Haralson County · Código de ordenanzas
Part - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS AND LAND DEVELOPMENT
Sec. 40-30. Utilities.
Sobre este texto
- As published by Municode, current through 2023-06-06
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
All utility facilities, including, but not limited to, gas, electric power, telephone, and cable television, shall be located underground throughout the subdivision or land development.
Whenever existing utility facilities (other than major distribution lines) are located above ground, except when existing with public roads rights-of-ways, they shall be removed and placed underground. Easements centered on rear lot lines shall be provided for utilities, private and public, and such easements shall be at least ten feet wide. When topographical or other conditions are such as to make impractical the inclusion of utilities along the rear lot lines of a subdivision, lot, or land development site, perpetual unobstructed easements at least ten feet in width shall be provided along side lot lines with satisfactory access.
Historia
(Res. of 1-23-2024(1), § 1(Exh. A))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.