge, but requires a verbal notification to the county engineer, or his designee 24 hours prior to the time of the test followed by written notice within ten days.

(4) Any non-stormwater discharge permitted under an NPDES permit, waiver, or waste discharge order issued to the discharger and administered under the authority of the US Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and provided that approval has been granted for any discharge to the storm drain system. Proof of compliance with said permit may be required in a form acceptable to the county engineer, or his designee prior to the allowing of discharges to the MS4.

(5) Any stormwater discharge regulated under an NPDES stormwater discharge permit for industrial activities provided that the discharger is in full compliance with all requirements of the permit. Proof of compliance with said permit may be required in a form acceptable to the county engineer, or his designee prior to the allowing of discharges to the MS4.

(6) Any stormwater discharge regulated under an NPDES stormwater discharge permit for construction activities or other local land disturbance permit provided that the discharger is in full compliance with all requirements of the permit. Proof of compliance with said permit may be required in a form acceptable to the county engineer, or his designee prior to the allowing of discharges to the MS4.

(Ord. of 1-06-15, § 7.3) Sec. 30-359. Prohibition of illicit connections.

The construction, use, maintenance or continued existence of illicit connections to the MS4 or watercourses is prohibited. This prohibition expressly includes, without limitation, illicit connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection.

(Ord. of 1-06-15, § 7.4) Sec. 30-360. Suspension of MS4 access.

The county engineer, or his designee may, without prior notice, suspend MS4 discharge access to a person when such suspension is necessary to stop an actual or threatened discharge that presents or may present imminent and substantial danger to the environment, or to the health or welfare of persons, or to the MS4 or waters of the United States. If the violator fails to comply with a suspension order issued in an emergency, the county engineer, or his designee may take such steps as deemed necessary to prevent or minimize damage to the MS4 or waters of the United States, or to minimize danger to persons. Any person discharging to the MS4 or watercourses in violation of this article may have their MS4 access terminated if such termination would abate or reduce an illicit discharge. The county engineer, or his designee will notify a violator of the proposed termination of its MS4 access. The violator may petition the county or it's agent for a reconsideration and hearing.

A person commits a violation of this article if the person reinstates MS4 access to premises terminated pursuant to this section, without the prior written approval of the county engineer, or his designee.

(Ord. of 1-06-15, § 7.5) Sec. 30-361. Monitoring of discharges.

This section applies to all facilities that have stormwater discharges associated with industrial activity, including construction activity.

(1) The county engineer, or his designee shall be permitted to enter and inspect facilities subject to regulation under this article as often as may be necessary to determine compliance with this article. If a discharger has security measures in force, which require proper identification and clearance before entry into its premises, the discharger shall make the necessary arrangements to allow access to representatives of the county engineer, or his designee.

(2) Facility operators shall allow the county engineer, or his designee ready access to all parts of the premises for the purposes of inspection, sampling, examination and copying of records that must be kept under the conditions of an NPDES permit to discharge stormwater, and the performance of any additional duties as defined by state and federal law.

(3) The county engineer, or his designee shall have the right to set up on any permitted facility such devices as are necessary in the opinion of the county engineer, or his designee to conduct monitoring and/or sampling of the facility's stormwater discharge.

(4) The county engineer, or his designee has the right to require the discharger to install monitoring equipment as necessary. The facility's sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the discharger at its own expense. All devices used to measure stormwater flow and quality shall be calibrated to ensure their accuracy.

(5) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the operator at the written or oral request of the county engineer, or his designee and shall not be replaced. The costs of clearing such access shall be borne by the operator.

(6) Unreasonable delays in allowing the county engineer, or his designee access to a permitted facility is a violation of a stormwater discharge permit and of this article. A person who is the operator of a facility with a NPDES permit to discharge stormwater associated with industrial activity commits a violation if the person denies the county engineer, or his designee reasonable access to the permitted facility for the purpose of conducting any activity authorized or required by this article.

(7) If the county engineer, or his designee has been refused access to any part of the premises from which stormwater is discharged, and he/she is able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this article or any order issued hereunder, or to protect the overall public health, safety, and welfare of the community, thenthe county may seek issuance of a search warrant from any court of competent jurisdiction.

(Ord. of 1-06-15, § 7.6) Sec. 30-362. Requirement to prevent, control and reduce stormwater pollutants.

The county may adopt requirements identifying best management practices (BMPs) for any activity, operation, or facility, which may cause or contribute to pollution or contamination of stormwater, the MS4 or watercourses, or waters of the U.S.

(1) Pollution prevention in new facilities. The owner or operator of a commercial or industrial establishment shall provide, at their own expense, reasonable protection from accidental discharge of prohibited materials or other wastes into the MS4 or watercourses through the use of these structural and non-structural BMPs.

(2) Pollution prevention in existing facilities. Any person responsible for a property or premise, which is, or may be, the source of an illicit discharge, may be required to implement, at said person's expense, additional structural and non-structural BMPs to prevent the further discharge of pollutants to the MS4 or watercourses.

(3) Discharge permits from regulatory agencies other than the county. Compliance with all terms and conditions of a valid NPDES permit authorizing the discharge of stormwater associated with industrial activity, to the extent practicable, shall be deemed compliant with the provisions of this section. BMPs designated for compliance with the NPDES permit or BMPs implemented as a result of action taken in compliance of this article shall be included in a stormwater pollution prevention plan (SWPPP) as necessary for compliance with requirements of the NPDES permit.

(Ord. of 1-06-15, § 7.7) Sec. 30-363. Watercourse protection.

Every person owning property through which a watercourse passes, or such person's lessee, shall keep and maintain that part of the watercourse within the property free of trash, debris, excessive vegetation, and other obstacles that would pollute, contaminate, or significantly retard the flow of water through the watercourse. In addition, the owner or lessee shall maintain existing privately owned structures within or adjacent to a watercourse, so that such structures will not become a hazard to the use, function, or physical integrity of the watercourse.

(Ord. of 1-06-15, § 7.8) Sec. 30-364. Notification of spills.

Notwithstanding other requirements of law, as soon as any person responsible for a facility or operation, or responsible for emergency response for a facility or operation has information of any known or suspected release of materials which are resulting or may result in illegal discharges or pollutants discharging into stormwater, the MS4 or watercourses, or waters of the U.S. said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release. In the event of such a release of hazardous materials said person shall immediately notify emergency response agencies of the occurrence via emergency dispatch services. In the event of a release of non-hazardous materials, said person shall notify the county engineer, or his designee in person, by phone, facsimile or email no later than the next business day. Notifications in person or by phone shall be confirmed by written notice addressed and mailed to the county engineer, or his designee within three business days of the phone notice. The notification of the discharge of materials to the county engineer, or his designee shall be in addition to notification of other applicable county, regional, state and federal authorities. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three years.

(Ord. of 1-06-15, § 7.9) Secs. 30-365—30-370. Reserved.

DIVISION 6. ENFORCEMENT

Sec. 30-371. Enforcement.

Enforcement of this article is final unless the person submits a written request for a hearing within ten days of the notice of violation being served.

Whenever the county engineer, or his designee finds that a person has violated a prohibition or failed to meet a requirement of this article, the county engineer, or his designee may order compliance by written notice of violation to the responsible party. Such notice may require without limitation:

(1) The performance of monitoring, analyses, and reporting;

(2) The elimination of illicit connections or discharges;

(3) That violating discharges, practices, or operations shall cease and desist;

(4) The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property;

(5) Payment of a fine to cover administrative and remediation costs; and

(6) The implementation of source control or treatment BMPs.

If abatement of a violation and/or restoration of affected property is required, the notice shall set forth a deadline within which such remediation or restoration must be completed.

Said notice shall further advise that, should the violator fail to remediate or restore within the established deadline, the work may be done by a designated governmental agency or a contractor and the expense thereof shall be charged to the violator.

(Ord. of 1-06-15, §§ 7.10, 9.0) Sec. 30-372. Violations, enforcement and penalties.

Any action or inaction that violates the provisions of this article or the requirements of an approved stormwater management design plan; land development related permit; or inspection and maintenance agreement and plan, may be subject to the enforcement actions outlined in this section. Any such action or inaction that is continuous with respect to time may be deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.

(Ord. of 1-06-15, § 8.0) Sec. 30-373. Notice of violation.

If the county determines that an owner, applicant or other responsible person has failed to comply with the provisions of this article, or the terms and conditions of an approved stormwater management design plan; land development related permit; or inspection and maintenance agreement and plan, it shall issue a written notice of violation to said owner, applicant or other responsible person. Where a person is engaged in a new development or redevelopment activity covered by this article without having first secured approval of the stormwater management design, the notice of violation shall be served on the owner or the person in charge of the new development or redevelopment activity being conducted on the development site.

The notice of violation shall contain the following information:

(1) The name and address of the owner, applicant or other responsible person;

(2) The address or other description of the site upon which the violation is occurring;

(3) A statement specifying the nature of the violation;

(4) A description of the remedial measures necessary to bring the action or inaction into compliance with the provisions of this article, or the terms and conditions of the approved stormwater management design plan; land development related permit; or inspection and maintenance agreement and plan, and the date for the completion of such remedial measures;

(5) A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is issued; and

(6) A statement that the determination of violation may be appealed to the county by filing a written notice of appeal within ten days after the notice of violation (except, that in the event the violation constitutes an immediate danger to public health or safety, a written notice of appeal must be filed within 24 hours after the notice of violation).

(Ord. of 1-06-15, § 8.1) Sec. 30-374. Appeal of notice of violation.

Any person receiving a notice of violation may appeal the determination of the county engineer, or his designee to the board of commissioners. The notice of appeal must be received within ten days from the date of the notice of violation, or within 24 hours if the violation constitutes an immediate danger to public health or safety. Hearing on the appeal before the appropriate authority or his/her designee shall take place within 15 days from the date of receipt of the notice of appeal. The decision of the reviewing authority or their designee shall be final.

