Effingham County · Code of Ordinances
Effingham County Code of Ordinances
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2026-08-04
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 5 of 6. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
(a) As used in this section, the term "off-road vehicle" means any motorized vehicle designed for or capable of cross-country travel on or immediately over land, water, snow, ice, marsh, swampland, or other natural terrain and not intended for use predominately on public roads, and any other vehicle defined as an off-road vehicle by O.C.G.A. § 40-7-3 currently or as may be amended by the General Assembly of Georgia, and includes, but is not limited to, four-wheel drive or low-pressure tire vehicles, two-wheel drive vehicles, amphibious machines, ground effect or air cushion vehicles, and any other means of transportation deriving power from any source other than muscle or wind, except that such term shall exclude any motorboat; any military, fire, or law enforcement vehicle; any vehicles used exclusively on airports; all farm machinery, farm tractors, and other self-propelled equipment for harvesting and transportation of forest products, for clearing land for planting for utility services and maintenance, for each moving, construction, or mining; and selfpropelled lawnmowers, snowblowers, garden or lawn tractors, or golf carts, while such vehicles are being used exclusively for their designed purposes.
(b) Any person operating an off-road vehicle under any of the following conditions shall be deemed to be in violation of this section and shall be punishable as provided by section 1-19 of this Code:
(1) Without operative brakes or without mufflers or other silencing equipment;
(2) On any public property, including, but not limited to, any road or right-of-way under the possession or control of Effingham County, except property designated by the board of commissioners for use by off-road vehicles;
(3) On any private property without the express written permission of the owner of the property or his agent, proof of which shall be in the immediate possession of the operator of an off-road vehicle at all times when operating such vehicle and which shall be displayed upon demand of any law enforcement officer;
(4) On any private property in any zoning district other than an AR-1 or AR-2 zoning district, except the property of the operator or his or her immediate family.
(Ord. No. 2025-144, 4-1-25) Sec. 74-8. Designated truck routes.
(a) Definition of vehicle classification.
(1) There are eight classes of commercial motor vehicles in the United States, divided into three, more general categories: light-duty, medium-duty, and heavy-duty.
Commercial motor vehicles or trucks that operate on U.S. highways can be classified based on their gross vehicle weight rating (GVWR) or axle configuration.
(2) Given the complexities of determining weight, the county has selected axle configuration as the guidance to determine vehicle class.
(3) The county prohibits the use of medium and heavy-duty vehicles, defined as commercial vehicles class 6 through 13, on routes not listed as designated truck routes in section 74-8(f).
(b) Vehicle type definition.
(1) The following vehicle type definitions shall be used to determine vehicle class, as defined by the Federal Highway Administration (FHWA) Traffic Monitoring Guide
(TMG):
a. Motorcycles. All two or three-wheeled motorized vehicles. Typical vehicles in this category have saddle type seats and are steered by handlebars rather than steering wheels. This category includes motorcycles, motor scooters, mopeds, motor-powered bicycles, and three- wheel motorcycles.
b. Passenger cars. All sedans, coupes, and station wagons manufactured primarily for the purpose of carrying passengers and including those passenger cars pulling recreational or other light trailers.
c. Other two-axle, four-tire single unit vehicles. All two-axle, four-tire, vehicles, other than passenger cars. Included in this classification are pickups, panels, vans, and other vehicles such as campers, motor homes, ambulances, hearses, carryalls, and minibuses. Other two-axle, four-tire single-unit vehicles pulling recreational or other light trailers are included in this classification. Because automatic vehicle classifiers have difficulty distinguishing class 3 from class 2, these two classes may be combined into class 2.
d. Buses. All vehicles manufactured as traditional passenger-carrying buses with two axles and six tires or three or more axles. This category includes only traditional buses (including school buses) functioning as passenger-carrying vehicles. Modified buses should be considered to be a truck and should be appropriately classified.
e. In determining information on trucks, the following criteria should be used:
1. Truck tractor units traveling without a trailer will be considered singleunit trucks;
2. A truck tractor unit pulling other such units in a saddle mount configuration will be considered one single-unit truck and will be defined only by the axles on the pulling unit;
3. Vehicles are defined by the number of axles in contact with the road.
Therefore, floating axles are counted only when in the down position; and
4. The term "trailer" includes both semi- and full trailers.
f. Two-axle, six-tire, single-unit trucks. All vehicles on a single frame including trucks, camping and recreational vehicles, motor homes, etc., with two axles and dual rear wheels.
g. Three-axle single-unit trucks. All vehicles on a single frame including trucks, camping and recreational vehicles, motor homes, etc., with three axles.
h. Four or more axle single-unit trucks. All trucks on a single frame with four or more axles.
i. Four or fewer axle single-trailer trucks. All vehicles with four or fewer axles consisting of two units, one of which is a tractor or straight truck power unit.
j. Five-axle single-trailer trucks. All five-axle vehicles consisting of two units, one of which is a tractor or straight truck power unit.
k. Six or more axle single-trailer trucks. All vehicles with six or more axles consisting of two units, one of which is a tractor or straight truck power unit.
l. Five or fewer axle multi-trailer trucks. All vehicles with five or fewer axles consisting of three or more units, one of which is a tractor or straight truck power unit.
m. Six-axle multi-trailer trucks. All six-axle vehicles consisting of three or more units, one of which is a tractor or straight truck power unit.
n. Seven or more axle multi-trailer trucks. All vehicles with seven or more axles consisting of three or more units, one of which is a tractor or straight truck power unit.
o. Certain truck configurations utilize axles that can be lifted when the vehicle is empty or lightly loaded. The position of these axles, sometimes called lift axles, drop axles, or tag axles, affects the classification category into which the vehicle falls. To maintain consistency between visual and axle-based counts, the FHWA-TMG recommends that only axles that are in the dropped position be considered when classifying the vehicle. While this promotes consistency, it may induce difficulty when interpreting classification. For example, a vehicle may exhibit directional differences in vehicle classification even though the same trucks may be travelling one direction loaded (with axles down) and the other direction empty (with axles lifted). For the purposes of this Code, the axle configuration used to determine class will be based on the observed configuration at the time of the violation.
p. Figure 1 of this section lists the 13 vehicle category classifications used by the
FWHA.
(c) Use of certain streets, etc., restricted to commercial vehicles.
(1) No vehicle defined as a commercial vehicle class 6 through 13 in sections 74-8(a) and
(b) shall use the streets, etc., not listed in section 74-8(f), which is hereby incorporated herein and made a part of this Code by reference, a copy of which shall be maintained on file in the office of the county clerk and in the office of the county engineer, unless exempt as defined in section 74-8(d).
(d) Commercial vehicles prohibited on certain streets; exception.
(1) Drivers of such vehicles defined as a commercial vehicle class 6 through 13 in sections 74-8(a) and (b) shall have in the cab of the truck a bill of lading, work order or receipt for services for an address on the street governed by this section or on a street that must be accessed from the street governed by this section. Nothing in this section shall be construed to prohibit such vehicles from crossing or using such streets as may be necessary to make delivery of articles, perform work, or pick up goods from any point along the line of the street, provided that the driver of such vehicle shall have in the cab of the truck a bill of lading, work order, or receipt for services that bears the address or an address along the line of the street governed by this section. In lieu of a bill of lading, work order, or receipt of services, the county may accept at its discretion a letter provided to the driver bearing the signature of a person of authority on company letterhead that denotes the truck destination or delivery point along the line of the street governed by this section.
(2) Vehicles defined as a commercial vehicle class 6 through 13 in sections 74-8(a) and
(b) going to or from the carrier's terminal facilities physically located on the street governed by this section.
(3) Vehicles defined as a commercial vehicle class 6 through 13 in sections 74-8(a) and
(b) going to or from a repair facility for service which is physically located on the street governed by this section.
(4) Bobtail truck, defined as only the tractor with no trailer and/or chassis attached, going to or from, and parking at, the driver's residence located on the street governed by this section.
(5) Wreckers on call, and emergency vehicles plainly marked with emergency equipment are exempt from this section.
(6) Drivers of commercial vehicles classified as class 6 through 13, as defined in sections 74-8(a) and (b), are required to travel exclusively on designated truck routes. When accessing a location off the truck route, drivers must use the shortest and most direct route to the nearest designated truck route of their origin or destination. Enforcement of this requirement shall be carried out by the officials designated in section 74-8(e).
(e) Violation and enforcement.
(1) Violation. Any person who violates this section shall be guilty of a violation and, upon conviction thereof, shall be punished as follows:
a. By a fine of not less than $200.00 and not more than $1,000.00.
(2) Enforcement. All law enforcement agencies, officers and officials of this state or any political subdivision thereof, or any enforcement agency, officer or any official of any commission of this state or any political subdivision thereof, are hereby authorized, empowered and directed to enforce compliance with this section.
(f) Designated truck routes.
(1) The following roadways are designated as truck routes. Any other road in the county shall be prohibited to commercial trucks class 6 through 13 traffic unless exempt per section 74-8(d).
a. Georgia State Highway 21.
b. Georgia State Highway 17.
c. Georgia State Highway 119.
d. Georgia State Highway 30.
e. Georgia State Highway 275.
f. Georgia State Highway 80.
g. Old Augusta Road South.
h. Old Augusta Central Road.
i. I-16.
j. I-95.
k. Blue Jay Road.
l. McCall Road (Gateway Parkway to Georgia State Highway 21/Rincon).
m. McCall Road (Blue Jay Road to Georgia State Highway 21/Rincon) n. Sandhill Road.
(2) The official truck route map shall be maintained by the county engineer. The official map is provided in Figure 2 of this section.
(3) Truck routes shall be signed as defined in the Manual of Uniform Traffic Control Devices for Streets and Highways (MUTCD) and as shown in Figure 3 of this section.
The following additional signs are allowed:
(Ord. No. 2025-144, 4-1-25) Chapter 75
UTILITIES*
ARTICLE I. IN GENERAL
Sec. 75-1. Required connection to water, sewer and water reuse lines.
New minor subdivisions, as defined in the subdivision regulations, shall be required to connect to county water, sewer, and reuse water lines where such lines are located in a road right-of-way or easement within 200 feet of the property line. Subdivisions containing three or less detached residences shall not be required to connect to a sewer force-main.
Major subdivisions, as defined in the subdivision regulations, commercial or industrial developments shall be required to connect to county water, sewer, and reuse water lines if such lines are located within 1,000 feet of the property line.
New single family residences shall not be required to connect to county water, sewer and reuse water lines.
Residential, commercial and industrial water main extensions requirements:
All specifications required by the county and by the Georgia Department of Natural Resources must be met by the developer.
If an existing main must be extended to serve a particular development, the Developer will be required to pay all of the initial costs, including but not limited to, contract prices, testing fees, and engineering fees. Developers are required to extend all mains along their entire property frontage if the existing main is adjacent to the proposed development.
All new water main extensions shall be sized, at minimum to meet the demand of the development as evidenced by an engineer's certification or a size equal to the existing county main, whichever pipe size is largest. The county may require that a larger pipe size be installed than is required by this section in order to extend water service beyond the property for which service is sought. If the county requires a larger pipe to be installed than is required by these standards, the county could participate in the cost of installing such pipe in the amount of the cost difference between installing the pipe needed to provide the capacity to serve the property and the pipe needed to accommodate the enlarged capacity required for extending water service beyond the property for which service is sought.
The requirement to connect to water, sewer and reuse lines as stated in this section may be waived by the board of commissioners if they determine that the cost of extending the water, sewer and reuse lines outweighs the public benefit or there are circumstances unique to the project that make the extensions infeasible.
(Amd. of 4-6-04; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10; Ord. of 10-21-14; Ord. of 3-7-17)
Sec. 75-2. Optional connection to water, sewer and water reuse lines.
The county shall not require the connection to water lines where existing structures are served by wells; nor shall the county require connection to sewer and reuse lines where existing structures are served by septic systems. The county shall not assess or collect any minimum fee or charge from owners of property with existing individual water and/or sewer services unless the property owner chooses to utilize the provided services.
(Amd. of 4-6-04; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10; Ord. of 10-21-14) Sec. 75-3. State and county health department requirements.
The provisions of this chapter shall not preclude enforcement of any federal, state, or county health department regulations, requirements or restrictions which are more stringent in nature than the requirements provided in this chapter regarding the use of individual private water supply facilities or individual private wastewater disposal facilities.
(Amd. of 4-6-04; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10; Ord. of 10-21-14) Secs. 75-4—75-25. Reserved.
ARTICLE II. WATER AND SEWER USER CHARGES
Sec. 75-26. Special service district.
This chapter shall apply to the Effingham County service area as defined in the service delivery strategy amendments approved by the Georgia Department of Community Affairs, a copy of which is on file in the office of the clerk of the board of commissioners.
(Ord. of 8-5-03; Ord. of 10-21-03; Ord. of 7-20-04(1), § 39-25; Ord. of 3-15-05, § 39-1; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10)
Secs. 75-27—75-51. Reserved.
Sec. 75-52. Water for construction purposes.
Water for all construction purposes (residential, commercial and/or industrial) shall be available through a standard water meter, and shall be paid for on a monthly basis by amount used according to the rates set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners, which shall be on file in the office of the county clerk.
(Ord. of 3-15-05, § 39-27; Ord. of 4-7-09; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10) Sec. 75-53. Reserved.
Sec. 75-54. Water meter fees.
The fee for a residential drinking water meter shall be published as set forth in the water, sewer, and re-use fee schedule adopted by the board of commissioners and on file in the office of the county clerk. All residential water meters shall be installed by county personnel. A cut-off valve for service shall be installed by the customer between the house and meter box.
The customer shall be responsible for any leaks from the meter box to the house.
Commercial/industrial drinking water meter fees and all re-use water meter fees shall be determined by meter size, with the actual cost to the county charged to the customer. If the customer requests that county personnel install the meter, a $100.00 installation surcharge will be added to the cost of the meter, box, and meter transmitting unit.
(Ord. of 8-5-03; Ord. of 10-21-03; Ord. of 7-20-04(1), § 39-29; Ord. of 3-15-05, § 39-29; Ord. of 1-16-07; Ord. of 11-6-07; Ord. of 5-5-09; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10; Ord.
of 12-3-13; Ord. of 5-6-14) Sec. 75-55. Reuse water lines.
All new developments (defined as major subdivisions, commercial or industrial projects) proposed to be served by public or private sewage services shall install purple pipe reuse lines within the development.
(Ord. of 1-5-10; Ord. of 12-7-10) Sec. 75-56. Reuse water capacity.
(a) Property owners requesting sewer service for new developments (as defined in section 75-55) shall design and construct a reuse irrigation or other utilization system so as to ensure that reuse water is used and/or stored on-site; or used and/or stored off-site at a location adjacent to the property or existing or proposed reuse water lines per the county's reuse water master plan; or other location approved by the board of commissioners. The design of such reuse system shall be subject to the approval of the board of commissioners and the Georgia Department of Natural Resources Environmental Protection Division. Only individual parcel owners not within developments covered above shall have the option of not constructing a reuse irrigation or other utilization system.
(b) If an off-site location is not adjacent to existing or proposed reuse lines, the property owner shall pay the cost of extending such lines to the off-site location.
(c) All property owners requesting sewer service shall pay to the county a reuse water capacity capital recovery fee, where an equivalent residential unit means, with respect to a water customer, the number of residential units to which the water demand of that customer is equivalent, based on an average demand of 300 gallons per day for a single-family residential unit (detached). The reuse capital cost recovery fee shall be $1,300.00/ERU. If a reuse irrigation or other utilization system is constructed by the owner/developer, the $1,300.00/ERU fee shall be waived or credited in accordance with Section 9 of the Development Impact Fee Ordinance and the following paragraphs.
(1) If developer is able to accept 100 percent of the reuse generated by the subject development, as determined per ERU:
a. The developer will be required to submit an engineer's evaluation of the proposed reuse sites for review by Effingham County staff and/or its designated engineer to determine the subject sites' beneficial irrigation capacity.
b. The developer will be required to consummate a reuse agreement with the BOC under the county's terms and conditions.
c. The reuse capital cost recovery fee as established within the Effingham County Code of Ordinances, currently $1,300.00/ERU, will be waived.
(2) Developer is able to accept more than 100 percent of the reuse generated by the subject development, as determined per ERU:
a. The developer will be required to submit an engineer's evaluation of the proposed reuse sites for review by Effingham County staff and/or its designated engineer to determine the subject sites' beneficial irrigation capacity.
b. The developer will be required to consummate a reuse agreement with the BOC under the county's terms and conditions.
c. The reuse capital cost recovery fee as established within the Effingham County Code of Ordinances, currently $1,300.00/ERU, will be waived for 100 percent of the subject development's reuse capacity and a credit given for any capacity generated in excess of the subject development's demand. Credit will be remitted from the reuse capital cost recovery fees generated at the time of collection of said fees for building permits within developments that are unable to provide reuse capacity. Said fees will be remitted quarterly to the subject developer.
(3) Developer is able to accept some portion less than 100 percent of the reuse generated by the subject development, as determined per ERU:
i. The developer will be required to submit an engineer's evaluation of the proposed reuse sites for review by Effingham County staff and/or its designated engineer to determine the subject sites' beneficial irrigation capacity.
ii. The developer will be required to consummate a reuse agreement with the BOC under their terms and conditions.
iii. The reuse capital cost recovery fee as established within the Effingham County Code of Ordinances, currently $1,300.00/ERU, will be waived for the reuse capacity generated per ERU on a percentage basis. The builder/developer will be required to remit to the BOC at the time a building permit is issued the outstanding percentage of the reuse capital cost recovery fee as established within the Effingham County Code of Ordinances.
(4) Reuse water capital cost recovery fees for detached/attached housing and nonresidential structures shall be charged according to the following table:
REUSE CAPITAL COST RECOVERY FEES
USES REUSE
RESIDENTIAL (per unit) Detached Housing $1,300.00 Attached Housing $859.30 NONRESIDENTIAL (per water meter size) .75 inch $1,300.00 1 inch $2,166.45
1.5 inches $4,333.55 2 inches $6,933.55 3 inches $13,866.45 4 inches $21,666.45
(5) If a reuse irrigation or other utilization system is constructed by the owner/developer, the fee shall be waived or credited in accordance with Section 9 of the Development Impact Fee Ordinance and the above paragraphs (1), (2), or (3).
