Skip to content
Georgia Commons
Menu

Jones County · Code of Ordinances

Part II - CODE OF ORDINANCES / Chapter 42 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 3 - PROVISIONS FOR FLOOD HAZARD REDUCTION

Sec. 42-99. New construction and/or substantial improvements.

About this text

  • As published by Municode, current through 2026-01-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of section 42-92, "elevated buildings". All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.

History

The history line the source prints at the end of the section.

(Ord. No. 200904-3o, 4-21-2009)

Read this code where it is posted (Municode) The source is the county's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jones-county/code/42-99@2026-01-16-6f3e9820f5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.