(Ord. of 1-06-15, § 8.4) Sec. 30-375. Penalties.

In the event that the remedial measures described in the notice of violation have not been completed by the date set forth for completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was issued.

Before taking any of the following actions or imposing any of the following penalties, the county shall first notify the owner, applicant or other responsible person in writing of its intended action and shall provide a reasonable opportunity of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or safety, 24 hours' notice shall be sufficient) to correct the violation. In the event the owner, applicant or other responsible person fails to correct the violation by the date set forth in said notice, the county may take any one or more of the following actions or impose any one or more of the following penalties.

(1) Stop work order. The county may issue a stop work order that shall be served on the owner, applicant or other responsible person. The stop work order shall remain in effect until the owner, applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise corrected the violation or violations described therein. The stop work order may temporarily be withdrawn or modified by the county to enable the applicant or other responsible person to take the remedial measures necessary to correct such violation or violations.

(2) Withhold certificate of occupancy. The county may refuse to issue a certificate of occupancy for the building or other structure constructed or being constructed on the development site until the owner, applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise corrected the violation or violations described therein.

(3) Suspension, revocation, or modification of LDA permit. The county may suspend, revoke or modify the LDA Permit authorizing the development project. A suspended, revoked or modified LDA Permit may be reinstated after the owner, applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise corrected the violation or violations described therein. The LDA Permit may be modified by the county to enable the owner, applicant or other responsible person to take the remedial measures necessary to correct such violation or violations.

(4) Civil penalties. In the event the owner, applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to correct the violation or violations described therein, by the date set forth in the notice of violation, the county may impose a penalty not to exceed $1,000.00 (depending on the severity of the violation) for each day the violation remains un-remedied after the date set forth in the notice of violation.

(5) Criminal penalties. For intentional and flagrant violations of this article, the county may issue a citation to the owner, applicant or other responsible person, requiring said person to appear in magistrate court to answer to criminal charges for such violation.

Upon conviction, such person shall be punished by a fine not to exceed $1,000.00, imprisonment for up to 60 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.

(Ord. of 1-06-15, § 8.3) Sec. 30-376. Enforcement measures after appeal.

If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in the event of an appeal, within ten days of the decision of the reviewing authority upholding the decision of the county engineer, or his designee, then representatives of the county engineer, or his designee may enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of any premises to refuse to allow the county engineer, or his designee or designated contractor to enter upon the premises for the purposes set forth above.

(Ord. of 1-06-15, § 8.4) Sec. 30-377. Cost of abatement of the violation.

Within 30 days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs. The property owner may file a written protest objecting to the amount of the assessment within 30 days. If the amount due is not paid within a timely manner as determined by the decision of the reviewing authority or by the expiration of the time in which to file an appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment.

(Ord. of 1-06-15, § 8.5) Sec. 30-378. Injunctive relief.

It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this article. If a person has violated or continues to violate the provisions of this article, the county engineer, or his designee may petition for a preliminary or permanent injunction restraining the person from activities which would create further violations or compelling the person to perform abatement or remediation of the violation.

(Ord. of 1-06-15, § 8.6) Sec. 30-379. Compensatory action.

In lieu of enforcement proceedings, penalties, and remedies authorized by this article, the county may impose upon a violator alternative compensatory actions, such as storm drain stenciling, attendance at compliance workshops, creek cleanup, etc.

(Ord. of 1-06-15, § 8.7) Sec. 30-380. Violations deemed a public nuisance.

In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this article that is a threat to public health, safety, and welfare, and is declared and deemed a nuisance, may be summarily abated or restored at the violator's expense, and/or a civil action to abate, enjoin, or otherwise compel the cessation of such nuisance may be taken.

(Ord. of 1-06-15, § 8.8) Sec. 30-381. Remedies not exclusive.

The remedies listed in this article are not exclusive of any other remedies available under any applicable federal, state or local law and it is within the discretion of the authorized enforcement agency to seek cumulative remedies.

(Ord. of 1-06-15, § 8.9) Sec. 30-382. Appeals.

(a) Any person aggrieved by a decision of the county engineer, or his designee, (including any decision with reference to the granting or denial for a variance from the terms of this article,) may appeal same by filing a written notice of appeal with the county administrator within five days of the issuance of said decision by the county engineer, or his designee. A notice of appeal shall state specific reasons.

(b) The county administrator shall prepare and send to the board of commissioners and appellant a written response to said notice of appeal within ten days of receipt of the notice of appeal.

(c) All appeals shall be heard by the board of commissioners. The hearing shall be held within 30 days after receipt of notice of appeal or a date mutually agreed upon in writing by the appellant and the county administrator. The board of commissioners shall then make its findings within ten days of the appeal hearing.

(Ord. of 1-06-15, § 10.0) Sec. 30-383. Emergency conditions.

If a condition presents an immediate danger to the public health, safety, or general welfare because of unsafe conditions or improper maintenance, the county engineer, or his designee shall have the right, should the owner not take immediate action, to make necessary corrections to protect the public and to make the facility safe at the expense of the responsible person. Expenses, if charged, shall be those direct costs incurred and those expenses documented in general accordance with chapter 7 of FEMA document P-323, Public assistance applicant handbook of latest revision

(Ord. of 1-06-15, § 11.0) Chapters 31—33 Chapter 34

FLOOD DAMAGE PREVENTION*

ARTICLE I. IN GENERAL

Sec. 34-1. Statutory authorization.

Article IX, Section II of the Constitution of the State of Georgia and Section 36-1-20(a) of the Official Code of Georgia Annotated have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the board of commissioners of Effingham County, Georgia, does ordain as follows:

(Ord. of 3-3-15, § 1) Sec. 34-2. Findings of fact.

(a) The flood hazard areas of Effingham County, Georgia, are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.

(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, floodproofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.

(Ord. of 3-3-15, § 1) Sec. 34-3. Statement of purpose.

It is the purpose of this chapter to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:

(1) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;

(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;

(3) Control filling, grading, dredging and other development which may increase flood damage or erosion;

(4) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands; and

(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.

(Ord. of 3-3-15, § 1) Sec. 34-4. Objectives.

The objectives of this chapter are:

(1) To protect human life and health;

(2) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;

(3) To help maintain a stable tax base by providing for the sound use and development of floodprone areas in such a manner as to minimize flood blight areas;

(4) To minimize expenditure of public money for costly flood control projects;

(5) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;

(6) To minimize prolonged business interruptions; and

(7) To insure that potential homebuyers are notified that property is in a flood area.

(Ord. of 3-3-15, § 1) Sec. 34-5. Definitions.

Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application.

Accessory structure means a structure having minimal value and used for parking, storage and other non-habitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and like structures.

Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall. Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered new construction.

Appeal means a request for a review of the county engineer's interpretation of any provision of this chapter.

Area of shallow flooding means a designated AO or AH zone on a community's flood insurance rate map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.

Area of special flood hazard is the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. In the absence of official designation by FEMA, areas of special flood hazard shall be those designated by the local community and referenced in section 34-7.

Base flood means the flood having a one percent chance of being equaled or exceeded in any given year.

Base flood elevation (BFE) means the elevation shown on the flood insurance rate map for zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one percent chance of equaling or exceeding that level in any given year.

Basement means that portion of a building having its floor sub grade (below ground level) on all sides.

Building (See structure).

Critical facility means any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include:

(1) Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials;

(2) Hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events;

(3) Emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and

(4) Generating plants, and other principal points of utility lines.

Development means any manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.

Elevated building means a non-basement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.

Existing construction for the purposes of determining rates, means structures for which the "start of construction" commenced before March 18, 1987, the effective date of the initial FIRM for Effingham County.

Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before August 5, 1986, the effective date of the first floodplain management regulations adopted by Effingham County.

Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.

Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:

(1) The overflow of inland or tidal waters; or

(2) The unusual and rapid accumulation or runoff of surface waters from any source.

Flood hazard boundary map (FHBM) means an official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as zone A.

Flood insurance rate map (FIRM) means an official map of a community, issued by the Federal Insurance Administration, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.

Flood insurance study means the official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.

Floodplain means any land area susceptible to flooding.

Floodproofing means any combination of structural and non-structural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.

Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.

Freeboard means a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.

Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building.

Historic structure means any structure that is:

(1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register;

(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;

(3) Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or

(4) Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either:

a. By an approved state program as determined by the Secretary of the Interior; or

b. Directly by the Secretary of the Interior in states without approved programs.

Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this Code.

Manufactured home means a building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.

Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.

Mean sea level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the North American Vertical Datum (NAVD) of 1988 is the datum to which base flood elevations shown on Effingham County's flood insurance rate map are referenced.

New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced after March 18, 1987, the effective date of the initial FIRM for Effingham County, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced after August 5, 1986, the effective date of the first floodplain management regulations adopted by Effingham County, and includes any subsequent improvements to such structures.

New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed after August 5, 1986, the effective date of the first floodplain management regulations adopted by Effingham County.

North American Vertical Datum of 1988 (NAVD 88) has replaced the National Geodetic Vertical Datum of 1929 in existing and future FEMA Flood Modernization Maps. NAVD 88 is used as a reference for establishing various elevations within the floodplain. For purposes of the National Flood Insurance Program, the NAVD 88 is the datum to which base flood elevations shown on Effingham County's flood insurance rate map are referenced.

Recreational vehicle means a vehicle, which is:

(1) Built on a single chassis;

(2) Four hundred square feet or less when measured at the largest horizontal projection;

(3) Designed to be self-propelled or permanently towable by a light duty truck; and

(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.

Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements.) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

Structure means a walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank.

Subdivision means the division of a single lot into two or more lots for the purpose of sale or development.

Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.

Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a five-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the "start of construction" of the improvement. NOTE: The market value of the structure should be (1) the appraised value of the structure prior to the start of the initial repair or improvement, or

(2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures which have incurred "substantial damage," regardless of the actual amount of repair work performed.