(d) The property owner shall construct and maintain the reuse water irrigation or other utilization system; provided that, at the discretion of the board of commissioners, the county may accept ownership and maintenance responsibility of a reuse system where the system is located on property dedicated to the county for recreation or other public purposes. An on-site or off-site reuse system, if constructed by the developer, must be in operation within one year of the approval of the first phase of the developer's development.
(e) Payment of all applicable reuse capital cost recovery fees shall be a precondition of issuance of a building permit.
(Ord. of 8-5-03; Ord. of 10-21-03; Ord. of 7-20-04(1), § 39-31; Ord. of 3-15-05, § 39-31; Ord. of 8-15-06; Ord. of 2-20-07; Ord. of 10-16-07; Ord. of 6-16-09; Ord. of 1-5-10; Ord. of 12-7-10;
Ord. of 5-3-11) Sec. 75-57. Refunds of water connection service charge and/or sewer development fees paid.
(a) Failure to provide service.
(1) Any water connection service charge and/or sewer development fees paid shall be refunded to the feepayor if capacity is available and service is denied.
(2) In order to be eligible for a refund, a feepayor or successor in interest shall file a written application for a refund with the board of commissioners or their designee within one year of the date such fee was paid. If a successor in interest claims a refund of water connection service charge and/or sewer development fees, the board of commissioners or a designee may require written documentation that such rights have been conveyed to the claimant prior to issuing the requested refund.
(3) Refunds shall be paid within 60 days after the date on which the board of commissioners or their designee determines that a sufficient proof of claim for a refund has been made.
(b) Failure to initiate development. If a feepayor has paid a water connection service charge and/or sewer development fee required by this section and has obtained a building permit, and the building permit for which the fee was paid later expires or is abandoned without the possibility of further extension, then the feepayor or the feepayor's successor in interest shall not be entitled to a refund of water connection service charge and/or sewer development fees paid, but shall instead be entitled to credit for the present value of the water connection service charge and/or sewer development fee against future water connection service charge and/or sewer development fees for the same parcel of land. In order to be eligible to receive this credit for future water connection service charge and/or sewer development fees, the feepayor or a successor in interest shall be required to submit an application for such credit to the board of commissioners or a designee within 30 days after the expiration of the building permit for which the fee was paid. If a successor in interest claims a refund of water connection service charge and/or sewer development fees, the board of commissioners or a designee may require written documentation that such rights have been conveyed to the claimant prior to issuing the requested refund.
(c) Limitations. After a water connection service charge and/or sewer development fee has been paid pursuant to this ordinance [Appendix D], no refund of any part of such fee shall be made if the project for which the fee was paid is later demolished, destroyed, or is altered, reconstructed, or reconfigured so as to reduce the size of the project or the number of units in the project.
(Ord. of 5-19-15) Sec. 75-58. Credits against water connection service charge and/or sewer development fees.
(a) Credits to be issued. When a developer or his or her predecessor in title or interest has constructed system improvements for a county water or sewer capital facility element, or contributed or dedicated land or money towards the completion of water or sewer system improvements for a county capital facility element, and the county has accepted such construction, contribution, or dedication, the county may issue a credit against the water connection service charge and/or sewer development fees otherwise due for the same county capital facilities element in connection with the proposed development.
(b) Limitations. Credits against water connection service charge and/or sewer development fees shall not be given for (a) project improvements, or (b) any construction, contribution, or dedication not agreed to in writing by the county prior to commencement of said construction, contribution, or dedication. No agreement shall be effective unless it is reduced to writing by the board in open and public meeting, and recorded in the board's minutes.
(c) Valuation of credit at present value.
(1) Land. Credit for qualifying land dedications shall not exceed the fair market value established by a private appraiser acceptable to the county in an appraisal paid for by the feepayor.
(2) Improvements. The board of commissioners shall determine the amount of credit due in an amount not to exceed the actual cost of design and construction as reflected by invoices, receipts, or other proof acceptable to the board. The board may consider fair market value as determined by a qualified appraiser, replacement cost, depreciation, and any other information it deems relevant in determining the credit to be issued.
(d) When credits become effective.
(1) Approved credits for acquisition or construction of system improvements shall generally become effective when (a) all required design, permitting, construction, inspection, and testing has been completed and has been accepted by the county, (b) a suitable maintenance and warranty bond has been received and approved by the county, and (c) all land and infrastructure has been dedicated to and accepted by the board of commissioners in open and public meeting in compliance with all applicable requirements of the county and the State of Georgia. The land and/or improvements must be conveyed to the county in a form acceptable to the board, at no cost to the county, before credits may become effective. No dedication of land or improvements shall be deemed to have been accepted except upon affirmative action by the board, as reflected by its minutes, in open and public meeting. Upon request of the feepayor, the county shall issue a letter stating the amount of credit available.
(e) Application procedures.
(1) In order to obtain a credit against water connection service charge and/or sewer development fees otherwise due, a feepayor shall submit a written offer to dedicate to the board of commissioners or a designee for specific parcels of qualifying land or to contribute or construct specific improvements to the county capital facilities in accordance with all applicable state or county design and construction standards, and shall specifically request a credit against the type of water connection service charge and/or sewer development fees for which the land dedication or improvement is offered. Such written request shall be filed prior to the time the feepayor begins construction of any improvements for which credit is requested, or the claim for the credit shall be waived. If no improvements are to be constructed, e.g. the credit requested is for only land value, the written request shall be filed prior to the issuance of the first building permit that creates an obligation to pay the type of fee against which the credit is requested, or the claim for credit shall be waived.
(2) After receipt of the request for credit, the board of commissioners or a designee shall review the request and determine whether the land or improvements offered for credit will reduce the costs of providing county capital facilities by an amount at least equal to the value of the credit. If the board of commissioners or a designee determines that the offered credit satisfies these criteria, then the credit shall be issued.
(f) Transferability of credit. A credit may only be transferred by the developer that has received the credit to a successor in interest pursuant to the terms of this section. The credit may be used only to offset water connection service charge and/or sewer development fees for the same county capital facility element for which the credit was issued, and within the same service area for which the credit was issued. Credits shall be transferred by any written instrument clearly identifying which credits issued under this section are being transferred, the dollar amount of the credit being transferred, and the county capital facilities element and service area for which the credit was issued. The instrument of transfer shall be signed by both the transferor and transferee, and a copy of the document shall be delivered to the county administrator or a designee for documentation of the change in ownership before it shall become effective.
(g) Accounting of credits. Each time a request to use approved credits is presented to the county, the county shall reduce the amount of the water connection service charge and/or sewer development fees for the type of fee for which the credit is provided, and shall note in the county's records the amount of credit remaining, if any. Upon request of the feepayor or successor in interest to whom the credit was issued, the county shall issue a letter stating the amount of credit remaining.
(h) Credits exceeding fee amounts.
(1) Credits issued for one county capital facilities element may not be used to reduce water connection service charge and/or sewer development fees due for a different capital facilities element, or to reduce water connection service charge and/or sewer development fees in a different service area.
(2) Unless otherwise stated in an agreement with the developer, the county shall be under no obligation to use any county funds - other than water connection service charge and/or sewer development fees paid by other development for the same county capital facility element in the same service area - to reimburse the developer for any amount by which such developer's dedication, construction, funding, or contribution exceeds water connection service charge and/or sewer development fees otherwise due from such developer for any capital facilities element.
(Ord. of 5-19-15) Secs. 75-59—75-99. Reserved.
ARTICLE III. OUTDOOR WATER USE
Sec. 75-100. Definitions.
When used in this section:
Address means the house number (a numeric or alphanumeric designation) that, together with the street name, describes a physical location of a specific property. Even numbered address means a house number ending with the number 0, 2, 4, 6, 8 or no house number, and Odd numbered address means a house number ending with the number 1, 3, 5, 7, or 9.
Declared drought response level means one of four levels of drought that can be declared based on the severity of drought conditions, with one being the least severe and four being the most severe.
(Ord. of 7-20-04(2), § 75-200; Ord. of 10-5-10; Ord. of 12-7-10) Sec. 75-101. Applicability of rule.
These rules apply to any county owned and operated water systems and customers of such, permitted by the Georgia Environmental Protection Division (EPD) for water withdrawal or for operation of a drinking water system in Effingham County.
(Ord. of 7-20-04(2), § 75-201; Ord. of 10-5-10; Ord. of 12-7-10) Sec. 75-102. Outdoor water use schedule during non-drought periods.
(a) (1) Persons may irrigate outdoors daily for purposes of planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants only between the hours of 4:00 p.m. and 10:00 a.m. (12:00 midnight to 10:00 a.m. and 4:00 p.m. to 12:00 midnight).
(2) Paragraph (1) of this section shall not create any limitation upon the following outdoor water uses:
a. Commercial agricultural operations as defined in O.C.G.A. § 1-3-3;
b. Capture and reuse of cooling system condensate or stormwater in compliance with applicable local ordinances and state guidelines;
c. Reuse of gray water in compliance with O.C.G.A. § 31-3-5.2 and applicable local board of health regulations adopted pursuant thereto;
d. Use of reclaimed wastewater by a designated user from a system permitted by the EPD to provide reclaimed wastewater;
e. Irrigation of personal food gardens;
f. Irrigation of new and replanted plant, seed, or turf in landscapes, golf courses, or sports turf fields during installation and for a period of 30 days immediately following the date of installation;
g. Drip irrigation or irrigation using soaker hoses;
h. Handwatering with a hose with automatic cutoff or handheld container;
i. Use of water withdrawn from private water wells or surface water by an owner or operator of property if such well or surface water is on said property;
j. Irrigation of horticultural crops held for sale, resale, or installation;
k. Irrigation of athletic fields, golf courses, or public turf grass recreational areas;
l. Installation, maintenance, or calibration of irrigation systems; or
m. Hydroseeding.
(b) Outdoor water use other than the above listed activities or activities exempt under section 75-104 shall occur only as follows:
(1) Odd-numbered addresses: Outdoor water use is allowed on Tuesdays, Thursdays and Sundays.
(2) Even-numbered addresses: Outdoor water use is allowed on Mondays, Wednesdays and Saturdays.
(Ord. of 7-20-04(2), § 75-202; Ord. of 10-5-10; Ord. of 12-7-10) Sec. 75-103. Outdoor water use schedule during declared drought response levels.
(a) The director of the EPD is authorized to make drought declarations.
(b) During declared drought conditions, outdoor water use other than activities listed in section 75-102 or activities exempted in section 75-104 shall occur only during scheduled hours on the scheduled days.
(c) Declared drought response level one: Outdoor water use may occur on scheduled days within the hours of 12:00 midnight to 10:00 a.m. and 4:00 p.m. to 12:00 midnight.
(1) Scheduled days for odd-numbered addresses are Tuesdays, Thursdays and Sundays.
(2) Scheduled days for even-numbered addresses are Mondays, Wednesdays and Saturdays.
(3) Use of hydrants for any purpose other than firefighting, public health, safety or flushing is prohibited.
(d) Declared drought response level two: Outdoor water use may occur on scheduled days within the hours of 12:00 midnight to 10:00 a.m.
(1) Scheduled days for odd-numbered addresses are Tuesdays, Thursdays and Sundays.
(2) Scheduled days for even-numbered addresses and golf course fairways are Mondays, Wednesdays and Saturdays.
(3) The following uses are prohibited:
a. Using hydrants for any purpose other than firefighting, public health, safety or flushing.
b. Washing hard surfaces, such as streets, gutters, sidewalks and driveways except when necessary for public health and safety.
(e) Declared drought response level three: Outdoor water use may occur on the scheduled day within the hours of 12:00 midnight to 10:00 a.m.
(1) The scheduled day for odd-numbered addresses is Sunday.
(2) The scheduled day for even-numbered addresses and golf course fairways is Saturday.
(3) The following uses are prohibited:
a. Using hydrants for any purpose other than firefighting, public health, safety or flushing.
b. Washing hard surfaces, such as streets, gutters, sidewalks, driveways, except when necessary for public health and safety.
c. Filling installed swimming pods except when necessary for health care or structural integrity.
d. Washing vehicles, such as cars, boats, trailers, motorbikes, airplanes, golf carts.
e. Washing buildings or structures except for immediate fire protection.
f. Non-commercial fundraisers, such as car washes.
g. Using water for ornamental purposes, such as fountains, reflecting pools, and waterfalls except when necessary to support aquatic life.
(f) Declared drought response level four: No outdoor water use is allowed, other than for activities exempted in 391-3-30-.05, or as the EPD director may order.
(Ord. of 7-20-04(2), § 75-203; Ord. of 10-5-10; Ord. of 12-7-10) Sec. 75-104. Exemptions.
(a) This rule shall not apply to the following outdoor water uses:
(1) Capture and reuse of cooling system condensate or stormwater in compliance with applicable local ordinances.
(2) Reuse of gray water in compliance with applicable local ordinances.
(b) The following established landscape water uses are exempt from the outdoor water use schedules of this rule.
(1) Use of reclaimed wastewater by a designated user from a system permitted by EPD to provide reclaimed wastewater.
(2) Irrigation of personal food gardens.
(c) Newly (in place less than 30 days) installed landscapes are subject to the following:
(1) Irrigation of newly installed landscapes is allowed any day of the week, but only during allowed hours for the drought response level in effect, for a period of 30 days following installation. No watering is allowed during drought response level four.
(2) For new landscapes installed by certified or licensed professionals, commercial exemptions apply.
(d) The following golf course outdoor water uses are exempt from the outdoor water use schedules of this rule.
(1) Use of reclaimed wastewater by a designated user from a system permitted by EPD to provide reclaimed wastewater.
(2) Irrigation of fairways during times of non-drought and declared drought response level one.
(3) Irrigation of tees during times of non-drought and declared drought response levels one, two and three.
(4) Irrigation of greens.
(e) The following commercial outdoor water uses are exempt from the outdoor water use schedules of this rule.
(1) Professionally certified or licensed landscapers, golf course contractors, and sports turf landscapers: during installation and 30 days following installation only. Professional landscapers must be certified or licensed for commercial exemptions to apply.
(2) Irrigation contractors: during installation and as needed for proper maintenance and adjustments only.
(3) Sod producers.
(4) Ornamental growers.
(5) Fruit and vegetable growers.
(6) Retail garden centers.
(7) Hydro-seeding.
(8) Power-washing.
(9) Construction sites.
(10) Producers of food and fiber.
(11) Car washes.
(12) Other activities essential to daily business.
(13) Watering-in of pesticides and herbicides.
(Ord. of 7-20-04(2), § 75-205; Ord. of 10-5-10; Ord. of 12-7-10) Secs. 75-105—75-150. Reserved.
ARTICLE IV. WATER AND WASTEWATER SYSTEMS*
DIVISION 1. GENERALLY
Sec. 75-151. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Act or the act means the Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, 33 USC 1251 et seq.
Approval authority means the director of the state environmental protection division.
Authorized representative of nondomestic user means an authorized representative of nondomestic user may be:
(1) If the user is a corporation:
a. The president, secretary, treasurer or a vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision-making functions for the corporation; or
b. The manager of one or more manufacturing, production or operation facilities employing more than 250 persons or having gross annual sales or expenditures exceeding $25,000,000.00 (in second quarter 1980 dollars), if authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.
(2) If the user is a partnership or sole proprietorship: a general partner or proprietor, respectively.
(3) If the user is a federal, state or local government facility: a director or highest official appointed or designated to oversee the operation and performance of the activities of the government facility or his designee.
(4) The individuals described in subsections (1) through (3) of this definition may designate another authorized representative if the authorization is in writing, the authorization specifies the individual or position responsible for the operation of the facility from which the discharge originates or having overall responsibility for environmental matters for the company and the written authorization is submitted to the county water system.
Biochemical oxygen demand (BOD) means the quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedure in five days at 20 degrees Celsius, expressed in milligrams per liter.
Building drain means that part of the piping of a building which collects wastewater inside the walls of the building and conveys it to outside the building walls.
Building sewer means the extension from the building drain to the public sewer or to other places of disposal, also called "house connection."
Cooling water means the water discharged from any use such as air conditioning, cooling or refrigeration or to which the only pollutant added is heat.
County water system means the administrative department within the county government which is responsible for the county water and wastewater systems.
Customer means every person who is responsible for contracting (expressly or implicitly) with the county in obtaining, having or using water or wastewater connections with, or sewer taps to, the county wastewater system and in obtaining, having or using water or other related services furnished by the county for the purpose of disposing of wastewater through such system. The term "customer" shall also include illicit users of the water or wastewater systems.
Department director means the person designated by the county as director of the county water system.
Direct discharge means the discharge of treated or untreated wastewater directly to the waters of the state.
Director of the county health department means the licensed person who has been duly appointed by the county board of health to act as its chief executive officer.
Domestic wastewater means that wastewater discharged into the wastewater system from domestic sources such as toilets, washing machines, dishwashers, sinks, showers and bathtubs from normal household usage.
Easement means any acquired legal right for the specific use of land owned by others.
Environmental Protection Agency or U.S. EPA means the U.S. Environmental Protection Agency, or where appropriate, the term may also be used as a designation for the administrator or other duly authorized official of such agency.
Existing source means any source of discharge, the construction or operation of which commenced prior to publication by the EPA of proposed categorical pretreatment standards, which will be applicable to such source if the standard is thereafter promulgated in accordance with section 307 of the act.
Federal categorical pretreatment standard or federal pretreatment standard means any regulation containing pollutant discharge limits promulgated by the EPA in accordance with section 307(b) and (c) of the act (33 USC 1317) which applies to a specific category of industrial users.
Floatable oil and grease means oil, fat or grease in a physical state such that it will separate by flotation from wastewater by treatment in an approved pretreatment facility or sand and oil/grease interceptor.
Flush toilet means the common sanitary flush commode in general use for the disposal of human excrement.
Garbage means the animal and vegetable waste resulting from the handling, preparation, cooking and serving of foods.
Grab sample means a sample which is taken from a waste stream on a one-time basis with no regard to the flow in the waste stream and without consideration of time.
Grit means matter consisting of sand, gravel, cinders or other heavy solid materials that have settling velocities or specific gravities greater than those of organic putrescible solids normally encountered in domestic wastewater.
Health department means the county board of health.
High strength wastewater means wastewater which contains quantities of specified constituents that exceed the quantities normally encountered in domestic wastewater (see subsection 75-279(a).
High strength wastewater surcharge means the charge made in excess of the normal sewer service charge for all high strength wastewater.
