Sec. 18-102. Lot size and setback requirements.

About this text

  • As published by Municode, current through 2025-09-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Lot size and setback requirements are as follows:

(a) Minimum lot size: 65,340 square feet.

(b) All lots shall have a minimum of 100 feet of road frontage or 60 feet adjacent to a cul de sac, or as otherwise required by

the health department at the septic site, whichever is greater.

(c) The principal building, HVAC, and any structures including retaining walls on

any lot shall meet the following setback requirements which shall be clear and

unobstructed:

(1) Front:

a. Sixty feet from the right of way of the county road or the specific state highways of Smith McGee, Cokesbury and Reed Creek Highways.

b. On interior subdivision roads, 40 feet from the right-of-way of the interior roadway (see corner lots below).

c. For all state highways except Smith McGee, Cokesbury and Reed Creek Highways, and for all county roads with a speed limit of 50 miles per hour or more, building setbacks must be 100 feet from the edge of the right of way which abuts the property line.

d. All corner lots must meet the requirements for either type of roadway that the property line is adjacent to.

(2) Rear: Ten feet from the property line.

(3) Side: Ten feet from the property line.

History

The history line the source prints at the end of the section.

(Ord. of 07-25-2023 (1))

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hart-county/code/18-102@2025-09-23-b334abbe46

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hart County Code of Ordinances, Sec. 18-102. Lot size and setback requirements | Georgia Commons