For the purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building.

The term does not, however, include (1) those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions and which have been identified by the code enforcement official, and not solely triggered by an improvement or repair project, or (2) any alteration of a "historic structure" provided that the alteration will not preclude the structure's continued designation as a "historic structure."

Substantially improved existing manufactured home parks or subdivisions means where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.

Variance is a grant of relief from the requirements of this chapter, which permits construction in a manner otherwise prohibited by this chapter.

Violation means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this chapter is presumed to be in violation until such time as evidence of compliance is provided.

(Ord. of 3-3-15, § 1; Ord. of 04-18-2023(1)) Sec. 34-6. Lands to which this chapter applies.

This chapter shall apply to all areas of special flood hazard within the unincorporated areas of Effingham County, Georgia.

(Ord. of 3-3-15, § 1) Sec. 34-7. Basis for area of special flood hazard.

The areas of special flood hazard identified by the Federal Emergency Management Agency (FEMA) in its flood insurance study (FIS), dated March 16, 2015, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this chapter. After the date of adoption of this ordinance, the most recently available flood insurance study (FIS), with accompanying maps and other supporting data will be used for the basis of determining areas of special flood hazard.

For any land areas acquired by Effingham County through de-annexation, the current effective FIS, for the cities of Guyton, Rincon, or Springfield, with accompanying maps and other supporting data and any revision thereto, are hereby adopted by reference.

Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a FIS.

The repository for public inspection of the FIS, accompanying maps and other supporting data is located in the Effingham County Planning and Engineering Department.

(Ord. of 3-3-15, § 1; Ord. of 04-18-2023(1)) Sec. 34-8. Establishment of development permit.

A development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities.

(Ord. of 3-3-15, § 1) Sec. 34-9. Compliance.

No structure or land shall hereafter be located, extended, converted or altered without full compliance with the terms of this chapter and other applicable regulations.

(Ord. of 3-3-15, § 1) Sec. 34-10. Abrogation and greater restrictions.

This chapter is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.

(Ord. of 3-3-15, § 1) Sec. 34-11. Interpretation.

In the interpretation and application of this chapter all provisions shall be:

(1) Considered as minimum requirements;

(2) Liberally construed in favor of the governing body; and

(3) Deemed neither to limit nor repeal any other powers granted under state statutes.

(Ord. of 3-3-15, § 1) Sec. 34-12. Warning and disclaimer of liability.

The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by manmade or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of Effingham County or by any officer or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made hereunder.

(Ord. of 3-3-15, § 1) Sec. 34-13. Penalties for violation.

Failure to comply with the provisions of this chapter or with any of its requirements, including conditions and safeguards established in connection with grants of variance or special exceptions shall constitute a misdemeanor. Any person who violates this chapter or fails to comply with any of its requirements shall, upon conviction thereof, be punished as provided in section 1-19 of the Code of Effingham County, and in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the county from taking such other lawful actions as is necessary to prevent or remedy any violation.

(Ord. of 3-3-15, § 1) Secs. 34-14—34-45. Reserved.

ARTICLE II. ADMINISTRATION

Sec. 34-46. Designation of chapter administrator.

The county engineer is hereby appointed to administer and implement the provisions of this chapter.

(Ord. of 3-3-15, § 1) Sec. 34-47. Permit procedures.

Application for a development permit shall be made to the planning and engineering department on forms furnished by the county prior to any development activities, and may include, but not be limited to the following: plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities.

Specifically, the following information is required:

(1) Application stage.

a. Elevation of the lowest floor, including basement, of all proposed structures in relation to mean sea level (or highest adjacent grade), referencing NAVD 88;

b. Elevation in relation to mean sea level, referencing NAVD 88, to which any non-residential structure will be floodproofed;

c. Design certification from a registered professional engineer or architect that any proposed non-residential floodproofed structure will meet the floodproofing criteria of subsection 34-82(2) of this chapter; and

d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development.

(2) Construction stage.

a. For all new construction and substantial improvements, the permit holder shall provide to the county engineer an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. Any lowest floor certification made relative to mean sea level, referencing NAVD 88, shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for non-residential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same;

b. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk; and

c. The county engineer shall review the above referenced certification data as submitted. Deficiencies shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make corrections as required by the county engineer shall be cause to issue a stop-work order for the project.

(Ord. of 3-3-15, § 1) Sec. 34-48. Reserved.

Sec. 34-49. Duties and responsibilities of the administrator.

Duties of the county engineer shall include, but shall not be limited to:

(1) Review proposed development to assure that the permit requirements of this chapter have been satisfied.

(2) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.

(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.

(4) When base flood elevation data or floodway data have not been provided by FEMA in accordance with section 34-7 of this chapter, then the county engineer may obtain, review and reasonably utilize any base flood elevation and floodway data available from federal, state or other sources in order to administer the provisions of article IV of this chapter.

(5) Review and maintain the actual elevation in relation to mean sea level (or highest adjacent grade), referencing NAVD 88, of the lowest floor, including basement, of all new or substantially improved structures in accordance with subsection 34-47(2) of this chapter.

(6) Review and maintain the actual elevation, in relation to mean sea level, referencing NAVD 88, to which any new or substantially improved structures have been floodproofed, in accordance with subsection 34-47(2) of this chapter.

(7) When floodproofing is utilized for a structure, the county engineer shall obtain certification of design criteria from a registered professional engineer or architect in accordance with subsection 34-47(l)(c) and subsection 34-82(2) or 34-84(2).

(8) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.

(9) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to FEMA.

(10) For any altered or relocated watercourse, submit engineering data/analysis within six months to FEMA to ensure accuracy of community flood maps through the letter of map revision process. Assure flood carrying capacity of any altered or relocated watercourse is maintained.

(11) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the county engineer shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this chapter.

(12) All records pertaining to the provisions of this chapter shall be maintained in the planning and engineering department and shall be open for public inspection.

(Ord. of 3-3-15, § 1) Sec. 34-50. Variance procedures.

(a) The board of commissioners shall hear and decide requests for appeals or variances from the requirements of this chapter.

(b) The board of commissioners shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the county engineer in the enforcement or administration of this chapter.

(c) Any person aggrieved by the decision of the board of commissioners may appeal such decision to the Superior Court of Effingham County, as provided in O.C.G.A. § 5-4-1.

(d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.

(e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided that the criteria of this section are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.

(f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.

(g) In reviewing such requests, the board of commissioners shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this chapter.

(h) Conditions for variances:

(1) A variance shall be issued only when there is:

a. A finding of good and sufficient cause;

b. A determination that failure to grant the variance would result in exceptional hardship; and

c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.

(2) The provisions of this chapter are minimum standards for flood loss reduction;

therefore any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of a historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.

(3) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.

(4) The county engineer shall maintain the records of all appeal actions and report any variances to FEMA upon request.

(i) Upon consideration of the factors listed above and the purposes of this chapter, the board of commissioners may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.

(Ord. of 3-3-15, § 1) Secs. 34-51—34-80. Reserved.

ARTICLE III. PROVISIONS FOR FLOOD HAZARD REDUCTION

Sec. 34-81. General standards.

In all areas of special flood hazard the following provisions are required:

(1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;

(2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;

(3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;

(4) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater:

a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:

1. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;

2. The bottom of all openings shall be no higher than one foot above grade;

and

3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions.

b. So as not to violate the "lowest floor" criteria of this chapter, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and

c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.

(5) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding;

(6) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;

(7) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;

(8) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;

(9) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and

(10) Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this chapter shall be undertaken only if the non-conformity is not furthered, extended or replaced.

(Ord. of 3-3-15, § 1) Sec. 34-82. Specific standards.

In all areas of special flood hazard the following provisions are required:

(1) New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of subsection 34-81(4) of this article.

a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.

(2) Non-residential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the county engineer as set forth in subsection 34-49(6) of this chapter.

(3) Standards for manufactured homes and recreational vehicles. Where base flood elevation data are available:

a. All manufactured homes placed and/or substantially improved on: (1) individual lots or parcels, (2) in new and/or substantially improved existing manufactured home parks or subdivisions, (3) in expansions to existing manufactured home parks or subdivisions, or (4) on a site in an existing manufactured home park or subdivision where a manufactured home has incurred "substantial damage" as a result of a flood must have the lowest floor including basement elevated no lower than one foot above the base flood elevation.

b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that:

1. The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation; and

2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.

c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement (reference subsection 34-81(6)).

d. All recreational vehicles placed on sites must either:

1. Be on the site for fewer than 180 consecutive days;

2. Be fully licensed and ready for highway use, (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or

3. The recreational vehicle must meet all the requirements for "new construction," including the anchoring and elevation requirements of items a. and c., above.

(4) Floodway. Located within areas of special flood hazard established in section 34-7 may be areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:

a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted provided that it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.

b. Any new construction or substantial improvement allowed in accordance with subsection a. above shall comply with all other applicable flood hazard reduction provisions of this article.

(Ord. of 3-3-15, § 1; Ord. of 04-18-2023(1)) Sec. 34-83. Building standards for streams without established base flood elevations and/or floodway (A-zones).

Within the areas of special flood hazard established in section 34-7, where streams exist but no base flood data have been provided (A-zones), or where base flood data have been provided but a floodway has not been delineated, the following provisions apply:

(1) When base flood elevation data or floodway data have not been provided by FEMA in accordance with section 34-7, then the county engineer may obtain, review, and reasonably utilize any scientific or historic base flood Item II. 5. elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of this article. If data are not available from these sources, then the following provisions (2) and (3) shall apply.

(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or within 20 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in an increase in flood levels during the occurrence of the base flood discharge.

(3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. NOTE: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-zone areas where a limited detail study has been completed). Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 34-81(4) of this article.

a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.

A registered land surveyor or professional engineer shall certify the lowest floor elevation level to the county engineer and the record shall become a permanent part of the permit file.