Holding tank waste means any waste from holding tanks such as vessels, chemical toilets, campers, trailers, septic tanks and vacuum-pump tank trucks.
Indirect discharges means the introduction of wastewater into the county wastewater system for treatment and disposal by the county.
Infiltration/inflow means groundwater and surface water which leaks into the wastewater system through cracked pipes, joints, manholes or other openings.
Inflow means water that flows into the wastewater system from the surface, streams, roof drains, downspouts or other such sources.
Interference means the inhibition or disruption of the wastewater treatment processes or operations which contributes to a violation of any requirement of the county's NPDES permit or detrimentally affects the operation of the wastewater treatment processes.
National Pollution Discharge Elimination System (NPDES) permit means a permit issued pursuant to section 402 of the act (33 USC 1342).
Natural outlet means any outlet, including storm sewers, watercourses, ponds, ditches, lakes or other bodies of surface water or groundwater.
New source:
(1) Any building, structure, facility or installation from which there is, or may be, a discharge of pollutants, the construction of which commenced after the publication of proposed pretreatment standards under section 307(c) of the act which may be applicable to such sources if such standards are thereafter promulgated in accordance with that section, provided that:
a. The building, structure, facility or installation is constructed at a site at which no other source is located;
b. The building, structure or installation totally replaces the process or production equipment that causes the discharge of pollutants at an existing source; or
c. The production or wastewater generating processes of the building, structure, facility or installation is subsequently independent of an existing source at the same site. In determining whether these are subsequently independent, factors such as the extent to which the new facility is integrated with the existing plant and the extent to which the new facility is engaged in the general type of activity as the existing source should be considered.
(2) Construction on a site at which an existing source is located results in a modification rather than a new source if construction does not create a new building, structure, facility or installation meeting the criteria of subsection (1)(b) or (c) of this definition but otherwise alters, replaces or adds to existing process or production equipment.
(3) Construction of a new source as defined under this definition has commenced if the owner/operator has:
a. Begun or caused to begin as part of a continuous on-site construction program:
1. Any placement, assembly or installation of facilities or equipment; or
2. Significant site preparation work, including clearing, excavation or removal of existing buildings, structures or facilities which is necessary for the placement, assembly or installation of new source facilities or equipment; or
b. Entered into a binding contractual obligation for the purchase of facilities or equipment which are intended to be used in its operation within a reasonable time. Options to purchase or contracts which can be terminated or modified without substantial loss and contract for feasibility engineering and design studies do not constitute a contractual obligation under this subsection.
Nondomestic user means any user of the county wastewater system who discharges wastewater into the wastewater system from a structure other than a residential unit.
Nondomestic wastewater means the wastewater generated from nondomestic users as distinct from domestic or sanitary wastes.
Pass through means a discharge which exits the POTW into waters of the United States or the waters of the state in quantities or concentrations which alone or in conjunction with a discharge or discharges from other sources is a cause of a violation of any requirement of the county's NPDES permit, including an increase in the magnitude or duration of a violation.
Person means any individual, partnership, co-partnership, firm, company, governmental entity or any other legal entity or their legal representatives, agents or assigns.
pH means the logarithm (base 10) of the reciprocal of the molar concentration of hydrogen ions in solution.
Pit privy means a shored, vertical pit in the earth used for the disposal of human or animal wastes.
Pollutant means any dredge, spoil, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discharged equipment, rock, sand, cellar dirt and industrial, municipal and agricultural waste discharged into water.
Pollution means the manmade or man-induced detrimental alteration of the chemical, physical, biological and radiological integrity of water or soil, or the products which create or cause such alteration.
Pretreatment or treatment means the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutants, or the alteration of the nature of pollutant properties in wastewater to a less harmful state prior to or in lieu of discharging or otherwise introducing such pollutants into the wastewater treatment system. The reduction or alteration can be obtained by physical, chemical or biological processes, or by process changes or other means, except as prohibited by 40 CFR 403.6(d).
Pretreatment requirements means any substantive or procedural requirement related to pretreatment, other than a national pretreatment standard imposed on a nondomestic user.
Prohibited discharge standard means absolute prohibitions against the discharge of certain substances; these prohibitions appear in section 75-271.
Properly shredded garbage means the wastes from the preparation, cooking and dispensing of food that has been shredded to such a degree that all particles will be carried freely under the flow conditions normally prevailing in public sewers, with no particles greater than one-half inch in any dimension.
Publicly owned treatment works (POTW) means a treatment works as defined by section 212 of the act (33 USC 1291) which is owned in this instance by the county. This definition includes any sewers that convey wastewater to the POTW treatment plant, but does not include pipes, sewers or other conveyances not connected to a facility providing treatment. For the purposes of this article "POTW" shall also include any sewers that convey wastewater to the POTW from persons outside the county who are, by contract or agreement with the county, users of the county's POTW.
POTW treatment plant means that portion of the POTW designed to provide treatment to wastewater.
Public sewer means a common sewer controlled by a governmental agency or public utility, in this case, the county.
Sanitary sewer or sewer means a sewer that carries liquid and water-carried wastes from residences, commercial buildings, industrial plants and institutions together with minor quantities of groundwater, storm waters and surface waters that are not admitted intentionally.
Septic tank means a subsurface impervious tank designed to temporarily retain sewage or similar waterborne wastes together with:
(1) A sewer line constructed with solid pipe, with the joints sealed, connecting the impervious tank with a plumbing stub out; and
(2) A subsurface system of trenches, piping and other materials constructed to drain the clarified discharge from the tank and distribute it underground to be absorbed or filtered.
Sewage means the spent water of a community. The equivalent term is "wastewater."
Sewer means a pipe or conduit that carries wastewater.
Sewer development fee means a fee assessed to new users of the county wastewater system to provide the funds necessary to renew, extend and/or improve the system where such renewals, extensions and/or improvements are necessitated by the reduced available wastewater system capacity caused by the new users' demands.
Significant contributing industry means any industry whose discharge meets the following:
(1) Any user discharging greater than 25,000 gallons per average working day of nondomestic wastewater into the county wastewater system;
(2) Any user who contributes five percent or more of the hydraulic or organic loading to a
POTW;
(3) Any user who discharges wastewater that violates any of the prohibited discharges in section 75-271 or who is believed by the county to discharge wastewater that violates any of the aforementioned prohibited discharges;
(4) Or who is subject to any Federal Categorical Pretreatment Standard. Upon finding that an industrial user meeting this criteria has no reasonable potential for adversely affecting any part of a water system POTW's operation or for violating any pretreat-ment standard or requirement, the water system may at any time on its own initiative or in response to a petition from an industrial user or POTW and in accordance with 40 CFR 403.8(f)(6) determine that such industrial user is not a significant industry.
(5) Or any user which would be a "significant industrial user" as defined in 40 CFR 403.3(t).
Sludge means the semisolid, putrid materials removed from wastewater by the action of settling or air flotation, consisting of feces, paunch, sand, gravel, mud, paper, cloth, shredded garbage, blood and other solid materials as normally removed through primary wastewater treatment, including septic tanks.
Slug means any discharge at a flow rate or concentration which could cause a violation of the prohibited discharge standards in section 75-271 or 75-272.
Standard industrial classification (SIC) means a classification pursuant to the Standard Industrial Classification Manual issued by the Executive Office of the President, Office of Management and Budget, 1972, as amended.
Storm drain, sometimes termed storm sewer, means a drain or sewer for conveying surface water, groundwater, subsurface water or unpolluted water from any source.
Storm water means any flow occurring during or following any form of natural precipitation and resulting therefore.
Surcharge means a separate charge by the county for the handling and treatment of high strength wastewater.
Suspended solids or total suspended solids or TSS means the total suspended matter that either floats on the surface of, or is in suspension in, water, wastewater or other liquids, and that is removable by laboratory filtering as prescribed in Standard Methods for the Examination of Water and Wastewater and referred to as nonfilterable residue.
Toxic pollutant means any pollutant or combination of pollutants listed as toxic in regulations promulgated by the administrator of the Environmental Protection Agency (EPA) under the provision of CWA 307(1) or other acts.
Unpolluted water means water of quality equal to or better than the effluent criteria in effect or water that would not cause violation of receiving water quality standards and would not be benefited by discharge to the sanitary sewers and wastewater treatment facilities.
User means any person who consumes water from the county water system or who contributes, causes or permits the contribution of wastewater into the county wastewater system.
Wastewater means the spent water of a community, including liquid and water-carried wastes and sewage from residences, commercial buildings, industrial plants and institutions, treated or untreated, together with any groundwater, surface water and stormwater that may be present.
Wastewater facilities means the structures, equipment and processes required to collect, carry away and treat domestic and nondomestic wastewaters and to dispose of the effluent.
Wastewater system or county wastewater system means the total wastewater disposal facilities owned and operated by the county. Also the administrative framework which operates the facilities.
Water and wastewater systems or county water and wastewater systems means the total county water system and county wastewater system considered in the aggregate as a whole.
Water system or county water system means the total water distribution facilities owned and operated by the county.
Watercourse means a natural or artificial channel for the passage of water, either continuously or intermittently.
Waters of the state means all streams, lakes, ponds, marshes, watercourses, waterways, wells, springs, reservoirs, aquifers, irrigation systems, drainage systems and all other bodies or accumulations of water, surface or underground, natural or artificial, public or private, which are contained within, flow through or border upon the state or any portion of the state.
(Ord. of 8-2-05, § 1-1) Sec. 75-152. Abbreviations.
The following abbreviations shall have the designated meanings:
BOD biochemical oxygen demand CFR Code of Federal Regulations COD Chemical oxygen demand CWA Clean Water Act EPA Environmental Protection Agency, U.S.
l liter mg milligram mg/l milligrams per liter NPDES National Pollutant Discharge Elimination System O & M Operation and maintenance OSHA Occupational Safety and Health Administration POTW Publicly owned treatment works psi Pounds per square inch SIC Standard Industrial Classification TSS total suspended solids USC United States Code VOC volatile organic compound (Ord. of 8-2-05, § 1-101) Sec. 75-153. Purpose and policy.
(a) Generally. This article regulates the use of the county water and wastewater systems.
(b) Compliance with state and federal water pollution control laws. This article sets forth uniform requirements for persons who cause wastewater to be discharged into the wastewater collection and treatment system of the county and enables the county to comply with all applicable state and federal laws required by the Clean Water Act of 1977, as amended and the General Pretreatment Regulations (40 CFR 403), as amended.
(c) Objectives. The federally mandated objectives of this article are to:
(1) Prevent the introduction of pollutants into the county wastewater system which will interfere with the operation of the system or contaminate the resulting sludge;
(2) Prevent the introduction of pollutants into the county wastewater system which will pass through the system, inadequately treated, into receiving waters or the atmosphere, or otherwise be incompatible with the system;
(3) Improve the opportunity to recycle and reclaim wastewater and sludge from the system; and
(4) Provide for the equitable distribution of the cost of the county wastewater system.
This article provides for the regulation of persons who cause wastewater to be discharged into the county wastewater system through the issuance of permits to certain non-domestic users and through enforcement activities, requires user reporting, assumes that existing customers' capacity will not be preempted and provides for the setting of fees for the equitable distribution of costs resulting from the operation and maintenance of the water and wastewater systems.
(d) Applicability. This article shall apply to the residents of the county and to all users of the county water and wastewater systems, including persons outside the county who are, by contract or agreement with the county, users of the county water or wastewater systems.
Except as otherwise provided in this article the county water system director or his agent shall administer, implement and enforce the provisions of the article.
(Ord. of 8-20-07, § 1-2) Sec. 75-154. Contracts for water and wastewater service.
The county and the board of county commissioners shall be expressly authorized and empowered to contract for a period not exceeding 50 years with any public agency, public corporation, city, town, county or authority, and they with the county, for water, sewer or other activities and transactions as such subdivisions are by law authorized, and any and all contracts concerning water and sewage heretofore so entered into by the county and the board of county commissioners thereof are expressly ratified and approved. That contract may be extended for an additional period if changes in the law occur during the contract running period. This authorization shall be cumulative of all other powers authorized and delegated to the county, the board of commissioners of the county and other governmental subdivisions, cities, towns and counties by other laws of whatever kind and nature, and this enactment shall not limit or restrict such power or authority in any way.
(Ord. of 8-20-07, § 1-3) Secs. 75-155—75-165. Reserved.
DIVISION 2. ENFORCEMENT
Sec. 75-166. Violations.
(a) General. The failure of any person to comply with any provision contained in this article shall be a violation which shall be enforced in accordance with the penalties and provisions as set forth in this division.
(b) Discharge violations. Any violation of the wastewater discharge prohibitions set forth in section 75-271 or violations of the conditions contained in a discharge permit issued by the county pursuant to section 75-274 shall be enforced as follows:
(1) Major violations, defined. Major violations shall be defined as follows:
a. The discharge by any user of a concentration greater than 1.4 times the allowable limit as set forth in this article, or a county-issued wastewater discharge permit, for BOD, TSS, ammonia, total phosphorus of 24-hour composite sample or oil and grease on a grab sample.
b. The discharge by any user of a concentration greater than 1.2 times the allowable limit as set forth in this article, or a county-issued discharge permit, for all regulated parameters other than those shown in subsection (b)(1)a of this section on a 24-hour composite sample.
c. Any discharge that exceeds the pH limit.
d. Any other discharge violation that the water system believes has caused, alone or in combination with other discharges, interference or pass through, including endangering the health of POTW personnel or the general public.
e. Failure to meet, within 90 days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction or attaining final compliance.
f. Any discharge of pollutants that has caused imminent endangerment to the public or to the environment or has resulted in the department director's exercise of his emergency authority to halt or prevent such a discharge.
g. Failure to provide within 30 days of the due date any required reports, including baseline monitoring reports, reports on compliance with categorical pretreatment, standard deadlines, periodic self-monitoring reports and reports on compliance with compliance schedules.
h. Failure to accurately report noncompliance.
i. Any other violations which the water system determines will adversely affect the operation or implementation of the local pretreatment program.
j. Any consecutive series of four minor violations.
k. Any significant violation as defined by 40 CFR 403.8(f)(2)(vii) shall also be considered a major violation.
(2) Major violations, enforced.
a. Major violations may be enforced in accordance with any of the provisions set forth subsequently in this division.
b. The water system shall publish annually in the largest daily county newspaper a list of users found in major violation and the enforcement action taken during the previous 12-month period.
(3) Minor violations, defined. Minor violations shall be defined as any wastewater discharge violation which is not a major violation, as defined in subsection (b)(1) of this section.
(4) Minor violations, enforced. Minor violations shall be enforced by written warning only.
The county shall provide written notice to the party in violation stating the nature of the violation and any other pertinent information regarding the violation or the need for corrective action.
(Ord. of 8-20-05, § 2-1) Sec. 75-167. Notice of violation.
(a) When the department director finds that a user has violated any provision of this article, a wastewater permit or order issued pursuant to this article or any other pretreatment standard or requirement, the department director may serve upon that user a written notice of violation. Within 15 days of the receipt of this notice, an explanation of the violation and a plan for the satisfactory correction and prevention thereof, to include specific actions, shall be submitted by the user to the department director. Submission of this plan in no way relieves the user of liability for any violations occurring before or after receipt of the notice of violation.
Nothing in this section shall limit the authority of the department director to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation. The offender shall, within the period of time stated in such notice, permanently cease all violation.
(b) Written notice personally delivered or placed in the U.S. mail to the person's last known address shall be deemed sufficient notice under this section. However, with respect to violations regarding nonpayment of amounts due under this article, only notice mailed to the person's last known address of the amount owed and the date upon which payment is due shall be required. Additionally, there shall be no prior notice requirement for violations of water use restrictions duly published in accordance with section 75-191.
(c) Repeat violations within a 12-month period shall be enforced in any manner subsequently described in this division or by any combination thereof.
(Ord. of 8-20-05, § 2-2) Sec. 75-168. Consent orders.
The department director may enter into consent orders, assurances of voluntary compliance or other documents establishing an agreement with any user responsible for noncompliance.
Such documents will include a specific action to be taken by the user to correct the noncompliance within a specific time period specified by the document. Such documents shall have the same force and effect as administrative orders issued pursuant to section 2-5 and shall be judicially enforced.
(Ord. of 8-20-05, § 2-3) Sec. 75-169. Show cause hearing.
The department director may order any user who violates any provisions of this article or who causes or allows an unauthorized discharge to show cause before the department director as to why a particular proposed enforcement action should not be taken. A notice shall be served on the user specifying the time and place of a hearing, to be held by the department director or his designee, regarding the violation, the reasons why the action is to be taken, the proposed enforcement actions and directing the user to show cause before the department director why the proposed enforcement action should not be taken. The notice of the hearing shall be served personally or by registered or certified mail, return receipt requested, not less than ten days before the hearing date. Service may be made on any agent, officer or person in responsible charge of a corporation.
(Ord. of 8-20-05, § 2-4) Sec. 75-170. Administrative orders and penalty.
(a) Compliance or administrative orders. When it is found that an industrial user has violated or continues to violate this article, or a permit or an order issued thereunder, the water system may issue an order to the industrial user responsible for the discharge directing that, following a specific time period, sewer service shall be discontinued unless adequate treatment facilities, devices or other related appurtenances have been installed and are properly operated. Orders may also contain such other requirements as might be reasonably necessary and appropriate to address the noncompliance, including the installation of pretreatment technology, additional self-monitoring and management practices.
(b) Cease and desist orders. When it is found that an industrial user has violated or continues to violate this article or a permit or order issued thereunder, the department director may issue an order to cease and desist all such violations and direct those persons in noncompliance to:
(1) Comply forthwith; and
(2) Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and terminating the discharge.
(c) Penalty. Notwithstanding any other section of this article, any user who is found to have violated any provision of this article or permits and orders issued pursuant to this article shall be fined in an amount not to exceed $1,000.00 per violation. Each day on which noncompliance shall occur or continue shall be deemed a separate and distinct violation. Such assessments may be added to the user's next scheduled sewer charge and the water system shall have such other collection remedies as necessary to collect these and other service charges. Unpaid charges, fines and penalties shall constitute a lien against the individual's property. Industrial users desiring to dispute such fines must file a request for the director to reconsider the fine within ten days of being notified of the fine. Where the water system director believes a request has merit, he shall convene a hearing on the matter within 15 days of receiving the request from the industrial user.
