Skip to content
Georgia Commons
Menu

Haralson County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 24 - MANUFACTURED AND MOBILE HOMES / Article II - PERMITS

Sec. 24-21. Temporary placement of a manufactured house.

About this text

  • As published by Municode, current through 2023-06-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Other than in a residential subdivision development, the owner of a lot upon which a single-family dwelling is being constructed may, upon first obtaining a temporary permit from the zoning administrator, temporarily place a manufactured house on said lot for use as a temporary dwelling for a period of 12 months or until construction of the dwelling is completed, whichever shall first occur.

(b) The application for a temporary permit shall have attached thereto a separate statement of the applicant that he acknowledges and agrees that the permit, if granted, is valid only for the time specified and that upon completion of the dwelling or the expiration of the permit, as the case may be, he shall cause the removal of said manufactured house and his failure to do so grants to the county the right to remove the same from the lot at applicant's expense.

(c) The manufactured house must at least be HUD approved but is not required to have hardboard siding or a pitched roof.

History

The history line the source prints at the end of the section.

(Ord. of 12-7-2004, art. IX, § 9.5)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:haralson-county/code/24-21@2023-06-06-f1682a3605

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.