(Ord. of 3-3-15, § 1; Ord. No. 2024-346, 7-16-24) Sec. 34-84. Standards for areas of special flood hazard (zones AE) with established base flood elevations without designated floodways.

Within the areas of special flood hazard established in section 34-7 where streams with base flood elevations are provided but no floodways have been designated (zones AE), the following provisions apply:

(1) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles.

(2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with section 34-82 of this article.

(Ord. of 3-3-15, § 1) Sec. 34-85. Standards for areas of shallow flooding (AO zones).

Areas of special flood hazard established in section 34-7 may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:

(1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of subsection 34-81(4) of this article.

A registered land surveyor or professional engineer shall certify the lowest floor elevation level to the county engineer and the record shall become a permanent part of the permit file.

(2) New construction or the substantial improvement of a non-residential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to the specified FIRM flood level plus one foot above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and as required in subsections 34-47(1)c. and (2).

(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.

(Ord. of 3-3-15, § 1) Sec. 34-86. Standards for subdivisions.

For the purposes this section, "subdivisions" shall include only major subdivisions as defined in the subdivision regulations (appendix B), and "development" shall not include those activities exempt under the development plan ordinance (appendix E).

(1) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage, and shall be reasonably safe from flooding;

(2) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage;

(3) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards; and

(4) For subdivisions and/or developments greater than 50 lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the "as-built" data to FEMA in order to obtain the final LOMR and assuring that the new base flood boundary, floodway and/or V zone boundary if applicable, and the applicable base flood elevation for the building site on each lot, be clearly marked on all recorded subdivision plats, be they for residential, commercial, or industrial use.

(Ord. of 3-3-15, § 1; Ord. of 04-18-2023(1)) Sec. 34-87. Standards for critical facilities.

(a) Critical facilities shall not be located in the area of special flood hazard.

(b) All ingress and egress from any critical facility must be protected to the highest known base flood elevation.

(Ord. of 3-3-15, § 1) Chapter 35

RESERVED

Chapter 36

FIRE PROTECTION AND FIRE PREVENTION REGULATIONS*

ARTICLE I. IN GENERAL

Sec. 36-1. Purpose.

The purposes of this chapter shall be to promote public safety and to prevent loss of life and property damage due to fire.

(Ord. of 2-20-07, § 15-1) Secs. 36-2—36-14. Reserved.

ARTICLE II. FIRE DEPARTMENT

Sec. 36-15. Fire department.

The county fire department shall have the authority to:

(1) Protect life and property against fire, explosions, hazardous materials, or electrical hazards;

(2) Detect and prevent arson;

(3) Administer and enforce the laws of this state; the rules and regulations, and any ordinances and codes that are adopted by the county commissioners that are related to the prevention and suppression of fires, explosions, or injuries from hazardous materials and explosions and the protection of life and property from such hazards;

(4) Conduct programs of public education in fire prevention and safety;

(5) In cooperation with law enforcement agencies, control and regulate the flow of traffic in areas of existing emergencies, including rail, highway, water, and air traffic;

(6) Perform all such services of a fire department as may be provided by law or which necessarily appertain thereto; and

(7) Inspect non-residential structures as provided in article VI of this chapter.

(Ord. of 2-20-07, § 15-15) Sec. 36-16. Position of fire chief.

The fire chief of the county fire department shall be responsible for the direct administration and enforcement of the International Fire Prevention Code, this chapter and other fire prevention and protection rules, regulations and ordinances. The fire chief of the county fire department may appoint qualified members of the fire department as inspectors as shall from time to time be necessary. The fire chief of the county fire department may also designate such number of inspectors as shall from time to time be authorized by the board of commissioners. When used in this chapter, the term(s) "fire chief," "code official," or "fire official" shall include the fire chief and the chief's lawful designees.

(Ord. of 2-20-07, § 15-16) Sec. 36-17. Powers of fire chief.

The fire chief, his designees and fire inspectors, while acting in their fire department capacity, are authorized to issue citations for violations of the International Fire Prevention Code, this chapter, rules and regulations, or other fire protection ordinances enacted by the county. The magistrate court may appoint the fire chief, his designees, and fire inspectors to act as constables to the extent that such officials are eligible for such appointment under the laws of the State of Georgia.

(Ord. of 2-20-07, § 15-17) Sec. 36-18. Duties of fire chief.

(a) It shall be the duty of the fire chief, in addition to the general duties of section 36-16, to enforce all laws and ordinances of the county covering the following.

(1) The prevention of fires.

(2) The storage, sale and use of combustible, flammable or explosive material.

(3) The installation and maintenance of automatic and other fire alarm systems, and fire extinguishing equipment.

(4) The maintenance and regulations of fire escapes.

(5) The means and adequacy of exit in case of fire from factories, schools, hotels, lodging houses, asylums, hospitals, churches, halls, theaters, amphitheaters, and all places in which numbers of persons work, live or congregate, from time to time, for any purpose.

(6) The investigation of the cause, origin, and circumstances of fires.

(7) The establishment of fire lanes.

(8) Fire safety, and fire protection.

(b) The fire chief shall investigate the cause, origin and circumstances of every fire occurring in the county by which property has been destroyed or damaged and, as far as possible, shall determine whether the fire is the result of carelessness or design. Such investigations shall begin immediately upon the occurrence of such a fire. Every fire shall be reported in writing within the fire department as soon as possible after occurrence of the investigated fire. Such reports shall be in such form as shall be prescribed by the fire chief, and shall contain a statement of all facts relating to the cause, origin and circumstances of such fire, the extent of the damage thereof, and the insurance upon such property and such information as may be required, including the injury, death or rescue of persons.

(Ord. of 2-20-07, § 15-18) Secs. 36-19—36-27. Reserved.

ARTICLE III. FIRE PREVENTION

Sec. 36-28. Title.

This article shall be known as the Fire Prevention Code of Effingham County, Georgia, and it may be cited as "The Fire Prevention Code."

(Ord. of 2-20-07, § 15-28) Sec. 36-29. Fire prevention code.

There is hereby adopted by the county commissioners that certain code known as the International Building Code Congress International, Inc., being particularly the 2012 edition of International Fire Prevention Code or any future editions hereinafter adopted by the county or the state department of community affairs. Reference to this chapter shall include the International Fire Prevention Code. This fire prevention code is hereby adopted in its entirety and all codes referenced therein, save and except such portions are hereinafter deleted, modified, or amended in section 36-30, and is hereby incorporated by reference as fully as if set out at length herein and the provisions thereof shall be controlling within the unincorporated area of the county. No less than one copy of the International Fire Prevention Code is filed at county clerk's office and not less than one copy is filed in the office of the chief of the county fire department.

(Ord. of 2-20-07, § 15-29; Ord. of 12-9-14(1)) Sec. 36-30. Adoption of state code.

In addition to above-referenced International Fire Prevention Code, there is hereby adopted by the county commissioners the state minimum fire safety standards as set forth in O.C.G.A. § 25-2-12 and all subsequent revisions thereof. This code is hereby incorporated by reference as fully as if set out at length herein and the provisions thereof shall be controlling within the unincorporated area of the county. Furthermore, it is hereby resolved that pursuant to O.C.G.A. § 25-2-12(b), the county will enforce the minimum fire safety standards as set forth in O.C.G.A. § 25-2-12(a).

(Ord. of 2-20-07, § 15-30) Sec. 36-31. Fire prevention scope.

The provisions of the International Fire Prevention Code, this chapter, rules and regulations, and other fire protection ordinances of the county shall apply equally to both public and private property, and shall apply to all structures and their occupancies, except as otherwise specified.

(Ord. of 2-20-07, § 15-31) Sec. 36-32. Establishment and duties of fire prevention division.

(a) The International Fire Code shall be enforced by the Effingham County Fire Department fire prevention division, which section is hereby established, and its members shall be appointed by the chief from the personnel of the fire department, and which section shall be operated under the supervision of the chief of the fire department.

(b) The fire marshal shall serve as chief of the fire prevention division. The chief of the fire department may serve as fire marshal, or may, with approval of the county administrator, designate a fire marshal from among the qualified members of the fire department of Effingham County.

(c) The fire marshal is permitted to detail such members of the fire department as inspectors as shall from time to time be necessary. The chief and the fire marshal shall recommend to the county administrator the employment of technical inspectors who, when such authorization is made, shall be selected through an examination to determine their fitness for the position.

(d) A report from the fire prevention division shall be made annually by the fire marshal and transmitted to the chief of the fire department; and the chief shall report when requested, and at least annually, to the board of commissioners of Effingham County; and his report shall contain all proceedings under this code with such statistics as the chief of the fire department deems appropriate to include therein; and the chief of the fire department shall also recommend any amendments to the code which, in his judgment, shall be desirable.

(e) The fire chief and the fire marshal shall cooperate with the other officials of the county and may request, in the discharge of their duties, the assistance and cooperation of other department officials of Effingham County.

(Ord. of 2-20-07, § 15-32) Sec. 36-33. Submission of plans and specifications required.

Owners, their agents or designees, of all buildings and tenant spaces covered by this chapter are required to submit plans and specifications of the project to the zoning administrator or his designee. The zoning administrator or his designee shall forward all plans to the fire chief's office for approval prior to construction. A final inspection and letter of compliance must be obtained from the fire chief prior to occupation or conducting of business.

(Ord. of 2-20-07, § 15-33) Sec. 36-34. Permits.

In accordance with requirements as detailed in chapter 4 of the International Fire Prevention Code, a permit shall be obtained from the fire chief to conduct certain operations described therein, or to store, handle, or use those processes described therein that are considered to present an extra or unusual fire hazard to life or property. Before permits may be issued, the fire chief or assistants and inspectors shall inspect and approve the receptacles, processes, vehicles, buildings, storage places or sites to be used for any such purposes. A $10.00 processing fee to cover administrating cost shall be imposed upon each permit application. The county shall revoke or suspend an individual or entity's business license for violation of this section. Violation of this section shall be punished by a fine of up to $1,000.00 and/or imprisonment of up to 30 days.