(Ord. of 8-20-05, § 2-5) Sec. 75-171. Revocation of permit.
(a) County discharge permits issued in accordance with the provisions of this article may be suspended, revoked or denied for any of the violations set forth in subsection 75-274(h)(2).
(b) In addition to the provisions set forth in subsection 75-274(h)(2), conditions resulting in termination of service may include but not be limited to:
(1) Violation of wastewater discharge permit conditions;
(2) Failure to accurately report the wastewater constituents and characteristics of its discharge;
(3) Failure to report significant changes in operation or wastewater volume constituents, and characteristics prior to discharge;
(4) Refusal of reasonable access to the user's premises for the purposes of inspection, monitoring or sampling; or
(5) Violation of pretreatment standards in division 6 of this article.
Where this action does not conflict with section 75-177, such user will be notified of the proposed termination of its discharge and be offered an opportunity to show cause under section 75-169 why the proposed action should not be taken. Exercise of this option by the department director shall not be a bar to, or be a prerequisite for, taking other actions against the user.
(Ord. of 8-20-05, § 2-6) Sec. 75-172. Termination of service; lien created by nonpayment of amounts due;
interest on amounts due.
In order to enforce the operation of this article, the county shall have the power and authority to enter upon the property of any user who has violated any provision of this article following due notice of the violation, as provided in section 75-167, to terminate the user's water and/or wastewater service in any manner deemed necessary and appropriate by the county. In the event of such termination under this section, the county shall retain all rights to collect unpaid bills or amounts owed by the terminated user according to law or other provisions of this article. Such rates or charges, if not paid when due, shall constitute a lien upon the premises served. Past due amounts shall bear interest at the same rate as would unpaid ad valorem taxes.
(Ord. of 8-20-05, § 2-7) Sec. 75-173. Civil liabilities and penalties.
(a) Any person violating the provisions of this article, discharge permit, federal or state pretreatment requirements or any order of the county board of commissioners shall be liable to the county for a maximum civil penalty under O.C.G.A. § 36-1-20 of $1,000.00 per violation per day. In the case of monthly or other longterm average discharge limit, penalties shall accrue for each day during the period of the violation.
(b) The department director may recover reasonable attorneys' fees, court costs and other expenses associated with enforcement activities, including sampling and monitoring expenses and the cost of actual damages incurred by the county.
(c) In determining the amount of civil liability, the court shall take into account all relevant circumstances including, but not limited to, extent of harm caused by the violation, the magnitude and duration of the violation, any economic benefit gained through the user's violation, corrective actions by the user, the compliance history of the user and any other factor as justice requires.
(d) Filing a suit for civil penalties shall not be a bar against, or a perquisite for, taking any other action against a user.
(Ord. of 8-20-05, § 2-8) Sec. 75-174. Injunctive relief.
When the department director finds that a user has violated or continues to violate any provisions of this article, a wastewater discharge permit or any order issued pursuant to this article or any other pretreatment standard or requirement, the department director may petition the appropriate superior court of jurisdiction through the county attorney for issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the wastewater discharge permit, order or other requirement imposed by this article on activities of the user. The water system director may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against a user.
(Ord. of 8-20-05, § 2-9) Sec. 75-175. Criminal penalties.
(a) A user who willfully or negligently violates, or continues to violate, any provision of this article, discharge permit or order issued pursuant to this article, or any other pretreatment standard or requirement shall upon conviction be guilty of a misdemeanor, punishable by a fine of not more than $1,000.00 per violation per day or imprisonment for not more than six months, or both.
(b) A user who willfully or negligently introduces any substance into the POTW which causes personal injury or property damage shall upon conviction be guilty of a misdemeanor and subject to a penalty of at least $1,000.00, or be subject to imprisonment for not more than six months, or both. This penalty shall be in addition to any other cause of action for personal injury or property damage available under state law.
(c) A user who knowingly makes any false statements, representations or certifications in any application, record, report, plan or other documentation filed, or required to be maintained, pursuant to this article, wastewater discharge permit or order issued pursuant to this article or who falsifies, tampers with or knowingly renders inaccurate any monitoring device or method required under this article shall upon conviction be punished by a fine of not more than $1,000.00 per violation per day, or six months' imprisonment, or both.
(d) In the event of a second conviction, a user shall be punished by a fine of not more that $1,000.00 per violation per day, or imprisonment for six months, or both.
(Ord. of 8-20-05, § 2-10) Sec. 75-176. Other enforcement and penalty provisions.
Other enforcement and penalty provisions contained in this article are as follows:
(1) Subsection 75-251(a) prohibits unauthorized water or sewer connections, punishable by a fine of up to $500.00 or six months' imprisonment for each offense.
(2) Subsection 75-251(c) makes it unlawful to maliciously, willfully or negligently break, damage, destroy, uncover, deface or tamper with water or wastewater facilities, punishable by a fine of up to $500.00 or six months' imprisonment for each offense.
(3) Subsection 75-251(b) provides that anyone damaging a water meter or meter box shall be liable for the cost of the damage or punished by a fine of up to $500.00 or six months' imprisonment for each offense.
(4) Section 75-284 provides for the revocation of holding tank haulers permits for the failure to pay for services rendered.
(5) Subsection 75-201(e) provides for the disconnection of water service for failure to pay service charges as they become due.
(6) Section 75-328 makes it unlawful to cause the deposition of pollution into or onto the streams, drainage ditches or soil of the county, punishable by a fine of up to $500.00 per day.
(Ord. of 8-20-05, § 2-11) Sec. 75-177. Enforcement actions cumulative.
Except as otherwise provided, all of the enforcement provisions set forth in this article are cumulative to any other enforcement procedures or remedies which may be available to the county either by local or state law or by this article.
(Ord. of 8-20-05, § 2-12) Sec. 75-178. Authority of department director to halt or prevent discharge of dangerous pollutants.
Nothing in this article shall restrain the department director from having the necessary authority and procedures, after informal notice to the discharger, to immediately effectively halt or prevent any discharge which reasonably appears to present imminent endangerment to the health or welfare of the public or wastewater treatment and collection personnel.
(Ord. of 8-20-05, § 2-13) Sec. 75-179. Affirmative defenses to discharge violations.
(a) For the purposes of this section, "upset" means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance or careless or improper operation.
(b) An upset shall constitute an affirmative defense to an action brought for noncompliance with categorical pretreatment standards if the requirements of subsection (c) of this section are met.
(c) A user who wishes to establish the affirmative defense of upset shall demonstrate through properly signed contemporaneous operating logs or other relevant evidence that:
(1) An upset occurred and the user can identify the causes of the upset.
(2) The facility was at the time being operated in a prudent and workmanlike manner and in compliance with applicable operation and maintenance procedures.
(3) The user has submitted the following information to the director within 24 hours of becoming aware of the upset (if this information is provided orally, a written submission must be provided within five days):
a. A description of the indirect discharge and cause of noncompliance;
b. The period of noncompliance, including exact dates and times, or if not corrected, the anticipated time the noncompliance is expected to continue; and
c. Steps being taken and/or planned to reduce, eliminate and prevent recurrence of the noncompliance.
(4) In any enforcement proceeding, the user seeking to establish the occurrence of an upset shall bear the burden of proof.
(5) Users will have the opportunity for a judicial determination on any claim upset only in an enforcement action brought for noncompliance with categorical pretreatment standards.
(6) Users shall control production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards upon reduction, loss or failure of its treatment facility until the facility is restored or an alternative method of treatment is provided. This requirement applies in the situation where, among other things, the primary source of power of the treatment facility is reduced, is lost or fails.
(7) Prohibited discharge standards. A user shall have an affirmative defense to an enforcement action brought against it for noncompliance with the general prohibitions in subsection 75-271(a) if it can prove that it did not know or have reason to know that its discharge, alone or in conjunction with discharges from other sources, would cause pass through or interference and that either:
a. A local limit exists for each pollutant discharge and the user was in compliance with each limit directly prior to and during the pass through or interference; or
b. No local limit exists, but the discharge did not change substantially in nature or constituents from the user's prior discharge when the county was regularly in compliance with NPDES permit and, in the case of interference, was in compliance with applicable sludge use or disposal requirements.
(Ord. of 8-20-05, § 2-14) Sec. 75-180. Bypassing.
(a) Definitions. For the purposes of this section:
Bypass means the intentional diversion of wastestreams from any portion of a user's treatment facility.
Severe property damage means substantial physical damage to property, damage to treatment facilities which cause them to be inoperable, substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.
(b) Bypass that does not violate applicable pretreatment standards. An industrial user may allow any bypass to occur which does not cause pretreatment standards or requirements to be violated, but only if it is also for essential maintenance to assure efficient operation. These bypasses are not subject to the provisions of subsections (c) and (d) of this section.
(c) Notice.
(1) If the permittee knows in advance of the need for a bypass, he shall submit prior notice to the county, if possible, at least ten days before the date of the bypass.
(2) The permittee shall submit oral notice of an unanticipated bypass that exceeds applicable pretreatment standards to the county within 24 hours from the time that the permittee first becomes aware of the bypass. A written submission shall also be provided within five days of the time the industrial user first becomes aware of the bypass. The written submission shall contain a description of the bypass and its causes; the duration of the bypass, including exact dates and times; if the bypass has not been corrected, the anticipated time it is expected to continue; and the steps taken or planned to reduce, eliminate and prevent reoccurrence of the bypass. The county may waive the written report requirement on a case-by-case basis if the oral report has been received within 24 hours.
(d) Prohibition of bypass. Bypass is prohibited and the county may take enforcement action against the permittee for a bypass unless:
(1) Bypass is unavoidable to prevent the loss of life, personnel injury or severe property damage;
(2) There is no feasible alternative to bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes or maintenance during normal periods of equipment downtime or preventive maintenance; and
(3) The permittee submitted notices as required under subsection (c) of this section.
(e) County approval. The county may approve an anticipated bypass, after considering its adverse effects, if the county determines that it will meet the three conditions listed in subsection (d) of this section.
(Ord. of 8-20-05, § 2-15) Sec. 75-181. Supplemental enforcement remedies.
(a) Performance bonds. The water system may decline to reissue a permit to any industrial user which has failed to comply with the provisions of this article or any other order or previous permit issued pursuant to this article unless such user first files with it a satisfactory bond payable to the water system in a sum not to exceed a value determined by the water system to be necessary to achieve consistent compliance.
(b) Liability insurance. The water system may decline to reissue a permit to any industrial user which has failed to comply with the provisions of this article or any order or previous permit issued pursuant to this article, unless the industrial user first submits proof that it has obtained financial assurances sufficient to restore or repair POTW damage caused by its discharge.
(c) Informant rewards. The water system is authorized to pay up to $500.00 for information leading to the discovery of noncompliance by an industrial user. If the information provided results in an administrative fine or civil penalty levied against the user, the water system is authorized to disperse up to ten percent of the collected fine or penalty to the informant.
However, a single reward payment may not exceed $10,000.00.
(Ord. of 8-20-05, § 2-16) Sec. 75-182. Right to enter premises, permitted activities on utility easements.
(a) Duly authorized employees and representatives of the county and authorized representatives of applicable federal and state regulatory agencies bearing proper credentials and identification shall be allowed to enter all properties for the purpose of inspection, observation, measurement, sampling, monitoring, testing and examination and copying of records pertinent to discharges to the county wastewater system in accordance with the provisions of this article. The county may, but is not required to, provide the user with prior notice of the entry.
(b) Duly authorized employees and representatives of the county bearing proper credentials and identification shall be permitted to enter all private properties through which the county holds a utility easement for the purposes of, but not limited to, inspection, observation, measurement, sampling, repair and maintenance of any portion of the water or wastewater facilities lying within such easement. All entry and subsequent work, if any, on such easement shall be done in full accord with the terms of the utility easement pertaining to the private property involved.
(Ord. of 8-20-05, § 2-17) Sec. 75-183. Right to obtain information.
Duly authorized employees and representatives of the county are authorized to obtain information concerning character, strength and quantity of nondomestic wastewater which may have a direct bearing on the kind and source of discharge to the county wastewater system.
(Ord. of 8-20-05, § 2-18) Sec. 75-184. Search warrants.
If the department director or his agents have been refused access to a building, structure or property, or any part thereof, and are able to demonstrate probable cause to believe that there may be a violation of this article, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program of the county designed to verify compliance with this article or any permit or order issued pursuant to this article or to protect the overall public health, safety and welfare of the community, then the department director may seek issuance of a search warrant from the magistrate's court of the county or discontinue service.
(Ord. of 8-20-05, § 2-19) Sec. 75-190. Safety rules.
While performing the necessary work on private properties referred to in this article, the duly authorized employees or representatives of the county shall observe all reasonable safety rules.
(Ord. of 8-20-05, § 2-20) Sec. 75-191. Right to curtail water usage during emergency conditions.
(a) Authority. The county chairman, with the authorization of the board of commissioners, is empowered to implement special water conservation measures during emergency conditions. The type, nature, degree, penalty, commencement and duration of any restrictions or prohibitions are to be determined by the county chairman and approved by the board of commissioners.
(b) Emergency conditions. For the purposes of this section only, emergency conditions shall include, but not be limited to times of drought, low stream flows, interruptions in the water supply from water suppliers, excessive losses or demands in the distribution system due to breaks, fires or other causes, contamination in the finished water, or any other purpose for which the curtailed use of water might be reasonably required in the best interest of public health, safety and welfare as determined by the county chairman.
(c) Restrictions. The water conservation measures may include restrictions or prohibitions on nonessential uses such as swimming pool filling, watering of lawns and gardens, washing of recreational or other vehicles, equipment, sidewalks, driveways, parking areas, tennis courts, patios and other paved areas, recreational uses, and other uses which the county chairman may deem to be nonessential.
(d) Notice. A notice of the restrictions or prohibitions imposed under this section shall be published in the county organ in a non-legal section. The notice shall set forth the specific nature of the restrictions or prohibitions, the reasons for the imposition of the restrictions or prohibitions, the date upon which the restrictions or prohibitions become effective, and their duration. The restrictions and prohibitions shall become effective no sooner than the first day following the publication date of the first notice. The notice shall be published once a month while the restrictions and prohibitions are in effect.
(e) Administrative surcharges for unauthorized use.
(1) If after an initial, written notice is posted by a Effingham County Utilities Department (ECUD) representative at the property where the violation of any of the provisions of this section occurred, then upon a subsequent violation that occurs after such violation, the owner or occupant receiving ECUD service will be subject to surcharges for unauthorized use of water and/or unauthorized use of service pursuant to subsection 75-204(k) on a schedule approved by the board of commissioners.
(2) Exercise of this option shall not be a bar to, or be a prerequisite for, taking other criminal and alternative actions permitted under this division.
(3) Any surcharges imposed pursuant to this section may, at the discretion of the issuing authority under extraordinary circumstances, be waived or reduced.
(4) Any surcharges imposed pursuant to this section shall be payable to the ECUD shall commence on the date of issuance of any notice of noncompliance, and shall not be affected by the filing of any appeal.
(Ord. of 8-20-05, § 2-21) Secs. 75-192—75-200. Reserved.
DIVISION 3. FEES AND CHARGES
Sec. 75-201. Service charges and fees generally.
(a) Purpose. It is the purpose of this division to establish a fee mechanism whereby the users of various county water and wastewater system services are charged for those services in an amount established by the county as being necessary to provide adequate financial support for the water and wastewater systems.
(b) Actual rates published separately. The actual rates charged by the county for the water and wastewater system services provided shall be as set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the county clerk.
(c) Changes in rates. The rates charged by the county for water and wastewater system services shall be revised from time to time by the board of commissioners.
(d) Method of calculating charge for multiple units on a single meter. The service charges to owners of buildings containing two or more family dwelling units or an integrated complex of buildings containing same, who have elected to use a single water meter to service such units in accordance with subsection 75-252(f), shall be as set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the county clerk.
(e) When service charges payable; disconnection of service for failure to pay. The payment of the sum due shall be made monthly or at such other time as indicated by the county in accordance with a statement setting forth the amount due. Payment for water, sewer, and/or reuse consumption from the prior month shall be made on or before the 25th day of the month, and shall be in default if not paid on or before the 25th day of the month. Failure to receive notice of the amount due shall in no way relieve the customer, or owner of the property served, from making payment as provided in this section. Should any customer, including the owner of the property, receiving water or wastewater service fail to pay any sum due pursuant to this section, the water service may be disconnected, in accordance with policies adopted by the board of commissioners, until such sums, with penalties as provided in this article, are paid in full. See section 75-172.
(f) Reconnection charge when water service interrupted for failure to pay service charge.
Upon the failure of any customer receiving water or wastewater service to make payment, the water service may be disconnected, and in that event a reconnection charge shall be assessed and collected prior to restoration of service. An additional service charge shall be imposed for restoration of service after normal working hours.
(Ord. of 8-20-05, § 2-41; Ord. of 6-16-09; Ord. of 12-7-10; Ord. of 5-6-14) Sec. 75-202. Wastewater system fees.
(a) Sewer development fee. There is hereby levied and assessed a sewer development fee for making connections to the county wastewater system. All amounts charged for wastewater connections shall be assessed to the owners of the property being connected, and such connection shall not be lawfully made prior to payment of such charges.
(b) Wastewater service charge for usage. There are hereby levied and assessed rates, fees and/or charges for the service, maintenance, operation and amortization of the county wastewater systems, based on the amount of water consumed per month by each customer for whom wastewater service is available from the county. See the definition of "sewer availability" as set forth in section 75-324 of this article. The charges for having service available shall be as set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the county clerk.
(c) Surcharge for high strength wastewater. See section 75-280.
(d) Exceptions to rule that wastewater service charge for usage be based on water consumed.
(1) Wastewater retained by significant contributing industries. Provision is made in subsection 75-280(d) for significant contributing industries to have wastewater service charges based on quantities of wastewater generated which are different than the quantities of water consumed, as metered. Significant contributing industries may have wastewater quantities for billing purposes of less than the metered water consumed due to "retainage" by following the procedures set forth in subsection 75-280(d).
(2) Increased wastewater flows due to inflow. Significant contributing industries who discharge polluted surface drainage into the county wastewater system shall be assessed a charge for the treatment thereof. The quantity of surface runoff to be assessed in this instance shall be determined by an independent registered engineer acceptable to the county.
