Skip to content
Georgia Commons
Menu

Hall County · Code of Ordinances

Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.10 - SEWERS AND SEWAGE DISPOSAL / Article I - PUBLIC SEWERS

13.10.1380. Industrial wastewater monitoring and reporting.

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Certification statement. All permitted user reports must contain the following certification statement and be signed by an authorized representative of the permitted user:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or

persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief is true, accurate, and

complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for known violations."

B. Discharge reports:

(1) Baseline monitoring reports application.

Within 180 days after the effective date of a categorical pretreatment standard, or the final administrative decision on a categorical determination under 40 CFR 403.6(a(4)), whichever is later, existing

categorical users currently discharging to, or scheduled to discharge to the POTW shall submit to the director a report which contains the information listed in 40 CFR 403.12(b(1-5)). New industrial users and new sources (as defined in 40 CFR 403.3(k)) shall also submit such reports to the director as required under 40 CFR 403.12(b(1-5)). New sources shall also be

required to include in this report information on the method of pretreatment the source intends to use to meet applicable

pretreatment standards. New sources shall give estimates of the information requested in 40 CFR 403.12(b(4-5)).

The report shall contain the information listed in subparagraphs (1) through (7) of 40 CFR 403.12(b):

(a) Identifying information. The name and address of the facility, including the name of the operator and owner;

(b) Environmental permits. A list of environmental control permits held by or for the facility;

(c) Description of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from regulated processes;

(d) Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use of the combined waste stream formula set out in 40 CFR 403.6(e);

(e) Measurement of pollutants:

i. The categorical pretreatment standards applicable to each regulated process;

ii. The results of sampling and analysis identifying the nature and concentration, and mass, where required by the standard or by the director, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily

maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be sampled and analyzed in accordance with procedures set out in Section 13.10.1390 of this chapter;

(f) Certification. A statement, reviewed by the user's authorized representative and certified by a qualified professional, indicating whether pretreatment standards are being

met on a consistent basis, and, if not, whether additional operation and maintenance (O & M) or additional pretreatment is required to meet the pretreatment standards and requirements; and

(g) Compliance schedule. If additional pretreatment or O & M will be required to meet the pretreatment standards, the shortest schedule by which the user will provide such additional

pretreatment or O & M. The completion date in this schedule shall not be later than the compliance date

established for the applicable pretreatment standard.

This requirement includes a baseline monitoring report (BMR) to be submitted to the county at least 90 days prior to discharge of any pollutants

to the POTW.

(2) Periodic monitoring reports. All permitted industry shall submit a discharge report as provided in 40 CFR 403.12(g and h).

The report shall be submitted on at least a biannual basis during the months of June and December or more frequently as directed by the county. These reports shall be based on sampling and analyses performed in the period covered by the report, and performed in accordance with Paragraph C. of this section. If a permitted user subject to the reporting requirements of this section monitors any pollutant more frequently than required by the county, using the procedures prescribed in

Paragraph D.(2) of this section, the results of the monitoring shall be included in the report.

Any permitted user subject to a categorical pretreatment standard, after the compliance date of such categorical pretreatment standards or, in the case of a new source, after commencement of the discharge into the POTW, shall, at least, submit to the director during the months

of June and December a discharge report indicating the nature, concentration and flow of pollutants in the effluent which are limited by such pretreatment standards. In addition, this report shall include a record of all daily flows, which during the reporting period exceeded the

average daily flow reported in 40 CFR 403, (or amendments thereto which may be promulgated from time to time). Collection and testing of wastewater samples used for compliance monitoring must be

in accordance with this article.

At the discretion of the director and in consideration of such factors as local high or low flow rates, holidays, budget cycles, etc., the director may agree to alter the months during which the above reports are to be submitted. Such reports shall be submitted more frequently if required in the pretreatment standard, pretreatment requirements, or required as part of the enforcement response program, or deemed necessary by the director.

(3) All permitted users shall promptly notify the director by phone with a subsequent written report in advance if possible, of any substantial change in the volume or character of pollutants in their discharge (change in chemical constituents or liquid materials), including the listed or characteristic hazardous wastes for which the user has submitted initial notification under 40 CFR 403.12 (p) and Paragraph B.(5) of this section, which are or may be

discharged and which potentially may interfere with the operation of the public treatment system. This notification is also

required in instances of potential problems, i.e., slug loads.

(4) In all events, the reports required under this Section, shall meet the requirements of 40 CFR 403.12, (b—g).

(5) The permitted user shall notify the county, the EPA regional waste management division director, and the state hazardous waste authorities in writing of any discharge into the POTW of a substance which, if otherwise disposed of, would be a

hazardous waste under 40 CFR, Part 261.