(Ord. of 2-20-07, § 15-34) Sec. 36-35. Fire lanes.

(a) It shall be unlawful for any person to park or stand a vehicle within a designated fire lane.

(b) A fire lane shall be a 12-foot traffic lane closest to buildings and other structures, unless other wise designated. The sheriff or the fire chief shall be authorized to designate fire lanes within the county by the posting of signs or by marking upon the pavement or roadway, so designating the fire lanes, or by requiring the owner of the property to so designate the fire lane.

(c) This section shall be enforced by any sheriff deputy of the county. Citations for violations shall be issued by such officers.

(d) Any person, corporation, partnership or other entity violating this section shall be tried before the magistrate court of the county and shall, upon conviction, be subject to up to the maximum fine and/or the maximum term of imprisonment as authorized by section 1-19 of the Official Code of Effingham County, Georgia.

(Ord. of 2-20-07, § 15-35) Sec. 36-36. Marking of utilities.

All buildings having more than one tenant space, or in complexes where utilities are not directly affixed to the building all electrical disconnects, meters and gas shut offs shall be marked by a permanent means with the unit number in which the device is servicing. The number will be at least two inches in height and on a contrasting background. The manner in which the device is marked must meet the approval of the fire official.

(Ord. of 2-20-07, § 15-36) Secs. 36-37—36-40. Reserved.

ARTICLE IV. OUTDOOR BURNING

Sec. 36-41. Permit required.

(a) It shall be unlawful for any person, firm, or corporation to set, kindle, maintain, or authorize the setting, kindling, or maintenance of any outdoor fire without first having obtained a permit there for as provided in this article. A permit need not be obtained for campfires for cooking.

(b) Permits will be issued by the Georgia Forestry office.

(c) Permits shall be issued for burning only during daylight hours burning Monday— Saturday.

(Ord. of 2-20-07, § 15-41; Ord. of 8-16-16, § 1) Sec. 36-42. Same—Issuance; site inspections.

(a) Permits must be obtained from the Georgia Forestry office. Permits may be issued over the telephone.

(b) If deemed necessary, an inspection of the site may be required before a permit is issued.

(Ord. of 2-20-07, § 15-42) Sec. 36-43. Same—Denial.

The fire chief or his designated representative may issue permits and may prohibit any or all outdoor fires based upon adverse weather conditions or consideration of risk of danger to the general health, safety, and welfare of the citizens of the county.

(Ord. of 2-20-07, § 15-43) Sec. 36-44. Limited fires after sundown.

All permitted fires shall have no additional fuel added after sundown on the date issued, unless otherwise specified by the fire chief or his designed representative.

(Ord. of 2-20-07, § 15-44) Sec. 36-45. Residential burning.

(a) Residential burning may be conducted provided that the fire is not less than 50 feet from any structure. Adequate provision must be made to prevent fire from spreading within 50 feet of any structure. Burning of materials other than plant growth originating on the premises is prohibited.

(b) Campfires for cooking are permitted (Ord. of 2-20-07, § 15-45) Sec. 36-46. Combustible demolition or construction materials.

Destruction of combustible demolition or construction materials, either on site or transported to a burning facility, is prohibited unless approved by the director of the Air Protection Branch, Environmental Protection Division, Georgia Department of Natural Resources.

(Ord. of 2-20-07, § 15-46) Sec. 36-47. Land clearing burns.

All land clearing burns must be a minimum of 300 feet from any dwelling and conducted in a predominantly nonresidential area. Plant growth only may be burned. Burning of all other materials is prohibited.

(Ord. of 2-20-07, § 15-1) Sec. 36-48. Fire to be attended.

No person shall leave a fire unattended. The fire shall be under observation at all times by the person starting the fire, or his designee. Such person shall have a continuous water supply or other adequate fire extinguishing equipment readily available for use (e.g. shovel, axe, rake, heavy land clearing equipment).

(Ord. of 2-20-07, § 15-1) Secs. 36-49—36-50. Reserved.

ARTICLE V. HAZARDOUS MATERIALS*

Sec. 36-51. Purpose.

The purpose of this article is to provide for the control and containment of hazardous materials after accident or discharge. The purpose of this article is not to impose upon the county or any of its officers and agents, any obligation to secure or remove any hazardous materials from the county once safe containment of the material is made; and nothing in this article is intended to relieve any owner or person in possession of hazardous material of any obligation imposed by state or federal law. Nothing in this article shall be deemed to permit the possession, storage, or use of hazardous materials, except in conformance with all state, federal or local laws.

(Ord. of 2-20-07, § 15-51) Sec. 36-52. Application.

This article shall apply to all incidents involving hazardous waste or hazardous materials within the boundaries of the county, and to all persons who may possess such materials found within the county except as prevailing state or federal laws or regulations may take precedence and control over any such incident or person.

(Ord. of 2-20-07, § 15-52) Sec. 36-53. Definitions.

For the purpose of this article, the following definitions apply:

Cleanup: The management, control, containment, recovery, removal or neutralization of any released hazardous material for the purpose of promoting or protecting public health or safety.

Hazardous materials: Those substances or materials in such quantity and form which may pose an unreasonable risk to health and safety or property, which may include, but are not limited to, explosives, radioactive materials, etiologic agents, flammable liquids and solids, combustible liquids or solids, poisons, oxidizing or corrosive materials, and compressed gases which are listed by the Materials Transportation Bureau of the United States Department of Transportation in Title 49 of the Code of Federal Regulations, and any amendment thereto.

Person: Any individual, corporation, partnership, trust, or other legal entity.

Responsible party: Any individual, partnership, corporation, association, trust or other entity partially or solely responsible for the release of any hazardous material within the county.

User: Any person who manufactures or transports, or owns, uses, handles, stores, or has the legal authority to control hazardous materials, specifically including their officers, directors, employees, and agents.

(Ord. of 2-20-07, § 15-53) Sec. 36-54. Duty to report.

Any person who causes or has knowledge of any discharge or release of hazardous materials from their safe container, in any manner which poses an actual or potential threat to people, animals, wildlife, vegetation, property, or the environment, shall immediately report the incident to the county fire department.

(Ord. of 2-20-07, § 15-54) Sec. 36-55. Cleanup.

The user or transporter of a hazardous material which is intentionally or accidentally discharged or released within the county shall, in addition to reporting the accident as required by section 36-54, take immediate action to cause the discharge or release to be cleaned up in an environmentally safe and scientifically sound manner, and to restore the site and the surrounding environment.

(Ord. of 2-20-07, § 15-55) Sec. 36-56. Intentional discharge or release.

The intentional discharge or release of a hazardous material within the county is strictly prohibited.

(Ord. of 2-20-07, § 15-1) Sec. 36-57. Cost recovery.

(a) Upon the completion of any cleanup or mitigation of hazardous materials in which county employees participated, all costs of the cleanup shall be itemized by each county department involved, including the fire department. Such costs shall include, but are not limited to:

(1) Charges for each responding vehicle but not limited to the fire department, police department, code enforcement, and public works.

(2) Replacement costs for equipment that is contaminated beyond re-use or repair.

(3) All personnel-related expenses incurred by the county, including but not limited to wages, salaries, fringe benefits and insurance for full-time, part-time and volunteer employees. These personnel related expenses shall commence when the affected departments begin responding to the incident and shall continue until all county personnel have concluded hazardous materials related responsibilities.

(4) Expenses of decontaminating and cleaning equipment.

(5) Technical consulting services specifically required as a result of the incident, including but not limited to technical experts or specialists not otherwise available to the county.

(6) Laboratory costs of analyzing samples taken during the incident.

(7) Costs of cleanup, storage or disposal of the released hazardous materials.

(8) Medical and hospital expenses incurred as a result of the incident.

(9) Legal, engineering, accounting billing, collection and other administrative expenses incurred as a result of the incident, including but not limited to recover expenses pursuant to this article.

(b) Upon receipt of these itemizations (including its own), but in no event later than 30 days from the date of the release, the county shall bill the full cost of the cleanup to the responsible party or parties. The bill shall include a description of costs incurred. Bills for less than the full amount of these costs shall be allowed, provided that the responsible party is advised of the reason therefore and the approximate date by which it can expect to receive a complete bill. Any amounts unpaid after 30 days shall bear interest at rate of 11 /2 percent

per month. Further, if the owner of the real property upon which the abatement of the emergency took place is determined in any report to be responsible for the discharge of hazardous materials therein, then and in the event; any charge not paid within 30 days from the date of the incidents shall be a lien upon the land or premises where the abatement took place. If the responsible party contests charges, he/she shall have ten days from receipt of the assessment to give notice of appeal, in writing to the county administrator. A hearing shall be held and a written decision made by the county administrator within 15 days thereafter. If the party is not satisfied with the decision of the county administrator, he or she may, within ten days of receipt of the decision of the county administrator, request a hearing before the board of commissioners for further consideration. A final decision shall be made with 15 days after the hearing.

(c) Each responsible party shall be jointly and severally liable to the county for the costs of the cleanup for which they are responsible. Such costs may be collected by any lawful means including, but not limited to, judicial proceedings.

(d) Any and all costs recovered from a responsible party shall be separate from and in addition to any penalty that may be assessed for any violation of any provision of this article.

(e) The minimum charges for hazardous materials emergency response on behalf of the county shall be based upon the following schedule:

(1) Emergency response vehicles.

(2) Specialized equipment/personal safety protection. Activities that require special protective equipment. Current reference to EPA/OSHA protection levels based on EPA protective ensembles:

(3) Emergency clean-up/containment response.

a. Manpower: Same as above.

b. Absorbents: Normal resupply fee.

(4) Contaminated equipment. The party responsible for the spill/incident shall be financially responsible for replacement of any routine or specialized equipment that becomes contaminated during response, containment, abatement and recovery efforts.

