Hart County · Code of Ordinances
Part II - CODE OF ORDINANCES / Chapter 66 - ROADS AND BRIDGES / Article VII - UTILITIES FACILITY INSTALLATION PERMIT
Sec. 66-187. Application.
About this text
- As published by Municode, current through 2025-09-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Application for a permit for utility facility installation shall be made to the county planning director. The applicant shall submit with the
permit application letter-size prints of a satisfactory plan showing in sufficient detail the location of the proposed facility or operation as described in the permit application. The plan shall show
the size or capacity of the facility to be installed;
its relationship to right-of-way features such as right-of-way lines, pavement edge, structures,
etc.; horizontal and vertical clearance to critical elements of the roadway and any other information necessary to evaluate the impact on the right-of-way and its operation. When changes
are required and approved on construction, the applicant shall provide revised "as built" plans and furnish two copies for the county's permit record files.
(b) In those cases where a state department of transportation application and permit is required, a copy of the state department of transportation application and permit along with the expected date of work commencement shall be provided to the planning director in addition to the application and permit requirements described in this article.
History
(Ord. of 10-27-1998, § 2)
Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.