Such notification must include the name of the hazardous waste as set forth in 40 CFR, Part 261, the EPA hazardous waste number and the type of discharge (continuous, batch, or other). If the user discharges more than 100 kilograms of such waste per calendar month to the POTW,

the notification shall also contain the following information to the extent such information is known and readily available to the user:

(a) An identification of the hazardous constituents contained in the wastes;

(b) An estimation of the mass and concentration of such constituents in the wastestream discharged during

that calendar month; and

(c) An estimation of the mass of constituents in the wastestream expected to be discharged during the following 12 months.

All permitted users shall provide the notification no later than 180 days after the discharge of the listed or characteristic

hazardous waste. Any notification under this paragraph needs to be submitted only once for each hazardous waste discharged.

However, notifications of changed discharges must be submitted under 40 CFR 403.12(j) and paragraph B.(6) of this section. The notification requirement in this section does not apply to pollutants already reported under the self-monitoring requirements of 40 CFR 403.12(b, d, and

e), and paragraph B.(2), (5) and (6) of this section.

Discharges are exempt from the above requirements of paragraph B.(5) of this section during a calendar month in which they discharge no more than 15 kilograms of hazardous wastes, unless the wastes are acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e).

Discharge of more than 15 kilograms of nonacute hazardous wastes in a calendar month, or of any quantity of acute hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e), requires a one-time notification.

Subsequent months during which the permitted user discharges more than such quantities of any hazardous waste do not

require additional notification unless specifically required by the director.

In case of any new regulation under Section 3001 of RCRA identifying additional characteristics of hazardous waste or listing any additional substance as a hazardous waste, the user must notify the county, the EPA regional waste management division director and the state hazardous waste authorities of the discharge of such

substance within 90 days of the effective date of such regulations.

In the case of any notification made under paragraph B.(6) of this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical.

(6) Categorical pretreatment standard compliance. Within 90 days following the date for final compliance with applicable categorical pretreatment standards or in the case of a new source following commencement of the introduction of wastewater in the POTW, any user subject to pretreatment standards and requirements shall submit to the county a report containing

the following information:

(a) The user shall submit information showing the measured average daily and maximum daily flow, in gallons per day, to the county from each of the following:

i. Regulated process streams; and ii. Other streams as necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e).

The director may allow for verifiable estimates of these flows where justified by cost or feasibility considerations.

(b) The user shall identify the pretreatment standards applicable to each regulated process. In addition, the

user shall submit the results of sampling and analysis identifying the nature and concentration (or mass,

where required) by the standard of the county for regulated pollutants in the discharge from each regulated process. Both daily maximum and average concentration (or mass, where required) shall be reported.

The sample shall be representative of daily operations outlined in this section.

(c) A statement, reviewed by an authorized representative of the permitted user and certified to by a qualified professional, indicating whether pretreatment standards are being

met on a consistent basis and, if not, whether additional operation and maintenance (O & M) or additional pretreatment is required for the user to meet the pretreatment standards and requirements.

For users subject to equivalent mass or concentration limits established by Hall County in accordance with the procedures in 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long term production rate. For all other users

subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production (or other measure of

operation), this report shall include the user's actual production during the appropriate sampling period.

(7) The reports required under this section shall carry the signature of an authorized representative certifying data accuracy and pretreatment standard compliance or appropriate operation and maintenance measures to ensure future compliance.

(8) Permitted users shall retain, and make available for inspection and copying, all records and information required to be retained under this article. These records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning compliance with this article, or where the user has been specifically notified of a longer retention period by the director. For each measurement or sample collected and analyzed for compliance purposes, a record of the following information shall be maintained:

(a) The exact place, date, time, and person who performed the sampling;

(b) The exact place, date, time, and person who performed the required analyses;

(c) The analytical techniques or methods used;

(d) All bench data derived for the purpose of calculating test results; and

(e) The results of all required analyses.

C. Records and monitoring.

(1) All permitted users who discharge or propose to discharge wastewaters to the wastewater treatment system shall maintain such records of production and related

factors, effluent flows and pollutant amounts or concentrations as are necessary to demonstrate compliance with the requirements of this article, wastewater

discharge permit and any applicable state, local or federal pretreatment standards or requirements.

(2) Such records shall be made available upon request by the director after reasonable notice. All such records relating to compliance with pretreatment standards shall be made available to officials of the U.S.

Environmental Protection Agency or Georgia environmental protection division upon demand. A summary of such data indicating the permitted user's compliance with this article shall be prepared as requested

and submitted to the director after reasonable notice.

(3) The owner or operator of any premises or facility discharging industrial wastewater into the system shall install, at its own cost and expense, suitable monitoring

equipment to facilitate the accurate observation, sampling, and measurement of wastes as required by the director. Such

equipment shall be maintained in proper working order and kept safe and accessible at all times.