(3) Discharge exceeding consumption. Where it can be shown that the volume of wastewater discharged is greater than the volume consumed through the water meter, wastewater charges may, at the county's discretion, be billed based on wastewater volumes.
(e) Special charges for non-domestic users. The county may adopt charges and fees relative to the non-domestic user program as necessary, to include the following:
(1) Fees for reimbursement of costs of setting up and operating the county's pretreatment program;
(2) Fees for monitoring, inspection and surveillance procedures;
(3) Fees for reviewing accidental discharge procedures and construction;
(4) Fees for permit applications;
(5) Fees for filing appeals;
(6) Fees for consistent removal by the county of pollutants otherwise subject to federal pretreatment standards; and
(7) Other fees as the county may deem necessary to carry out the requirements of the nondomestic users' program.
These fees relate solely to the matters covered by this subsection and are separate from all other fees chargeable by the county.
(f) Holding tank (including septic tank) haulers and discharges.
(1) A fee may be charged for the permitting of holding tank waste haulers as provided in section 75-284.
(2) A fee shall be established for the disposal of the contents of holding tanks into the county wastewater system as set forth in section 75-284.
(Ord. of 8-20-05, § 2-42; Ord. of 6-16-09; Ord. of 12-7-10) Sec. 75-203. Water system fees.
(a) Water connection service charge. There is hereby levied and assessed a service charge for making connections to the county water system. All amounts charged for water connections pursuant to this article shall be assessed to the owners of the property being connected, and such charges shall be collected prior to the making of such connection. Water connection assessments shall be as set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the county clerk.
(b) Water service charge for usage. There are hereby levied and assessed rates, fees and/or charges for the service, maintenance, operation and amortization of the county water system, based on the amount of water consumed per month by each customer receiving water from the county. The schedule for usage service charges shall be as set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the county clerk.
(c) Fire service charge. A separate charge for fire service may be established for varying sizes of water meters or fire line diameters.
(Ord. of 8-20-05, § 2-42; Ord. of 6-16-09; Ord. of 12-7-10) Sec. 75-204. Miscellaneous charges.
(a) Delinquent billed accounts. All billed accounts are due and payable on the date as described in subsection 75-201(e). Billed accounts not paid by due date are delinquent, and service may be disconnected by the county and/or a service charge added to the account. This delinquent service charge is also applicable to each service call to discontinue service for delinquent accounts. The customer shall be charged for the service call even if the service is not disconnected. Also, see section 75-172.
(b) Service calls. Customer service calls may be charged to the customer requesting the service in accordance with the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the county clerk. An additional service charge shall be imposed for restoration of service after normal working hours. No payments on accounts will be accepted in the field.
(c) New customer service. Service charges shall be levied for the following new customer service:
(1) Regular water service turn-on, within three workdays after application.
(2) Emergency water service turn-on.
(3) Temporary service; a service charge, as set forth in the fee schedule adopted by the board of commissioners and on file in the office of the county clerk, will be charged to water and/or wastewater system users who wish to have temporary service for up to ten working days (two calendar weeks). There shall be an administrative fee, and charges for usage shall be at the regular residential or commercial/industrial rates for water and/or sewer as applicable.
(d) Meter reinstallation due to nonpayment or failure to apply for service. A service charge to reinstall a meter shall be levied.
(e) Meter replacement, damaged. A charge will be made to replace a meter which has been damaged or frozen, or has in any way been made inoperative. This includes the service call.
The damaged meter must be returned. Also see subsection 75-251(c).
(f) Meter missing or stolen, replacement. The current cost of a new meter, box and/or MXU (radio read device) must be paid when a meter is missing or stolen.
(g) Miscellaneous service calls. Service calls to uncover meters, raise meters where the yard has been back-filled or landscaped, or repair meter boxes or meter connections will be billed at county cost.
(h) Returned checks. A processing fee as established by the county board of commissioners will be charged for returned checks. If water service has been discontinued as a result of the returned check, the services in subsections (a) and (d) of this section will also apply.
(i) Failure to apply for service. A fee will be charged to water and/or wastewater system users who have not properly applied for service in their own name within 30 days of change of ownership or occupancy (including initial occupancy). A separate fee shall be charged for each trip made by the county in an effort to have the customer properly and successfully apply for service, and/or service may be disconnected by the county. Payment must be made by the applicant for all water and wastewater services utilized subsequent to the former customer discontinuing service.
(j) Water and wastewater deposits. A deposit, which includes a $25.00 administrative fee, is required on all accounts prior to the time water and/or wastewater service is connected. This deposit shall be as set forth in the water and sewer fee schedule adopted by the board of commissioners and on file in the office of the county clerk. The deposit amount shall be increased to triple the average bill for the last 12 months if service is disconnected, and the new deposit amount must be funded prior to restoration of service. The deposit, but not the administrative fee, shall be held for two years, after which it shall be refunded to owners with a good payment history (defined as no more than two late payments). Renters will be refunded the deposit, less the administrative fee and any unpaid balance, only upon termination of service. Customers requesting the transfer of service from one location to another shall not be required to post an additional deposit, provided that service at the former location is disconnected within one month from establishing service at the new location.
(k) Unauthorized connection or usage. The county shall establish fees to be charged for unauthorized water or wastewater system connections and also establish separate fees for the unauthorized use of county water or wastewater system services. Also see section 75-251.
(Ord. of 8-20-05, § 2-44; Ord. of 6-16-09; Ord. of 12-7-10; Ord. of 5-6-14) Sec. 75-205. Charges for fire hydrant meter.
The following charges shall be levied for the use of a fire hydrant meter as provided in subsection 75-252(d):
(1) A deposit payable at the time the meter is picked up.
(2) A service charge for processing the meter rental.
(3) A charge for the water used.
(4) Cost for all damages to meter due to user's negligence.
(5) Monthly rental fee; charges 1, 2, and 3 above shall be as set forth in the water, sewer, and re-use fee schedule adopted by the board of commissioners and on file in the office of the county clerk. The customer shall be billed for charges 1—4 above when the meter is returned for refund on deposit, or on a monthly basis if the deposit is expended, whichever occurs first. The maximum rental period shall be six months.
(Ord. of 8-20-05, § 2-45; Ord. of 6-16-09; Ord. of 12-7-10; Ord. of 5-6-14) Sec. 75-206. Fire service charge.
(a) General. A fee shall be levied to all county water system customers who have fire service meters installed in accordance with section 75-239 or who have non-metered fire service lines.
(b) Fixed monthly service charges. A minimum monthly charge shall be levied on all fire service customers based on the size of the fire line, when no meter is provided; the size of the detector meter, when used; or the size of the full flow factory mutual meter, when used.
(c) Variable monthly service charges based on usage. Water used through full flow factory mutual meters shall be billed at usual rates. The water that is measured by the detector meter will be billed at five times the normal water charge.
(Ord. of 8-20-05, § 2-46; Ord. of 6-16-09; Ord. of 12-7-10) Sec. 75-207. Optional waiver of charges by county.
The department director may waive the provisions of sections 75-201 through 75-206 in accordance with a separate policy approved by the board of commissioners.
(Ord. of 8-20-05, § 2-47; Ord. of 12-7-10) Sec. 75-208. Reserved.
Sec. 75-209. Late fees for unpaid, past due invoiced accounts.
All invoiced water system accounts are due and payable on the date of invoicing. All invoiced accounts not paid on due date are past due. A late fee shall be assessed on all unpaid, past due invoices as set forth in the water, sewer, and reuse fee schedule adopted by the board of commissioners and on file in the office of the clerk. This late fee provision shall not apply to billed accounts which are covered by subsection 75-204(a).
(Ord. of 8-20-05, § 2-49; Ord. of 6-16-09; Ord. of 12-7-10) Secs. 75-210—75-220. Reserved.
DIVISION 4. CONSTRUCTION STANDARDS
Sec. 75-221. Permit required for opening, altering or connecting to public water or wastewater facilities.
No person, other than an authorized county employee, shall uncover, make any connections to, use, alter or disturb any public water or wastewater line, or appurtenance thereto, without first obtaining an approved set of plans, or a written permit from the department director.
(Ord. of 8-20-05, § 2-71) Sec. 75-222. Application for connection permit.
(a) The owner of the land upon which a water or wastewater connection is desired, or his agent, shall make application on a special form furnished by the county. The permit application shall be supplemented by the owner's drawings, plans, specifications or other such information which, in the judgment of the department director, is considered to be pertinent to the desired connection. Water and wastewater connection service charges shall be paid as stipulated in sections 75-202 and 75-203.
(b) All costs and expenses incidental to the connection shall be borne by the owner. The owner shall indemnify the county against any loss or damage to the county water or wastewater facilities that may be directly or indirectly occasioned by the connection.
(Ord. of 8-20-05, § 2-72) Sec. 75-223. Separate service to separate buildings.
A separate and independent water and wastewater connection shall be provided for every building, except where one building stands at the rear of another on an interior lot and no private water or wastewater line is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway. In the above instance, the front building water and/or wastewater line may be extended to the rear of the building and the whole considered as one building; however, in such case the county does not and will not assume any obligation or responsibility for maintenance of or damage caused by or resulting from any such single connection aforementioned.
(Ord. of 8-20-05, § 2-73) Sec. 75-224. Utilization of previously used water and wastewater pipes and materials.
Previously used water and wastewater pipes and materials may be utilized in connection with new buildings only when found, on examination and test by the department director or his designee, to be in good, serviceable condition and to meet all requirements of this article.
(Ord. of 8-20-05, § 2-74) Sec. 75-225. Compliance with technical codes.
The size, materials of construction, methods of construction, slope and alignment of all water and wastewater facilities construction shall conform to the technical codes and specifications described below. To the extent that any conflicting provisions exist in the below described technical codes and specifications, the provisions of the earliest mentioned document shall prevail.
(1) State plumbing code, in effect in the county. See the plumbing code in effect in the county as it presently exists or may be amended.
(2) Standard building code, in effect in the county. See the building code in effect in the county as it presently exists or as it may be amended.
(3) One- and two-family dwelling code, in effect in the county. See state dwelling code in effect in the county as it presently exists or as it may be amended.
(4) The current water and wastewater standards for residential and commercial development in the county, as it presently exists or as it may be amended.
(5) County backflow prevention by containment policy and procedures in effect in the county as it presently exists or as it may be amended. See subsection 75-231(c).
(6) Water Environment Federation Manual of Practice No. 9, latest edition, for wastewater system construction.
(7) American Water Works Association Standard Specifications C-100 through C-900, latest editions, for water system construction.
(Ord. of 8-20-05, § 2-75; Ord. of 9-10-13) Sec. 75-226. Elevation of wastewater connections, check prior to pouring foundation.
It shall be the obligation of the owner of the building being connected to the county wastewater system to determine the elevations, grades and alignment of sewer lines necessary to serve the building prior to the pouring of the building foundation or footings, and to design and construct the connecting sewer in accordance with the information thus obtained.
Whenever possible, a building sewer shall be brought to the building at an elevation below the lowest floor. In all buildings in which any building drain is too low to permit gravity flow to the county wastewater system, the wastewater carried by such building drain shall be lifted by an approved means into the county wastewater system. Operation and maintenance of such a lifting system shall be the sole responsibility of the property owner.
(Ord. of 8-20-05, § 2-76) Sec. 75-227. Conditions to determine if building is served by public wastewater system.
The county wastewater system is designed to provide gravity service to the ground level floor of buildings, and above. Basements and below-grade living areas may or may not be served by gravity by the county wastewater system. A building is considered to be "served" by the county wastewater system for purposes set forth in this article whenever sewer service is provided to the ground level floor. The requirements for dry sewers are presented in section 75-240.
(Ord. of 8-20-05, § 2-77) Sec. 75-228. Connection of downspouts, drains to wastewater system.
No person shall make connection of roof downspouts, foundation drains, areaway drains or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to the county wastewater system unless such connection is approved for purposes of disposal of polluted surface drainage and for which a discharge permit has been issued. See subsections 75-271(a)(15) and 75-202(d)(2).
(Ord. of 8-20-05, § 2-78) Sec. 75-229. Water and wastewater connections.
(a) Construction procedures.
(1) All pavement cuts shall be made by sawing prior to excavation to eliminate uneven and ragged edges.
(2) All backfill beneath roads, sidewalks or other paved areas shall be compacted to 95 percent Standard Proctor using mechanical tamping equipment in six-inch lifts. It shall be the responsibility of the person making the water or sewer connection to demonstrate to the department director or his representative that 95 percent compaction has be obtained.
(3) All road cuts shall have an eight-inch-thick concrete cap (3,000 psi in 28 days) which shall extend not less than 12 inches beyond the edges of the back filled ditch.
(4) Final asphalt patches shall match the existing pavement type, quality and thickness as closely as possible. Special care shall be exercised to match existing slopes and grades for a smooth transition.
(b) Inspection of connections by county. The applicant for a building sewer connection permit shall notify the department director when the building sewer is ready for inspection and connection to the county wastewater system. The connection and testing shall be made in the presence of the department director or his representative.
(c) Guarding excavations. All excavations for building sewer installation shall be adequately guarded with barricades and lights in compliance with all OSHA and state department of transportation requirements so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored to "as good as new condition" in a manner satisfactory to the county.
(Ord. of 8-20-05, § 2-79) Sec. 75-230. Restoration of disturbed public property.
All water or wastewater construction work conducted on the public right-of-way or any public property shall be conducted only with proper permission from the department director.
All disturbed areas as a result of such construction shall be restored to a condition that is "as good as new." The scheduling of such construction activities shall be as approved by the department director if such scheduling approval is determined to be in the public's best interest.
(Ord. of 8-20-05, § 2-80) Sec. 75-231. Backflow prevention.
(a) When required. All wastewater treatment plants, commercial businesses, industries or institutions that handle toxic or hazardous chemicals shall be required to install backflow prevention mechanisms. Additionally, approved backflow preventers or vacuum breakers shall be installed with all plumbing fixtures or equipment for which the potable water supply outlet may be submerged without the protection of a minimum air gap. The particular backflow prevention devices utilized in any given situation shall be as specified in the plumbing code, as per the policy and procedures, or as approved by the department director.
(b) Minimum required air gap. The minimum required air gap shall be measured vertically from the lowest end of a potable water outlet to the flood rim or line of the fixture or receptacle into which it discharges. The minimum required air gap shall be twice the effective opening of a potable water outlet unless the outlet is a distance less than three times the effective opening away from a wall or similar vertical surface, in which case the minimum required air gap shall be three times the effective opening of the outlet. In no case shall the minimum required air gap be less than is provided in the plumbing code. All residential meters will be installed with Straight Cartridge Style Dual Check Valves, Ford HHCI33-311 or equivalent backflows.
(c) Policy and procedures. It is determined necessary for the protection of the public health, safety, welfare and convenience of the citizens of Effingham County, and in accordance with the requirements of the Georgia Department of Natural Resources, Environmental Protection Division, and the International Plumbing Code, to establish a policy of backflow prevention by containment. Procedures outlined in this policy, along with other applicable codes and regulations, are designed to provide reasonable protection for Effingham County potable water systems from contamination and pollution resulting from backflow and/or backsiphonage through uncontrolled plumbing connections and/or cross-connections.
(1) The policy and procedures of backflow prevention by containment are to be filed with the permanent records of the Effingham County Board of Commissioners and may be inspected by any interested party during regular office hours at the office of the county clerk.
(2) The policy and procedures shall be in force and effect from and after the date of approval by the board of commissioners of this section.
(3) The county may withhold the issuance of any building permit and/or occupancy or use permit in any subdivision, development or improvement to which the policy and procedures apply until there is compliance with the regulations and specifications contained in said policy of backflow prevention by containment.
(4) Violation of the policy and procedures shall be punished in accordance with all applicable sections of the Code of Effingham County, specifically including division 2 of this article.
(Ord. of 8-20-05, § 2-81; Ord. of 9-10-13) Sec. 75-232. Temporary water supply standpipes in elbows only.
All standpipes installed for the purpose of providing temporary water supply at any given location shall be installed on a 90-degree elbow. Tees, crosses and wyes or other connecting devices shall not be utilized. When the permanent water connection is made, the temporary elbow shall be removed.
(Ord. of 8-20-05, § 2-82) Sec. 75-233. Limitation on construction of permanent structures near water or wastewater easements.
No permanent structures shall be constructed within a permanent water or wastewater easement on front and rear setbacks, or within two feet on side setbacks.
(Ord. of 8-20-05, § 2-83) Sec. 75-234. Capping and sealing of discontinued water and sewer connections.
All water and sewer service connections for which service has been discontinued as a result of the demolition of the structure being served by the connection, or for any other reasons, shall be properly and permanently capped and sealed to prevent the entrance of groundwater or surface water in the case of sewers and the escape of potable water in the case of water lines.
(Ord. of 8-20-05, § 2-84) Sec. 75-235. Location of water meters.
All water meters shall be installed at an easily accessible location on or near the property line of the premises being served adjacent to the public right-of-way. Water meters shall not be installed behind enclosed fences, in paved driveways or in paved parking areas.
(Ord. of 8-20-05, § 2-85) Sec. 75-236. Wastewater lift station.
(a) Lift stations serving two or more buildings. All wastewater lift stations installed in the county which serve two or more buildings shall be designed and constructed in strict conformity to the county standards. Engineering plans shall be prepared for all wastewater lift stations, and such plans shall be approved by the county water system prior to construction.
Following the construction and acceptance by the county of a wastewater lift station, title to the lift station shall be conveyed to the county.
(b) Lift stations serving a single building. Unless otherwise approved by the county, all wastewater lift stations serving a single building shall be owned, operated and maintained by the building owner.
(Ord. of 8-20-05, § 2-86) Sec. 75-237. All water and wastewater facilities construction plans must be approved by the county.
In the event of a delegation of authority from the state environmental protection division, the county water system shall have review authority over all water and wastewater facilities constructed in the county. Thereafter, all water and wastewater facilities construction plans, whether in incorporated or unincorporated areas, shall be approved by the county water system prior to the commencement of construction.
(Ord. of 8-20-05, § 2-87) Sec. 75-238. Fire hydrant installation and repairs.
(a) Where possible fire hydrants shall be installed at a location that minimizes the potential for traffic damage. All fire hydrants shall have individual disconnect gate valves on the horizontal connecting pipe and concrete thrust blocks between the back of the hydrant and firm, undisturbed soil.
(b) All new fire hydrants installed must be inspected by the county before back filling.
