Skip to content
Georgia Commons
Menu

Heard County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 40 - SUBDIVISIONS / Article III - MINIMUM DESIGN STANDARDS

Sec. 40-119. Easements.

About this text

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Utility. Utility easements for overhead services shall be located within the platted street right-of-way and shall be a minimum width of 15 feet. Whenever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within said subdivision or phase thereof. Water and sewer lines outside of street rights-of-way shall follow side and rear property lines and shall have a minimum easement width of 20 feet, except that a greater width shall be provided where it is determined by the county engineer or person designated by the commission chairperson, county commission or county manager, that a greater width is necessary for maintenance or construction.

(b) Drainage. Drainage easements shall be provided as required by the county engineer after review of the preliminary construction plans and preliminary plat of the subdivision.

History

The history line the source prints at the end of the section.

(Ord. of 1-12-1999, § 5-2)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:heard-county/code/40-119@2024-07-16-355b58f2f3

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.