(5) Personnel. Reimbursement for personnel utilized during the spill/incident shall be at 11

/2 times the hourly rate except as annotated below:

(6) Other types of vehicles.

Sec. 36-58. Emergency operations.

The fire chief of the county or his designated representative shall take, and be in control of, any actions necessary to mitigate a hazardous materials incident within the county, except where state or federal agencies have jurisdiction by law.

(Ord. of 2-20-07, § 15-58) Sec. 36-59. Requirement to report the spill or release of hazardous substances.

(a) Title, purpose, and scope.

(1) This section shall be the report of spill or release of hazardous substance or oil.

(2) Purpose. This section is adopted into the Code of Effingham County pursuant to the powers granted Effingham County as a political subdivision of the State of Georgia, and as part of its strategy for emergency management plan pursuant to the Official Code Of Georgia Annotated (O.C.G.A.) §§ 38-3-27, 38-3-28 and 38-3-52 to require prompt reporting of a reportable quantity of a spill or release of any hazardous substance or oil which is known to have or suspected to have left the boundaries of the facility where stored and used. The requirement pursuant to this Ordinance is to assist Effingham County in ensuring the health, safety and welfare of its citizens and derive the necessary knowledge and information needed of potentially hazardous substances in Effingham County and to develop an emergency management plan and response.

(3) Scope. In the interest of the general health of the public, any "person" as that term is defined in O.C.G.A. § 12-14-1(6) owning or having control over any hazardous substance or oil upon learning of an "incident" as defined herein, involving such hazardous substance or oil shall immediately report by telephone to Effingham County E-911.

(b) Definitions. The following words of terms as used herein, shall have the same meaning and definition as set forth in the referred to sections of O.C.G.A. and in the Code of Federal Regulations (CFR):

(1) "Hazardous substance" - O.C.G.A. § 12-14-1(4).

(2) "Oil" - O.C.G.A. § 12-14-1(5).

(3) "Person" - O.C.G.A. §§ 12-14-1(6) and 12-14-3(a).

(4) "Reportable Quantity" - O.C.G.A. § 12-14-1(7).

(5) "Spills or Release" - O.C.G.A. § 12-14-1(8).

(6) "Facility" - 40 C.F.R. 302.3.

(c) Incident, defined. An "incident" is defined herein as a known or suspected spill or release of a reportable quantity of a "hazardous substance" and the known or suspected spill or release of oil which has left the boundaries of the facility where stored or used.

(d) Notification requirements. Upon the occurrence of an incident as defined herein, where such an incident is known or suspected, notification shall be by immediate telephone call Effingham County E-911. "Immediate" as defined herein shall be within 15 minutes of a person learning of such an incident.

(e) Spills. Any airborne spill or release or any spill or release into any stream or ditch in which water is capable of moving from the facility upon which spill or releases occurs to another property, when such spill or release or discharge meets the definition of a reportable quantity shall be considered to have left the boundaries of the facility of the owner or operator, and shall require reporting hereunder.

(f) Penalties. Violation of this section shall be subject to being fined upon conviction thereof by the Magistrate Court of Effingham County in an amount not to exceed $1,000.00 for each violation. Each failure to report a release or discharge of reportable quantity shall be considered a separate violation.

(g) Federal and state law. Nothing contained herein shall be construed in any way to abrogate, modify or change any provision or requirement outlined in the Federal Emergency Planning and Community Rights to Know Act, 42 USC § 11001 et. seq., 40 CFR § 355.20, 40 CFR § 302, 40 CFR § 355.40, the Clean Water Act, 33 USC 1251 et seq., 40 CFR 110.1, the provisions of O.C.G.A. § 12-14-1 et seq. or any other general law in force or hereinafter enacted in the State of Georgia.

(Ord. No. 2025-312, 7-1-25) Secs. 36-60—36-70. Reserved.

ARTICLE VI. NON-RESIDENTIAL STRUCTURES

Sec. 36-71. Applicability.

This article shall apply to the construction, alteration, repair, equipment, use and occupancy, location, maintenance, of every building or structure or appurtenances connected to or attached to such buildings or structures, except for one and two family dwellings. This is to include new and existing structures in the unincorporated area of Effingham County.

(Ord. of 2-20-07, § 15-71) Sec. 36-72. Inspections.

(a) The fire chief or his assistants and inspectors shall inspect or cause to be inspected all non-residential structures on a periodic basis for compliance with the International Fire Protection Code, this chapter, and rules and regulations and other fire protection ordinances of Effingham County, and shall make such orders as may be necessary for the enforcement of the laws and ordinances governing the same.

(b) Upon complaint submitted in writing alleging a failure to comply with the International Fire Prevention Code, this chapter, and fire related rules, regulations, and ordinances, the fire chief or assistants or inspectors may enter in or upon any building or premises complained of for the purpose of investigating the complaint.

(c) The fire chief, any assistant, or any inspector who has been deputized by the state safety fire commissioner pursuant to O.C.G.A. § 25-2-12.1 is further authorized to seek inspection warrants against non-cooperating parties pursuant to O.C.G.A. § 25-2-22.1.

Inspection warrants may be issued by any judge of the superior, state, municipal or magistrate court upon proper oath or affirmation showing probable cause.

(Ord. of 2-20-07, § 15-72) Sec. 36-73. Right of entry by fire official.

The fire chief or his designee is granted the right of entry to any and all buildings of whatever size or nature which are being used for personal care homes and housing individuals not related by blood or marriage. The fire chief or his designee upon entry may survey the premises and make recommendations as to fire hazards and the proper procedures to abate said hazards in accordance with State Minimum Fire Safety Standards.

Except in the case of an inspection based upon a complaint or warrant as set forth in section 36-72, the fire chief or his designee shall notify the owner or occupant of an inspection not less than 48 hours before such inspection is to occur.

(Ord. of 2-20-07, § 15-73) Secs. 36-74—36-90. Reserved.

ARTICLE VII. FIREWORKS

Secs. 36-91—36-99. Reserved.

ARTICLE VIII. ENFORCEMENT

Sec. 36-100. Violations.

It shall be unlawful for any person to violate this chapter, to permit or maintain such a violation, to refuse to obey any provision thereof, or to fail or refuse to comply with any such provision or regulation. Proof of such unlawful act or failure shall be deemed prima facie evidence that such act is that of the owner or other person in control of the premises.

Prosecution or lack thereof of either the owner, occupant, or the person in charge shall not be deemed to relieve any of the others. Each day during which a violation is on-going shall be deemed a separate violation.

(Ord. of 2-20-07, § 15-100) Sec. 36-101. Order to remove fire hazard.

Whenever the fire chief or inspector, shall find in any building, or upon any premises or other places, combustible or explosive matter or dangerous accumulations of rubbish or unnecessary accumulation of wastepaper, boxes, shavings, or any highly flammable material especially liable of fire, and which is so situated as to endanger property; or shall find obstructions to or on fire escapes, stairs, passageways, doors or windows, liable to interfere with the operations of the fire department or egress of occupants in case of fire, the fire chief or inspector shall order the same to be removed or remedied, and such order shall forthwith be complied with by the owner or occupant of such premises or buildings, subject to the appeals procedure provided for in this chapter. An owner or occupant failing to comply with such order within a reasonable period after the service of the said order shall be liable to penalties as hereinafter provided.

(Ord. of 2-20-07, § 15-101) Sec. 36-102. Service of order to remove hazard.

The service of any such order may be made upon the occupant or owner of the premises to whom it is directed, either by delivering a copy of same to such occupant or owner personally, or leaving it with any person in charge of the premises, or, in case no such person is found upon the premises, by affixing a copy thereof in a conspicuous place on the door to the entrance of said premises, such order may be served either by delivering or and leaving with said person copy of the order, or, if such owner, is absent from the jurisdiction of the officer making the order, by mailing such copy by certified mail to the owner's last known address.

(Ord. of 2-20-07, § 15-102) Sec. 36-103. Penalty for violation of article.

Any person violating any provision of this article shall be deemed guilty of a misdemeanor and shall be punished as provided in section 1-19 of this Code.

(Ord. of 2-20-07, § 15-103) Sec. 36-104. Service of order prerequisite to citation.

The service of an order to remove a hazard and non-compliance of the property owner or occupant of the premises shall be prerequisites to the issuance of a citation for a violation of this Code, except in the case of a violation that results in the loss of life or injury to person or property.

(Ord. of 2-20-07, § 15-104) Chapter 37

RESERVED

Chapter 38

HEALTH AND SANITATION*

ARTICLE I. IN GENERAL

Sec. 38-1. Reserved.

Sec. 38-2. Reserved.

Sec. 38-3. Smoking in public buildings.

(a) This section is enacted pursuant to O.C.G.A. § 16-12-2(c), which specifically authorizes the enactment of local ordinances prohibiting smoking.

(b) The smoking of tobacco products presents serious public health concerns to the state and to the citizens of the state. The Surgeon General has determined that smoking causes lung cancer, heart disease, and other serious diseases, and that there are hundreds of thousands of tobacco-related deaths in the United States each year. These diseases most often do not appear until many years after the person in question begins smoking. The presence of tobacco smoke in places used by or open to the public is offensive to and hazardous to non-smokers.

(c) All buildings in the unincorporated area of Effingham County which are used by or open to the public are designated no-smoking areas.

(d) Effective January 1, 2003, no certificate of occupancy shall be issued to the owner or occupant of any building in the unincorporated area of the county intended to be used by or open to the public unless signs are posted therein clearly designating such building a no-smoking area.

(e) Effective November 21, 2002 all buildings in the unincorporated area of the county used by or open to the public shall be posted with signs clearly designating such building a no-smoking area.

(f) The board of health is authorized to adopt reasonable regulations regarding the number and placement of no-smoking signs.

(g) The board of health may conduct periodic inspections of any building in the unincorporated area of the county used by or open to the public for the purpose of determining whether or not said building and owners or occupants thereof are in compliance with this section and board of health rules and regulations.