About of service cover will be placed on any fire hydrant which has been turned off for repairs or is out of service for any reason and immediate notice will be given to the chief of the fire department. The chief shall also be notified when such hydrant is returned to active service.
When repairs have been completed, the county water system personnel will notify the fire chief the date that repairs were completed and remove the cover.
(Ord. of 8-20-05, § 2-88) Sec. 75-239. Fire service metering requirements.
(a) All fire service systems on private property having fire hydrants, hand hose connections or sprinkler heads shall utilize underwriter approved full flow factory mutual fire line meters or shall be provided with dual service consisting of a separate domestic service meter and a detector meter on the fire service line.
(b) When unauthorized water is used through a detector meter or a dual service connection in three or more billing periods in one calendar year, it shall be replaced with a factory mutual full flow fire line meter. Unauthorized use of water is defined as non-fire-fighting water and/or water use without prior notification and approval of the county water system.
(c) Installation of factory mutual fire line meters as required by this section will be handled by county water system crews at the expense of the building owner or lessee. The cost of installation will be at a rate established for each individual site.
(d) All water meters, detector of fire line, shall be installed on or near the county right-of-way.
(e) Vaults shall be constructed to county specifications.
(f) Vault construction and meter installation shall be inspected by the county after work has been completed to ensure that specifications have been met.
(Ord. of 8-20-05, § 2-89) Sec. 75-240. Dry sewers and septic tanks.
(a) For new subdivisions and nonresidential properties in areas which can be connected to active sewer by gravity sewer and the county does not plan to construct additional sewers downstream of the subject property:
(1) An active sewer shall be provided to all sites smaller than 0.5 acre, if water service is being provided by a community water system, or smaller than 1.0 acre if the site contains a private well.
(2) Septic tanks may be utilized on sites of at least 0.5 acre, if water service is being provided by a community water system, or at least 1.0 acre if the site contains a private well, if the anticipated wastewater generation for the site is no more than one equivalent residential unit (eru) per 0.5 acre, if water service is being provided by a community water system, or no more than no more than one eru per 1.0 acre if the site contains a private well and with the approval of the county health department.
(3) The county may consider development of a private developer agreement or special sewer availability area.
(b) For new subdivisions and nonresidential properties in areas which can be connected to active sewer and the county plans to construct additional sewers downstream of the subject property:
(1) Dry sewers, constructed in accordance with the county water and wastewater system standards, shall be provided to all sites smaller than 0.5 acre, if water service is being provided by a community water system, or smaller than 1.0 acre if the site contains a private well which are not provided with an active sewer.
(2) In all areas where dry sewers are required by this section, septic tanks shall also be provided with the approval of lot sizes and septic tank suitability from the health department.
(3) Septic tanks may be utilized on sites of at least 0.5 acre, if water service is being provided by a community water system, or at least 1.0 acre if the site contains a private well, if the anticipated wastewater generation for the site is no more than one equivalent residential unit (eru) per 0.5 acre, if water service is being provided by a community water system or no more than no more than one eru per 1.0 acre if the site contains a private well and with the approval of the county health department.
(4) The county may consider development of a private developer agreement or special sewer availability area.
(c) For new subdivisions and nonresidential properties in areas which cannot be connected to active sewer and the county does not plan to construct additional sewers downstream of the subject property, septic tanks may be utilized with the approval of the health department.
(d) Septic tanks shall be constructed and operated in accordance with the provisions of section 75-322.
(Ord. of 8-20-05, § 2-90) Secs. 75-241—75-250. Reserved.
DIVISION 5. GENERAL USE OF PUBLIC WATER AND WASTEWATER FACILITIES
Sec. 75-251. General.
(a) Unauthorized connections prohibited. No person shall make an unauthorized water or sewer connection nor obtain unauthorized water or wastewater services. Persons so making unauthorized connections or obtaining unauthorized service shall be subject to a fee as set forth in the county water and wastewater fee schedule, published separately, and shall also be punished as provided in subsection 75-176(1).
(b) Requirement to prevent cross connections. The construction and operation of all water and wastewater system piping shall be in such a manner so as to eliminate cross connections or the possibility thereof. It is the intent of this section to protect the public health by providing regulations whereby the possibilities for the contamination of the water supply due to cross connections with the wastewater system are greatly reduced or eliminated. For that reason the provisions and requirements contained in the county backflow prevention by containment policy and procedures are adopted herein by reference. See subsection 75-231(c).
(c) Malicious damage to equipment. No person shall maliciously, willfully or negligently break, damage, destroy, uncover, deface or tamper with any structure, appurtenance or equipment which is a part of the water or wastewater facilities. Any person violating this provision shall be subject to immediate arrest under the charge of disorderly conduct and punished as provided in subsection 75-176(2).
(Ord. of 8-20-05, § 2-111; Ord. of 1-5-10; Ord. of 12-7-10; Ord. of 9-10-13) Sec. 75-252. Water system.
(a) Conditions for use of private wells. See section 75-301.
(b) Responsibility for meter and meter box. Anyone receiving water service from the county water system shall be responsible for the meter and meter box from the time it is installed until it is removed. Any changes in the slope or grade of the premises shall be made so as not to damage the meter or meter box, or cover the meter box. Anyone damaging the meter or meter box, or covering same with earth, shall be liable for the cost of the damage or subject to punishment as provided in subsection 75-176(3). Water users shall not remove the box from the meter or leave the meter exposed to possible freezing or other damage.
(c) Backflow prevention. Certain county water system users shall be required to provide backflow prevention. For specific backflow prevention requirements see subsection 75-231(c) and the backflow prevention by containment policy and procedures.
(Ord. of 8-20-05, § 2-112; Ord. of 1-5-10; Ord. of 12-7-10; Ord. of 9-10-13) Sec. 75-253. Wastewater system.
(a) Toilets required.
(1) No person shall dispose of human excrement except in a toilet. All toilets shall either be connected to the county wastewater system or to an approved private wastewater disposal facility that complies with the provisions of division 8 of this article.
(2) The owners of all houses, buildings or properties used for human occupancy, employment, recreation or other purposes situated within the county jurisdiction, and abutting on any street, alley or right-of-way in which there is now located, or may in the future be located, a public sanitary sewer of the county is hereby required at the owner's expense to install suitable toilet facilities therein. All toilet facilities shall be kept clean and in a sanitary working condition. Flush toilets shall be provided at all times with sufficient running water under pressure to flush the toilet clean after each use.
(b) Discharge of polluted waters to a storm sewer or natural outlet prohibited.
(1) It shall be unlawful for any person to place, deposit or permit to be deposited in any unsanitary manner on public or private property within the county or into any storm sewer or any sewer which connects to the storm sewer system of the county any polluted water or wastewater.
(2) It shall be unlawful to discharge to any natural outlet within the county any wastewater or other polluted waters, except where suitable treatment has been provided in accordance with the provisions of this article. No provision of this article shall be construed to relieve the owner of a discharge to any natural outlet of the responsibility for complying with applicable state and federal regulations governing such discharge.
(c) Discharge of grease trap contents into county wastewater system prohibited. The discharge of the materials collected from grease traps into the county wastewater system is prohibited. See also subsection 75-278(e).
(d) Requirement to mitigate infiltration/inflow. It shall be the obligation of all users of the county wastewater system to reduce to the extent reasonably possible all infiltration and inflow. Infiltration and inflow shall be reduced by using watertight pipe and construction materials in all private portions of the sewer system, as well as those sewer systems which are to be deeded to the county.
(e) Prohibited discharges. The prohibited discharges set forth in section 75-271 are incorporated in this section by reference.
(f) Connection of private water system users prohibited. No premises which utilize a private water system shall be allowed to connect to the county wastewater system.
(Ord. of 8-20-05, § 2-113; Ord. of 1-5-10; Ord. of 12-7-10) Sec. 75-254. Wellhead protection.
(a) Purpose. The purpose of this division is to insure the provision of a safe and sanitary drinking water supply for Effingham County public water systems by the establishment of wellhead protection zones surrounding the wellheads for all wells that are supply sources for Effingham County public water systems, and by the designation and regulation of property uses and conditions which may be maintained within such zones.
(b) Establishment of a wellhead protection zone. There is hereby established a use district to be known as a wellhead protection zone as identified and described within the State of Georgia approved wellhead protection plan for each Effingham County public water system.
(c) Prohibited uses. Land use activities in the wellhead protection zones as identified and described as potential pollution sources in the State of Georgia approved wellhead protection plan for each Effingham County public water system will be prohibited as stated in the plan.
(d) Administration. The policies and procedures for administration of any wellhead protection zone established under this ordinance shall be the same as provided in the Effingham County Zoning Ordinance, as the same is presently enacted or may from time to time be amended.
(Ord. of 1-5-10; Ord. of 12-7-10) Secs. 75-255—75-270. Reserved.
DIVISION 6. NONDOMESTIC USE OF PUBLIC WASTEWATER FACILITIES
Sec. 75-271. General sewer use requirements.
(a) Prohibited discharges. No person shall discharge or cause to be discharged any of the following described waters or wastes into the county wastewater system:
(1) Any pollutant, liquid, solid or gas which creates a fire or explosive hazard in the POTW or any discharge or with a flashpoint less than 140 degrees Fahrenheit or 60 degrees Celsius as measured using the test methods in 40 CFR 261.21; or any liquid, solid or gas, either singly or in combination with any other materials, that causes the atmosphere in the sewer to exceed the ten percent lower limit of any gases measured as methane.
(2) Any waters containing toxic or poisonous solids, liquids or gases in sufficient quantity, either singly or by interaction with other wastes, to injure or interfere with any waste treatment process, constitute a hazard to humans or animals, create a public nuisance, or create any hazard in the receiving waters of the wastewater treatment facility.
(3) Any waters or wastes having a pH lower than 5.5 or greater than 12.5, having any other corrosive property capable of causing damage or hazard to sewers, structures, equipment or personnel or any water or wastes of sufficiently high pH and volume to raise the pH of the wastewater at the influent to a treatment plant above 9.0 for a period longer than one minute.
(4) Solid or viscous substances in quantities or of such size capable of causing obstruction to the flow in sewers or other interference with the proper operation of the wastewater facilities such as, but not limited to, ashes, bones, cinders, sand, mud, straw, shavings, metal, glass, rags, feathers, tar, plastics, wood, unground garbage, whole blood, paunch manure, hair and fleshing, entrails and paper dishes, cups, milk containers, etc., either whole or ground by garbage grinders.
(5) Any garbage that has not been properly shredded. Garbage grinders may be connected to sanitary sewers from homes, hotels, institutions, restaurants, hospitals, catering establishments or similar places where garbage originates from the preparation of food in kitchens for the purpose of consumption on the premises or when served by caterers.
(6) Any waters or wastes containing toxic gases, vapors, fumes or odor-producing substances in sufficient quantity to cause the OSHA's atmospheric limits to be exceeded in the manholes, or any noxious or malodorous gas or substance capable of creating a public nuisance or hazard to life or preventing entry into sewers for the maintenance, inspection and repair thereof.
(7) Any radioactive wastes or isotopes of such half-life or concentrations as may exceed limits established in compliance with applicable state or federal regulations.
(8) Quantities of flow, concentrations or both which constitute a slug as defined in section 75-171.
(9) Water or wastes containing substances which are not amenable to treatment or reduction by the wastewater treatment processes employed.
(10) Any water or wastes, which by interaction with other waters or wastes in the county wastewater system, release obnoxious gases, form solids which interfere with the collection system or create a condition deleterious to structures and treatment processes.
(11) Wastewater having a temperature higher than 150 degrees Fahrenheit (65 degrees Celsius) or causing the temperature at the influent to a treatment plant to exceed 104 degrees Fahrenheit (40 degrees Celsius).
(12) Any substance which may cause the water pollution control facility effluent or any other products of the water pollution control facility, such as residues, sludges or scums, to be unsuitable for reclamation and reuse.
(13) Any substance which will cause the water pollution control facility to violate its NPDES permit or the receiving water quality standards.
(14) Any wastewater with objectionable color not removed in the treatment process, such as, but not limited to, dye wastes, ink wastes and vegetable tanning solutions.
(15) Any unpolluted cooling water, groundwater, roof drainage, basement drainage, subsurface drainage or yard drainage through direct or indirect connection to the wastewater treatment facilities unless a storm sewer or other reasonable alternative for removal of such drainage does not exist, and then only when discharge is expressly permitted by a wastewater discharge permit and the appropriate charges are paid for the volume thereof. See subsection 75-202(d)(2).
(16) Trucked or hauled wastes except at points designated by the water system director in accordance with section 75-284.
(17) Pollutants, including oxygen demanding pollutants (BOD, etc.), released in a discharge at a flow rate and/or pollutant concentration which, either singly or by interaction with other pollutants, will cause interference with the POTW.
(18) Petroleum oil, non biodegradable cutting oil or products of mineral oil origin, in amounts that will cause interference or pass through.
(b) Local limits. No user shall discharge wastewaters to the sanitary sewer system or POTW which exceed the county's daily maximum discharge limits as developed by the water system and approved by the county board of commissioners. The currently adopted limits shall be on file and available at the office of the county clerk and at the office of the director of the county water system.
(1) Discharges under 10,000 gallons per day, where applicable, may be required to meet a mass limit in pounds per day equivalent to industrial flows of 10,000 gallons per day.
(2) Conventional pollutants: biochemical oxygen demand (BOD), total suspended solids (TSS), ammonia as NH3-N and total phosphorus will be regulated by high strength surcharge in accordance with section 75-279.
(c) State requirements. Any laws or regulations promulgated by the state relative to the construction or use of wastewater facilities which are more strict than the regulations provided in the county Code are incorporated in this section by reference, and such regulations may be enforced by the county.
(d) Federal pretreatment standards.
(1) The federal government has adopted regulations governing wastewater discharges from industries into publicly owned wastewater treatment works (POTWs). These federal regulations are generally referred to as the federal pretreatment standards, or the Federal Categorical Pretreatment Standards, as set forth in 40 CFR chapter 1, subpart n, parts 405—471. Any portion of these federal standards which are more strict than the regulations in this article are incorporated by reference, and such regulations may be enforced by the county.
(2) It is the affirmative obligation of all industrial users regulated by the federal pretreatment standards, inclusive of the Federal Categorical Pretreatment Standards, to comply with the federal standards whether or not the industry has received notification from the county or any other jurisdiction of the existence and nature of the federal standards.
(3) Where a categorical pretreatment standard is expressed only in terms of either the mass limits or either the mass or the concentration of a pollutant in wastewater, the department director may impose equivalent concentration or mass limits in accordance with 40 CFR 403.6.
(4) When wastewater subject to a categorical pretreatment standard is mixed with wastewater not regulated by the same standard, the department director shall impose an alternative limit using the combined waste stream formula in 40 CFR 403.6(e).
(5) A user may obtain a variance from a categorical pretreatment standard if the user can prove pursuant to the procedural and substantive provisions in 40 CFR 403.13 that factors relating to its discharge are fundamentally different from the factors considered by EPA when developing the categorical pretreatment standards.
(6) A user may obtain a net gross adjustment to a categorical standard in accordance with
40 CFR 403.15.
(e) Modifications to federal standards.
(1) From time to time, the federal government may alter existing federal pretreatment standards or promulgate new standards. None of the provisions contained in this Code shall prevent the timely implementation of new or altered federal standards by the industries to whom the new or altered standards apply. Where new or altered federal standards are more strict than the standards presently being imposed by the county, the county may, without prejudice, immediately revise any industrial wastewater discharge permits to reflect the new or altered standards. If the industrial user is unable to immediately conform to the new or altered standards, a reasonable schedule for compliance shall be provided by the department director.
(2) Where the county's wastewater treatment system achieves consistent removal of pollutants limited by federal pretreatment standards, the county may apply to the approval authority for modification of specific limits in the federal pretreatment standards. "Consistent removal" shall mean reduction in the amount of a pollutant or alteration of the nature of the pollutant by the wastewater treatment system to a less toxic or harmless state in the effluent which is achieved by the system in 95 percent of the samples taken when measured according to the procedures set forth in section 403.7(c)(2) of title 40 of the Code of Federal Regulations, part 403, "General Pretreatment Regulations for Existing and New Sources of Pollution," promulgated pursuant to the Clean Water Act, as amended. The county may then modify pollutant discharge limits in the federal pretreatment standards if the requirements contained in 40 CFR part 403, section 403.7, are fulfilled and prior approval from the state environmental protection division is obtained.
(f) County's right of revision. The county reserves the right to establish, by article or in wastewater discharge permits, more stringent standards or requirements on discharges to the
POTW.
(g) Dilution. No user shall ever increase the use of process water, or in any way attempt to dilute a discharge, as a partial or complete substitute for adequate treatment to achieve compliance with a discharge limitation unless expressly authorized by an applicable pretreatUTILITIES § 75-271 ment standard or requirement. The water system director or his agent may impose mass limitations on users who are using dilution to meet applicable pretreatment standards or requirements, or in other cases when the imposition of mass limitations is appropriate.
(Ord. of 8-20-05, § 2-141) Sec. 75-272. Significant contributing industries.
(a) General. All significant contributing industries (see definition of significant contributing industries in section 75-171) that discharge wastewater effluent into the county wastewater system shall comply with the following subsections of this section.
(b) Sampling manhole. In order to provide for accurate sampling and measurement of industrial wastes, each significant contributing industry shall provide and maintain, on each of its industrial waste outlet sewers, a large manhole or sampling chamber to be located outside the plant. If inside the plant fence, there shall be a gate near the sampling manhole with a key furnished to the county. There shall be ample room provided in each sampling manhole to enable convenient inspection and sampling by the county, or its agent. In certain sampling manholes where noxious fumes may accumulate, the county may require a fume exhaust system to protect the life and health of the county employees who are required to enter the sampling manhole. The fume exhaust system should extract the fumes from the bottom of the manhole and provide not less than one air change per minute. The manhole shall include a waterproof 120V, single phase electrical outlet at or near the installation.
(c) Provision for flow monitoring. Each sampling manhole shall contain a properly installed flow monitoring device such as a Parshall flume, Palmer-Bowlus flume or other similar device approved by the county. Plans of the proposed sampling manhole and monitoring device shall be prepared by a registered engineer and submitted to the county for review and approval. The ECUD director may require the industrial user to install additional equipment necessary to measure, record, and total flow. This equipment shall be maintained at all times in a safe and proper operating condition. Devices used to measure wastewater flow shall be calibrated periodically, but not less frequently than annually, to ensure their accuracy. Records of this calibration must be kept for a period of three years and submitted to the ECUD upon request.
