Ir al contenido
Georgia Commons
Menú

Jones County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 42 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 3 - PROVISIONS FOR FLOOD HAZARD REDUCTION

Sec. 42-99. New construction and/or substantial improvements.

Sobre este texto

  • As published by Municode, current through 2026-01-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of section 42-92, "elevated buildings". All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 200904-3o, 4-21-2009)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:jones-county/code/42-99@2026-01-16-6f3e9820f5

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.