(h) A person who smokes tobacco in any form, smokes from any battery operated electronic smoking device designed to deliver nicotine, and/or other substances through a vapor inhaled by the user or uses smokeless tobacco products in any building in the unincorporated area of the county that is used by or open to the public and that is clearly designated by a no-smoking sign may be prosecuted pursuant to section 1-19 of this Code.

(Amend. of 7-2-02; Ord. of 5-17-16, § 1) Secs. 38-4—38-30. Reserved.

ARTICLE II. STATE RULES, REGULATIONS

Sec. 38-31. Definitions.

The following words, terms, and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Health officer means the county director of health or his authorized representative.

(Ord. of 5-15-90, § 1; Ord. of 6-19-90, § 7) Sec. 38-32. Adopted.

The following rules and regulations of the state department of human resources are hereby adopted and on file in the office of the county clerk:

(1) Chapter 290-5-14. Food Services, revised July 19, 1995.

(2) Chapter 290-5-18, Tourist Courts, revised March 25, 1996.

(3) Chapter 290-5-26. On-Site Sewage Management Systems, February 20, 1998, as amended by the county board of health.

(4) Chapter 511-3-8, Body Art, effective October 6, 2023.

(Ord. of 5-15-90, § 1; Ord. of 6-19-90, § 1; Amend. of 10-17-00; Ord. No. 2024-491, 10-15-24) Sec. 38-33. Issuance of citation.

(a) Upon information of a violation of any of the rules and regulations adopted in this article being made known to the county health officer or to his designee, there shall cause a citation to be issued requiring such violator to appear before the judge of the magistrate court on a day and time certain, then and there to stand trial for such violation.

(b) Citations issued under this section shall be pursuant to O.C.G.A. § 15-10-63 and shall be personally served upon the person accused of such violation. Each citation shall state the time and place at which the accused is to appear for trial.

(Ord. of 5-15-90, § 1; Ord. of 6-19-90, § 5) Sec. 38-34. Penalty for violation.

(a) Any person violating the provisions of this article may be punished as provided in section 1-19. Separate offenses shall be deemed to be committed on each day during or on which a violation occurs or continues.

(b) In addition to all other provisions of this article, any violation of this article is hereby deemed to be a continuing nuisance and may be abated by an application for injunction in the superior court or other court of competent jurisdiction.

(Ord. of 5-15-90, § 1; Ord. of 6-19-90, § 6) Chapters 39—41 Chapter 42

OFFENSES*

Sec. 42-1. Damage to county property.

It shall be illegal for any person to willfully deface, damage, or break any picnic, recreational, or other county property on land or within buildings owned, controlled, or under the jurisdiction of the county.

(Ord. of 7-16-91, § 1(e)) Sec. 42-2. Disturbing the peace.

It shall be illegal for any person to engage in conduct that is inherently offensive as manifested by cursing, boisterousness, or causing excessive noises to the extent that such conduct may offend or disturb others of the same facility on land or within buildings owned, controlled, or under the jurisdiction of the county.

(Ord. of 7-16-91, § 1(d)) Sec. 42-3. Nude swimming.

It shall be illegal for any person to swim in any public park, stream, pool, or body of water adjacent to any county park or property while in a nude or seminude condition on land or within buildings owned, controlled, or under the jurisdiction of the county.

(Ord. of 7-16-91, § 1(c)) Sec. 42-4. Littering.

(a) General provisions.

(1) Purpose and intent. The purpose of this section is to protect the public health, safety, environment, and general welfare through the regulation and prevention of litter.

The objectives of this section are:

a. Provide for uniform prohibition throughout Effingham County of any and all littering on public or private property; and,

b. Prevent the desecration of the beauty and quality of life of Effingham County and prevent harm to the public health, safety, environment, and general welfare, including the degradation of water and aquatic resources caused by litter.

(2) Applicability. This section shall apply to all public and private property within the unincorporated limits of Effingham County.

(3) Compatibility with other regulations. This section is not intended to interfere with, abrogate, or annul any other ordinance, rule or regulation, statute, or other provision of law. The requirements of this section should be considered minimum requirements, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule or regulation, or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence.

(4) Severability. If the provisions of any article, section, subsection, paragraph, subdivision or clause of this section shall be judged invalid by a court of competent jurisdiction, such order of judgment shall not affect or invalidate the remainder of any article, section, subsection, paragraph, subdivision or clause of this section.

(b) Definitions.

Litter means any organic or inorganic waste material, rubbish, refuse, garbage, trash, hulls, peelings, debris, grass, weeds, ashes, sand, gravel, slag, brickbats, metal, plastic, and glass containers, broken glass, dead animals or intentionally or unintentionally discarded materials of every kind and description which are not waste as such term is defined in O.C.G.A., § 16-7-51, paragraph 6.

Public or private property means the right of way of any road or highway; any body of water or watercourse or the shores or beaches thereof; any park, playground, building, refuge, or conservation or recreation area; timberlands or forests; and residential, commercial, industrial, or farm properties.

(c) Prohibition against littering public or private property or waters. It shall be unlawful for any person or persons to dump, deposit, throw, leave or cause or permit the dumping, depositing, placing, throwing or leaving of litter on any public or private property in the unincorporated limits of Effingham County or any waters in the unincorporated limits of Effingham County unless:

(1) The property is designated by the state or by any of its agencies or political subdivisions for the disposal of such litter, and such person is authorized by the proper public authority to use such property;

(2) The litter is placed into a receptacle or container installed on such property; or,

(3) The person is the owner or tenant in lawful possession of such property, or has first obtained consent of the owner or tenant in lawful possession, or unless the act is done under the personal direction of the owner or tenant, all in a manner consistent with the public welfare.

The discharge of construction site waste such as, but not limited to, concrete washout, chemicals, fuel, sanitary waste, and construction debris from construction sites, is prohibited.

(d) Vehicle loads causing litter. No person shall operate any motor vehicle with a load on or in such vehicle unless the load on or in such vehicle is adequately secured to prevent the dropping or shifting of materials from such load onto the roadway.

(e) Violations, enforcement and penalties.

(1) Violations. It shall be unlawful for any person to violate or fail to comply with any of the requirements of this section. Any person who has violated or continues to violate the provisions of this section, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or otherwise sentenced in a manner provided by law.

(2) Evidence.

a. Whenever litter is thrown, deposited, dropped or dumped from any motor vehicle, boat, airplane, or other conveyance in violation of this section, it shall be prima facie evidence that the operator of the conveyance has violated this section.

b. Except as provided in subsection (1), whenever any litter which is dumped, deposited, thrown or left on public or private property in violation of this section is discovered to contain any article or articles, including but not limited to letters, bills, publications or other writing which display the name of the person thereon in such a manner as to indicate that the article belongs or belonged to such person, it shall be a rebuttable presumption that such person has violated this section.

(3) Penalties. Any person who violates this section shall be guilty of a violation and, upon conviction thereof, shall be punished as follows:

a. By a fine of not less than $200.00 and not more than $1,200.00; and

b. In addition to the fine set out in subsection a. above, the violator shall reimburse Effingham County for the reasonable cost of removing the litter when the litter is ordered removed by Effingham County; and

c. 1. In the sound discretion of the court, the person may be directed to pick up and remove from any public street or highway or public right-of way for a distance not to exceed one mile any litter he has deposited and any and all litter deposited thereon by anyone else prior to the date of execution of sentence; or

2. In the sound discretion of the court, the person may be directed to pick up and remove any and all litter from any public property, private right-ofway, or with prior permission of the legal owner or tenant in lawful possession of such property, any private property upon which it can be established by competent evidence that he has deposited litter. Pick up and removal shall include any and all litter deposited thereon by anyone prior to the date of execution of sentence; and,

d. The court may publish the names of persons convicted of violating this ordinance.

(4) Enforcement. All law enforcement agencies, officers and officials of this state or any political subdivision thereof, or any enforcement agency, officer or any official of any commission of this state or any political subdivision thereof, are hereby authorized, empowered and directed to enforce compliance with this section. The Effingham County code enforcement officer will be the primary enforcement officer for this section.

(Ord. of 7-16-91, § 1(b); Ord. of 12-9-14(2); Ord. of 6-2-15, §§ 1—5) Sec. 42-5. Turkey shoots.

Turkey shoots shall be held from 10:00 a.m. to 11:00 p.m.

(Mo. of 11-1-88) Sec. 42-6. Disorderly conduct.

It shall be unlawful for any person within the county to violate any of the following subsections of this section:

(1) Disturb or violate the peace, good order, or quiet of the county or any part thereof by riotous, boisterous, noisy, or disorderly conduct.

(2) Act in a violent or tumultuous manner toward another whereby any person is placed in danger of safety of his life, limb, or health.

(3) Act in a violent or tumultuous manner toward another whereby the property of any person is placed in danger of being destroyed or damaged.

(4) Cause, provoke, or engage in any fight, brawl, or riotous conduct so as to endanger the life, limb, health, or property of another.

(5) Assemble or congregate with another or others for the purpose or with the intent to engage in gaming.

(6) Frequent any public place with intent to obtain money from other persons by illegal and fraudulent schemes, tricks, artifices, or devices.

(7) Frequent any place where illegal sale or possession of alcoholic beverages or narcotics or dangerous drugs are practiced, allowed, or tolerated.

(8) Assemble for the purpose of engaging in any fraudulent scheme, device, or trick, to obtain any valuable thing in any place or from any person in the county, or who shall aid or abet therein.

(9) Use fighting words directed towards any person who becomes outraged and thus creates a turmoil.

(10) By acts of violence, interfere with another's pursuit of a lawful occupation.

(11) Accost or force one's company upon any other person or attempt to pick up or entice any other person to so accompany.

(12) Congregate with another or others in or on any public way so as to halt the flow of vehicular or pedestrian traffic and refuse to clear such public way when ordered by lawful authority.