(Ord. of 8-20-05, § 2-142) Sec. 75-273. Wastewater permit application and questionnaire.
(a) Application. All non domestic users shall, upon the request of the county complete and submit to the county a wastewater permit application. The wastewater permit application shall be on a form provided by the county and attached to a questionnaire provided by the county. The information on the questionnaire shall be used for the purpose of determining whether the industry is a significant contributing industry and for other purposes.
(b) Contents of application. The questionnaire shall include the following information, at a minimum:
(1) Name and address of the owner.
(2) The company name, address and location, if different from the address.
(3) SIC number, according to the Standard Industrial Classification Manual, U.S. Office of Management and Budget, 1972, as amended.
(4) Wastewater constituents and characteristics, including, but not limited to, those shown in section 75-271.
(5) Time and duration of contribution.
(6) Average daily and three-minute peak wastewater flow rates, including daily, monthly and seasonal variations, if any.
(7) Site plans, floor plans, mechanical and plumbing plans and details to show all sewers, sewer connections and appurtenances by size, location and elevation.
(8) Description of activities, facilities and plant processes on the premises including all materials which are or could be discharged.
(9) Where known, the nature and concentration of any pollutants in the discharge which are limited by city, county, state or federal pretreatment standards, and a statement regarding whether or not the discharge standards are being met on a consistent basis and if not, whether additional operation and maintenance (O & M) and/or additional pretreatment is required for the user to meet applicable discharge standards.
(10) If additional pretreatment and/orO&M will be required to meet the discharge standards, the shortest schedule by which the user will provide such additional pretreatment must be set forth. The completion date in this schedule shall represent a reasonable timeframe when considering the circumstances of each individual situation. The following conditions shall apply to this schedule:
a. The schedule shall contain increments of progress in the form of dates for the commencement and completion of major events leading to the construction and operation of the pretreatment facilities required for the user to meet the applicable discharge standards, e.g., hiring an engineer, completing preliminary plans, completing final plans, executing contract for major components, commencing construction, completing construction, etc.
b. No increment referred to in subsection (b)(10)a of this section shall exceed nine months.
c. Not later than 14 days following each date in the schedule and the final date for compliance, the user shall submit a progress report to the county, including, as a minimum, whether or not it has complied with the increment of progress to be met on such date and, if not, the date on which it expects to comply with this increment of progress, the reason for delay and the steps being taken by the user to return the construction to the schedule established. In no event shall more than nine month elapse between such progress reports.
(11) Each product produced by type, amount, process or processes and rate of production.
(12) Type and amount of raw materials processed, average and maximum per day.
(13) Number and type of employees and hours of operation of plant and proposed or actual hours of operation of the pretreatment system.
(14) Any other information as may be deemed necessary for the county to evaluate the permit application.
(15) A description of other environmental permits held by the facility.
(c) Certification. All wastewater discharge permit applications, questionnaires and user reports must be signed by an authorized representative of the user and contain the following certification statement:
"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
The county will evaluate the data furnished by the user and may require additional information.
(Ord. of 8-20-05, § 2-143) Sec. 75-274. Discharge permits.
(a) General.
(1) It shall be unlawful for any significant contributing industry, as determined under this article, to discharge wastewater into the county wastewater system without a county-issued discharge permit.
(2) All significant contributing industries proposing to connect to or to contribute to the county wastewater system shall obtain a wastewater discharge permit before connecting to or contributing to the county system.
(3) All existing significant contributing industries connected to or contributing to the county wastewater system shall obtain a wastewater discharge permit.
(b) Application. When requested to do so by the county, all significant contributing industries shall complete and file with the county an application in the form prescribed by the county and accompanied by a fee as set by the county from time to time. Existing users shall apply for a discharge permit within 60 days of notification by the county that a discharge permit is required. Proposed new users shall make application not less than 90 days prior to connecting to or contributing to the county wastewater system. Each discharge permit application shall be completed as described in subsection 75-276(a).
(c) Permit modifications.
(1) The county water system may modify a wastewater discharge permit for good cause including, but not limited to, the following reasons:
a. To incorporate any new or revised federal, state or local pretreatment requirements;
b. To address significant alterations or additions to the user's operation, processes or wastewater volume or character since the time of wastewater discharge permit issuance;
c. A change in the POTW that requires either a temporary or permanent reduction or elimination of the authorized discharge;
d. Information indicating that the permitted discharge poses a threat to the county's POTW, personnel or the receiving waters;
e. Violation of any terms or conditions of the wastewater discharge permit;
f. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application or in required reporting;
g. Revision of or a grant of variance from categorical pretreatment standards pursuant to 40 CFR 403.13;
h. To correct typographical or other errors in the wastewater discharge permit;
i. To reflect a transfer of the facility ownership or operation to a new owner or operator in accordance with subsection (g) of this section.
(2) When a permitted industrial user has significantly changed circumstances that cause the conditions in its discharge permit to become inaccurate or unrepresentative, then and in that event the industry shall apply to the county for a permit modification. Such changed circumstances shall include significantly altered production practices or processes, plant expansions or reductions, modifications to pretreatment facilities, etc.
(3) Within nine months of the promulgation of a federal pretreatment standard, the discharge permits of users subject to such standards shall be revised to require compliance with such standards within the timeframe prescribed by such standard.
Where a user, subject to a federal pretreatment standard, has not previously submitted an application for a wastewater discharge permit as required by subsection
(b) of this section, the user shall apply for a wastewater discharge permit within 180 days after the promulgation of an applicable federal pretreatment standard. In addition, the user with an existing wastewater discharge permit shall submit to the county within 180 days after the promulgation of an applicable federal pretreatment standard the information required by subsection 75-276(a).
(d) Conditions. Wastewater discharge permits shall be expressly subject to all provisions of this article and all other applicable regulations, user charges and fees established by the county. Permits must contain the following:
(1) A statement that indicates the duration, which in no event shall exceed five years;
(2) A statement that the wastewater discharge permit is nontransferable without prior notification to the county in accordance with this section, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit;
(3) Effluent limits based upon applicable pretreatment standards;
(4) Self-monitoring, sampling, reporting, notification and record-keeping requirements.
These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency and sample type based upon federal, state and local law; and
(5) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by federal, state and local law.
(e) Contents. Permits may contain the following:
(1) The unit charge or schedule of user charges and fees for the wastewater which is to be discharged by the permittee into the county wastewater system.
(2) Limits on average and maximum rate and time of discharge or requirements for flow regulations and equalization.
(3) Requirements for installation and maintenance of inspection and sampling facilities.
(4) Specifications for monitoring programs, which may include sampling locations, frequency of sampling, number, types and standards for tests and reporting schedule.
(5) Requirements for submission of technical reports or discharge reports. See subsection 75-276(c).
(6) Requirements for maintaining and retaining plans and records relating to wastewater discharges as specified by the county, and affording the county access thereto.
(7) Requirements for notification of the county of any new introduction of wastewater constituents or any substantial change in the volume or character of the wastewater constituents being introduced into the county wastewater system.
(8) Requirements for notification of accidental discharges as per section 75-283.
(9) Other conditions as deemed appropriate by the county to ensure compliance with this article.
(f) Duration. Permits shall be issued for a specified time period as determined by the county, not to exceed five years. A permit may be issued for a period less than a year or may be stated to expire on a specific date. The user shall apply for permit re-issuance a minimum of 60 days prior to the expiration of the user's existing permit. The terms and conditions of the permit may be subject to modification by the county during the term of the permit as limitations or requirements as identified in subsection (c) of this section are modified, conditions change or other just cause exists. The user shall be informed of any proposed changes in his permit at least 30 days prior to the effective date of change. Any changes or new conditions in the permit shall include a reasonable time schedule for compliance.
(g) Transfer. Wastewater discharge permits are issued to a specific user for a specific operation. A wastewater discharge permit shall not be reassigned, transferred or sold to a new owner, new user, different premises or a new or changed operation without the approval of the county. When approved by the county for transfer, any succeeding owner or user shall also comply with the terms and conditions of the existing permit. The department director must be notified in writing no less than 30 days prior to any transfer for approval by the county.
(h) Suspension, revocation or denial.
(1) Procedure. When the department director has reason to believe that any one of the conditions enumerated in subsection (h)(2) of this section exists, he shall give written notice thereof to the permittee. Such notice shall set forth the time and place where the charges shall be heard by the department director. The hearing date shall not be less than 15 days from the mailing of such notice by certified mail to the permittee at the address shown on the permit or at permittee's last known address. At the hearing, the permittee shall have an opportunity to refute the allegations set forth in the proposed permit revocation notice.
If, after the hearing, the department director finds that any one of the conditions enumerated in subsection (h)(2) of this section exists, he shall have the right to suspend, revoke or deny the permit.
(2) Grounds. The department director may suspend, revoke or deny a wastewater discharge permit for good cause including, but not limited to, the following reasons:
a. Failure to notify the water system director of significant changes to the wastewater prior to the changed discharge;
b. Failure to provide prior notification to the water system director of changed conditions pursuant to section 75-276;
c. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge permit application;
d. Falsifying self-monitoring reports;
e. Failure to pay fees or charges established pursuant to this article;
f. Failure to submit a compliance report following written notice from the county that such report is due;
g. Tampering with monitoring equipment;
h. Refusing to allow water system employees timely access to the facility premises and records;
i. Failure to pay fines;
j. Failure to meet effluent limitations;
k. Failure to complete a wastewater questionnaire or the discharge permit application;
l. Failure to meet compliance schedules;
m. Failure to provide advance notice of the transfer of business ownership of a permitted facility; or
n. Violation of any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this article.
(i) Publication of names of permit violators. The county shall annually publish in the largest daily newspaper a list of major violators as defined in section 75-201 during the 12 previous months. The notification shall also summarize any enforcement actions taken against the user and the user's response to such enforcement actions during same 12 months.
(j) Wastewater discharge permit appeals. The department director shall provide public notice of the issuance of a wastewater discharge permit. Any person, including the user, may petition the department director to reconsider the terms of a wastewater discharge permit within 15 days of notice of its issuance.
(1) Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal.
(2) In its petition, the appealing party must indicate the wastewater discharge permit provisions objected to, the reasons for this objection and the alternative condition, if any, it seeks to place in the wastewater discharge permit.
(3) The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal.
(4) If the department director fails to set within 30 days a request for reconsideration, a wastewater discharge permit appeal shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a discharge permit or not to modify a discharge permit shall be considered final administrative action for purposes of judicial review.
(5) Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision must do so by filing a complaint with the superior court for the county within 30 days.
(Ord. of 8-20-05, § 2-144) Sec. 75-275. Sampling and testing procedures.
(a) Sampling procedures. When wastewater sampling is required by the county of any user for any purpose, the following sampling procedures shall be utilized:
(1) For conventional pollutants, metals, acid organics, base/neutral organics and pesticides, a 24-hour composite sample shall be collected from a well-mixed waste stream.
Samples shall be taken at increments of not less than one per hour over 24 hours or the time of discharge. Where batches of wastewater are treated and released, single grabs from each well-mixed batch discharged during a 24-hour period may be used to form the composite in relation to volumes discharged.
(2) Cyanide, pH, grease and oil, phenols, volatile organics, sulfides and temperature shall consist of a minimum or four grab samples collected from a well-mixed waste stream.
Volatile organic samples shall be collected in triplicate bottles.
(3) The county may require special sampling and/or analysis, either through permit or special order.
All samples shall be properly refrigerated and preserved in accordance with 40 CFR 136. The frequency of sampling, sampling chamber, metering device, sampling methods and analysis of samples shall be subject, at any time, to inspection and verification by the county. Sampling and measuring facilities shall be such as to provide safe access for authorized personnel of the county for making such inspections and verification.
(b) Testing procedures.
(1) All wastewater monitoring samples required by the county shall be tested by an independent laboratory for the parameters required, with the results submitted to the county on the original laboratory report sheets. The requirement for utilization of an independent laboratory may be waived by the county when the required tests are performed by the county or other approved agency or when duplicate ("split") samples are provided to the county and the county's testing results of such duplicate samples show a reasonable correlation with the user's in-house testing results.
(2) All measurements, tests and analyses of the characteristics of waters and wastes to which reference is made in this article shall be determined in accordance with the latest edition of 40 CFR 136 or in accordance with any applicable EPA testing procedure of general acceptance in the chemical testing industry; provided, however, all such analyses that shall be determined in accordance with these requirements shall prevail in the event of a conflict.
(3) All analysis for permit reporting shall be performed by certified laboratory analysts as required by the rules of the state board of examiners for certification of water and wastewater treatment plant operators and laboratory analysts.
(Ord. of 8-20-05, § 2-145) Sec. 75-276. Reporting requirements.
(a) Baseline monitoring reports.
(1) Within either 180 days after the effective date of a categorical pretreatment standard, or the final decision on a categorical determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the department director a report which contains the information listed in subsection (a)(2) of this section. At least 90 days prior to commencement of discharge, a new source shall report the method of pretreatment it intends to use to meet the applicable categorical standard. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged. See subsection 75-274(b).
(2) Users described in subsection (a)(1) of this section shall submit the information set forth below:
a. Identifying information. The name and address of the facility, including the name of the operator and owner.
b. Environmental permits. A list of environmental control permits held by or for the facility.
c. Description of operations. A brief description of the nature, average rate of production and standard industrial classification of the operations carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated process.
d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e).
e. Measurement of pollutants.
1. The categorical pretreatment standards applicable to each process.
2. The results of sampling and analysis identifying the nature and concentration and/or mass, where required by the standard or by the department director, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum and longterm average concentrations, or mass where required, shall be analyzed in accordance with procedures set out in 40 CFR 136.
3. Sampling must be performed in accordance with the procedures set in section 75-275.
f. Certification. A statement reviewed by the users' authorized representative and certified by a qualified professional indicating whether pretreatment standards are being met on a consistent basis.
g. Compliance schedule. If additional pretreatment and/or O & M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional pretreatment and/or O & M. The completion date in this schedule will not be later than the compliance date established for the applicable pretreatment standard. A compliance schedule pursuant to this section must meet requirements set out in subsection (b) of this section.
h. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with subsection 75-273(c).
(b) Compliance schedules. The following conditions shall apply to the compliance schedule required in subsection (a)(2)g of this section.
(1) The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards. Such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction and beginning and conducting routine operation.
(2) No increment referred to in subsection (b)(1) of this section shall exceed nine months.
(3) The user shall submit a progress report to the department director no later than 14 days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay and, if appropriate, the steps being taken by the user to return to the established schedule.
(4) In no event shall more than nine months elapse between such progress reports to the department director.
(c) Compliance reports.
(1) Ninety-day compliance report. Within 90 days following the date for final compliance with applicable pretreatment standards or, in the case of a new source, following commencement of the introduction of wastewater into the county wastewater system, any user subject to permit standards and requirements shall submit to the department director a report indicating the nature and concentration of all pollutants in the discharge from the regulated process which are limited by discharge standards and requirements, and the average and maximum daily flow for these process units in the user facility which are limited by such standards or requirements. The report shall state whether the applicable discharge standards or requirements are being met on a consistent basis and, if not, what additionalO&M and/or pretreatment is necessary to bring the user into compliance with the applicable standards or requirements. This statement shall be signed by an authorized representative of the industrial user and certified by a qualified professional.
(2) Periodic compliance reports. All users who have been issued discharge permits are required to submit compliance reports at the intervals set forth in each user's individual permit, but not less than twice a year. The compliance reports shall address the discharge parameters and all other information indicated as being necessary to report as shown in the user's permit.
(3) Missing or late reports. If a permitted user fails to submit a compliance report in accordance with the reporting schedule contained in its permit, the county will provide written notice of the deficiency to the user. The written notice of deficiency will provide a timeframe of not less than 15 or more than 30 days within which the late compliance report must be submitted to the county. All sampling and testing performed under this subsection for reporting requirements shall be conducted in accordance with section 75-275.
(4) Repeat sampling for violations. All violations must be orally reported to the county within 24 hours of first becoming aware of them. The permittee must then repeat the sampling and submit the results of the repeated sample within 30 days of first becoming aware of the violation. A user may avoid re-sampling if samples were collected by the county between the time of the violation and when the user received the results indicating the violation.
(d) Reserved.
(e) Reports of changed conditions. Each user must notify the department director of any planned significant changes to the user's operations or system which might alter the nature, quality or volume of its wastewater at least 30 days before the change.
(1) The department director may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under section 2-143.
(2) The department director may issue a wastewater discharge permit under section 75-274 or modify an existing wastewater discharge permit under subsection 75-274(c) in response to changed conditions or anticipated changed conditions.
(3) For purpose of this requirement, significant changes include, but are not limited to, flow increases of 20 percent or greater and the discharge of any previously unreported pollutants.
(f) Confidential information.
(1) Information and data obtained from reports, questionnaires, permit applications, permits, monitoring programs and from inspections shall be available to the public or other governmental agency without restriction unless the user specifically requests at the time of information submittal, and is able to demonstrate to the satisfaction of the county that the release of such information would divulge information, processes or methods of production entitled to protection as trade secrets of the user. As defined in the Georgia Open Records Act.
(2) When requested by the person furnishing a report that such information should be held confidential, the portions of a report which might disclose trade secrets or secret processes shall not be made available for inspection by the public. However, all information shall be made available upon written request to governmental agencies for uses related to this article or for other regulatory or enforcement purposes. All portions of such reports shall be available for use by the state or any state agency in judicial review or enforcement proceedings involving the person furnishing the report. Wastewater constituents and characteristics will not be recognized as confidential information.
(3) Information accepted by the county as confidential shall not be transmitted to the general public by the county until and unless a ten-day notification is given to the user.
Information required by government agencies will be provided upon demand.
(g) Maintenance of records.
(1) Sampling and testing records. Any permitted user subject to the reporting requirements established in this section shall maintain records of all information resulting from any monitoring activities. Such records shall include for all samples:
a. The date, exact place, method and time of sampling and names of the person or persons taking the samples;
b. The dates analyses were performed;
c. The name of the persons who performed the analysis;
d. The analytical techniques/methods used; and
e. The results of such analyses.
