Skip to content
Georgia Commons
Menu

Hall County · Code of Ordinances

Part III - ETHICS BOARD / Title 13 - PUBLIC SERVICES* / Chapter 13.20 - CONSTRUCTION STANDARDS AND OPERATIONAL RESPONSIBILITIES FOR SEWERAGE SYSTEMS AND FOR REUSE SYSTEMS

13.20.070. Bonding, county acceptance and

About this text

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

easements.

A. Owner must provide a security escrow account or bond to protect the public's interest in ensuring proper construction and ongoing maintenance of the system. The escrow account or bond will have a monetary value equal to 100

percent of the costs to install any related pipes, mechanical equipment, paving or other appurtenances deemed pertinent to the operation of the proposed sewerage or reuse system. This amount

will be determined by Hall County Public Works and Utilities Director after review of design plans and construction documents. The escrow account or bond must be accepted by Hall County Board of Commissioners and held by the board unless ownership of the sewerage system and reuse system is transferred to the county and all requirements of this chapter are met.

B. The county retains the right to audit the amount of the escrow or bond and the balance in the reserve to ensure they are being collected and disbursed in accordance with the objectives of this chapter. The owner shall pay for the costs of this audit and promptly remedy any discrepancies determined by the audit.

C. The sewerage system and reuse system will be conveyed to Hall County, Georgia, along with the reserve balance and security escrow account and bond within 30 days after notice of final acceptance by the county. The owner will provide a reserve balance that is equal to 70 percent of the cost to replace the sewerage system and reuse system, except the land. An appraiser, chosen by the county, will determine the prevailing costs.

D. Thirty days prior to the county accepting responsibility for any sewerage system and reuse system, the owner, at his expense, must use a professional engineering firm licensed in the State of Georgia to provide certification that the sewerage system and reuse system is in compliance with all design criteria, certification that the

sewerage system and reuse system is in good working order and has no known maintenance problems or deficiencies, certification that the user charges are sufficient to pay the operating costs of the sewerage system and reuse system, and certification that the reserve balance is adequate considering the past maintenance and current condition of the sewerage system and reuse system. The county will not accept ownership of

the sewerage system or reuse system without said certification.

E. The owner agrees to provide proof that adequate sewerage system and reuse system capacity exists to service the maximum number of prespecified users.

F. In no event shall the county accept ownership prior to the sewerage system or reuse system operating for a time period of at least five years

after final platting, or 90 percent of the maximum prespecified number of users, whichever the county desires.

G. The sewerage system and reuse system, the land necessary for the proper operation of the sewerage system and reuse system and all required buffers shall be conveyed to the county fee simple in the form of a permanent easement

certified by a registered surveyor in the State of Georgia. No obstruction shall be built, constructed, or planted that would inhibit access to the easements. Linear easements shall be a minimum of 30 feet in width.

H. The owner must make the following certification prior to the county's acceptance: "The owner understands that this approval for providing Sewerage System and/or Reuse System for the development (or other name) named

and is not for general use by others unless specifically approved by the County as a modification. The pre-specified number of users for this subdivision (or other name) is ."

History

The history line the source prints at the end of the section.

(Res. of 1-8-09(2), §§ 1, 2(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hall-county/code/13.20.070@2026-05-28-9a21967a54

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hall County Code of Ordinances, 13.20.070. Bonding, county acceptance and | Georgia Commons