(13) Defecate or urinate on streets, lanes, or sidewalks, or in the halls or elevators of public or commercial buildings, or in any park or playground, or on any property open to public view.

(Ord. of 12-6-88(2)) Sec. 42-7. Firearms.

(a) As used in this Code section, the term:

(1) "Firearm" means any handgun, rifle, or shotgun.

(2) Vacant

(3) "Public highway" means every public street, road, and highway in this state.

(4) Vacant

(5) "Sport shooting range" means an area designated and operated by a person or entity for the sport shooting of firearms, target practice, trapshooting, skeet shooting, or shooting sporting clays and not available for such use by the general public without payment of a fee, membership contribution, or dues or without the invitation of an authorized person, or any area so designated and operated by a unit of government, regardless of the terms of admission thereto.

(6) Vacant

(7) "Unit of government" means any of the departments, agencies, authorities, or political subdivisions of the state, cities, municipal corporations, townships, or villages and any of their respective departments, agencies, or authorities.

(b) It shall be unlawful for any person in Effingham County to discharge or shoot any firearms which project lead or any other missile as follows:

(1) Into a dwelling, house, railroad train, boat, aircraft, motor vehicle, or any building or structure used for assembling of people; or

(2) Within 75 yards of any occupied building or upon the land of another or across the property line of another without first obtaining written permission of such property owner(s); or

(3) At a mark, at any inanimate object, or at random, on, along or across a public highway; or

(4) At or from any motor vehicle, at any person, at any other motor vehicle, or at any building or habitable structure.

(5) It shall be unlawful for any person, without legal justification, to discharge a firearm on or within 50 yards of a public highway.

(c) This section shall not apply to or affect any of the following:

(1) All federal, military, state, county, and municipal law enforcement peace officers possessing the duty and power of arrest whether such officers are within or outside their jurisdictions or on or off duty, or any person summoned by such officers to assist in making arrests or preserving the peace while actually engaged in assisting such officer, or any other person otherwise authorized by Georgia statute; or

(2) Any person lawfully exercising the destruction of dangerous animals, or for lawful nuisance wildlife abatement by persons properly permitted by the Georgia Department of Natural Resources, or in the lawful exercise of trapping by properly licensed trappers; or

(3) In connection with the discharge of blank cartridges for theatrical purposes or for signal purposes in athletic or sporting events, military exercises, funerals, reviews, or memorial events; or

(4) Any citizen when lawfully defending person or property; or

(5) Any citizen or legal entity engaged in the lawful use or legal nonconforming use under any zoning ordinance at any private or commercial sport shooting range.

a. For the purposes of this section a "sport shooting range" means an area designed and operated for the use and discharge of guns, air guns, BB guns, pistols, or other firearms, which project lead or any other missile that received prior approval from Effingham County to operate.

(d) It shall be unlawful for any person to discharge a firearm while:

(1) Under the influence of alcohol or any drug or any combination of alcohol and any drug to the extent that it is unsafe for the person to discharge such firearm except in defense of life, health, and property;

(2) The person's alcohol concentration is 0.08 grams or more at any time while discharging such firearm or within three hours after such discharge of such firearm from alcohol consumed before such discharge ended; or

(3) Subject to the provisions of subsection (c) of this Code section, there is any amount of marijuana, or a controlled substance as defined in O.C.G.A. § 16-13-21, present in the person's blood or urine, or both, including the metabolites and derivatives of each or both without regard to whether or not any alcohol is present in the person's breath or blood.

(e) The fact that any person charged with violating this section is or has been legally entitled to use a drug shall not constitute a defense against any charge of violating this section; provided, however, that such person shall not be in violation of this subsection unless such person is rendered incapable of possessing or discharging a firearm safely as a result of using a drug other than alcohol which such person is legally entitled to use.

(f) Any person convicted of violating subsection (c) of this section shall be guilty of a misdemeanor of a high and aggravated nature.

(Ord. of 9-2-80; Ord. of 2-18-97; Ord. No. 2024-606, 3-5-24) Sec. 42-8. Public assemblies.

Any gathering or assemblage of persons in any public square or park of the county shall be unlawful without permission previously obtained from the county commission; and any public assemblage or procession in any street, square, or thoroughfare within the corporate limits of the county shall be unlawful without such permission.

(Ord. of 9-1-81) Sec. 42-9. Overcharging for goods, materials, services and housing during state of emergency prohibited.

(a) Overcharging prohibited. It shall be unlawful during a declared state of emergency or subsequent period of recovery in which the county has been declared a disaster area for any person, firm, or corporation located or doing business in the unincorporated part of the county to overcharge for any goods, materials, services, or housing within the unincorporated part of the county.

(b) Definitions.

Overcharging. The term "overcharging" is defined as charging prices for goods, materials, services, or housing that are substantially in excess of the customary or applicable cases substantially in excess of the supplier's or provider's costs for such goods, materials, services, or housing. Overcharging shall be presumed in the event of a substantial price increase during times of emergency or subsequent recovery as compared to the price charged immediately prior to the onset of the emergency, but such presumption shall be rebuttable where the increase in price is attributable to higher costs to the provider or supplier.

State of emergency. The term "state of emergency" is defined, pursuant to O.C.G.A.

§ 38-3-3(5), as a condition declared by the governor when, in his judgment, the threat or actual occurrence of a disaster or emergency is of sufficient severity and magnitude as to warrant extraordinary efforts in preventing or alleviating the damage, loss, hardship, or suffering threatened or caused thereby.

Subsequent recovery period. The term "subsequent recovery period" is defined as that period during which the disaster continues to cause disruptions in the disaster area, but shall not exceed six months after the emergency declaration has been terminated by the Governor unless extended by resolution of the county board of commissioners.

(c) Penalties. Violations of this section shall be punishable as provided in section 1-19 of this Code.

(Ord. of 6-1-99(2), §§ 1—3) Sec. 42-10. Door-to-door solicitation/canvassing.

(1) Intent and purpose. The intent of the board of commissioners in enacting this article is to regulate the sale of goods and services by solicitors or canvassers at residences in the county in order to diminish criminal activity in the county and abusive techniques utilized by any such solicitor or canvasser which adversely affect the public health, safety and welfare in the county. This article is not intended as a de facto prohibition of door-to-door solicitation, nor is it an attempt to adversely affect interstate commerce. Instead, this article is intended to balance competing interests, reduce criminal activity and protect county citizens from abusive sales techniques versus the conduct of proper commercial sales activity. This article is not intended to allow any business activity which would otherwise be unlawful.

(2) Definitions. In this article, the term solicitor or canvasser means any person who solicits orders on behalf of a firm, corporation, company, association, partnership or individual for any goods, services, wares or merchandise or other things of value, from house to house. Any person who obtains orders for merchandise, services, or other things of value shall be deemed a solicitor. The term solicitor or canvasser shall not mean an individual or field sales representative working for or on behalf of a bona fide charitable or nonprofit organization, or students or parents of students (i.e., PTA, booster club organizations) participating in approved school-sponsored fund raisers.

(3) Solicitor/canvasser permit.

(a) Permit required; applicability of article.

1. Resident/nonresident solicitors/canvassers. All solicitors or canvassers are subject to all rules and regulations of this article.

(b) Application; investigation of applicant; grounds for denial.

1. No solicitor/canvasser shall be authorized to solicit orders until he files an application with the county sheriff's office and obtains a permit and registers as a solicitor. This application shall be upon forms prescribed by the county sheriff's office. Upon application, the county sheriff's office, within ten days, shall examine the police record, if any, of the applicant. The sheriff shall determine whether there are any records of complaints against the applicant in the records of the sheriff's office or the GCIC/NCIC crime database system. The sheriff may, at his discretion, conduct a background check of the corporate officers or any other person named on the application. The sheriff may, at his discretion, make any other inquiries he deems necessary for the investigation of the applicant including but not limited a search of the Better Business Bureau.

No permit shall be given to any applicant who shall have either a pending charge or a conviction for a crime of moral turpitude or an offense involving the elements of assault and battery, or any civil judgment involving unethical and improper business actions, including but not limited to action which would constitute fraud and deceit under the laws of the state. In addition, the applicant shall be registered to do business in the State of Georgia as required by the Georgia Secretary of State's Office, and the applicant shall have a valid business license in the municipality or county where the business is located.

2. No application for a permit under this section shall be received or acted upon if the applicant has submitted the same or a similar application for a permit within the preceding 12 months, which prior application has been dismissed, denied or abandoned. No permit shall be granted if the applicant is in violation of this article or has, within 12 months preceding the application, been in violation of this article or any law or ordinance regulating the activities for which such permit is sought.

(c) Fee. The applicant for a solicitor's permit shall pay a fee as specified by the county sheriff's office, as cost for investigation and regulation under this article. This fee shall be used for payment of the cost of such registration, investigation and regulation of persons subject to this article.

(d) Term; renewal. A permit issued under this article shall be valid for six months from the date the permit is issued. The permit may be renewed by filing a renewal application with the county sheriff's office upon forms prescribed by the office, and paying a renewal fee as set by the sheriff's office, to cover the expense of updating the investigative report.

(4) Badge for solicitors. All solicitors/canvassers shall wear a badge, the design of which shall be in the discretion of the county sheriff's office, but which shall be uniform as to all solicitors/canvassers. The badge shall provide the following information: the name of the solicitor or canvasser, the name of the company, and an identification number, in large enough type to be read and seen by persons with normal vision at a distance of ten feet. At all times, the solicitor or canvasser shall wear the badge on either the left or right shoulder or around the neck so that such badge can be readily seen by the owner or occupant of the premises. The company soliciting shall provide a list of all individuals that will be canvassing on behalf of the business to the sheriff's office. Each individual canvassing shall carry a state issued identification card to present to the owner or occupant of the premises and any sheriff's deputy.

(5) Conduct of business by solicitors/canvassers; information to be provided to customers.

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:effingham-county/code/whole@2026-08-04-ace683cb05

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.