(2) Monitoring activities and records of results. Any permitted user subject to the reporting requirements established in this section shall be required to retain for a minimum of three years any records of monitoring activities and results, whether or not such monitoring activities are required by this article, and shall make such records available for inspection and copying by the county, state or EPA. This period of retention shall be extended during the course of any unresolved litigation regarding the permitted user, or when requested by the county, state or EPA.
(h) Notification of discharge of hazardous waste.
(1) Any user who commences the discharge of hazardous waste shall make a one-time notification to the POTW, the EPA Regional Waste Management Division Director and state hazardous wastes authorities, in writing, of any discharge into the POTW of a substance which if otherwise disposed of would be a hazardous waste under 40 CFR
261. Such notification must include the name of the hazardous waste as set forth in 40 CFR 261, the EPA hazardous waste number and the type of discharge (continuous, batch or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW, the notification shall also contain the following information to the extent such information is known and readily available to the user:
an identification of the hazardous constituents contained in the wastes, an estimation of the mass and concentration of such constituents in the waste stream discharged during the calendar month, and an estimation of the mass of constituents in the waste stream expected to be discharged during the following 12 months. All notifications must take place no later than 180 days after the discharge commences. Any notification under this subsection needs to be submitted under this section. The notification requirement in this section does not apply to pollutants already reported by users subject to categorical pretreatment standards under subsection 75-271(b).
(2) Dischargers are exempt from the requirements of subsection (h)(1) of this section during a calendar month in which they discharge no more than 15 kilograms of hazardous waste, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Discharge of more than 15 kilograms of non acute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification. Subsequent months during which the user discharges more than such quantities of hazardous waste do not require additional notification.
(3) In the case of any new regulations under section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the county office of environmental compliance, the EPA Regional Waste Management Waste Division Director, and the state hazardous waste authorities of the discharge of such substance within 90 days of the effective date of such regulations.
(4) In the case of any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.
(5) This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this article, a permit issued pursuant to this article or any applicable federal or state law.
(i) Certification statements. All user reports shall contain the certification statement contained in subsection 75-273(c).
(j) Reports from unpermitted users. All users not required to obtain a wastewater discharge permit shall provide appropriate reports to the department director as he may require.
(Ord. of 8-20-05, § 2-146) Sec. 75-277. Industrial pretreatment facilities.
(a) Requirement. All users shall provide necessary wastewater pretreatment as required to comply with the limitations and provisions contained in this article and to achieve compliance with all federal categorical pretreatment standards within the time limitations as specified by the federal pretreatment regulations. Any facilities required to pretreat wastewater to a level acceptable to the county shall be provided, operated and maintained at the user's expense.
Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the county for review and shall be acceptable to the county prior to commencement of construction of the facility. The review of such plans and operating procedures will in no way relieve the user of the responsibility for modifying the facility as necessary to produce an effluent acceptable to the county under the provisions of this article. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be acceptable to the county prior to the user's initiation of the changes.
(b) Compliance schedules. The timing of construction and operation of pretreatment facilities as required pursuant to this article shall be in accordance with the compliance schedules provided to the county as described in subsection 75-276(b). However, the county shall also have the authority to issue compliance schedules independent of the permitting process, and such compliance schedules may be enforced by the county as provided in division 2 of this article.
(c) Maintenance of pretreatment facilities. All wastewater pretreatment facilities shall be properly and adequately maintained by the user so as to achieve the intended purpose of the facilities.
(d) Maintenance of operators. All pretreatment facilities shall maintain certified wastewater operators as required by the rules of the state board of examiners for certification of water and wastewater treatment plant operators and laboratory analysts.
(Ord. of 8-20-05, § 2-147) Sec. 75-278. Sand and oil/grease interceptors.
(a) Requirements.
(1) All users involved in the preparation of food for commercial purposes shall provide oil/grease interceptors or traps. additionally, any user who generates a wastewater which contains greater than the quantity of oil and grease regulated under section 75-271, and provided that the excess oil and grease is floatable and can be effectively removed in an oil/grease interceptor or trap, then such user will be required to install a grease/oil interceptor.
(2) All users whose wastewater stream is associated with unusually large quantities of grit, sand or gravel shall be required to install a sand trap. All car/truck wash systems shall be required to install sand and grease traps.
(3) The requirements of this section shall not apply to private living quarters or dwelling units.
(b) For facilities other than eating establishments.
(1) Design criteria. All sand and oil/grease interceptors used in conjunction with facilities other than eating establishments shall have a capacity that will provide not less than ten minutes nor more than 30 minutes retention time at the peak eight-hour flow rate.
Flow-through velocities shall not exceed one foot per second at the peak eight-hour flow rate.
(2) Compliance with plumbing code. All sand and oil/grease interceptors shall be sized, located and constructed in accordance with the provisions of the duly adopted the county plumbing code where such parameters have not been otherwise set forth in this article.
(c) Maintenance. To the extent section 75-279 applies only to food service or food preparation establishments' grease recovery systems, all other users shall maintain all grease, oil and sand interceptors in continuously efficient operation at all times. In the maintaining of these interceptors, the user shall be responsible for the proper recovery, removal and disposal by appropriate means of the captured material, and shall maintain records of the dates and means of disposal which are subject to review by the department director. The frequency of removal shall be such as to ensure that no overflows of oil, grease or sand into the wastewater system ever results.
(d) Proper disposal of collected materials. Any removal and hauling of the collected materials not performed by the owner's employees must be performed by waste disposal firms holding current county health department waste hauler permits for restaurant grease or hazardous waste transport permits for petroleum products. Under no circumstances shall the collected materials ever be returned to the wastewater system.
(Ord. of 8-20-05, § 2-148) Sec. 75-279. Food service and food preparation recovery systems.
(a) Definitions and abbreviations. The following definitions and abbreviations shall apply only to this section:
Active interior recovery device (AIRD). An active automatic separator and remover of grease, fats and oils from effluent discharge that cleans itself of accumulated grease, fats and oils at least once every 24 hours, utilizing an electromechanical apparatus to accomplish removal.
Clean-out port. A pipe that extends from the ground surface to the interior of the passive exterior device ("PED") so as to allow access and inspection of the interior of the PED.
Effluent T-valve. A T-shaped valve extending from the ground surface below grade into the PED to a depth allowing recovery of water located under the layer of grease, fats and oils to be discharged.
Exterior grease trap. A grease trap which contains baffles sufficient to allow a proper separation of grease from water.
Grease, fats and oils recovery system or grease recovery system. A system of interceptors, separators, traps, or grease recovery devices, which prevents free floating grease, fats and oils from entering the sewage system by recovering and removing these substances from water.
Grease-laden waste. Effluent discharge that is produced from food processing, food preparation or other commercial source where grease, fats and oils enter automatic dishwasher pre-rinse stations, sinks or other appurtenances.
(Grease) trap. An interceptor, separator or recovery vehicle that prevents free-floating grease, fats and oil from entering the sewage disposal system. Also includes a passive interceptor whose rated flow exceeds 50 gallons per minute or minimum storage capacity of 750 gallons or more and which is located outside the building.
Grease recovery device. Any separator of fats, oils or grease, excluding passive interior devices.
Interior grease trap. A grease trap located inside a food service establishment; may be an active or passive trap.
Manifest. A log or recording of the volume, date of removal and disposal destination of pumped materials from a grease trap or other device.
OCUD. Oconee County Utility Department.
Passive exterior device (PED). An oil/water separating container that requires pumping and is housed outside a building or structure.
Passive interior device (PID). An oil/water separating container that requires normal manual cleaning, by pumping or bailing, and is housed inside a building or structure. A passive interceptor with no moving parts with a rated flow of 50 gallons per minute or less that serves as a fixture trap and is located inside a building.
Solids transfer/grease recovery device. An active automatic pretreatment device which macerates coarse solids and separates/recovers free floating grease fats and oils from effluent.
The device cleans itself of accumulated grease, fats and oils at least once every 24 hours, utilizing electromechanical apparatus to accomplish recovery and removal.
User. Food service or food preparation establishments, their owners or operators, or their agents, that receive county wastewater system service and/or reclamation facility service (see section 2-227). The term excludes industrial food preparation facilities.
(b) General. Users that generate grease, fats or oil, or any combination thereof, and discharge water to a county wastewater reclamation facility shall be required to install, operate, clean and maintain a grease recovery system of appropriate size and design to achieve compliance with requirements set forth under this section.
(c) Administration.
(1) Registration requirement. Each user required to install a grease, fats and oils recovery system as set forth in paragraphs (2) of this section shall register its recovery system with the Effingham County Utility Department (ECUD) for the purpose of obtaining a discharge permit. Such application shall include the name, address, telephone number and factors indicating the potential for grease-laden waste to be introduced into the wastewater collection system. ECUD shall provide the user with a discharge permit number, its expiration date, and the capacity and design requirements of a compliant grease removal system. ECUD shall keep a continuous public log of all permitted users, including their registration number, address and contact name of the user.
ECUD will review discharge permits annually. Those found to be in compliance with existing federal, state, and local laws and regulations will be renewed by ECUD.
(2) Inspection fees. No fee will be charged for an annual inspection by OCUD for the discharge permit. However, if the grease recovery system is not in compliance with this section, a $25.00 re-inspection fee will be charged for each inspection thereafter until the grease recovery system is in compliance and approved by ECUD. Failure to pay the re-inspection fee shall result in the forfeiture of the discharge permit.
(3) Records. All users must keep a record of any cleaning or maintenance of their grease recovery system. The following records must be kept on-site at the food service establishment for a period of three years:
a. Manifest. All removal of grease traps contents must be tracked by a manifest that confirms pumping, hauling and disposal of wastes whether it is collected by interior or exterior grease traps.
1. Information. This manifest shall contain the following information:
A. Generator information, including name, address, volume pumped, date and time of the pumping and signature of the generator verifying the information.
B. Transporter information, including company name, address, license plate number, permit number and driver's name and signature verifying transporter information.
C. Receiving information, including the facility's name, address, date and time of receiving, EPD number and signature verifying receipt of the waste.
2. Reporting. Completed exterior grease trap cleaning manifests must be mailed to the county water system office of environmental compliance within 14 days after the trap is cleaned.
3. Maintenance log. For all interior grease traps, whether active or passive, a continuous log indicating each cleaning or maintenance for the previous 12 months shall be maintained by each user of a grease recovery system. This log shall be kept in a conspicuous location where it can be inspected by the county health department and ECUD personnel upon request.
(d) Grease recovery systems.
(1) Where required. Grease, fats and oils recovery systems shall be installed where grease-laden waste from food preparation, food processing or other commercial use will be discharged into the ECUD wastewater collection system.
(2) Technology required. An approved grease, fats and oils recovery system shall be installed consisting of one or a combination of the following methods.
a. Passive technology that is an approved exterior grease trap.
b. Active technology including:
1. An approved grease recovery device; or
2. An approved solids transfer/grease transfer device.
(3) Prohibited discharge. Waste that does not contain grease, fats or oils and otherwise does not require grease separation treatment shall not be discharged into the grease recovery system. Wastewater from dishwasher machines or wastewater that otherwise exceeds 130 degrees Fahrenheit shall not be introduced into any interior grease recovery device. Food-waste grinders shall not discharge into the building drainage system through a grease trap or grease recovery device.
(4) Dumpsters/dumpster pads. Dumpsters/dumpster pads may be allowed to connect to the wastewater collection system under the following conditions:
a. The dumpster/dumpster pad is covered and constructed in such a manner so as to protect the drainage connection from storm water runoff; and
b. The drain is connected to an exterior grease trap of at least 750 gallons which will be maintained by the user in the method prescribed by this section for other exterior grease traps.
(5) Passive exterior device (PED) requirements.
a. Each PED design, including size, type and location shall be reviewed and approved by the engineering and records division of the OCUD in substantial conformity to a grease trap detail approved and amended from time to time by OCUD. PEDs shall
1. Be sized and engineered based upon the anticipated load and/or conditions of actual use.
2. Shall be constructed of sound durable material, not subject to excessive corrosion or decay, and shall be water and gas tight if PEDs of pre-cast or poured in place concrete.
3. Be traffic-worthy with at least one manhole opening and one clean-out port or manhole over the discharge T-valve.
4. Contain baffles sufficient to allow a proper separation of grease from water.
5. Be a minimum of 750 gallons and a maximum of 3,000 gallons in size.
Multiple PEDs are allowed.
b. Passive interior devices (PIDs). There shall be no PIDs installed in any user's premises upon the effective date of this article.
c. Sizing. All grease traps shall have a capacity and design in compliance with the following equations:
1. Restaurants:
(S) × (20) × (Hr/12) × (LF) = capacity in gallons S = number of seats in dining/bar area Hr = number of hours open LF = loading factor:
1.25 interstate highways
1.00 other freeways
0.8 main highways
0.5 other roads or highways (eliminates 1.00 recreational areas)
2. Hospitals, nursing homes, or other types of commercial food preparation facilities:
(M) × (5) × (LF) = capacity in gallons M = meals per day LF = loading factor:
1.0 with dishwasher
0.5 without dishwasher
(6) Active interior recovery device requirements.
a. AIRDs may be allowed in lieu of PEDs in accordance with the following conditions:
1. The method of food preparation involves and/or creates little or no discharge of grease; or
2. A technically logistical reason exists as to why an exterior grease trap cannot be installed (i.e., conflicts with existing utilities, elevation disparities or location on a second floor).
3. The installation or use of all grease recovery devices must be approved by the ECUD.
b. Location. Grease recovery devices shall receive all grease-laden waste discharge from the major point sources. A floor drain shall not be considered a major point source.
c. Sizing. Grease recovery devices shall be sized based upon the anticipated load and/or conditions of actual use and the manufacturer's recommendation.
(e) Alternative methods.
(1) Alternative technology/methods. Engineered alternative technology or methods may be permitted, provided the technology or method meets the minimum performance standards set forth by this section or by ECUD.
(2) Biological or chemical treatment agents. The use of biological or chemical treatment agents may be allowed in addition to, but not in lieu of, required grease removal systems, provided the user supplies verification that discharge requirements are being met. To verify compliance, beginning 90 days from the last trap cleaning, the discharge must be sampled four times within 24 hours during the hours of operation and analyzed for oil and grease concentrations. In addition, the depth of bottom and top solids must be measured. This testing must be performed monthly and the results submitted to ECUD within the same testing monthly. When the oil and grease concentrations exceed the county's daily maximum discharge limits and/or the combined depth of bottom and top solids exceeds 50 percent of the total depth of the trap, the trap must be cleaned and the process started again.
(f) User responsibility.
(1) User responsibility and acknowledgement.
a. Users that are required to install a grease, fats and oils recovery system shall be responsible for the cleaning and maintenance of the grease, fats and oils recovery systems located on the property. The user shall be responsible for maintaining any grease recovery system pursuant to subsection b. below and in such a manner that the grease discharge shall not exceed the county's daily maximum discharge limits as developed and approved by the county board of commissioners. The currently adopted limits shall be on file at the office of the county clerk and at the office of the director of the county water system.
b. The user shall maintain accurate records (manifests and logs) of the dates of cleaning and the means of disposal of grease, fats and oils. These records are subject to inspection and review by ECUD pursuant to and in accordance with subsection (c)(3) above.
c. Any removal and hauling of grease, fats and oils shall be prevent discharge over the daily maximum, OCUD will require the user to repair, replace or upgrade their grease removal system, which may include one or more of the user's devices, at the user's expense.
d. All costs related to the building's sewer installation, grease recovery system or connection and registration shall be borne by the user.
e. The user shall be required to sign an acknowledgment form furnished by ECUD attesting to the user's understanding of the aforementioned responsibility.
(2) Grease trap maintenance.
a. All grease traps shall be maintained by the user at the user's expense. Maintenance shall include the complete recovery of all contents, including floating materials, wastewater and bottom sludges and solids. All grease recovery systems, including passive interior devices, passive exterior devices, and any grease recovery devices, shall be properly and adequately maintained by the user so as to achieve the intended purpose of the device.
b. In the maintaining of these grease recovery systems, the user shall be responsible for proper recovery, removal and disposal by appropriate, approved means of the captured material by a licensed waste disposal or rendering firm.
c. Pumping/cleaning frequency. All PEDs shall be completely pumped out at a minimum of once every three months, or more frequently as required by ECUD to comply with this section or the manufacturer's recommendation. The frequency of removal shall be such as to ensure that no overflows of oils or grease into the wastewater collection system ever results. Decanting or discharging of removed waste back into the trap from which the waste was removed or to any other grease trap or sanitary sewer connection for the purpose of reducing the volume to be hauled is prohibited.
(g) Enforcement.
(1) Monitoring. The user shall install a manhole on the discharge sewer to allow observation, sampling and measurement of grease recovery system discharges. This manhole shall be installed so as to be safe and accessible at all times.
(2) Inspection and entry. Any authorized representative of ECUD bearing proper credentials and identification shall be permitted to enter and inspect all properties without prior notification. This right of inspection shall include the right to measure, observe, monitor, sample, test, record, review and make copies of all pertinent documents in accordance with this section.
(h) Violations and penalties.
(1) Violations. It shall be unlawful for any user to discharge water to ECUD in a manner in violation of this section, or of any conditions set forth in this article. Any person who violates any provision of this section shall, in addition to the penalties specified herein, be subject to the provisions contained in sections 75-166 through 75-181 to the extent such violations, notice and penalties are not addressed in this section.
(2) Notice of noncompliance. If through inspection, it is determined that the user has failed to comply with the provisions of this section, a written warning of the violation shall be given to the user, the contractor named in the permit, or the user's authorized agent. The notice shall set forth the violation and the measure needed to achieve compliance. The user shall have seven days from receipt of this notice to comply. Where an emergency exists, a written warning shall be given to the user, and user will have 24 hours to comply.
(3) Failure to comply. ECUD shall have the power and authority to enter upon the property of any user who, after having received a written warning, has failed to comply with the terms of service of this article, to terminate the user's water and/or wastewater service in any manner deemed necessary and appropriate by OCUD.
Additionally, ECUD may request that the county board of commissioners suspend or revoke the user's business license after a show cause hearing, pursuant to section 75-169.
(4) Overflow penalty. Any sewer or manhole overflow traced to an inadequately operating grease recovery system or lack of a grease recovery system will result in a service charge to the user. The service charge shall include the cost of cleaning up the overflow and for cleaning grease out of the immediately adjacent contaminated ECUD wastewater collection system. This penalty will be doubled with each successive overflow.
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.