Skip to content
Georgia Commons
Menu

Haralson County · Code of Ordinances

Part - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS AND LAND DEVELOPMENT

Sec. 40-30. Utilities.

About this text

  • As published by Municode, current through 2023-06-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All utility facilities, including, but not limited to, gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision or land development.

Whenever existing utility facilities (other than major distribution lines) are located above ground, except when existing with public roads rights-of-ways, they shall be removed and placed underground. Easements centered on rear lot lines shall be provided for utilities, private and public, and such easements shall be at least ten feet wide. When topographical or other conditions are such as to make impractical the inclusion of utilities along the rear lot lines of a subdivision, lot, or land development site, perpetual unobstructed easements at least ten feet in width shall be provided along side lot lines with satisfactory access.

History

The history line the source prints at the end of the section.

(Res. of 1-23-2024(1), § 1(Exh. A))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:haralson-county/code/40-30@2023-06-06-d074eb137e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.