(4) The monitoring equipment shall be located and maintained on the user's premises outside of the building. When such a location would be impractical or cause

undue hardship on the user, the board of commissioners may allow such facility to be constructed in the public street or sidewalk area.

(5) When more than one user can discharge into a common sewer, the director may require installation of separate monitoring equipment for each user. When there is a significant difference in wastewater

constituents and characteristics produced by different operations of a single user, the director may require that separate monitoring facilities be installed for each separate discharge.

(6) Whether constructed on public or private property, the monitoring facilities shall be constructed in accordance with the director's requirements and all applicable construction standards and specifications.

D. Inspection, sampling and analysis.

(1) Compliance determination. Compliance determinations with respect to code prohibitions and limitations may be made on the basis of either instantaneous grab samples or composite samples of wastewater, unless specified in an industrial discharge permit. Composite samples may be taken over a 24-hour period, or over a

longer or shorter time span, as determined necessary by the director to meet the needs of specific circumstances, and

may require records of flow monitoring and measurement when deemed necessary by the director. When evaluating the compliance status of an industrial user or

a significant industrial user, the POTW uses all samples which were obtained through appropriate sampling techniques and analyzed in accordance with the procedures established in 40 CFR, Part 136.

When the county splits a sample with a user, the county uses the results from each of the split samples providing the sample has been properly collected, preserved and analyzed, as referenced in paragraph D.(5) of this section. When

such a split sample produces two different analytical results, an average of the results from the split samples is determined and use of the resulting average number

determines the compliance status of the industrial user. If one or both of the analytical split sample results is determined to be invalid, the county recalculates the

compliance status of the user, using all valid results.

(2) Analysis of industrial wastewaters. Laboratory analysis of industrial wastewater samples shall be performed in accordance

with section 13.10.1390 of this chapter. In the case where a concentration limit contained in a wastewater discharge permit is lower than lab detection limits, the

lowest reportable detection limit shall be in accordance with lab detection limits as specified by EPD in accordance with 40

C.F.R. 136.

(3) Sampling frequency. Sampling of industrial wastewater for the purpose of compliance determination with respect to code prohibitions and limitations will be done

at such intervals as the director may designate. Each permitted user will sample at least two times each year as described in 40 CFR 403. Additional sampling may be required by the director. The county may require a permitted user to

conduct a 129-priority pollutant scan at least once every three years or at the time there is a process change that, in the opinion of the director, would warrant such a scan. The county will conduct at least one unannounced sampling of industrial wastewaters for compliance purposes from each permitted user.

(4) Resampling frequency. If sampling performed by a permitted user indicates a violation, the user shall notify the county

within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis of the pollutant(s) in violation and submit the results of the repeat analysis to the county within 30 days after becoming aware of the violation, except the user is not required to resample if:

(a) The county performs sampling of the user at least once per month; or

(b) The county performs sampling of the user between the time when the user performs its initial sampling and the time when the user receives the results of this sampling.

(5) Laboratory accreditation. All analysis submitted to the county for the purpose of compliance determination and other purposes as the director deems necessary, shall be performed by a laboratory having

been accredited by a recognized thirdparty laboratory accreditation organization if no federal or state accreditation program is available. If a laboratory is not

accredited, then the laboratory must demonstrate to the county's satisfaction that quality assurance and quality control measures are at least as stringent as those used by the county's laboratory.

E. Facility operation. The user shall at all times maintain in good working order and operate as efficiently as possible all treatment or control facilities, including inspection and sampling of systems installed or used by the user to achieve compliance with all terms and conditions

of this article. When required by the director, the user shall provide for adequate documentation of pretreatment controls, such as a standard operating procedures manual and quality control programs.

F. Confidentiality. The director shall provide appropriate confidentiality in handling and monitoring all collected information so as to avoid the disclosure, accidentally or purposefully, of trade

secrets deemed vital to each industrial discharger under surveillance by this program. Public access to such information shall be limited as provided in 40 CFR 403.14.

G. Ordinance supersession. Upon the promulgation of a national categorical pretreatment standard for a particular industrial subcategory, the national standard, if more stringent than limitations imposed under this article for sources in that subcategory, shall immediately supersede

the limitations imposed under this article. The director shall notify all affected significant industrial users of the applicable reporting requirements under 40 CFR 403.12.

History

The history line the source prints at the end of the section.

(Res. of 1-8-09(1), §§ 1, 2(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/code/13.10.1380@2026-05-28-235737d983

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Code of Ordinances, 13.10.1380. Industrial wastewater monitoring and reporting | Georgia Commons